際際滷

際際滷Share a Scribd company logo
Profile: Pravendra Kumar
Title: Engineer (Ericsson RAN Certified)
Summary
7+ years of experience in Project rollout, Operations & Maintenance, Integration & Commissioning,
Quality Control of GRAN, WRAN,LRAN
expertise in WCDMA, BTS, RNC, NODE-B, ENODEB.
Skilled in managing Implementation, commissioning activities as well as operations and
maintenance; conversant with diagnosing the faults, rectification, planning & scheduling.
Hands on experience in telecom field handling Ericsson, 2G and have worked in Ericssons 3G
(node B,RNC), 4G LTE [e Node b], RBS equipments, NOKIA Ultra and Flexi BTS, Samsung e
node B.
Nokia and Ericsson, Samsung Product Areas
Nokia Ultra,flexi BTS commissioning and integration.
Samsung eNode b Installation , site RFI and quality measurement.
Traning by Samsung for eNode b installation.
WCDMA & LTE RAN: RNC 3810, and RBS 3922, 3767,6202,6601,6201.
2G RAN: RBS 2964, 2954, 2111.
Transmission Node: ML TN, ML, Nokia FIU, RRI, NEC.
Experience
Current Organization:
Ericsson India Global Services Private Limited (10th Oct. 2013 to present)
Functional Role: Integration Engineer/ Project Lead
Project Name : Delhi/NCR Idea 2G, 3G Roll out.
Scope : 2g, 3g node integration roll out
Responsibilities :
 Site creation, detection ,cell parameter modification
 Troubleshooting of alarm and fault on RBS, BSC and RNC.
 Follow up for proper analysis & RCA for critical faults of network.
 Correlate the various KPI's affecting HW alarms and take the necessaryaction.
 Supportfor Node B acceptance completion.
 Configuration, Integration and Troubleshooting of 3G Nodes.
 Scripts loading for definitions of 3G, 2G nodes.
 Node parameter change.
 LKF (license key file) Loading.
 Monitoring of NODE-B alarms at RNC end
 NODE-B AT.
Project Name : Spain -Orange.
Scope : , LTE Node health check-up & troubleshooting ,integration
Responsibilities : integration LTE Node health check up & troubleshooting
Previous Organization:
Metric Telecom Networks Private Limited (10th June. 2013 to 10th June. 2013)
Functional Role: Project Lead for BSNL & Reliance in UP West & Delhi/NCR.
 Ensure implementation of MOPs and processes for smooth running of day to day operations
 Follow up for proper analysis & RCA for critical faults of network.
 Correlate the various KPI's affecting HW alarms and take the necessaryaction.
 Supportfor Node B acceptance completion.
 New site survey and planning for Samsung e Node b, Ericsson, ZTE, NOKIA BTS, and NODE B.
 Customer acceptance.
 Installation of Samsung e node b.
 Team management and supervision (engineers & technician)
 Site creations and deletion in RNC 3810 BY EM
 Commissioning of Ericsson RBS 3967, 3922 and RBS 6000
 Scripts Editing for 3g nodes.
ORAGNIZATION- System & Telecom Services (10th June. 2011 to 1st June. 2013)
Functional Role: Engineer (O&M), BSNL UP West
 Ericsson RBS 3000 Software Upgradation.
 Configuration, Integration and Troubleshooting of 3G Nodes.
 Scripts loading for definitions of 3G nodes.
 Node B parameter change.
 LKF (license key file) Loading.
 Monitoring of NODE-B alarms at RNC end
 NODE-B AT.
ORAGNIZATION -Ericsson India Pvt. ltd (off role) (9th Sep. 2009 to 10th June. 2011)
Functional Role: Integration Engineer (O&M),, Vodafone_ 3G in Delhi/NCR
 Commissioned Ericsson node b 6202, 6601, 6601e
 Customer acceptance and hand over of newly commissioned RBS.
 Trouble Shooting of Node b 6202, 6601, 6601e.
Integration Engineer, AIRCELL_3G in CHENNAI.
 Commissioned Ericsson node b 6202, 6601,6201, 6601e
 Customer acceptance and hand over of newly commissioned RBS.
 Trouble Shooting of Node b 6202, 6601, 6201 6601e.
 Integration Engineer, UNINOR -GSM UP West.
 Integration of Ericsson RBS 2964, 2954, 2111.
 Successfully troubleshoot e2e network issues during roll out.
 Check Site installation quality and handling responsibility to rectify all punch points.
 Coordinating with the field technicians and Engineers to resolve network-degrading faults generated
at BTS sites.
ORAGNIZATION- ALPHA DESIGN TECHNOLOGYS PVT.LTD. (10th Sep. 2008 to 25th
June. 2009)
Functional Role: DEUPTY ENGINEER, Vodafone-GSM UP West
 Integration and Testing of Nokia ULTRA & FLEXI BTS.
 Check Site installation quality and handling responsibility to rectify all punch points. series.
 Managing all the resources as per project requirement
 Operation & maintenance of transmission links.
 Return Loss Measurements using VSWR Meter.
ORAGNIZATION- P.S ERECTORS PVT.LTD.
Functional Role: I & C Engineer, Vodafone-GSM PUNJAB.
 Installation & Commissioned RBS 2964, 2954, 2111.
 ERICSSION Link configuration MLE & traffic node-2P, 6P, 20P SDH & PDH.
 Traffic routing of E_1.
 SNCP Traffic routing of E_1.
 Software up gradation.
 Microwave Dishes installation & alignment (0.3m, 0.6m, and 1.2m).
 HUAWEI BTS(3606 E) Installation & power measurement
Summary of Expertise Areas
 WRAN: Project rollout and Integrated different types of RBS as well as Node B.
 GRAN: Project rollout and Integrated and troubleshoot different types of RBS.
 TRANSMISSION: Worked with Mini link Craft, TN, NEC, NOKIA
Languages
 English: Read, Write, Speak
 Hindi: Read, Write, Speak
Education
 2007 Bachelor of Engineering  Electronics and Communication Engineering securing 66%.
 2004 Diploma- Electronics securing 75.24%.
 2000 Matriculation (10th Standard) securing 56%.
Contact information
 Name : Pravendra Kumar
 E-mail : pk.chahal@gmail.com
 Phone : 08335073984
 Address : Vill-Jalalpur Hasna,Post-Haldaur,Dist-Bijnor (U.P)
Ad

