際際滷

際際滷Share a Scribd company logo
I B R A H I M A B D E L K H A L I G I B R A H I M M O H A M E D Page 1
CURRICULUM VITAE
Family name: Mohamed
First names: Ibrahim
Date of birth: 05 May1973
Nationality: Sudanese
Civil status: Married
Mobile : +966580222983 - +966500717051
Email : ibrahim_elthany@msn.com
Education:
Institution (Date from - Date to) Degree(s) or Diploma(s) obtained:
Omdurman Islamic University (1993  1999) BSc Degree (Honours) in Civil Engineering
Language skills: (1 - excellent; 5 - basic)
Language Reading Speaking Writing
Arabic 1 1 1
English 1 1 1
Membership of professional bodies:
- Member of the Sudanese Engineering Society
- Member of the Sudanese Engineering Council
- Member of Saudi Council of Engineers
Other skills:
Basic training course for engineers in Sudan:-
1. Training Zero for engineering skills (Faculty of Engineering - Omdurman Islamic University)
2. Surveying training (Faculty of Engineering - Omdurman Islamic University)
3. Computer Skills Course
4. HSE Courses
Key qualifications:
 16 Years of relevant experience in Civil Engineering practice.
 Project Manager for a number of projects comprising multi-disciplinary teams in different parts of Sudan
and Kingdom of Saudi Arabia, and for different project types.
 Very good experience in HSE procedures.
 Undertaken a number of project assignments in Southern Sudan.
 Expertise includes design, planning and construction supervision for different projects with different
companies.
Specific experience in the region:
Country Date from - Date to
Kingdom of Saudi Arabia (FADHA ENGINEERING CONSULTANTS) December 2012  Till now
Sudan (Newtech Consultant Group) March 2011  December 2012
Sudan (TECHNICAL STUDIES Co. Ltd  (TEST) Joint venture with Oceans  Esu/
Altakamul Alhandasi Consortium for Construction & Environmental Solutions - UAE))
August 2008  Feb 2011
Sudan (Bee Petroleum Co. Ltd.) August 2001  June 2008
Sudan (Ministry of National Defence Engineering Consult Office)
November 1999  February
2001
I B R A H I M A B D E L K H A L I G I B R A H I M M O H A M E D Page 2
Professional experience:
Position: Resident Engineer- (December 2014  Till now).
Employer: FADHA ENGINEERING CONSULTANTS.
Project: Infrastructure and Landscape for Marvella Community Project  Riyadh.
Client: Rafal Real Estate Development in KSA.
Project Cost: 9,381,909 SAR.
Responsibilities:
- Verifying and correcting the Shop & as built Drawings supplied by the contractor.
- Ensuring that the work accomplished in accordance with the technical specifications and other Contract
Documents, and bringing any instances of non-conformance with the technical specifications to the Client
attention.
- Review Monitoring the day-to-day quality control and quantity measurements of the works carried out under
the Contract.
- Preparing monthly progress report submitted to Client and National Water Company.
- Check and sign the monthly payment certificates when the quality of the works is satisfactory and the
quantities are correct.
Position: Project Manager- (January 2013  October 2014).
Employer: FADHA ENGINEERING CONSULTANTS.
Project: Construction of Urgent Building for Faculty of Arts & Science  Northern Border University.
Client: Ministry of Higher Education in KSA.
Project Cost: 65,894,090 SAR.
Responsibilities:
- Verifying and correcting the Tender, Shop & as built Drawings supplied by the contractor.
- Review Monitoring the day-to-day quality control and quantity measurements of the works carried out under
the Contract, which submitted by site engineer.
- Ensuring that the construction work accomplished in accordance with the technical specifications and other
Contract Documents, and bringing any instances of non-conformance with the technical specifications to the
Client attention.
- Checking all quantity measurements and calculations required for payment Purposes and ensuring that all
measurements and calculations carried out in a manner and at the frequencies specified in the contract
documents.
- Preparing monthly progress report attached by our recommendation for rushing work to finalize on the
specified time with high quality standards.
Second Position: Team Leader-(July 2011  December 2012).
First Position: Site Civil Engineer (March 2011 - July 2011).
Employer: Newtech Consulting Group.
