際際滷

際際滷Share a Scribd company logo
aeCurriculum Vit
Page 1 of 5
PERSONAL DATA:
Name:
Date of Birth:
Nationality:
Marital Status:
UAE Address
Mobile / Home No:
E-mail address:
Mostafa Prince Aly
30 January 1990
Egyptian
Single
Dubai,UAE
+971552114788 / +97155 9419417
+20 (10) 1637606 / +20 (11) 40135557
mostprince7800@yahoo.com
Education:
B. Sc. Electrical Machinery and Power
Bachelor Degree in Engineering
Helwan University, Cairo, Egypt
Graduated 2011
Professional Objective:
To acquire a position of Electrical Engineer in a successful organization, where I would refine my skills and
educational background as an Electrical Engineer.
Skills & Interests:
 Ability to handle with people.
 Ability to handle new tasks.
 Good oral and written communication skills.
 Fast adaptation to working environment.
 Team player.
 UAE driving license
 Interests in photography, tennis, swimming, jogging, cycling & hiking, travelling and music.
Training Courses and Certificates
 Microsoft Operating System (Windows XP)
 Microsoft Office 2000 Office XP
 Aviation Information Technology (AVIT) Certificate
 Design of Electrical Work for Projects (26 June  08 July 2010)
 Ministry of Defence Information Systems Department and Information Systems Institute
 Excel 2007 Fundamentals (12-29 December 2011)
 Ministry of Defence Information Systems Department and Information Systems Institute
 AutoCAD 2D (21-30 July 2007)
 Advance Level of the Conversation Program at the British Council Agouza (04 October 2010  30 October 2011).
Languages:
 Arabic (Mother Tongue)
 English (Fluent, Spoken & Written)
Career History:
Page 2 of 5
Commodore MEP- subsidiary of Commodore
Contracting L.L.C
September 2015 Till Date
Project:
Position:
Project Description:
Responsibilities
Client:
Consultant:
Contractors:
Al Habtoor Leighton Group
December 2013 Till August 2015
Project:
Position:
Project Description:
Al Habtoor Polo Resort & Club
Electrical project engineer
The project consists of 136-key St. Regis-branded hotel, 162
Andalusian-style villas and branded villas, polo club, state-
of-the-art polo academy, riding school and exceptional
equestrian facilities, including 520 stables.
My responsibilities include the following
 Preparation of detailed electrical shop drawings of the
contracted project in the field of low voltage and
coordinating with low current specialist subcontractors.
 Preparation of related material submittals and producing
of materials orders.
 Supervising and ensuring work is executed according to
contract specifications, approved design drawings,
agreed procedures, and method statements.
 Coordination with other trades at site such as civil, steel
structure, and interior design.
Dubai National investments company.LLC (Al HABTOOR
Group)
ATK Engineering Consultant
Main contractor; Parkway International Contracting
MEP contractor; Commodore MEP- subsidiary of
Commodore Contracting L.L.C
Al HABTOOR CITY
Electrical Engineer
The project consists of three internationally branded hotels,
comprising a 5-storeys luxury hotel St. Regis in the podium, a
37-storeys Westin Main Hotel and a 27-storeys Lifestyle W
Hotel, including the Aqua Theatre are within a total GFA of
357,255 sq.m. This site is located in corner of Meydan St. and
Sheikh Zayed Road, Business Bay Area, Dubai.
Page 3 of 5
Responsibilities
Client:
Consultant:
Contractors:
Value;
Al Habtoor Leighton Group
Febuary 2013 Till December 2013
Project:
Position:
Project Description:
Responsibilities
My responsibilities include coordinating among all trades:
civil and steel structures, dome acoustic treatment and
projection surfaces, interior design, seating, rigging, stage
lighting, audio, projection, performance flooring, special
water features, machinery, automation and control and
conventional MEP in addition to leading all specialty
international consultants to prepare specifications and
drawings for their scopes of work, communicating with and
qualifying all potential international contractors for the
specialty systems and planning all related activities from
tendering to award and execution while making sure that the
project program and the set handing-over date are well
respected.
