Mastes Scheduling Producci坦n I IITI MC. Ma. del Pilar C. Le坦n Franco
Master  Scheduling  (MPS) It forms the link between production planning and what manufacturing will actually build. It forms the basis for calculating the capacity and resources needed The MPS drives the material requirements plan It keeps priorities valid. The MPS is a priority plan for manufacturing.
Master Scheduling (MPS) The end items made by the company are assembled from component and subcomponents parts. These must be available in the right quantities at the right time to support the master production schedule.  The material requirements planning system plan the schedule for these components based on the needs of the MPS.
Master Scheduling (MPS) The master production schedule is a plan for manufacturing.  It reflects the needs of the marketplace and the capacity of manufacturing and forms a priority plan for manufacturing to follow.
Master Scheduling (MPS) MPS Makes possible valid order promises Sales Production The production plan Forecasts for individual end items Actual orders received from customers and for stock replenishment Inventory levels for individual end items Capacity restraints
Relationship to  produce plan 500 Aggregate Inventory (units) Production Plan 250 215 160 160 160 160 Aggregate  Forecast (units) 6 5 4 3 2 1 Week
Developing a Master production Schedule The objectives in developing an MPS are: To maintain the desired level of customer service by maintaining finished-goods inventory levels or by schedule to meet customer delivery requirements To make the best use of material, labor and equipment To maintain inventory investment at the required levels
Developing a Master production Schedule The plan must satisfy customer demand, be within the capacity of manufacturing, and be within the guidelines of the production plan
Developing a Master production Schedule Steps: Develop a preliminary MPS Check the preliminary MPS against available capacity Resolve differences between the preliminary MPS and capacity availability
Preliminary Master Production  Schedule 油 100 100 油 100 油 MPS 20 80 40 0 60 20 80 Projected Available 60 60 60 60 60 60 Forecast 6 5 4 3 2 1 0 Week
Rough-Cut Capacity Planning RCCP checks whether critical resources are available to support the preliminary master production schedules.  Critical resources include bottleneck operations, labor, and critical materials.
Rough-Cut Capacity  Planning 油 油 油 油 油 Total Horas 油 油 油 油 油 Fine 油 油 油 油 油 Medium Total 3 2 1 0 Week hrs./unit 1.2 Fine hrs./unit 0.5 Medium 80 20 30 10 20 Fine 120 15 40 25 40 Medium Total 3 2 1 0 Week
Resolution of Differences Compare the total time required to the available capacity of the work center Resources use Customer service Cost
Master Schedule Decisions The MPS should represent as efficiently as possible what manufacturing will make. Make to stock products:  Limited number of standard items are assembled from many components Make to order products:  Many different ended items are made form a small number of components Assemble to order products:  Many end items can be made form combinations of basic components and subassemblies.
Master Schedule Decisions Make to stock Assemble to Order Make to order End Product Raw Material End Product Raw Material End Product Raw Material MPS MPS MPS FAS FAS FAS = Finaly Assembly Schedule

More Related Content

What's hot (20)

Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
Kinshook Chaturvedi
Capacity planning ppt
Capacity planning pptCapacity planning ppt
Capacity planning ppt
Gagan bhati
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps om
fatuma ahmed
Aggregate Planning
Aggregate  PlanningAggregate  Planning
Aggregate Planning
ahmad bassiouny
Aggregate Planning
Aggregate PlanningAggregate Planning
Aggregate Planning
ahmad bassiouny
Mrp
MrpMrp
Mrp
sujan99
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
Pankaj Kumar
Manufacturing Resource Planning | Management
Manufacturing Resource Planning | ManagementManufacturing Resource Planning | Management
Manufacturing Resource Planning | Management
Transweb Global Inc
Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009
Akash Maurya
Material Requirement Planning (MRP)
Material Requirement Planning (MRP)Material Requirement Planning (MRP)
Material Requirement Planning (MRP)
Konok Mondal
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
Naushii Khan
CAPACITY PLANNING
CAPACITY PLANNINGCAPACITY PLANNING
CAPACITY PLANNING
Shilpi Panchal
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
shoaibzaheer1
Material Requirement and Planning
Material Requirement and PlanningMaterial Requirement and Planning
Material Requirement and Planning
Asim Irshad
MRP-II
MRP-IIMRP-II
MRP-II
Somashekar S.M
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
Delwin Arikatt
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
jhanakshah
Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)
Snehav Sharma
Capacity Management
Capacity ManagementCapacity Management
Capacity Management
Yash Vardhan Lohia
manufacturing resource planning
manufacturing resource planningmanufacturing resource planning
manufacturing resource planning
Dinesh Nikam
Capacity planning ppt
Capacity planning pptCapacity planning ppt
Capacity planning ppt
Gagan bhati
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps om
fatuma ahmed
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
Pankaj Kumar
Manufacturing Resource Planning | Management
Manufacturing Resource Planning | ManagementManufacturing Resource Planning | Management
Manufacturing Resource Planning | Management
Transweb Global Inc
Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009
Akash Maurya
Material Requirement Planning (MRP)
Material Requirement Planning (MRP)Material Requirement Planning (MRP)
Material Requirement Planning (MRP)
Konok Mondal
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
Naushii Khan
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
shoaibzaheer1
Material Requirement and Planning
Material Requirement and PlanningMaterial Requirement and Planning
Material Requirement and Planning
Asim Irshad
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
Delwin Arikatt
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
jhanakshah
Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)
Snehav Sharma
manufacturing resource planning
manufacturing resource planningmanufacturing resource planning
manufacturing resource planning
Dinesh Nikam