Project: Construction of Office and Accommodation units for Ministry of Legal Affairs And Judiciary in
Southern Sudan TORIT, BOR & KUAJOK.
Client: Delegation of Europe Union-(SUDAN).
Project Cost: 3,298,508 Euro.
Responsibilities:
- Verifying and correcting the Shop Drawings supplied by the contractor.
- Monitoring the day-to-day quality control and quantity measurements of the works carried out under the
Contract.
- Ensuring that the construction work accomplished in accordance with the technical specifications and other
Contract Documents, and bringing any instances of non-conformance with the technical specifications to the
Team Leaders attention.
- Execution of the Taking Over by the Employer from the Contractor of each Stage in contract, in particular by
preparing lists of deficiencies, which need to corrected, and assisting with monitoring of the performance of
I B R A H I M A B D E L K H A L I G I B R A H I M M O H A M E D Page 3
the works During the Defects Liability Period.
- Checking all quantity measurements and calculations required for payment Purposes and ensuring that all
measurements and calculations carried out in a manner and at the frequencies specified in the contract
documents.
Company: TECHNICAL STUDIES Co. Ltd  (TEST) Joint venture with Oceans  Esu/ Altakamul Alhandasi
Consortium for Construction & Environmental Solutions - UAE - Engineering - (Aug/2008  Feb/2011).
Job : Quality Control Quality assurance Civil engineer.
Client : Ministry of Energy and Mining - Oil Exploration Companies  (GNPOC  WNPOC  PDOC)
Country : Sudan.
Cost : 22,850,000 USD.
 Supervision of all civil work in Tharjath bioremediation project (WNPOC), from the early start up to
commissioning August 01
st
2008  January 15
th
2009.
Include the earth work of constructing bioremediation bunds up to graveling top and pump station civil work
and manage all related soil tests as well as concreting tests in pump station, suction and delivery basins,
also include installation of the pipeline, hydraulic transfer pipes, gate valves, weir gates and surround fence.
Responsibilities:
- Checking all quantity measurements and calculations required for payment purposes and ensuring that all
measurements and calculations carried out in a manner and at the frequencies specified in the contract
documents.
- Preparing detailed recommendations to the Team Leader for contract change orders.
- Monitoring the day-to-day quality control and quantity measurements of the works carried out under the
Contract and countersigning the monthly payment certificates when the quality of the works is satisfactory
and the quantities are correct.
- Identifying construction problems and delays and recommending actions to expedite progress if the works
fall behind schedule.
- Write a day-by-day project diary, which shall record all events pertaining to the administration of the contract,
request from and orders given to the contractor and any other related information.
- Carrying out such duties under the terms of the contract, which may from time to time delegated in writing by
the Team Leader.
- Verifying and correcting the As-Built Drawings supplied by the contractor.
- Execution of the Taking Over by the Employer from the Contractor of each stage in contract, in particular by
preparing lists of deficiencies, which need to corrected, and assisting with monitoring of the performance of
the works during the Defects Liability Period.
 Supervision of all civil work in Munga bioremediation project (GNPOC) from the start up to completion,
January 15
th
2009  February 15
th
2010, as the same above task.
Responsibilities:
- Write a day-by-day project diary, which shall record all events pertaining to the administration of the contract,
request from and orders given to the contractor and any other related information.
- Carrying out such duties under the terms of the contract, which may from time to time delegated in writing by
the Team Leader.
- Verifying and correcting the As-Built Drawings supplied by the contractor.
- Execution of the Taking Over by the Employer from the Contractor of each stage in contract, in particular by
preparing lists of deficiencies, which need to corrected, and assisting with monitoring of the performance of
the works during the Defects Liability Period.
- Checking all quantity measurements and calculations required for payment purposes and ensuring that all
measurements and calculations carried out in a manner and at the frequencies specified in the contract
documents.
- Preparing detailed recommendations to the Team Leader for contract change orders.
- Monitoring the day-to-day quality control and quantity measurements of the works carried out under the
Contract and countersigning the monthly payment certificates when the quality of the works is satisfactory
and the quantities are correct.
