MISSION CRITICAL
CREATING EXCEPTIONAL ENVIRONMENTS.
With over 46 years experience in understanding there is no single point of failure. Mission critical design is at the core of our practice. FXB Engineering
provides integrated planning, architecture, engineering, and project management for information technology facilities.
Our intimate experience with facilities reliability allows us to carefully select systems and components that optimize the power of cooling with energy
efficientcomponentswhileprovidingmultiplelevelsofavailabilityinthesamespace.Ourengineeringteamintegratesrack-and-serversolutionsintoour
facilitiesinfrastructure to optimize new highly efficient IT with closely coupled cooling and power delivery schemes to minimize the demand for power,
space, and cooling.
Our success is built using a collaborative, flexible team
structure that begins with offering reliable and trustwor-
thy partnerships. Tailoring our approach to align with
clientsrequirements, we leverage our best practices and
processes to drive successful outcomes.
Our past project experience ranges from 500 square foot
data centers to 150,000 square foot collocation facilities.
Wehaveprovidedengineeringservicesformissioncritical
facilities in markets such as utilities and communications,
data processing, shared collocation, financial institutions,
medical institutions and large commercial facilities.
INDUSTRY
EXPERTISE
Facility types include:
Traditional data centers
Trading and call centers
 Business-hosting facilities
 Computational research facilities
 Mission-critical utility-infrastructure
 911 call centers
What we do:
 Site Assessment
 Feasibility Studies
 Information Gathering
 Equipment Procurement
 Design & Drawings
 Bid Leveling
 Construction Administration
 Commissioning
 Project Close-out
Critical Power Systems
MISSION CRITICAL PROJECT SNAPSHOT
AEGONDataCenter
AmerisourceBergen
CatholicHealthInitiative
ConfidentialBroadcastingCompany,multiplelocations
ConfidentialCableCompany,multiplelocations
CommerceBank
CSLBehring
Cyber
EndoPharmaceutical
FortressMissionCriticalDataCenter
GlobalCommunicationsCompany
HCLDataCenter
KeystoneMercyDataCenter
MARSDataCenter
MetromediaFiberNetwork,multiplelocations
MerrillLynch
NetworkPlus,multiplelocations
NutriSystems
PhiladelphiaAdministrationDataCenter
RenaissanceTechnologies,multiplelocations
St.JosephsUniversity
StateStreetDataCenter,multiplelocations
SteelOrca
ThomsonReuters,multiplelocations
TransitWireless,multiplelocations
UniversityofPennsylvaniaHealthSystems
VerisignInc.
VishayInterTechnologyInc.
XOCommunications,multiplelocations
WEVE GOT IT
COVERED FOR YOU.
IMPROVING RELIABILITY
Project: CriticalPowerSystemsUpgrade
Purpose: To replace end of life Critical Power Infrastructure and to improve overall reliability and
maintainability of critical power systems.
Highlights: Replace 800kW Rotary UPS with two (2) new redundant 1100kW UPS systems. Replace
(3) 750kW generators with (3) 1500 kW generators and paralleling switchgear. Phased project to
allow for one complete UPS system to be installed, tested and fully commissioned prior to removing
the existing system.
Timeframe & Budget:
Phase I was completed in 2012; Phase II finished in 2015. Project stayed on budget at $9.9 million
Client: SeeAbove
Purpose: To replace end of life mechanical equipment for critical facility and
improve overall reliability and control.
Highlights: Replace air cooled chillers, pumps & complete piping systems.
Three (3) new 275 ton chillers. Three (3) new wet cell cooling towers. Phased
project to allow for the new chiller plant to be installed, tested and fully
commissioned while the existing mechanical equipment remained in place.
Project:
Project completed in 2014.
Project budget: $11 million
IMPROVING FEASIBILITY
BRINGING WIRELESS
Client: BaseStationHotels,TransitWireless,Manhattan,NY
Purpose: MEP improvements to mission critical data center.
Highlights:TransitWireless recently completed the build out of its wireless
andWi-Fi network in all 30 of the MTAs underground subway stations in the
borough. FXB provided MEP for 5,000 - 6,000 s.f fitouts for communication
equipment and A&E documentation.
Project:
Projects were completed in 2012, 2014 and 2015.
Project budget: $7.4 million
For more information on additional Mission Critical Projects, visit: www.FXBinc.com