Similar to Master Scheduling (20)

mastes Production scheduling Plan in production
mastes Production scheduling Plan in productionmastes Production scheduling Plan in production
mastes Production scheduling Plan in production
DrArunVidyaK
Master Production scheduling Plan in Production
Master Production scheduling Plan in ProductionMaster Production scheduling Plan in Production
Master Production scheduling Plan in Production
DrArunVidyaK
Master schedualing
Master schedualingMaster schedualing
Master schedualing
Mostafa Ashour
MASTER PRODUCTION SCHEDULE (MPS).pptx
MASTER PRODUCTION SCHEDULE (MPS).pptxMASTER PRODUCTION SCHEDULE (MPS).pptx
MASTER PRODUCTION SCHEDULE (MPS).pptx
GulaHangus
Operation management of Dilla University business
Operation management of Dilla University businessOperation management of Dilla University business
Operation management of Dilla University business
mesfinabera180
Aggregate Planning and RCCP
Aggregate Planning and RCCPAggregate Planning and RCCP
Aggregate Planning and RCCP
Amalia Syafitri
Production Planning
Production PlanningProduction Planning
Production Planning
Transweb Global Inc
Module 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxModule 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptx
Shivakumar Malagihal
Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)
Manu Alias
SCM Chap 6mmmmmmmmmmmmmmmmmmmmmmmmm.pptx
SCM Chap 6mmmmmmmmmmmmmmmmmmmmmmmmm.pptxSCM Chap 6mmmmmmmmmmmmmmmmmmmmmmmmm.pptx
SCM Chap 6mmmmmmmmmmmmmmmmmmmmmmmmm.pptx
blackknight37
Operations Management Classroom Presentation
Operations Management Classroom PresentationOperations Management Classroom Presentation
Operations Management Classroom Presentation
AsishPanda25
Mrpc final
Mrpc finalMrpc final
Mrpc final
Vipul Saxena
Erp chapter 3
Erp chapter 3Erp chapter 3
Erp chapter 3
PoonamPangarkar1
Session 4
Session 4Session 4
Session 4
Kinshook Chaturvedi
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
ManiMj6
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)
Somashekar S.M
Capacity Planning Product and operation management
Capacity Planning Product and operation managementCapacity Planning Product and operation management
Capacity Planning Product and operation management
adamdeascartes
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
Aastha Chopra
Heizer 14
Heizer 14Heizer 14
Heizer 14
ajithsrc
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING
Aqib ali
mastes Production scheduling Plan in production
mastes Production scheduling Plan in productionmastes Production scheduling Plan in production
mastes Production scheduling Plan in production
DrArunVidyaK
Master Production scheduling Plan in Production
Master Production scheduling Plan in ProductionMaster Production scheduling Plan in Production
Master Production scheduling Plan in Production
DrArunVidyaK
MASTER PRODUCTION SCHEDULE (MPS).pptx
MASTER PRODUCTION SCHEDULE (MPS).pptxMASTER PRODUCTION SCHEDULE (MPS).pptx
MASTER PRODUCTION SCHEDULE (MPS).pptx
GulaHangus
Operation management of Dilla University business
Operation management of Dilla University businessOperation management of Dilla University business
Operation management of Dilla University business
mesfinabera180
Aggregate Planning and RCCP
Aggregate Planning and RCCPAggregate Planning and RCCP
Aggregate Planning and RCCP
Amalia Syafitri
Module 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxModule 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptx
Shivakumar Malagihal
Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)
Manu Alias
SCM Chap 6mmmmmmmmmmmmmmmmmmmmmmmmm.pptx
SCM Chap 6mmmmmmmmmmmmmmmmmmmmmmmmm.pptxSCM Chap 6mmmmmmmmmmmmmmmmmmmmmmmmm.pptx
SCM Chap 6mmmmmmmmmmmmmmmmmmmmmmmmm.pptx
blackknight37
Operations Management Classroom Presentation
Operations Management Classroom PresentationOperations Management Classroom Presentation
Operations Management Classroom Presentation
AsishPanda25
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
ManiMj6
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)
Somashekar S.M
Capacity Planning Product and operation management
Capacity Planning Product and operation managementCapacity Planning Product and operation management
Capacity Planning Product and operation management
adamdeascartes
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
Aastha Chopra
Heizer 14
Heizer 14Heizer 14
Heizer 14
ajithsrc
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING
Aqib ali