I B R A H I M A B D E L K H A L I G I B R A H I M M O H A M E D Page 4
- Identifying construction problems and delays and recommending actions to expedite progress if the works
fall behind schedule.
 Supervision of all civil work in Palouge & Adar Bioremediation Project (PDOC) following the work remain,
February 15
th
2010  May 10
th
2010, as the same above task.
Responsibilities:
- Checking all quantity measurements and calculations required for payment purposes and ensuring that all
measurements and calculations carried out in a manner and at the frequencies specified in the contract
documents.
- Preparing detailed recommendations to the Team Leader for contract change orders.
- Monitoring the day-to-day quality control and quantity measurements of the works carried out under the
Contract and countersigning the monthly payment certificates when the quality of the works is satisfactory
and the quantities are correct.
- Write a day-by-day project diary, which shall record all events pertaining to the administration of the contract,
request from and orders given to the contractor and any other related information.
- Carrying out such duties under the terms of the contract, which may from time to time delegated in writing by
the Team Leader.
- Verifying and correcting the As-Built Drawings supplied by the contractor.
- Execution of the Taking Over by the Employer from the Contractor of each stage in contract, in particular by
preparing lists of deficiencies, which need to corrected, and assisting with monitoring of the performance of
the works during the Defects Liability Period.
- Identifying construction problems and delays and recommending actions to expedite progress if the works
fall behind schedule.
- Ensuring that the construction work accomplished in accordance with the technical specifications and other
Contract Documents, and bringing any instances of non-conformance with the technical specifications to the
Team Leaders attention.
 Project Manager Assistant of all engineering and administration work for bioremediation project (GNPOC),
May 10
th
2010  Feb 2011.
Responsibilities:
- Acted as direct link between the Client and the Contractors.
- Overall management of all project financial, technical and progress issues.
- Liaising with the Client on key technical and financial issues.
- Interpreting and applying various legal provisions of the contract documents, in particular with respect to
Claims from the Contractor for item extensions or extra payments.
- Identifying construction problems, delays and recommending actions to expedite progress if the works fall
behind schedule.
Company: BEE PETROLEUM CO.LTD.  (Aug/2001  Jun/2008).
Job : Site Engineer Operation Supervisor Sales Engineer Purchase Manager Head of
Transportation Department  Oil &Gas Depot Manager.
Country: Sudan.
 Engineering Field:-
 Site Engineer  Construction & Project Department  Elgaili Depot  (08/2001-10/2002).
- Follow up the construction of Gasoline tank (1000M3), connected with pump (120M3/H) until the
Filling area by pipeline (4") and connection between Gasoline tank and the Control office  M/O
Power by pipeline (8") 500M.L.
- Prepare all the equipment Contractor needs in site.
- Prepare weekly budget and payment for Contractor & labors.
- Send daily, weekly & monthly report to the Depot manager and Construction Projects manager.
- Follow up all the Operations, Admin & Financial work (06/2002-10/2002).
I B R A H I M A B D E L K H A L I G I B R A H I M M O H A M E D Page 5
 Site Engineer  Construction & Projects Department  (10/2002-02/2003).
- Follow up civil work in three petroleum station sites (building, concrete and steel work)
- Fix and connect tanks with dispensers by pipeline (2") underground.
- Prepare a weekly budget for Contractor & labors.
- Send daily, weekly & monthly report to the Construction manager.
 Administration Field:-
 Operation Supervisor  Elshagarh Depot  (02/2003-06/2003).
- Check daily stock of products in Depot.
- Oversee and analyze operations in oil and gas operations.
- Ensure adherence to safety regulations
- Recommend operational changes to senior management when necessary to ensure that
production quotas and procedures done.
- Check the pipeline from pumps to the tanks and from pumps to the filling Meters.
- Check daily the safety system workability.
- Prepare production and operation reports to the senior management and Depot Manager.
 Purchase Manager  (06/2003-10/2003).
- Define all the needs for all departments every year with specification to open Tenders.
- Follow up with finance Department the bills, which paid to the Contractors monthly.
- Prepare monthly report to the General Manager.
 Head of Transportation Department  (10/2003-05/2005).
- Follow up all Technical, Administration and Financial work.
- Improve the workshop by good Equipment and technical employees with training courses.
