ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
JEFFERSON PANGAN
Address: #24 Purok 4 Brgy. Triala Guimba Nueva Ecija Philippines
Contact Details:
Mobile #: +639173026091/+639276194791
E-mail: panganjefferson@yahoo.com
PROFESSIONAL OBJECTIVE:
 To establish a successful and rewarding career by achieving and maintaining a good position in a progressive
organization through my experience and skills.
PERSONAL INFORMATION:
 Birth Date : March 27,1983
 Passport Number : : SS0281115
 Nationality : Filipino
SKILLS:
 Expert on Vacuum Technology and thin Film Deposition (PECVD).
 Capable of reading schematic and electrical diagrams for basis and troubleshooting.
 Expert in operating HMI (Human Machine Interface) and Manufacturing Execution System (MES).
 Excellent communication skills, speaking, writing, and reading in English as well as presentation skills.
 Active Statistical Process Control member.
 Knowledgeable in uses and functions of instrumentation tools such as vacuum gauges, thermocouples, etc.
 Expert on B&R Software Automation Studio.
 Knowledge in maintenance and operation of
-Chillers
-Pumps
-CDA Compressors
-Air Dryers
-Cooling Towers
-Scrubber Units
-General Exhausts
-Chemical Dispense Systems
ACHIEVEMENTS:
 Projects Implemented to improve machine availability and yield performance:
• Sourced out alternative dry pump that reduced more than 50% of cost and repair.(ADP 122 H)
• Modification of loader and unloader parts that reduced the yield loss to 30%.
• Improvement on carrier top plate that reduced breakdown occurrence by 40%.
• Installation of sensor in loader module to detect not fully inserted wafers into the cassette.
• Sourced out new carbon plates design to eliminate wafer misalignment.
• Installation of of quick connect fittings for booster pumps for quick troubleshooting and electrical
safety. Also to prevent turning off the PCW supply that may also affect the Pumpstand Unit.
EMPLOYMENT HISTORY:
Equipment/Machine Handled:
 PECVD Sin ARC Process (OTB)for Solar Cell Manufacturer
 Jusung PECVD Process for Solar Cell Manufacturer
 Leak Checker (Alcatel and Pfeiffer) for Solar Cell Manufacturer
 Diffusion Process (MRL Industries) for Solar Cell Manufacturer
 APCVD Process (Sierratherm)) for Solar Cell Manufacturer
 PECVD bARC Process (Roth and Rau) for Solar Cell Manufacturer
 Kurdex Process for Solar Cell Manufacturer
 Trane Water and Air Cooled Chillers
 Trane Chillers Systems
 HuntAir Air Handling Units
 Trane Air Handling Units
 Allen Bradley,ABB and Danfoss VFDs
 Kruger General Exhaust Motors
 Scrubber Units
 SunPower Philippines Manufacturing Limited (April 2014-Present)
Position: Facilities Sustaining Engineer
Overall Responsibilities:
• Attends Daily Facilities Operations Meeting.
• Attends Daily Huddle meeting with MFG and EE Team.
• Walk-thru on all facilities area to ensure that is free from safety hazard on people and equipment.
• Implements Created PM Schedule for all facilities utilities (Mechanical,HVAC,Electrical,WWTP,RODI and
CDS).
• Implements developed strategic and tactics programs to meet the vision and mission of the company and
to accomplish set goals.
• Assists in carrying out reliability and hardening programs and engineering solutions on assigned Process
Equipment concerns
 SunPower Philippines Manufacturing Limited (December 2012 – April 2014)
Position: Facilities Sustaining– Mechanical Process
Overall Responsibilities:
• Attends Daily Facilities Operations.
• Assists in managing in-house Facilities operations contractor.
• Walk-thru on the area of responsibilities to ensure area is free from safety hazard on people and
equipment.
• Monitors Preventive maintenance Program (Water Cooled Chillers, Air Cooled Chillers, CHWP’s, Air
Compressors, Air Dryers, Vacuum Pumps, Make-up Air Units, Air-Handling Units & General Exhaust).