Recently uploaded (20)

Borderless Access Global - B2B Panel Book 2025
Borderless Access Global -  B2B Panel Book 2025Borderless Access Global -  B2B Panel Book 2025
Borderless Access Global - B2B Panel Book 2025
Borderless Access
PHX_Investor_Presentation_March 2025 _ VF.pdf
PHX_Investor_Presentation_March 2025 _ VF.pdfPHX_Investor_Presentation_March 2025 _ VF.pdf
PHX_Investor_Presentation_March 2025 _ VF.pdf
PanhandleOilandGas
Why External Audits Are Critical for Australian Startups & Scale-Ups.pdf
Why External Audits Are Critical for Australian  Startups & Scale-Ups.pdfWhy External Audits Are Critical for Australian  Startups & Scale-Ups.pdf
Why External Audits Are Critical for Australian Startups & Scale-Ups.pdf
DFK BKM
Regulatory Considerations for Active Implantable Medical Devices (AIMDs)
Regulatory Considerations for Active Implantable Medical Devices (AIMDs)Regulatory Considerations for Active Implantable Medical Devices (AIMDs)
Regulatory Considerations for Active Implantable Medical Devices (AIMDs)
I3CGLOBAL
Western Alaska Minerals Corporate Presentation Mar 2025.pdf
Western Alaska Minerals Corporate Presentation Mar 2025.pdfWestern Alaska Minerals Corporate Presentation Mar 2025.pdf
Western Alaska Minerals Corporate Presentation Mar 2025.pdf
Western Alaska Minerals Corp.
Pallas-BrandFare-Credential-Presentation
Pallas-BrandFare-Credential-PresentationPallas-BrandFare-Credential-Presentation
Pallas-BrandFare-Credential-Presentation
team586612
Turjo Wadud: The Mastermind Behind Billion-Dollar Business Exits
Turjo Wadud: The Mastermind Behind Billion-Dollar Business ExitsTurjo Wadud: The Mastermind Behind Billion-Dollar Business Exits
Turjo Wadud: The Mastermind Behind Billion-Dollar Business Exits
Turjo Wadud
ch 2 Principles of management class 12.pptx
ch 2 Principles of management class 12.pptxch 2 Principles of management class 12.pptx
ch 2 Principles of management class 12.pptx
mdshayaan4764
List of Top Companies and their CEO_s in World.pdf
List of Top Companies and their CEO_s in World.pdfList of Top Companies and their CEO_s in World.pdf
List of Top Companies and their CEO_s in World.pdf
rvanchurba
China Gold International English PPT-2025 PDAC
China Gold International English PPT-2025 PDACChina Gold International English PPT-2025 PDAC
China Gold International English PPT-2025 PDAC
China_Gold_International_Resources
Illuminati agent in Kampala Uganda +256788065400/0701593598
Illuminati agent in Kampala Uganda +256788065400/0701593598Illuminati agent in Kampala Uganda +256788065400/0701593598
Illuminati agent in Kampala Uganda +256788065400/0701593598
talemwan81
the process of deciding about sources and documentation of procurements
the process of deciding about sources and documentation of procurementsthe process of deciding about sources and documentation of procurements
the process of deciding about sources and documentation of procurements
sadiahanif22
Redpoint Ventures Market Update March 2025
Redpoint Ventures Market Update March 2025Redpoint Ventures Market Update March 2025
Redpoint Ventures Market Update March 2025
Razin Mustafiz
Borderless Access Global - Panel Book 2025
Borderless Access Global - Panel Book 2025Borderless Access Global - Panel Book 2025
Borderless Access Global - Panel Book 2025
Borderless Access
Online Webinar PowerPoint Templates.pptx
Online Webinar PowerPoint Templates.pptxOnline Webinar PowerPoint Templates.pptx
Online Webinar PowerPoint Templates.pptx
Anonymoushbl0ek0qdZ
TriStar Gold Corporate Presentation March 2025
TriStar Gold Corporate Presentation March 2025TriStar Gold Corporate Presentation March 2025
TriStar Gold Corporate Presentation March 2025
Adnet Communications
chapter one Financial planning presentation
chapter one Financial planning presentationchapter one Financial planning presentation
chapter one Financial planning presentation
MitikuNegash3
2024 Anaplan End User Community Results Overview
2024 Anaplan End User Community Results Overview2024 Anaplan End User Community Results Overview
2024 Anaplan End User Community Results Overview
Eric Stieg
Illuminati agent in Kampala Uganda call +256788065400/0701593598
Illuminati agent in Kampala Uganda call +256788065400/0701593598Illuminati agent in Kampala Uganda call +256788065400/0701593598
Illuminati agent in Kampala Uganda call +256788065400/0701593598
talemwan81
Avast Premium Security Crack + License Key {2025}