- Prepare monthly report to the General Manager.
 Manager  Elshagarh Oil &Gas Depot  (05/2005-05/2007).
- Follow up all Technical, Administration and Financial work in Depot.
- Oversee and analyze operations in oil and gas operations.
- Ensure adherence to safety regulations
- Evaluate efficiency of production sites to determine adequacy of personnel, equipment and
Technologies used, and make changes to work schedule or equipment when necessary.
- Confer with other managers to set production quotas, to plan extraction sites and to develop
policies for the removal of raw materials.
- Hire personnel and oversee training needs of staff.
- Prepare daily and monthly reports about products stocks (Diesel, Gasoline & Gas) comparing
between imports and exports.
 Marketing Field:-
 Sales Engineer  Sales Department  (05/2007-06/2008).
- Attract customers by given them brief of our products with good offers.
- Marketing survey for offers of other companies.
- Create good relationship with customers after finishing sale operations.
- Prepare weekly reports to the Sales Manager.
I B R A H I M A B D E L K H A L I G I B R A H I M M O H A M E D Page 6
Company : MINISTRY OF NATIONAL DEFENCE ENGINEERING CONSULT OFFICE  (Nov/1999-
Feb/2001).
Job : Civil Engineer.
Country: Sudan.
Projects: More than 9 different building projects across Khartoum.
Responsibilities:
 Design, Planning, and Supervision.
References:
- Eng. Abd Elftah Suliman, Administration Manager, Bee Petroleum CO.LTD. Mob: +249 912178632.
- Eng. Kamal Salih Saleim, General Manager, TECHNICAL STUDIES Co. Ltd  (TEST), Mob: +249 912317125.
- Eng. Abdelhafiz Abdelmoneim, Project Manager, Newtech Consultant Group, Mob: +249 913131312.
- Eng. Abubaker Ali, Managing Director, FADHA ENGINEERING CONSULTANTS, Mob: +966 580578507.

More Related Content

What's hot (20)

DOC
Gerry_Garciano_resume
Gerry (Abdullah) Garciano
DOCX
Updated CV of MUSA ELSHEIKH
Musa Elsheikh
DOCX
CV of KP Tomy
Tomy Pappu
DOC
Scott Frisa Resume
Scott Frisa
PDF
Amr. 2015....
Amr Eltony
PDF
Curriculum Vitae end to start 19-7-2016
Ayman Issa
DOC
2015 CV
Jamal Monte
PDF
Naim CV
Naim Fannoon
DOCX
RICKY - CV- 01-Apr-2015
Ricky Dasal
PDF
C.V28-01-2016
Ahmed Adel
PDF
Tawfig Khidir - CV
Tawfig Adham
PDF
Eng.ahmed
AHMED ALY
PDF
2014-2015
Mohamed Anany Said
PDF
ADAMRIDZUANRESUME
zabur adam
PDF
hassan assamy - TO
hassan assamy
PDF
RESUME Khaled 2017
Khaled Kareem
DOCX
UPDATE CV 2015
abdul sattar
PDF
Curriculum Vitae - Sayed Abdul Kader -
Abdulkader Sayed
DOCX
CV mohamed
Mohamed EL Saadani, PMP
DOCX
API 510 RESUME
Jason Evans
Gerry_Garciano_resume
Gerry (Abdullah) Garciano
Updated CV of MUSA ELSHEIKH
Musa Elsheikh
CV of KP Tomy
Tomy Pappu
Scott Frisa Resume
Scott Frisa
Amr. 2015....
