Downer Engineering secured a contract with Gen-I to remove and replace server cabinets for BNZ Bank branches nationwide. They conducted dry runs to plan the risk mitigation strategy. Downer Engineering then removed the existing cabinets and installed new hardware, while Gen-I performed software upgrades and testing, providing an end-to-end solution. It was a mission critical project requiring close communication between Downer Engineering, Gen-I and BNZ IT staff over several months.