• Implements Created PM Schedule – HVAC system, Compressed Air system & Vacuum system.
• Provides data and information in generating reports on evaluation on Pm performance, Compliance Vs
Backlog (HVAC system, Compressed Air system & Vacuum system).
• Implements developed strategic and tactics programs to meet the vision and mission of the company and
to accomplish set goals.
• Assists in carrying out reliability and hardening programs and engineering solutions on assigned Process
Equipment concerns
 SunPower Philippines Manufacturing Limited (May 2012 – December 2012)
Position: Facilities Sustaining– Instrumentation and Control
Overall Responsibilities:
• Attends to daily facilities operations
• Monitors and keeps track off Shift Reports and daily monitoring logs
• Walk-thru on the Area Of Responsibilities to ensure area is free from safety hazard on people and
equipment
• Monitors Preventive Maintenance Programs (FMS Components (PLCS and Instruments), Vertex,
Midas, and Sieger)
• Ensures execution of Create PM Schedule (FMS Components (PLCS and Instruments), Vertex, Midas,
and Sieger)
• Monitors and updates Equipment History Sheets
• Develops strategic and tactics programs to meet the vision and mission of the company and to
accomplish set goals (Key Performance Indicators)
• Develops reliability and hardening programs or Projects for Facilities Monitoring System (FMS)and
LSS
• Develops engineering solutions on assigned process equipment-issues and problems to avoid
repeat/occurrences
• Reviews of spare parts Program and ensure availability
• Responds on any incident that may occur during my shift
 SunPower Philippines Manufacturing Limited (April 2010 – April2011)
Position: Senior Equipment Technician– OTB SiN-ARC/APCVD/KURDEX
 SunPower Philippines Manufacturing Limited (June 2009 – April 2010)
Position: Equipment Technician– OTB SiN-ARC
Overall Responsibilities:
• Plans and monitors implementation of maintenance programs and activities, maintenance and
consumable change.
• Attends regular operations review.
• Schedules daily preventive maintenance.
• Prepares downtime report analysis and future plans.
• Conducts spare management and monitoring.
• Assist Equipment Engineers in designing future projects.
• Acts as Officer-in-Charge if the Engineer is not around.
• Prepares purchase request and follow-ups.
• Coordinates with vendors regarding spare parts and sourcing out other vendor for spare parts for cost
reduction.
• Respond immediately to equipment breakdown.
• Assist Junior Technician in the performance of unscheduled maintenance, which includes
troubleshooting, replacement of faulty parts, realignment and check-out to the component level.
• Recognizes and reports sub-standard equipment performance and pursues corrective actions.
• Attends and participate in yield review, 8D, and OCAP.
• Prepares documentation of outgoing items/equipment for repair.
• Active participation on Statistical Process Control.
 SunPower Philippines Manufacturing Limited (June 26, 2006 – June 2009)
Position: Lead Technician– OTB SiN-ARC/Diffusion Process(MRL Industries)
Overall Responsibilities:
• Proper endorsement every shift transition.
• Verify actual counts against overall WIP counts and its progress.
• Perform qualification run and production run of quality wafers.
• Perform 5s and proper housekeeping.
• Support PE/EE/Trainors in other activities related to process improvement.
• Escalate issues and concerns or any other tool abnormalities to immediate superior.
• Process monitoring.
• Chart Update.
• Performed GUI.
• Participate in Statistical Process Control activities.
EDUCATIONAL BACKGROUND
Tertiary Level
Nueva Ecija University of Science and Technology (2000 – 2005)
Cabanatuan City Nueva Ecija, Philippines
Bachelor of Science, Major in Mechanical Engineering
Secondary Level
Nueva Ecija National High School (1996 – 2000)
Cabanatuan City Nueva Ecija, Philippines
REFERENCES: Furnished upon request.
I hereby certify that the above-mentioned information is true and correct to the best of my knowledge and ability.
Should there be any proven falsifications is a ground for revocation of my application. For further clarifications or
inquiries, please don’t hesitate to get in touch with me on the provided contact details mentioned on this CV.