Amr Eltony
Curriculum Vitae end to start 19-7-2016
Ayman Issa
2015 CV
Jamal Monte
Naim CV
Naim Fannoon
RICKY - CV- 01-Apr-2015
Ricky Dasal
C.V28-01-2016
Ahmed Adel
Tawfig Khidir - CV
Tawfig Adham
Eng.ahmed
AHMED ALY
2014-2015
Mohamed Anany Said
ADAMRIDZUANRESUME
zabur adam
hassan assamy - TO
hassan assamy
RESUME Khaled 2017
Khaled Kareem
UPDATE CV 2015
abdul sattar
Curriculum Vitae - Sayed Abdul Kader -
Abdulkader Sayed
API 510 RESUME
Jason Evans

Similar to Ibrahim_Abdelkhalig_Curriculum_vitae_(2) (20)

PDF
Civil eng.m.sayed c.v & cover letter last
Mohamed Sayed
DOCX
Furrukh Shahzad CV Quantity Surveyor
Furrukh Shahzad
PDF
CV_Civil_Engineer
Anas Zannerni
DOCX
CV_Ahmad_Eida final
Ahmad Eida
DOCX
CV_Mahmoud_Reda
mahmod reda
DOCX
CV AMINUL 19-05-2015
Aminul Haque
DOCX
CV-Atif_Ashraf-4
Atif Ashraf
DOCX
Zuher Mirza CV
zuher mirza
DOC
2017 悋愕惘 悋悵悋惠 惆愕 忰惆 忰惡惶
Mohamed Hablas
PDF
Mostafa Ragaee
Mostafa Ragaee
DOCX
Resume_[Sr. Estimator - Sr. QS]
Baalamurugan Manickam
DOCX
Ayman Hussien cv - Copy
ayman hussien
DOCX
Vivencio pachoro cv 2016
Vivencio Pachoro
DOCX
CV-MEP-Ahmad Majdalawi
Ahmad Majdalawi
DOCX
CV-MEP-Ahmad Majdalawi
Ahmad Majdalawi
DOCX
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
Abdoo Sowar
DOC
hidayath cv 2016
raja mohamed Hidayath
PDF
Mostafa omar el beh 2015 cv
Mostafa Omar
PDF
Azem Al-Kurdi CV - 4.9.2016
Azem Al Kurdi
Civil eng.m.sayed c.v & cover letter last
Mohamed Sayed
Furrukh Shahzad CV Quantity Surveyor
Furrukh Shahzad
CV_Civil_Engineer
Anas Zannerni
CV_Ahmad_Eida final
Ahmad Eida
CV_Mahmoud_Reda
mahmod reda
CV AMINUL 19-05-2015
Aminul Haque
CV-Atif_Ashraf-4
Atif Ashraf
Zuher Mirza CV
zuher mirza
2017 悋愕惘 悋悵悋惠 惆愕 忰惆 忰惡惶
Mohamed Hablas
Mostafa Ragaee
Mostafa Ragaee
Resume_[Sr. Estimator - Sr. QS]
Baalamurugan Manickam
Ayman Hussien cv - Copy
ayman hussien
Vivencio pachoro cv 2016
Vivencio Pachoro
CV-MEP-Ahmad Majdalawi
Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
Ahmad Majdalawi
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
Abdoo Sowar
hidayath cv 2016
raja mohamed Hidayath
Mostafa omar el beh 2015 cv
Mostafa Omar
Azem Al-Kurdi CV - 4.9.2016
Azem Al Kurdi
Ad

Ibrahim_Abdelkhalig_Curriculum_vitae_(2)

  • 1. I B R A H I M A B D E L K H A L I G I B R A H I M M O H A M E D Page 1 CURRICULUM VITAE Family name: Mohamed First names: Ibrahim Date of birth: 05 May1973 Nationality: Sudanese Civil status: Married Mobile : +966580222983 - +966500717051 Email : ibrahim_elthany@msn.com Education: Institution (Date from - Date to) Degree(s) or Diploma(s) obtained: Omdurman Islamic University (1993 1999) BSc Degree (Honours) in Civil Engineering Language skills: (1 - excellent; 5 - basic) Language Reading Speaking Writing Arabic 1 1 1 English 1 1 1 Membership of professional bodies: - Member of the Sudanese Engineering Society - Member of the Sudanese Engineering Council - Member of Saudi Council of Engineers Other skills: Basic training course for engineers in Sudan:- 1. Training Zero for engineering skills (Faculty of Engineering - Omdurman Islamic University) 2. Surveying training (Faculty of Engineering - Omdurman Islamic University) 3. Computer Skills Course 4. HSE Courses Key qualifications: 16 Years of relevant experience in Civil Engineering practice. Project Manager for a number of projects comprising multi-disciplinary teams in different parts of Sudan and Kingdom of Saudi Arabia, and for different project types. Very good experience in HSE procedures. Undertaken a number of project assignments in Southern Sudan. Expertise includes design, planning and construction supervision for different projects with different companies. Specific experience in the region: Country Date from - Date to Kingdom of Saudi Arabia (FADHA ENGINEERING CONSULTANTS) December 2012 Till now Sudan (Newtech Consultant Group) March 2011 December 2012 Sudan (TECHNICAL STUDIES Co. Ltd (TEST) Joint venture with Oceans Esu/ Altakamul Alhandasi Consortium for Construction & Environmental Solutions - UAE)) August 2008 Feb 2011 Sudan (Bee Petroleum Co. Ltd.) August 2001 June 2008 Sudan (Ministry of National Defence Engineering Consult Office) November 1999 February 2001
  • 2. I B R A H I M A B D E L K H A L I G I B R A H I M M O H A M E D Page 2 Professional experience: Position: Resident Engineer- (December 2014 Till now). Employer: FADHA ENGINEERING CONSULTANTS. Project: Infrastructure and Landscape for Marvella Community Project Riyadh. Client: Rafal Real Estate Development in KSA. Project Cost: 9,381,909 SAR. Responsibilities: - Verifying and correcting the Shop & as built Drawings supplied by the contractor. - Ensuring that the work accomplished in accordance with the technical specifications and other Contract Documents, and bringing any instances of non-conformance with the technical specifications to the Client attention. - Review Monitoring the day-to-day quality control and quantity measurements of the works