Dubai National investments company.LLC(Al HABTOOR Group)
Khatib & Alami Consolidated Engineering Co
Main contractor ; Al Habtoor Leighton Group
MEP contractor; Al Habtoor Leighton speacon/ Darke and
scull JV , Commodore MEP- subsidiary of Commodore
Contracting L.L.C
1.9 BILLION
Al Bustan Complex
Electrical Engineer
The project consist of the construction of the Al Bustan Complex,
consisting of an Office Building, Hotel, Serviced Apartment, Retail
Mall and two Apartment Buildings built above five levels of
Basement Car Park. The site is located at the corner of 29th St in
Airport Road, Abu Dhabi (Plot C1, Sector E35)
I was assigned to lead all involved subcontractors at Al
Bustan Complex, worth AED 2.5B, to complete installation,
Page 4 of 5
Client:
Consultant:
Contractors:
Value;
Training
Al Habtoor Leighton Group
August 2012- February 2013
Project:
Position:
Project Description:
Responsibilities
Client:
Contractors:
Value :
testing and commissioning of fire Alarm system and its
interefaces with all MEP systems and other systems
including: Firefighting, HVAC, access control, public
address, FM200, and CO detection
Al Hamid Group
Cox Architects and Planners
CPM
Main contractor; Al Habtoor Leighton Group
MEP contractor; ELECTRICAL SERVICES EST. (ELSERVCO)
AED 2.25 Billion
.
Abu Dhabi Islamic Bank New Head Quarter
Electrical engineer
The project comprises the construction of two towers covering
approximately 97,000 square meters, consisting of a ground
floor, mezzanine level and 12 upper floors, as well as four levels
of basement parking.
A section of the ground floor houses Abu Dhabi Islamic Bank's
front office retail hall, with the remaining floor area built as shell
and core to house additional retail tenants. The upper floors are
office space constructed as shell and core only.
 Preparation of shop drawing for the power, lighting and low
current layouts.
 Review electrical specifications in general and in specific
tasks.
 Attending Internal inspections for 2nd fix installations going
on site and executing the required modification
Abu Dhabi Islamic Bank (ADIB)
Al Habtoor Leighton Group
AED 400 Million
Page 5 of 5
Aktor-Al Darwish Engineering, Cimolai Spa-
Cybarcco
01 August  19 September 2009
Project:
Position:
El Doha International Airport
MEP Engineer Trainee
Duties:
 Preparation of shop drawing for the power, lighting and low current layouts.
 Review electrical specifications in general and in specific tasks.
 Internal inspections for 2nd fix installations going on site.
Oger, Abu Dhabi (Contractor)
16 August  08 September 2008
Project:
Position:
UAE University New Campus
MEP QC Engineer Trainee
Duties:
 My training was about observing works at the execution stage in site and off-site with the technicians and engineers
under supervision of MEP Engineering Team.
COX Group Abu Dhabi (Consultant)
27 July  14 August 2008
Project:
Position:
UAE University New Campus
MEP Engineer Trainee
Duties:
 The training was focused on the principle design consultant project office where I got involved in the study of project
design documents along with the site inspections.

More Related Content

What's hot (19)

ENG Taher CV
ENG Taher CVENG Taher CV
ENG Taher CV
taher hassanen
m.attia (Elec.) (1)
m.attia (Elec.) (1)m.attia (Elec.) (1)
m.attia (Elec.) (1)
Mohamed Attia
Alaa_Attiya resume
Alaa_Attiya resumeAlaa_Attiya resume
Alaa_Attiya resume
Alaa Attiya
B K SIKDAR CV
B K SIKDAR CVB K SIKDAR CV
B K SIKDAR CV
BINOY SIKDAR
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
Hazim Abusharkh
Qatar CV
Qatar CVQatar CV
Qatar CV
Ameen Al Ghandour
Adham mohammad Daradkeh
Adham mohammad DaradkehAdham mohammad Daradkeh
Adham mohammad Daradkeh
adham daradkeh
Mohamed Hassan CV ..
Mohamed Hassan CV ..Mohamed Hassan CV ..
Mohamed Hassan CV ..
mohamed tohamy
Mohamed Nabil Omar - CV
Mohamed Nabil Omar - CVMohamed Nabil Omar - CV
Mohamed Nabil Omar - CV
Mohamed Omer
mohamed samir_civil eng
mohamed samir_civil engmohamed samir_civil eng
mohamed samir_civil eng
Mohamed Samir
emad_azab_CV
emad_azab_CVemad_azab_CV
emad_azab_CV
Emad Azab
Hayan CV 2016
Hayan CV 2016Hayan CV 2016
Hayan CV 2016
Hayan Ashour
MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016
Mohammed Salah
Shereen ashraf cv.