More Related Content

What's hot (20)

SANTOSH_TELECOM_CV
SANTOSH_TELECOM_CVSANTOSH_TELECOM_CV
SANTOSH_TELECOM_CV
santosh verma
rohit_soni
rohit_sonirohit_soni
rohit_soni
Rohit Soni
shriram2016
shriram2016shriram2016
shriram2016
shriram t.s
Naveed CV (1) (1)
Naveed CV (1) (1)Naveed CV (1) (1)
Naveed CV (1) (1)
Muhammad Naveed Afzal
Ihab Eltahan's C.V.
Ihab Eltahan's C.V.Ihab Eltahan's C.V.
Ihab Eltahan's C.V.
Ihab EL-Tahan
CV_Devesh
CV_DeveshCV_Devesh
CV_Devesh
DEVESH SAGAR
cv 2
cv 2cv 2
cv 2
waqas Aslam
APAA SIMON AHUNGWA
APAA SIMON AHUNGWAAPAA SIMON AHUNGWA
APAA SIMON AHUNGWA
apaa simon
RAMZAN MALIK
RAMZAN MALIKRAMZAN MALIK
RAMZAN MALIK
Muhammad Ramzan
CV Shabbir 1
CV Shabbir 1CV Shabbir 1
CV Shabbir 1
Shabbir Hussain
m.zaheer ali (1)
m.zaheer ali (1)m.zaheer ali (1)
m.zaheer ali (1)
muhammad zahir ali
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission Engineer
Esrar Khan
CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27
abdul jabbar
Amin Bolghari
Amin BolghariAmin Bolghari
Amin Bolghari
Amin bolghari
Bhashker_sharma_CV
Bhashker_sharma_CVBhashker_sharma_CV
Bhashker_sharma_CV
bhashker sharma
Wilmar Sibayan CV
Wilmar Sibayan CVWilmar Sibayan CV
Wilmar Sibayan CV
wilmar sibayan
Transmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathiTransmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathi
swatantra tripathi
suresh resume
suresh resumesuresh resume
suresh resume
Suresh sekar
Muhammad Faisal
Muhammad Faisal Muhammad Faisal
Muhammad Faisal
Mohammad Faisal
gulfam hussain cv
gulfam hussain cvgulfam hussain cv
gulfam hussain cv
gulfam hussain