More Related Content

What's hot (18)

Pankaj-prajapati
Pankaj-prajapatiPankaj-prajapati
Pankaj-prajapati
Pankaj Kumar Prajapati
Ìý
Alfred Chikunichawa New Complete CV (1)
Alfred Chikunichawa New Complete CV (1)Alfred Chikunichawa New Complete CV (1)
Alfred Chikunichawa New Complete CV (1)
Alfred Chikunichawa
Ìý
AMIT KR BASU
AMIT KR BASUAMIT KR BASU
AMIT KR BASU
Amit Basu
Ìý
Resume - Satnam Singh
Resume - Satnam SinghResume - Satnam Singh
Resume - Satnam Singh
Satnam Singh
Ìý
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
barun dutta
Ìý
David Lawrence11
David Lawrence11David Lawrence11
David Lawrence11
David Lawrence
Ìý
Royster menezes - Mechanical Engineer
Royster menezes - Mechanical EngineerRoyster menezes - Mechanical Engineer
Royster menezes - Mechanical Engineer
Royster Menezes
Ìý
CV
CVCV
CV
Abhinesh Thomas
Ìý
Resume
ResumeResume
Resume
Josh Thompson
Ìý
ResumeSujit
ResumeSujitResumeSujit
ResumeSujit
SUJIT JOSHI
Ìý
AVINASH . Basrur
AVINASH . BasrurAVINASH . Basrur
AVINASH . Basrur
Avinash B
Ìý
Md.Azharuddin CV
Md.Azharuddin CVMd.Azharuddin CV
Md.Azharuddin CV
Md. Azharuddin
Ìý
Naveesh Kapoor - resume
Naveesh Kapoor - resumeNaveesh Kapoor - resume
Naveesh Kapoor - resume
Naveesh Kapoor
Ìý
Suresh Resume
Suresh ResumeSuresh Resume
Suresh Resume
Suresh Kumar
Ìý
Qa
QaQa
Qa
arman Sharma
Ìý
CV_E. R Caoile_rev
CV_E. R Caoile_revCV_E. R Caoile_rev
CV_E. R Caoile_rev
Elmer Caoile, PEE
Ìý
CV
CVCV
CV
Adam Asem
Ìý
Electronic Controls Engineer
Electronic Controls EngineerElectronic Controls Engineer
Electronic Controls Engineer
Ronald Ehrhardt
Ìý
Alfred Chikunichawa New Complete CV (1)
Alfred Chikunichawa New Complete CV (1)Alfred Chikunichawa New Complete CV (1)
Alfred Chikunichawa New Complete CV (1)
Alfred Chikunichawa
Ìý
AMIT KR BASU
AMIT KR BASUAMIT KR BASU
AMIT KR BASU
Amit Basu
Ìý
Resume - Satnam Singh
Resume - Satnam SinghResume - Satnam Singh
Resume - Satnam Singh
Satnam Singh
Ìý
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
barun dutta
Ìý
David Lawrence11
David Lawrence11David Lawrence11
David Lawrence11
David Lawrence
Ìý
Royster menezes - Mechanical Engineer
Royster menezes - Mechanical EngineerRoyster menezes - Mechanical Engineer
Royster menezes - Mechanical Engineer
Royster Menezes
Ìý
ResumeSujit
ResumeSujitResumeSujit
ResumeSujit
SUJIT JOSHI
Ìý
AVINASH . Basrur
AVINASH . BasrurAVINASH . Basrur
AVINASH . Basrur
Avinash B
Ìý
Md.Azharuddin CV
Md.Azharuddin CVMd.Azharuddin CV
Md.Azharuddin CV
Md. Azharuddin
Ìý
Naveesh Kapoor - resume
Naveesh Kapoor - resumeNaveesh Kapoor - resume
Naveesh Kapoor - resume
Naveesh Kapoor