Shereen ashraf cv.Shereen ashraf cv.
Shereen ashraf cv.
ShereenAshraf25
Ici j sern unit employer brief v2 (1)
Ici j sern unit employer brief v2 (1)Ici j sern unit employer brief v2 (1)
Ici j sern unit employer brief v2 (1)
Macy Khor
Adnan AlHamayel
Adnan AlHamayelAdnan AlHamayel
Adnan AlHamayel
Adnan Hamayel
ISMAIL MAHMOUD
ISMAIL MAHMOUDISMAIL MAHMOUD
ISMAIL MAHMOUD
ismail mahmoed
Mohamed Medhat-CV
Mohamed Medhat-CVMohamed Medhat-CV
Mohamed Medhat-CV
Mohamed Medhat
c.v mohab A.hamza (References)
c.v mohab A.hamza (References) c.v mohab A.hamza (References)
c.v mohab A.hamza (References)
Mohab Hamza
m.attia (Elec.) (1)
m.attia (Elec.) (1)m.attia (Elec.) (1)
m.attia (Elec.) (1)
Mohamed Attia
Alaa_Attiya resume
Alaa_Attiya resumeAlaa_Attiya resume
Alaa_Attiya resume
Alaa Attiya
Adham mohammad Daradkeh
Adham mohammad DaradkehAdham mohammad Daradkeh
Adham mohammad Daradkeh
adham daradkeh
Mohamed Hassan CV ..
Mohamed Hassan CV ..Mohamed Hassan CV ..
Mohamed Hassan CV ..
mohamed tohamy
Mohamed Nabil Omar - CV
Mohamed Nabil Omar - CVMohamed Nabil Omar - CV
Mohamed Nabil Omar - CV
Mohamed Omer
mohamed samir_civil eng
mohamed samir_civil engmohamed samir_civil eng
mohamed samir_civil eng
Mohamed Samir
emad_azab_CV
emad_azab_CVemad_azab_CV
emad_azab_CV
Emad Azab
MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016
Mohammed Salah
Ici j sern unit employer brief v2 (1)
Ici j sern unit employer brief v2 (1)Ici j sern unit employer brief v2 (1)
Ici j sern unit employer brief v2 (1)
Macy Khor
c.v mohab A.hamza (References)
c.v mohab A.hamza (References) c.v mohab A.hamza (References)
c.v mohab A.hamza (References)
Mohab Hamza

Similar to Mostafa CV (20)

Michael e. cruz c.v.
Michael e. cruz   c.v.Michael e. cruz   c.v.
Michael e. cruz c.v.
Michael Cruz
Michael E. Cruz - C.V.
Michael E. Cruz - C.V.Michael E. Cruz - C.V.
Michael E. Cruz - C.V.
Michael Cruz
Ahmed Zahran C.V
Ahmed Zahran C.VAhmed Zahran C.V
Ahmed Zahran C.V
Ahmed Zahran
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammed
ahmed ali
Hani Shaker mep
Hani Shaker mepHani Shaker mep
Hani Shaker mep
hani ayyad
Mohamed Mustafa Ali CV
Mohamed Mustafa Ali CVMohamed Mustafa Ali CV
Mohamed Mustafa Ali CV
Mohamed Mustafa
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
waleed thabet
Mohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CV
Mohamed Diab
modified cv khaled
modified  cv khaledmodified  cv khaled
modified cv khaled
khaled soliman
Mahmoud
MahmoudMahmoud
Mahmoud
Mahmoud elashwah
ALAA ABBAS
ALAA ABBASALAA ABBAS
ALAA ABBAS
alaa abbas
Senior Level Assignment
Senior Level AssignmentSenior Level Assignment
Senior Level Assignment
Shetty Jeevan
Akhila CV
Akhila CVAkhila CV
Akhila CV
Akhila V.S.