carried out under the Contract. - Preparing monthly progress report submitted to Client and National Water Company. - Check and sign the monthly payment certificates when the quality of the works is satisfactory and the quantities are correct. Position: Project Manager- (January 2013 October 2014). Employer: FADHA ENGINEERING CONSULTANTS. Project: Construction of Urgent Building for Faculty of Arts & Science Northern Border University. Client: Ministry of Higher Education in KSA. Project Cost: 65,894,090 SAR. Responsibilities: - Verifying and correcting the Tender, Shop & as built Drawings supplied by the contractor. - Review Monitoring the day-to-day quality control and quantity measurements of the works carried out under the Contract, which submitted by site engineer. - Ensuring that the construction work accomplished in accordance with the technical specifications and other Contract Documents, and bringing any instances of non-conformance with the technical specifications to the Client attention. - Checking all quantity measurements and calculations required for payment Purposes and ensuring that all measurements and calculations carried out in a manner and at the frequencies specified in the contract documents. - Preparing monthly progress report attached by our recommendation for rushing work to finalize on the specified time with high quality standards. Second Position: Team Leader-(July 2011 December 2012). First Position: Site Civil Engineer (March 2011 - July 2011). Employer: Newtech Consulting Group. Project: Construction of Office and Accommodation units for Ministry of Legal Affairs And Judiciary in Southern Sudan TORIT, BOR & KUAJOK. Client: Delegation of Europe Union-(SUDAN). Project Cost: 3,298,508 Euro. Responsibilities: - Verifying and correcting the Shop Drawings supplied by the contractor. - Monitoring the day-to-day quality control and quantity measurements of the works carried out under the Contract. - Ensuring that the construction work accomplished in accordance with the technical specifications and other Contract Documents, and bringing any instances of non-conformance with the technical specifications to the Team Leaders attention. - Execution of the Taking Over by the Employer from the Contractor of each Stage in contract, in particular by preparing lists of deficiencies, which need to corrected, and assisting with monitoring of the performance of
  • 3. I B R A H I M A B D E L K H A L I G I B R A H I M M O H A M E D Page 3 the works During the Defects Liability Period. - Checking all quantity measurements and calculations required for payment Purposes and ensuring that all measurements and calculations carried out in a manner and at the frequencies specified in the contract documents. Company: TECHNICAL STUDIES Co. Ltd (TEST) Joint venture with Oceans Esu/ Altakamul Alhandasi Consortium for Construction & Environmental Solutions - UAE - Engineering - (Aug/2008 Feb/2011). Job : Quality Control Quality assurance Civil engineer. Client : Ministry of Energy and Mining - Oil Exploration Companies (GNPOC WNPOC PDOC) Country : Sudan. Cost : 22,850,000 USD. Supervision of all civil work in Tharjath bioremediation project (WNPOC), from the early start up to commissioning August 01 st 2008 January 15 th 2009. Include the earth work of constructing bioremediation bunds up to graveling top and pump station civil work and manage all related soil tests as well as concreting tests in pump station, suction and delivery basins, also include installation of the pipeline, hydraulic transfer pipes, gate valves, weir gates and surround fence. Responsibilities: - Checking all quantity measurements and calculations required for payment purposes and ensuring that all measurements and calculations carried out in a manner and at the frequencies specified in the contract documents. - Preparing detailed recommendations to the Team Leader for contract change orders. - Monitoring the day-to-day quality control and quantity measurements of the works carried out under the Contract and countersigning the monthly payment certificates when the quality of the works is satisfactory and the quantities are correct. - Identifying construction problems and delays and recommending actions to expedite progress if the works fall behind schedule. - Write a day-by-day project diary, which shall record all events pertaining to the administration of the contract, request from and orders given to the contractor and any other related information. - Carrying out such duties under the terms of the contract, which may from time to time delegated in writing by the Team Leader. - Verifying and correcting the As-Built Drawings supplied by the contractor. - Execution of the Taking Over by the Employer from the Contractor of each stage in contract, in particular by preparing lists of deficiencies, which need to corrected, and assisting with monitoring of