Ìý
Suresh Resume
Suresh ResumeSuresh Resume
Suresh Resume
Suresh Kumar
Ìý
Electronic Controls Engineer
Electronic Controls EngineerElectronic Controls Engineer
Electronic Controls Engineer
Ronald Ehrhardt
Ìý

Viewers also liked (16)

Mark Joseph Chua_CV
Mark Joseph Chua_CVMark Joseph Chua_CV
Mark Joseph Chua_CV
Mark Joseph Chua
Ìý
Lawrence Lee Resume HH
Lawrence Lee Resume HHLawrence Lee Resume HH
Lawrence Lee Resume HH
Lawrence Lee
Ìý
KHAJA RESUME
KHAJA RESUMEKHAJA RESUME
KHAJA RESUME
khaja ji
Ìý
rizwan (2) - Copy (1)
rizwan (2) - Copy (1)rizwan (2) - Copy (1)
rizwan (2) - Copy (1)
MUHAMMAD RIZWAN
Ìý
Malcolm Anthony CV 22-02-2015
Malcolm Anthony CV 22-02-2015Malcolm Anthony CV 22-02-2015
Malcolm Anthony CV 22-02-2015
Malcolm Anthony
Ìý
Aldrin 2014
Aldrin 2014Aldrin 2014
Aldrin 2014
Aldrin Aguilera
Ìý
Damian new CV
Damian new CVDamian new CV
Damian new CV
damian nwaeze udo
Ìý
jordans resume (1)
jordans resume (1)jordans resume (1)
jordans resume (1)
Jordan Meek
Ìý
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
proactives
Ìý
Modified Resume Nestor 2016...
Modified Resume Nestor 2016...Modified Resume Nestor 2016...
Modified Resume Nestor 2016...
NESTOR N. LAWAS
Ìý
VENKADESAN RESUME.
VENKADESAN RESUME.VENKADESAN RESUME.
VENKADESAN RESUME.
Pancharathinam Venkadesan
Ìý
QUIN ROLANDO I. VALCORZA
QUIN ROLANDO I. VALCORZAQUIN ROLANDO I. VALCORZA
QUIN ROLANDO I. VALCORZA
Quin Rolando Valcorza
Ìý
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
Mohammad Arif uzair
Ìý
mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.
Raman Mechanical_Piping
Ìý
Dillon Blanchard Resume 1
Dillon Blanchard Resume 1Dillon Blanchard Resume 1
Dillon Blanchard Resume 1
Dillon Blanchard
Ìý
Top 8 hydraulic engineer resume samples
Top 8 hydraulic engineer resume samplesTop 8 hydraulic engineer resume samples
Top 8 hydraulic engineer resume samples
tonychoper2305
Ìý
Lawrence Lee Resume HH
Lawrence Lee Resume HHLawrence Lee Resume HH
Lawrence Lee Resume HH
Lawrence Lee
Ìý
KHAJA RESUME
KHAJA RESUMEKHAJA RESUME
KHAJA RESUME
khaja ji
Ìý
rizwan (2) - Copy (1)
rizwan (2) - Copy (1)rizwan (2) - Copy (1)
rizwan (2) - Copy (1)
MUHAMMAD RIZWAN
Ìý
Malcolm Anthony CV 22-02-2015
Malcolm Anthony CV 22-02-2015Malcolm Anthony CV 22-02-2015
Malcolm Anthony CV 22-02-2015
Malcolm Anthony
Ìý
jordans resume (1)
jordans resume (1)jordans resume (1)
jordans resume (1)
Jordan Meek
Ìý
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
proactives
Ìý
Modified Resume Nestor 2016...
Modified Resume Nestor 2016...Modified Resume Nestor 2016...
Modified Resume Nestor 2016...