Avast Premium Security Crack + License Key {2025}Avast Premium Security Crack + License Key {2025}
Avast Premium Security Crack + License Key {2025}
chenstok38
Borderless Access Global - B2B Panel Book 2025
Borderless Access Global -  B2B Panel Book 2025Borderless Access Global -  B2B Panel Book 2025
Borderless Access Global - B2B Panel Book 2025
Borderless Access
PHX_Investor_Presentation_March 2025 _ VF.pdf
PHX_Investor_Presentation_March 2025 _ VF.pdfPHX_Investor_Presentation_March 2025 _ VF.pdf
PHX_Investor_Presentation_March 2025 _ VF.pdf
PanhandleOilandGas
Why External Audits Are Critical for Australian Startups & Scale-Ups.pdf
Why External Audits Are Critical for Australian  Startups & Scale-Ups.pdfWhy External Audits Are Critical for Australian  Startups & Scale-Ups.pdf
Why External Audits Are Critical for Australian Startups & Scale-Ups.pdf
DFK BKM
Regulatory Considerations for Active Implantable Medical Devices (AIMDs)
Regulatory Considerations for Active Implantable Medical Devices (AIMDs)Regulatory Considerations for Active Implantable Medical Devices (AIMDs)
Regulatory Considerations for Active Implantable Medical Devices (AIMDs)
I3CGLOBAL
Western Alaska Minerals Corporate Presentation Mar 2025.pdf
Western Alaska Minerals Corporate Presentation Mar 2025.pdfWestern Alaska Minerals Corporate Presentation Mar 2025.pdf
Western Alaska Minerals Corporate Presentation Mar 2025.pdf
Western Alaska Minerals Corp.
Pallas-BrandFare-Credential-Presentation
Pallas-BrandFare-Credential-PresentationPallas-BrandFare-Credential-Presentation
Pallas-BrandFare-Credential-Presentation
team586612
Turjo Wadud: The Mastermind Behind Billion-Dollar Business Exits
Turjo Wadud: The Mastermind Behind Billion-Dollar Business ExitsTurjo Wadud: The Mastermind Behind Billion-Dollar Business Exits
Turjo Wadud: The Mastermind Behind Billion-Dollar Business Exits
Turjo Wadud
ch 2 Principles of management class 12.pptx
ch 2 Principles of management class 12.pptxch 2 Principles of management class 12.pptx
ch 2 Principles of management class 12.pptx
mdshayaan4764
List of Top Companies and their CEO_s in World.pdf
List of Top Companies and their CEO_s in World.pdfList of Top Companies and their CEO_s in World.pdf
List of Top Companies and their CEO_s in World.pdf
rvanchurba
Illuminati agent in Kampala Uganda +256788065400/0701593598
Illuminati agent in Kampala Uganda +256788065400/0701593598Illuminati agent in Kampala Uganda +256788065400/0701593598
Illuminati agent in Kampala Uganda +256788065400/0701593598
talemwan81
the process of deciding about sources and documentation of procurements
the process of deciding about sources and documentation of procurementsthe process of deciding about sources and documentation of procurements
the process of deciding about sources and documentation of procurements
sadiahanif22
Redpoint Ventures Market Update March 2025
Redpoint Ventures Market Update March 2025Redpoint Ventures Market Update March 2025
Redpoint Ventures Market Update March 2025
Razin Mustafiz
Borderless Access Global - Panel Book 2025
Borderless Access Global - Panel Book 2025Borderless Access Global - Panel Book 2025
Borderless Access Global - Panel Book 2025
Borderless Access
Online Webinar PowerPoint Templates.pptx
Online Webinar PowerPoint Templates.pptxOnline Webinar PowerPoint Templates.pptx
Online Webinar PowerPoint Templates.pptx
Anonymoushbl0ek0qdZ
TriStar Gold Corporate Presentation March 2025
TriStar Gold Corporate Presentation March 2025TriStar Gold Corporate Presentation March 2025
TriStar Gold Corporate Presentation March 2025
Adnet Communications
chapter one Financial planning presentation
chapter one Financial planning presentationchapter one Financial planning presentation
chapter one Financial planning presentation
MitikuNegash3
2024 Anaplan End User Community Results Overview
2024 Anaplan End User Community Results Overview2024 Anaplan End User Community Results Overview
2024 Anaplan End User Community Results Overview
Eric Stieg
Illuminati agent in Kampala Uganda call +256788065400/0701593598
Illuminati agent in Kampala Uganda call +256788065400/0701593598Illuminati agent in Kampala Uganda call +256788065400/0701593598
Illuminati agent in Kampala Uganda call +256788065400/0701593598
talemwan81
Avast Premium Security Crack + License Key {2025}
Avast Premium Security Crack + License Key {2025}Avast Premium Security Crack + License Key {2025}
Avast Premium Security Crack + License Key {2025}
chenstok38