the performance of the works during the Defects Liability Period. Supervision of all civil work in Munga bioremediation project (GNPOC) from the start up to completion, January 15 th 2009 February 15 th 2010, as the same above task. Responsibilities: - Write a day-by-day project diary, which shall record all events pertaining to the administration of the contract, request from and orders given to the contractor and any other related information. - Carrying out such duties under the terms of the contract, which may from time to time delegated in writing by the Team Leader. - Verifying and correcting the As-Built Drawings supplied by the contractor. - Execution of the Taking Over by the Employer from the Contractor of each stage in contract, in particular by preparing lists of deficiencies, which need to corrected, and assisting with monitoring of the performance of the works during the Defects Liability Period. - Checking all quantity measurements and calculations required for payment purposes and ensuring that all measurements and calculations carried out in a manner and at the frequencies specified in the contract documents. - Preparing detailed recommendations to the Team Leader for contract change orders. - Monitoring the day-to-day quality control and quantity measurements of the works carried out under the Contract and countersigning the monthly payment certificates when the quality of the works is satisfactory and the quantities are correct.
  • 4. I B R A H I M A B D E L K H A L I G I B R A H I M M O H A M E D Page 4 - Identifying construction problems and delays and recommending actions to expedite progress if the works fall behind schedule. Supervision of all civil work in Palouge & Adar Bioremediation Project (PDOC) following the work remain, February 15 th 2010 May 10 th 2010, as the same above task. Responsibilities: - Checking all quantity measurements and calculations required for payment purposes and ensuring that all measurements and calculations carried out in a manner and at the frequencies specified in the contract documents. - Preparing detailed recommendations to the Team Leader for contract change orders. - Monitoring the day-to-day quality control and quantity measurements of the works carried out under the Contract and countersigning the monthly payment certificates when the quality of the works is satisfactory and the quantities are correct. - Write a day-by-day project diary, which shall record all events pertaining to the administration of the contract, request from and orders given to the contractor and any other related information. - Carrying out such duties under the terms of the contract, which may from time to time delegated in writing by the Team Leader. - Verifying and correcting the As-Built Drawings supplied by the contractor. - Execution of the Taking Over by the Employer from the Contractor of each stage in contract, in particular by preparing lists of deficiencies, which need to corrected, and assisting with monitoring of the performance of the works during the Defects Liability Period. - Identifying construction problems and delays and recommending actions to expedite progress if the works fall behind schedule. - Ensuring that the construction work accomplished in accordance with the technical specifications and other Contract Documents, and bringing any instances of non-conformance with the technical specifications to the Team Leaders attention. Project Manager Assistant of all engineering and administration work for bioremediation project (GNPOC), May 10 th 2010 Feb 2011. Responsibilities: - Acted as direct link between the Client and the Contractors. - Overall management of all project financial, technical and progress issues. - Liaising with the Client on key technical and financial issues. - Interpreting and applying various legal provisions of the contract documents, in particular with respect to Claims from the Contractor for item extensions or extra payments. - Identifying construction problems, delays and recommending actions to expedite progress if the works fall behind schedule. Company: BEE PETROLEUM CO.LTD. (Aug/2001 Jun/2008). Job : Site Engineer Operation Supervisor Sales Engineer Purchase Manager Head of Transportation Department Oil &Gas Depot Manager. Country: Sudan. Engineering Field:- Site Engineer Construction & Project Department Elgaili Depot (08/2001-10/2002). - Follow up the construction of Gasoline tank (1000M3), connected with pump (120M3/H) until the Filling area by pipeline (4") and connection between Gasoline tank and the Control office M/O Power by pipeline (8") 500M.L. - Prepare all the equipment Contractor needs in site. - Prepare weekly budget and payment for Contractor & labors. - Send daily, weekly & monthly report to the Depot manager and Construction Projects manager. - Follow up all the Operations, Admin & Financial work (06/2002-10/2002).