NESTOR N. LAWAS
Ìý
Dillon Blanchard Resume 1
Dillon Blanchard Resume 1Dillon Blanchard Resume 1
Dillon Blanchard Resume 1
Dillon Blanchard
Ìý
Top 8 hydraulic engineer resume samples
Top 8 hydraulic engineer resume samplesTop 8 hydraulic engineer resume samples
Top 8 hydraulic engineer resume samples
tonychoper2305
Ìý

Similar to Pangan_Jefferson_CV (20)

CV
CVCV
CV
Ronnie MacGregor
Ìý
jhon_dechavez resume
jhon_dechavez resumejhon_dechavez resume
jhon_dechavez resume
Pedro Jr. De Chavez
Ìý
resume2016.doc1
resume2016.doc1resume2016.doc1
resume2016.doc1
Joseph Munar
Ìý
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experience
DHRUVA MISHRA
Ìý
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
5Asdfghjkl
Ìý
robert calleja (2)
robert calleja (2)robert calleja (2)
robert calleja (2)
Robert Calleja
Ìý
RESUME
RESUMERESUME
RESUME
Tito Arpon
Ìý
resume-ts-current- edit 02-08
resume-ts-current- edit 02-08resume-ts-current- edit 02-08
resume-ts-current- edit 02-08
Thomas Savard
Ìý
randycordero
randycorderorandycordero
randycordero
Randy Cordero
Ìý
msanjuan_RESUME
msanjuan_RESUMEmsanjuan_RESUME
msanjuan_RESUME
Mark San Juan
Ìý
SHERIF EISSA - Resume-
SHERIF EISSA - Resume-SHERIF EISSA - Resume-
SHERIF EISSA - Resume-
Sherif Eissa
Ìý
Joseph Phillips - Resume 2016
Joseph Phillips - Resume 2016Joseph Phillips - Resume 2016
Joseph Phillips - Resume 2016
Joe Phillips
Ìý
Res 10-30-15
Res 10-30-15Res 10-30-15
Res 10-30-15
Allen Besander
Ìý
Resume
ResumeResume
Resume
K Raji
Ìý
SAGUINSIN, KRISTOFFER CARLO B. (RESUME)
SAGUINSIN, KRISTOFFER CARLO B. (RESUME)SAGUINSIN, KRISTOFFER CARLO B. (RESUME)
SAGUINSIN, KRISTOFFER CARLO B. (RESUME)
Kristoffer Carlo Saguinsin
Ìý
SUMMARY OF SKILLSAn experienced professional with a divers.docx
SUMMARY OF SKILLSAn experienced professional with a divers.docxSUMMARY OF SKILLSAn experienced professional with a divers.docx
SUMMARY OF SKILLSAn experienced professional with a divers.docx
picklesvalery
Ìý
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
Albert Aivan Laguador
Ìý
Zackhayer3
Zackhayer3Zackhayer3
Zackhayer3
Zack Hayer
Ìý
new resume
new resumenew resume
new resume
Rudy Garza
Ìý
Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...
Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...
Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...
Ricky Chan
Ìý
resume2016.doc1
resume2016.doc1resume2016.doc1
resume2016.doc1
Joseph Munar
Ìý
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experience
DHRUVA MISHRA
Ìý
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
5Asdfghjkl
Ìý
robert calleja (2)
robert calleja (2)robert calleja (2)
robert calleja (2)
Robert Calleja
Ìý
resume-ts-current- edit 02-08
resume-ts-current- edit 02-08resume-ts-current- edit 02-08
resume-ts-current- edit 02-08
Thomas Savard
Ìý
msanjuan_RESUME
msanjuan_RESUMEmsanjuan_RESUME
msanjuan_RESUME
Mark San Juan
Ìý
SHERIF EISSA - Resume-
SHERIF EISSA - Resume-SHERIF EISSA - Resume-
SHERIF EISSA - Resume-
Sherif Eissa
Ìý
Joseph Phillips - Resume 2016
Joseph Phillips - Resume 2016Joseph Phillips - Resume 2016
Joseph Phillips - Resume 2016
Joe Phillips
Ìý
Resume
ResumeResume
Resume
K Raji
Ìý
SUMMARY OF SKILLSAn experienced professional with a divers.docx
SUMMARY OF SKILLSAn experienced professional with a divers.docxSUMMARY OF SKILLSAn experienced professional with a divers.docx
SUMMARY OF SKILLSAn experienced professional with a divers.docx
picklesvalery
Ìý
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
Albert Aivan Laguador
Ìý
Zackhayer3
Zackhayer3Zackhayer3
Zackhayer3
Zack Hayer
Ìý
new resume
new resumenew resume
new resume
Rudy Garza
Ìý
Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...
Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...
Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...
Ricky Chan
Ìý

Pangan_Jefferson_CV

  • 1. JEFFERSON PANGAN Address: #24 Purok 4 Brgy. Triala Guimba Nueva Ecija Philippines Contact Details: Mobile #: +639173026091/+639276194791 E-mail: panganjefferson@yahoo.com PROFESSIONAL OBJECTIVE:  To establish a successful and rewarding career by achieving and maintaining a good position in a progressive organization through my experience and skills. PERSONAL INFORMATION:  Birth Date : March 27,1983  Passport Number : : SS0281115  Nationality : Filipino SKILLS:  Expert on Vacuum Technology and thin Film Deposition (PECVD).  Capable of reading schematic and electrical diagrams for basis and troubleshooting.  Expert in operating HMI (Human Machine Interface) and Manufacturing Execution System (MES).  Excellent communication skills, speaking, writing, and reading in English as well as presentation skills.  Active Statistical Process Control member.  Knowledgeable in uses and functions of instrumentation tools such as vacuum gauges, thermocouples, etc.  Expert on B&R Software Automation Studio.  Knowledge in maintenance and operation of -Chillers -Pumps -CDA Compressors -Air Dryers -Cooling Towers -Scrubber Units -General Exhausts -Chemical Dispense Systems ACHIEVEMENTS:  Projects Implemented to improve machine availability and yield performance: • Sourced out alternative dry pump that reduced more than 50% of cost and repair.(ADP 122 H) • Modification of loader and unloader parts that reduced the yield loss to 30%. • Improvement on carrier top plate that reduced breakdown occurrence by 40%. • Installation of sensor in loader module to detect not fully inserted wafers into the cassette. • Sourced out new carbon plates design to eliminate wafer misalignment. • Installation of of quick connect fittings for booster pumps for quick troubleshooting and electrical safety. Also to prevent turning off the PCW supply that may also affect the Pumpstand Unit. EMPLOYMENT HISTORY: Equipment/Machine Handled:  PECVD Sin ARC Process (OTB)for Solar Cell Manufacturer  Jusung PECVD Process for Solar Cell Manufacturer  Leak Checker (Alcatel and Pfeiffer) for Solar Cell Manufacturer  Diffusion Process (MRL Industries) for Solar Cell Manufacturer  APCVD Process (Sierratherm)) for Solar Cell Manufacturer  PECVD bARC Process (Roth and Rau) for Solar Cell Manufacturer  Kurdex Process for Solar Cell Manufacturer  Trane Water and Air Cooled Chillers  Trane Chillers Systems  HuntAir Air Handling Units  Trane Air Handling Units
  • 2.  Allen Bradley,ABB and Danfoss VFDs  Kruger General Exhaust Motors  Scrubber Units  SunPower Philippines Manufacturing Limited (April 2014-Present) Position: Facilities Sustaining Engineer Overall Responsibilities: • Attends Daily Facilities Operations Meeting. • Attends Daily Huddle meeting with MFG and EE Team. • Walk-thru on all facilities area to ensure that is free from safety hazard on people and equipment. • Implements Created PM Schedule for all facilities utilities (Mechanical,HVAC,Electrical,WWTP,RODI and CDS). • Implements developed strategic and tactics programs to meet the vision and mission of the company and to accomplish set goals. • Assists in carrying out reliability and hardening programs and engineering solutions on assigned Process Equipment concerns  SunPower Philippines Manufacturing Limited (December 2012 – April 2014) Position: Facilities Sustaining– Mechanical Process Overall Responsibilities: • Attends Daily Facilities Operations. • Assists in managing in-house Facilities operations contractor. • Walk-thru on the area of responsibilities to ensure area is free from safety hazard on people and equipment. • Monitors Preventive maintenance Program (Water Cooled Chillers, Air Cooled Chillers, CHWP’s, Air Compressors, Air Dryers, Vacuum Pumps, Make-up Air Units, Air-Handling Units & General Exhaust). • Implements Created PM Schedule – HVAC system, Compressed Air system & Vacuum system. • Provides data and information in generating reports on evaluation on Pm performance, Compliance