Master Scheduling

  • 1. Mastes Scheduling Producci坦n I IITI MC. Ma. del Pilar C. Le坦n Franco
  • 2. Master Scheduling (MPS) It forms the link between production planning and what manufacturing will actually build. It forms the basis for calculating the capacity and resources needed The MPS drives the material requirements plan It keeps priorities valid. The MPS is a priority plan for manufacturing.
  • 3. Master Scheduling (MPS) The end items made by the company are assembled from component and subcomponents parts. These must be available in the right quantities at the right time to support the master production schedule. The material requirements planning system plan the schedule for these components based on the needs of the MPS.
  • 4. Master Scheduling (MPS) The master production schedule is a plan for manufacturing. It reflects the needs of the marketplace and the capacity of manufacturing and forms a priority plan for manufacturing to follow.
  • 5. Master Scheduling (MPS) MPS Makes possible valid order promises Sales Production The production plan Forecasts for individual end items Actual orders received from customers and for stock replenishment Inventory levels for individual end items Capacity restraints
  • 6. Relationship to produce plan 500 Aggregate Inventory (units) Production Plan 250 215 160 160 160 160 Aggregate Forecast (units) 6 5 4 3 2 1 Week
  • 7. Developing a Master production Schedule The objectives in developing an MPS are: To maintain the desired level of customer service by maintaining finished-goods inventory levels or by schedule to meet customer delivery requirements To make the best use of material, labor and equipment To maintain inventory investment at the required levels
  • 8. Developing a Master production Schedule The plan must satisfy customer demand, be within the capacity of manufacturing, and be within the guidelines of the production plan
  • 9. Developing a Master production Schedule Steps: Develop a preliminary MPS Check the preliminary MPS against available capacity Resolve differences between the preliminary MPS and capacity availability
  • 10. Preliminary Master Production Schedule 油 100 100 油 100 油 MPS 20 80 40 0 60 20 80 Projected Available 60 60 60 60 60 60 Forecast 6 5 4 3 2 1 0 Week
  • 11. Rough-Cut Capacity Planning RCCP checks whether critical resources are available to support the preliminary master production schedules. Critical resources include bottleneck operations, labor, and critical materials.
  • 12. Rough-Cut Capacity Planning 油 油 油 油 油 Total Horas 油 油 油 油 油 Fine 油 油 油 油 油 Medium Total 3 2 1 0 Week hrs./unit 1.2 Fine hrs./unit 0.5 Medium 80 20 30 10 20 Fine 120 15 40 25 40 Medium Total 3 2 1 0 Week
  • 13. Resolution of Differences Compare the total time required to the available capacity of the work center Resources use Customer service Cost
  • 14. Master Schedule Decisions The MPS should represent as efficiently as possible what manufacturing will make. Make to stock products: Limited number of standard items are assembled from many components Make to order products: Many different ended items are made form a small number of components Assemble to order products: Many end items can be made form combinations of basic components and subassemblies.
  • 15. Master Schedule Decisions Make to stock Assemble to Order Make to order End Product Raw Material End Product Raw Material End Product Raw Material MPS MPS MPS FAS FAS FAS = Finaly Assembly Schedule