Viewers also liked (7)

Ericsson RBS RET Alarms Troubleshooting Guide Flow Chart v2
Ericsson RBS RET Alarms Troubleshooting Guide   Flow Chart v2Ericsson RBS RET Alarms Troubleshooting Guide   Flow Chart v2
Ericsson RBS RET Alarms Troubleshooting Guide Flow Chart v2
Mohamed Abd El Razek Bakry
LTE Site Check
LTE Site CheckLTE Site Check
LTE Site Check
nedimsahin
Systesm information layer 3 messages
Systesm information layer 3 messagesSystesm information layer 3 messages
Systesm information layer 3 messages
Telebeansolutions
Tems layer3_messages
Tems  layer3_messagesTems  layer3_messages
Tems layer3_messages
badgirl3086
Ericsson commond list, BSS+NSS=OSS
Ericsson commond list, BSS+NSS=OSSEricsson commond list, BSS+NSS=OSS
Ericsson commond list, BSS+NSS=OSS
Md Shameem
LTE: X2 interface
LTE: X2 interfaceLTE: X2 interface
LTE: X2 interface
Schwannden Kuo
Lte optimization
Lte optimizationLte optimization
Lte optimization
tharinduwije
Ericsson RBS RET Alarms Troubleshooting Guide Flow Chart v2
Ericsson RBS RET Alarms Troubleshooting Guide   Flow Chart v2Ericsson RBS RET Alarms Troubleshooting Guide   Flow Chart v2
Ericsson RBS RET Alarms Troubleshooting Guide Flow Chart v2
Mohamed Abd El Razek Bakry
LTE Site Check
LTE Site CheckLTE Site Check
LTE Site Check
nedimsahin
Systesm information layer 3 messages
Systesm information layer 3 messagesSystesm information layer 3 messages
Systesm information layer 3 messages
Telebeansolutions
Tems layer3_messages
Tems  layer3_messagesTems  layer3_messages
Tems layer3_messages
badgirl3086
Ericsson commond list, BSS+NSS=OSS
Ericsson commond list, BSS+NSS=OSSEricsson commond list, BSS+NSS=OSS
Ericsson commond list, BSS+NSS=OSS
Md Shameem
Lte optimization
Lte optimizationLte optimization
Lte optimization
tharinduwije
Ad

Similar to pravendra -cv (20)