4-MC-PW_Amias_16_158
4-MC-PW_Amias_16_1584-MC-PW_Amias_16_158
4-MC-PW_Amias_16_158
Abu Eyad
amit CV
amit CVamit CV
amit CV
Amit Anand
ELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV MELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV M
usama gamal
Shameem Ahamed - Electrical Engineer
Shameem Ahamed - Electrical EngineerShameem Ahamed - Electrical Engineer
Shameem Ahamed - Electrical Engineer
Shameem Ahamed
Zaid abu khater cv
Zaid abu khater cvZaid abu khater cv
Zaid abu khater cv
Zaid Abu Khater
eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)
Mostafa Kamal batroukha
CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)
Mohd ismail
Michael e. cruz c.v.
Michael e. cruz   c.v.Michael e. cruz   c.v.
Michael e. cruz c.v.
Michael Cruz
Michael E. Cruz - C.V.
Michael E. Cruz - C.V.Michael E. Cruz - C.V.
Michael E. Cruz - C.V.
Michael Cruz
Ahmed Zahran C.V
Ahmed Zahran C.VAhmed Zahran C.V
Ahmed Zahran C.V
Ahmed Zahran
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammed
ahmed ali
Hani Shaker mep
Hani Shaker mepHani Shaker mep
Hani Shaker mep
hani ayyad
Mohamed Mustafa Ali CV
Mohamed Mustafa Ali CVMohamed Mustafa Ali CV
Mohamed Mustafa Ali CV
Mohamed Mustafa
Mohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CV
Mohamed Diab
Senior Level Assignment
Senior Level AssignmentSenior Level Assignment
Senior Level Assignment
Shetty Jeevan
4-MC-PW_Amias_16_158
4-MC-PW_Amias_16_1584-MC-PW_Amias_16_158
4-MC-PW_Amias_16_158
Abu Eyad
ELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV MELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV M
usama gamal
Shameem Ahamed - Electrical Engineer
Shameem Ahamed - Electrical EngineerShameem Ahamed - Electrical Engineer
Shameem Ahamed - Electrical Engineer
Shameem Ahamed
CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)
Mohd ismail

Mostafa CV

  • 1. aeCurriculum Vit Page 1 of 5 PERSONAL DATA: Name: Date of Birth: Nationality: Marital Status: UAE Address Mobile / Home No: E-mail address: Mostafa Prince Aly 30 January 1990 Egyptian Single Dubai,UAE +971552114788 / +97155 9419417 +20 (10) 1637606 / +20 (11) 40135557 mostprince7800@yahoo.com Education: B. Sc. Electrical Machinery and Power Bachelor Degree in Engineering Helwan University, Cairo, Egypt Graduated 2011 Professional Objective: To acquire a position of Electrical Engineer in a successful organization, where I would refine my skills and educational background as an Electrical Engineer. Skills & Interests: Ability to handle with people. Ability to handle new tasks. Good oral and written communication skills. Fast adaptation to working environment. Team player. UAE driving license Interests in photography, tennis, swimming, jogging, cycling & hiking, travelling and music. Training Courses and Certificates Microsoft Operating System (Windows XP) Microsoft Office 2000 Office XP Aviation Information Technology (AVIT) Certificate Design of Electrical Work for Projects (26 June 08 July 2010) Ministry of Defence Information Systems Department and Information Systems Institute Excel 2007 Fundamentals (12-29 December 2011) Ministry of Defence Information Systems Department and Information Systems Institute AutoCAD 2D (21-30 July 2007) Advance Level of the Conversation Program at the British Council Agouza (04 October 2010 30 October 2011). Languages: Arabic (Mother Tongue) English (Fluent, Spoken & Written) Career History:
  • 2. Page 2 of 5 Commodore MEP- subsidiary of Commodore Contracting L.L.C September 2015 Till Date Project: Position: Project Description: Responsibilities Client: Consultant: Contractors: Al Habtoor Leighton Group December 2013 Till August 2015 Project: Position: Project Description: Al Habtoor Polo Resort & Club Electrical project engineer The project consists of 136-key St. Regis-branded hotel, 162 Andalusian-style villas and branded villas, polo club, state- of-the-art polo academy, riding school and exceptional equestrian facilities, including 520 stables. My responsibilities include the following Preparation of detailed electrical shop drawings of the contracted project in the field of low voltage and coordinating with low current specialist subcontractors. Preparation of related material submittals and producing of materials orders. Supervising and ensuring work is executed according to contract specifications, approved design drawings, agreed procedures, and method statements. Coordination with other trades at site such as civil, steel structure, and interior design. Dubai National investments company.LLC (Al HABTOOR Group) ATK Engineering Consultant Main contractor; Parkway International Contracting MEP contractor; Commodore MEP- subsidiary of Commodore Contracting L.L.C Al HABTOOR CITY Electrical Engineer The project consists of three internationally branded hotels, comprising a 5-storeys luxury hotel St. Regis in the podium, a 37-storeys Westin Main Hotel and a 27-storeys Lifestyle W Hotel, including the Aqua Theatre are within a total GFA of 357,255 sq.m. This site is located in corner of Meydan St. and Sheikh Zayed Road, Business Bay Area, Dubai.