More Related Content

What's hot (14)

LLC Presentation
LLC PresentationLLC Presentation
LLC Presentation
Peter Bates
Motiva online monitoring and optimization energy system
Motiva online monitoring and optimization energy systemMotiva online monitoring and optimization energy system
Motiva online monitoring and optimization energy system
KBC (A Yokogawa Company)
Energy storage fauzan kurnia
Energy storage fauzan kurniaEnergy storage fauzan kurnia
Energy storage fauzan kurnia
fznkurnia
Resume MRoyse 10_16
Resume MRoyse 10_16Resume MRoyse 10_16
Resume MRoyse 10_16
Martin Royse
CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-
Maurizio Sirica
Data Centers and Mission Critical Opportunities
Data Centers and Mission Critical OpportunitiesData Centers and Mission Critical Opportunities
Data Centers and Mission Critical Opportunities
Black & Veatch
T.Chandramouli _ Resume
T.Chandramouli _ ResumeT.Chandramouli _ Resume
T.Chandramouli _ Resume
Chandramouli Tadepalli
Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)
Sachin Pyasi
IT Consulting & Integration Services for Energy & Utilities Sectors
IT Consulting & Integration Services for Energy & Utilities SectorsIT Consulting & Integration Services for Energy & Utilities Sectors
IT Consulting & Integration Services for Energy & Utilities Sectors
Schneider Electric
CPEInformation
CPEInformationCPEInformation
CPEInformation
josh dinnell
Resume ravindra
Resume ravindraResume ravindra
Resume ravindra
Ravindra Singh
Interview Preparation
Interview PreparationInterview Preparation
Interview Preparation
Ben Manesh
John Hopwood Resume
John Hopwood ResumeJohn Hopwood Resume
John Hopwood Resume
John Hopwood
Data Center Server Rack Strategies
Data Center Server Rack StrategiesData Center Server Rack Strategies
Data Center Server Rack Strategies
42U Data Center Solutions
LLC Presentation
LLC PresentationLLC Presentation
LLC Presentation
Peter Bates
Motiva online monitoring and optimization energy system
Motiva online monitoring and optimization energy systemMotiva online monitoring and optimization energy system
Motiva online monitoring and optimization energy system
KBC (A Yokogawa Company)
Energy storage fauzan kurnia
Energy storage fauzan kurniaEnergy storage fauzan kurnia
Energy storage fauzan kurnia
fznkurnia
Resume MRoyse 10_16
Resume MRoyse 10_16Resume MRoyse 10_16
Resume MRoyse 10_16
Martin Royse
CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-
Maurizio Sirica
Data Centers and Mission Critical Opportunities
Data Centers and Mission Critical OpportunitiesData Centers and Mission Critical Opportunities
Data Centers and Mission Critical Opportunities
Black & Veatch
Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)
Sachin Pyasi
IT Consulting & Integration Services for Energy & Utilities Sectors
IT Consulting & Integration Services for Energy & Utilities SectorsIT Consulting & Integration Services for Energy & Utilities Sectors
IT Consulting & Integration Services for Energy & Utilities Sectors
Schneider Electric
Interview Preparation
Interview PreparationInterview Preparation
Interview Preparation
Ben Manesh
John Hopwood Resume
John Hopwood ResumeJohn Hopwood Resume
John Hopwood Resume
John Hopwood

Similar to FXB_Mission Critical (20)

KinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementKinetIQ Solutions Capability Statement
KinetIQ Solutions Capability Statement
Ray Salmons
Centerre Brochure
Centerre BrochureCenterre Brochure
Centerre Brochure
Rachael Lyman
SECS White Paper For Folders
SECS White Paper For FoldersSECS White Paper For Folders
SECS White Paper For Folders
Jessica Rearick
SDC Intergate.Manhattan Brochure
SDC Intergate.Manhattan BrochureSDC Intergate.Manhattan Brochure
SDC Intergate.Manhattan Brochure
ArleneECarvalho
BLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHURE
BLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHUREBLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHURE
BLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHURE
Berry Veney
RMJElectrical 2015 Brochure
RMJElectrical 2015 BrochureRMJElectrical 2015 Brochure
RMJElectrical 2015 Brochure
Jerome Bruggeman, MBA, CPA
RMJElectrical 2015 JB Brochure
RMJElectrical 2015 JB BrochureRMJElectrical 2015 JB Brochure
RMJElectrical 2015 JB Brochure
Rodney M. Jarrell, CEO, RMJ Electrical Contractors
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptx
Schneider Electric
Using Retro-Commissioning to Improve Operations and Energy Use through Climat...
Using Retro-Commissioning to Improve Operations and Energy Use through Climat...Using Retro-Commissioning to Improve Operations and Energy Use through Climat...
Using Retro-Commissioning to Improve Operations and Energy Use through Climat...
Paladino and Company
SEI brochure
SEI brochureSEI brochure
SEI brochure
carynbest123
CaseStudyCSI
CaseStudyCSICaseStudyCSI
CaseStudyCSI
Steve Jones
Customer presentation
Customer presentationCustomer presentation
Customer presentation
Daniel Webb
Tony Greenfield CV 23 March 2015 pdf
Tony Greenfield CV 23 March 2015 pdfTony Greenfield CV 23 March 2015 pdf
Tony Greenfield CV 23 March 2015 pdf
Tony Greenfield
Mike najarian resume
Mike najarian resumeMike najarian resume
Mike najarian resume
Mike Najarian Senior IT PMP PMO
Intergate Manhattan brochure 0115
Intergate Manhattan brochure 0115Intergate Manhattan brochure 0115
Intergate Manhattan brochure 0115
ArleneECarvalho
Keith Larkin Resume
Keith Larkin ResumeKeith Larkin Resume
Keith Larkin Resume
larkink
Jason Clark, Head of Property Management - UBS
Jason Clark, Head of Property Management - UBSJason Clark, Head of Property Management - UBS
Jason Clark, Head of Property Management - UBS
Global Business Intelligence
Cloudsmartz Case Study: Managed Services
Cloudsmartz Case Study: Managed ServicesCloudsmartz Case Study: Managed Services
Cloudsmartz Case Study: Managed Services
CloudSmartz
Going Modular? Lessons learned from 500 modular data center implementations
Going Modular?  Lessons learned from 500 modular data center implementations Going Modular?  Lessons learned from 500 modular data center implementations
Going Modular? Lessons learned from 500 modular data center implementations
John M. Kundtz Associate Partner / Sales Mgr / BDE
Property Management Firm Creates Energy - Efficient Smart Building
Property Management Firm Creates Energy - Efficient Smart BuildingProperty Management Firm Creates Energy - Efficient Smart Building
Property Management Firm Creates Energy - Efficient Smart Building
Cisco Canada
KinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementKinetIQ Solutions Capability Statement
KinetIQ Solutions Capability Statement
Ray Salmons
Centerre Brochure
Centerre BrochureCenterre Brochure
Centerre Brochure
Rachael Lyman
SECS White Paper For Folders
SECS White Paper For FoldersSECS White Paper For Folders
SECS White Paper For Folders
Jessica Rearick
SDC Intergate.Manhattan Brochure
SDC Intergate.Manhattan BrochureSDC Intergate.Manhattan Brochure
SDC Intergate.Manhattan Brochure
ArleneECarvalho
BLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHURE
BLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHUREBLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHURE
BLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHURE
Berry Veney
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptx
Schneider Electric
Using Retro-Commissioning to Improve Operations and Energy Use through Climat...
Using Retro-Commissioning to Improve Operations and Energy Use through Climat...Using Retro-Commissioning to Improve Operations and Energy Use through Climat...
Using Retro-Commissioning to Improve Operations and Energy Use through Climat...
Paladino and Company
Customer presentation
Customer presentationCustomer presentation
Customer presentation
Daniel Webb
Tony Greenfield CV 23 March 2015 pdf
Tony Greenfield CV 23 March 2015 pdfTony Greenfield CV 23 March 2015 pdf
Tony Greenfield CV 23 March 2015 pdf
Tony Greenfield
Intergate Manhattan brochure 0115
Intergate Manhattan brochure 0115Intergate Manhattan brochure 0115
Intergate Manhattan brochure 0115
ArleneECarvalho
Keith Larkin Resume
Keith Larkin ResumeKeith Larkin Resume
Keith Larkin Resume
larkink
Cloudsmartz Case Study: Managed Services
Cloudsmartz Case Study: Managed ServicesCloudsmartz Case Study: Managed Services
Cloudsmartz Case Study: Managed Services
CloudSmartz
Property Management Firm Creates Energy - Efficient Smart Building
Property Management Firm Creates Energy - Efficient Smart BuildingProperty Management Firm Creates Energy - Efficient Smart Building
Property Management Firm Creates Energy - Efficient Smart Building
Cisco Canada