Vs Backlog (HVAC system, Compressed Air system & Vacuum system). • Implements developed strategic and tactics programs to meet the vision and mission of the company and to accomplish set goals. • Assists in carrying out reliability and hardening programs and engineering solutions on assigned Process Equipment concerns  SunPower Philippines Manufacturing Limited (May 2012 – December 2012) Position: Facilities Sustaining– Instrumentation and Control Overall Responsibilities: • Attends to daily facilities operations • Monitors and keeps track off Shift Reports and daily monitoring logs • Walk-thru on the Area Of Responsibilities to ensure area is free from safety hazard on people and equipment • Monitors Preventive Maintenance Programs (FMS Components (PLCS and Instruments), Vertex, Midas, and Sieger) • Ensures execution of Create PM Schedule (FMS Components (PLCS and Instruments), Vertex, Midas, and Sieger) • Monitors and updates Equipment History Sheets • Develops strategic and tactics programs to meet the vision and mission of the company and to accomplish set goals (Key Performance Indicators) • Develops reliability and hardening programs or Projects for Facilities Monitoring System (FMS)and LSS • Develops engineering solutions on assigned process equipment-issues and problems to avoid repeat/occurrences • Reviews of spare parts Program and ensure availability • Responds on any incident that may occur during my shift  SunPower Philippines Manufacturing Limited (April 2010 – April2011) Position: Senior Equipment Technician– OTB SiN-ARC/APCVD/KURDEX
  • 3.  SunPower Philippines Manufacturing Limited (June 2009 – April 2010) Position: Equipment Technician– OTB SiN-ARC Overall Responsibilities: • Plans and monitors implementation of maintenance programs and activities, maintenance and consumable change. • Attends regular operations review. • Schedules daily preventive maintenance. • Prepares downtime report analysis and future plans. • Conducts spare management and monitoring. • Assist Equipment Engineers in designing future projects. • Acts as Officer-in-Charge if the Engineer is not around. • Prepares purchase request and follow-ups. • Coordinates with vendors regarding spare parts and sourcing out other vendor for spare parts for cost reduction. • Respond immediately to equipment breakdown. • Assist Junior Technician in the performance of unscheduled maintenance, which includes troubleshooting, replacement of faulty parts, realignment and check-out to the component level. • Recognizes and reports sub-standard equipment performance and pursues corrective actions. • Attends and participate in yield review, 8D, and OCAP. • Prepares documentation of outgoing items/equipment for repair. • Active participation on Statistical Process Control.  SunPower Philippines Manufacturing Limited (June 26, 2006 – June 2009) Position: Lead Technician– OTB SiN-ARC/Diffusion Process(MRL Industries) Overall Responsibilities: • Proper endorsement every shift transition. • Verify actual counts against overall WIP counts and its progress. • Perform qualification run and production run of quality wafers. • Perform 5s and proper housekeeping. • Support PE/EE/Trainors in other activities related to process improvement. • Escalate issues and concerns or any other tool abnormalities to immediate superior. • Process monitoring. • Chart Update. • Performed GUI. • Participate in Statistical Process Control activities. EDUCATIONAL BACKGROUND Tertiary Level Nueva Ecija University of Science and Technology (2000 – 2005) Cabanatuan City Nueva Ecija, Philippines Bachelor of Science, Major in Mechanical Engineering Secondary Level Nueva Ecija National High School (1996 – 2000) Cabanatuan City Nueva Ecija, Philippines REFERENCES: Furnished upon request. I hereby certify that the above-mentioned information is true and correct to the best of my knowledge and ability. Should there be any proven falsifications is a ground for revocation of my application. For further clarifications or inquiries, please don’t hesitate to get in touch with me on the provided contact details mentioned on this CV.