resume_anjuln
resume_anjulnresume_anjuln
resume_anjuln
ANJUL N
Resume-vinay
Resume-vinayResume-vinay
Resume-vinay
vinay mishra
VED RESUME(1)
VED RESUME(1)VED RESUME(1)
VED RESUME(1)
Ved parkash
Nawal Kishore
Nawal KishoreNawal Kishore
Nawal Kishore
nawal kishore Prasad
LOKESH YADAV RESUME
LOKESH YADAV  RESUMELOKESH YADAV  RESUME
LOKESH YADAV RESUME
Lokesh Yadav
RESUME_Sushil
RESUME_SushilRESUME_Sushil
RESUME_Sushil
Sushil Kumar
ADEEL SHAHZAD Resume
ADEEL SHAHZAD ResumeADEEL SHAHZAD Resume
ADEEL SHAHZAD Resume
Adeel KCN Maqbool
AKHILESH Resume
AKHILESH ResumeAKHILESH Resume
AKHILESH Resume
akhiles Akhilesh.Kumar.Singh
ajay awasthi resume.....
ajay awasthi resume.....ajay awasthi resume.....
ajay awasthi resume.....
Ajay Awasthi
Rizwan Ahmad (f)
Rizwan Ahmad (f)Rizwan Ahmad (f)
Rizwan Ahmad (f)
Rizwan Ahmad
Resume kasi
Resume kasiResume kasi
Resume kasi
kasi srinivas
Resume (2)
Resume (2)Resume (2)
Resume (2)
Ajay Awasthi
Chiranjit Chatterjee_Updated_ CV
Chiranjit Chatterjee_Updated_ CVChiranjit Chatterjee_Updated_ CV
Chiranjit Chatterjee_Updated_ CV
Chiranjit Chatterjee
Engr M Ali
Engr M AliEngr M Ali
Engr M Ali
Engr Muhammad Ali Khan
CV_ Sudhir
CV_ Sudhir CV_ Sudhir
CV_ Sudhir
Sudhir Gupta
Saeed Jalal CV
Saeed Jalal CVSaeed Jalal CV
Saeed Jalal CV
Saeed Jalal
Rajbir Resume
Rajbir ResumeRajbir Resume
Rajbir Resume
Rajbir Singh
Akhilesh cv for noc
Akhilesh cv for nocAkhilesh cv for noc
Akhilesh cv for noc
Akhilesh Chaurasiya
Lakhbinder Singh Info - Nov 2016
Lakhbinder Singh Info - Nov 2016Lakhbinder Singh Info - Nov 2016
Lakhbinder Singh Info - Nov 2016
LAKHBINDER SINGH
Ambika Bhardwaj (1)
Ambika Bhardwaj (1)Ambika Bhardwaj (1)
Ambika Bhardwaj (1)
Ambika Bhardwaj
Ad