FXB_Mission Critical

  • 1. MISSION CRITICAL CREATING EXCEPTIONAL ENVIRONMENTS. With over 46 years experience in understanding there is no single point of failure. Mission critical design is at the core of our practice. FXB Engineering provides integrated planning, architecture, engineering, and project management for information technology facilities. Our intimate experience with facilities reliability allows us to carefully select systems and components that optimize the power of cooling with energy efficientcomponentswhileprovidingmultiplelevelsofavailabilityinthesamespace.Ourengineeringteamintegratesrack-and-serversolutionsintoour facilitiesinfrastructure to optimize new highly efficient IT with closely coupled cooling and power delivery schemes to minimize the demand for power, space, and cooling. Our success is built using a collaborative, flexible team structure that begins with offering reliable and trustwor- thy partnerships. Tailoring our approach to align with clientsrequirements, we leverage our best practices and processes to drive successful outcomes. Our past project experience ranges from 500 square foot data centers to 150,000 square foot collocation facilities. Wehaveprovidedengineeringservicesformissioncritical facilities in markets such as utilities and communications, data processing, shared collocation, financial institutions, medical institutions and large commercial facilities. INDUSTRY EXPERTISE Facility types include: Traditional data centers Trading and call centers Business-hosting facilities Computational research facilities Mission-critical utility-infrastructure 911 call centers What we do: Site Assessment Feasibility Studies Information Gathering Equipment Procurement Design & Drawings Bid Leveling Construction Administration Commissioning Project Close-out Critical Power Systems MISSION CRITICAL PROJECT SNAPSHOT AEGONDataCenter AmerisourceBergen CatholicHealthInitiative ConfidentialBroadcastingCompany,multiplelocations ConfidentialCableCompany,multiplelocations CommerceBank CSLBehring Cyber EndoPharmaceutical FortressMissionCriticalDataCenter GlobalCommunicationsCompany HCLDataCenter KeystoneMercyDataCenter MARSDataCenter MetromediaFiberNetwork,multiplelocations MerrillLynch NetworkPlus,multiplelocations NutriSystems PhiladelphiaAdministrationDataCenter RenaissanceTechnologies,multiplelocations St.JosephsUniversity StateStreetDataCenter,multiplelocations SteelOrca ThomsonReuters,multiplelocations TransitWireless,multiplelocations UniversityofPennsylvaniaHealthSystems VerisignInc. VishayInterTechnologyInc. XOCommunications,multiplelocations
  • 2. WEVE GOT IT COVERED FOR YOU. IMPROVING RELIABILITY Project: CriticalPowerSystemsUpgrade Purpose: To replace end of life Critical Power Infrastructure and to improve overall reliability and maintainability of critical power systems. Highlights: Replace 800kW Rotary UPS with two (2) new redundant 1100kW UPS systems. Replace (3) 750kW generators with (3) 1500 kW generators and paralleling switchgear. Phased project to allow for one complete UPS system to be installed, tested and fully commissioned prior to removing the existing system. Timeframe & Budget: Phase I was completed in 2012; Phase II finished in 2015. Project stayed on budget at $9.9 million Client: SeeAbove Purpose: To replace end of life mechanical equipment for critical facility and improve overall reliability and control. Highlights: Replace air cooled chillers, pumps & complete piping systems. Three (3) new 275 ton chillers. Three (3) new wet cell cooling towers. Phased project to allow for the new chiller plant to be installed, tested and fully commissioned while the existing mechanical equipment remained in place. Project: Project completed in 2014. Project budget: $11 million IMPROVING FEASIBILITY BRINGING WIRELESS Client: BaseStationHotels,TransitWireless,Manhattan,NY Purpose: MEP improvements to mission critical data center. Highlights:TransitWireless recently completed the build out of its wireless andWi-Fi network in all 30 of the MTAs underground subway stations in the borough. FXB provided MEP for 5,000 - 6,000 s.f fitouts for communication equipment and A&E documentation. Project: Projects were completed in 2012, 2014 and 2015. Project budget: $7.4 million For more information on additional Mission Critical Projects, visit: www.FXBinc.com