  • 3. Page 3 of 5 Responsibilities Client: Consultant: Contractors: Value; Al Habtoor Leighton Group Febuary 2013 Till December 2013 Project: Position: Project Description: Responsibilities My responsibilities include coordinating among all trades: civil and steel structures, dome acoustic treatment and projection surfaces, interior design, seating, rigging, stage lighting, audio, projection, performance flooring, special water features, machinery, automation and control and conventional MEP in addition to leading all specialty international consultants to prepare specifications and drawings for their scopes of work, communicating with and qualifying all potential international contractors for the specialty systems and planning all related activities from tendering to award and execution while making sure that the project program and the set handing-over date are well respected. Dubai National investments company.LLC(Al HABTOOR Group) Khatib & Alami Consolidated Engineering Co Main contractor ; Al Habtoor Leighton Group MEP contractor; Al Habtoor Leighton speacon/ Darke and scull JV , Commodore MEP- subsidiary of Commodore Contracting L.L.C 1.9 BILLION Al Bustan Complex Electrical Engineer The project consist of the construction of the Al Bustan Complex, consisting of an Office Building, Hotel, Serviced Apartment, Retail Mall and two Apartment Buildings built above five levels of Basement Car Park. The site is located at the corner of 29th St in Airport Road, Abu Dhabi (Plot C1, Sector E35) I was assigned to lead all involved subcontractors at Al Bustan Complex, worth AED 2.5B, to complete installation,
  • 4. Page 4 of 5 Client: Consultant: Contractors: Value; Training Al Habtoor Leighton Group August 2012- February 2013 Project: Position: Project Description: Responsibilities Client: Contractors: Value : testing and commissioning of fire Alarm system and its interefaces with all MEP systems and other systems including: Firefighting, HVAC, access control, public address, FM200, and CO detection Al Hamid Group Cox Architects and Planners CPM Main contractor; Al Habtoor Leighton Group MEP contractor; ELECTRICAL SERVICES EST. (ELSERVCO) AED 2.25 Billion . Abu Dhabi Islamic Bank New Head Quarter Electrical engineer The project comprises the construction of two towers covering approximately 97,000 square meters, consisting of a ground floor, mezzanine level and 12 upper floors, as well as four levels of basement parking. A section of the ground floor houses Abu Dhabi Islamic Bank's front office retail hall, with the remaining floor area built as shell and core to house additional retail tenants. The upper floors are office space constructed as shell and core only. Preparation of shop drawing for the power, lighting and low current layouts. Review electrical specifications in general and in specific tasks. Attending Internal inspections for 2nd fix installations going on site and executing the required modification Abu Dhabi Islamic Bank (ADIB) Al Habtoor Leighton Group AED 400 Million
  • 5. Page 5 of 5 Aktor-Al Darwish Engineering, Cimolai Spa- Cybarcco 01 August 19 September 2009 Project: Position: El Doha International Airport MEP Engineer Trainee Duties: Preparation of shop drawing for the power, lighting and low current layouts. Review electrical specifications in general and in specific tasks. Internal inspections for 2nd fix installations going on site. Oger, Abu Dhabi (Contractor) 16 August 08 September 2008 Project: Position: UAE University New Campus MEP QC Engineer Trainee Duties: My training was about observing works at the execution stage in site and off-site with the technicians and engineers under supervision of MEP Engineering Team. COX Group Abu Dhabi (Consultant) 27 July 14 August 2008 Project: Position: UAE University New Campus MEP Engineer Trainee Duties: The training was focused on the principle design consultant project office where I got involved in the study of project design documents along with the site inspections.