pravendra -cv

  • 1. Profile: Pravendra Kumar Title: Engineer (Ericsson RAN Certified) Summary 7+ years of experience in Project rollout, Operations & Maintenance, Integration & Commissioning, Quality Control of GRAN, WRAN,LRAN expertise in WCDMA, BTS, RNC, NODE-B, ENODEB. Skilled in managing Implementation, commissioning activities as well as operations and maintenance; conversant with diagnosing the faults, rectification, planning & scheduling. Hands on experience in telecom field handling Ericsson, 2G and have worked in Ericssons 3G (node B,RNC), 4G LTE [e Node b], RBS equipments, NOKIA Ultra and Flexi BTS, Samsung e node B. Nokia and Ericsson, Samsung Product Areas Nokia Ultra,flexi BTS commissioning and integration. Samsung eNode b Installation , site RFI and quality measurement. Traning by Samsung for eNode b installation. WCDMA & LTE RAN: RNC 3810, and RBS 3922, 3767,6202,6601,6201. 2G RAN: RBS 2964, 2954, 2111. Transmission Node: ML TN, ML, Nokia FIU, RRI, NEC. Experience Current Organization: Ericsson India Global Services Private Limited (10th Oct. 2013 to present) Functional Role: Integration Engineer/ Project Lead Project Name : Delhi/NCR Idea 2G, 3G Roll out. Scope : 2g, 3g node integration roll out Responsibilities : Site creation, detection ,cell parameter modification Troubleshooting of alarm and fault on RBS, BSC and RNC. Follow up for proper analysis & RCA for critical faults of network. Correlate the various KPI's affecting HW alarms and take the necessaryaction. Supportfor Node B acceptance completion. Configuration, Integration and Troubleshooting of 3G Nodes. Scripts loading for definitions of 3G, 2G nodes. Node parameter change. LKF (license key file) Loading. Monitoring of NODE-B alarms at RNC end
  • 2. NODE-B AT. Project Name : Spain -Orange. Scope : , LTE Node health check-up & troubleshooting ,integration Responsibilities : integration LTE Node health check up & troubleshooting Previous Organization: Metric Telecom Networks Private Limited (10th June. 2013 to 10th June. 2013) Functional Role: Project Lead for BSNL & Reliance in UP West & Delhi/NCR. Ensure implementation of MOPs and processes for smooth running of day to day operations Follow up for proper analysis & RCA for critical faults of network. Correlate the various KPI's affecting HW alarms and take the necessaryaction. Supportfor Node B acceptance completion. New site survey and planning for Samsung e Node b, Ericsson, ZTE, NOKIA BTS, and NODE B. Customer acceptance. Installation of Samsung e node b. Team management and supervision (engineers & technician) Site creations and deletion in RNC 3810 BY EM Commissioning of Ericsson RBS 3967, 3922 and RBS 6000 Scripts Editing for 3g nodes. ORAGNIZATION- System & Telecom Services (10th June. 2011 to 1st June. 2013) Functional Role: Engineer (O&M), BSNL UP West Ericsson RBS 3000 Software Upgradation. Configuration, Integration and Troubleshooting of 3G Nodes. Scripts loading for definitions of 3G nodes. Node B parameter change. LKF (license key file) Loading. Monitoring of NODE-B alarms at RNC end NODE-B AT. ORAGNIZATION -Ericsson India Pvt. ltd (off role) (9th Sep. 2009 to 10th June. 2011) Functional Role: Integration Engineer (O&M),, Vodafone_ 3G in Delhi/NCR Commissioned Ericsson node b 6202, 6601, 6601e Customer acceptance and hand over of newly commissioned RBS.
  • 3. Trouble Shooting of Node b 6202, 6601, 6601e. Integration Engineer, AIRCELL_3G in CHENNAI. Commissioned Ericsson node b 6202, 6601,6201, 6601e Customer acceptance and hand over of newly commissioned RBS. Trouble Shooting of Node b 6202, 6601, 6201 6601e. Integration Engineer, UNINOR -GSM UP West. Integration of Ericsson RBS 2964, 2954, 2111. Successfully troubleshoot e2e network issues during roll out. Check Site installation quality and handling responsibility to rectify all punch points. Coordinating with the field technicians and Engineers to resolve network-degrading faults generated at BTS sites. ORAGNIZATION- ALPHA DESIGN TECHNOLOGYS PVT.LTD. (10th Sep. 2008 to 25th June. 2009) Functional Role: DEUPTY ENGINEER, Vodafone-GSM UP West Integration and Testing of Nokia ULTRA & FLEXI BTS. Check Site installation quality and handling responsibility to rectify all punch points. series. Managing all the resources as per project requirement Operation & maintenance of transmission links. Return Loss Measurements using VSWR Meter. ORAGNIZATION- P.S ERECTORS PVT.LTD. Functional Role: I & C Engineer, Vodafone-GSM PUNJAB. Installation & Commissioned RBS 2964, 2954, 2111. ERICSSION Link configuration MLE & traffic node-2P, 6P, 20P SDH & PDH. Traffic routing of E_1. SNCP Traffic routing of E_1. Software up gradation. Microwave Dishes installation & alignment (0.3m, 0.6m, and 1.2m). HUAWEI BTS(3606 E) Installation & power measurement Summary of Expertise Areas WRAN: Project rollout and Integrated different types of RBS as well as Node B. GRAN: Project rollout and Integrated and troubleshoot different types of RBS. TRANSMISSION: Worked with Mini link Craft, TN, NEC, NOKIA Languages English: Read, Write, Speak Hindi: Read, Write, Speak
  • 4. Education 2007 Bachelor of Engineering Electronics and Communication Engineering securing 66%. 2004 Diploma- Electronics securing 75.24%. 2000 Matriculation (10th Standard) securing 56%. Contact information Name : Pravendra Kumar E-mail : pk.chahal@gmail.com Phone : 08335073984 Address : Vill-Jalalpur Hasna,Post-Haldaur,Dist-Bijnor (U.P)