  • 5. I B R A H I M A B D E L K H A L I G I B R A H I M M O H A M E D Page 5 Site Engineer Construction & Projects Department (10/2002-02/2003). - Follow up civil work in three petroleum station sites (building, concrete and steel work) - Fix and connect tanks with dispensers by pipeline (2") underground. - Prepare a weekly budget for Contractor & labors. - Send daily, weekly & monthly report to the Construction manager. Administration Field:- Operation Supervisor Elshagarh Depot (02/2003-06/2003). - Check daily stock of products in Depot. - Oversee and analyze operations in oil and gas operations. - Ensure adherence to safety regulations - Recommend operational changes to senior management when necessary to ensure that production quotas and procedures done. - Check the pipeline from pumps to the tanks and from pumps to the filling Meters. - Check daily the safety system workability. - Prepare production and operation reports to the senior management and Depot Manager. Purchase Manager (06/2003-10/2003). - Define all the needs for all departments every year with specification to open Tenders. - Follow up with finance Department the bills, which paid to the Contractors monthly. - Prepare monthly report to the General Manager. Head of Transportation Department (10/2003-05/2005). - Follow up all Technical, Administration and Financial work. - Improve the workshop by good Equipment and technical employees with training courses. - Prepare monthly report to the General Manager. Manager Elshagarh Oil &Gas Depot (05/2005-05/2007). - Follow up all Technical, Administration and Financial work in Depot. - Oversee and analyze operations in oil and gas operations. - Ensure adherence to safety regulations - Evaluate efficiency of production sites to determine adequacy of personnel, equipment and Technologies used, and make changes to work schedule or equipment when necessary. - Confer with other managers to set production quotas, to plan extraction sites and to develop policies for the removal of raw materials. - Hire personnel and oversee training needs of staff. - Prepare daily and monthly reports about products stocks (Diesel, Gasoline & Gas) comparing between imports and exports. Marketing Field:- Sales Engineer Sales Department (05/2007-06/2008). - Attract customers by given them brief of our products with good offers. - Marketing survey for offers of other companies. - Create good relationship with customers after finishing sale operations. - Prepare weekly reports to the Sales Manager.
  • 6. I B R A H I M A B D E L K H A L I G I B R A H I M M O H A M E D Page 6 Company : MINISTRY OF NATIONAL DEFENCE ENGINEERING CONSULT OFFICE (Nov/1999- Feb/2001). Job : Civil Engineer. Country: Sudan. Projects: More than 9 different building projects across Khartoum. Responsibilities: Design, Planning, and Supervision. References: - Eng. Abd Elftah Suliman, Administration Manager, Bee Petroleum CO.LTD. Mob: +249 912178632. - Eng. Kamal Salih Saleim, General Manager, TECHNICAL STUDIES Co. Ltd (TEST), Mob: +249 912317125. - Eng. Abdelhafiz Abdelmoneim, Project Manager, Newtech Consultant Group, Mob: +249 913131312. - Eng. Abubaker Ali, Managing Director, FADHA ENGINEERING CONSULTANTS, Mob: +966 580578507.