This document contains a summary of Muhammad Umar Iqbal's qualifications and experience as a Quality Control Inspector. It outlines his educational background which includes a diploma in civil engineering. It then details his 5 years of experience in process inspection, documentation, troubleshooting, and enforcing regulations for various building and infrastructure projects in the UAE. His roles have included quality control inspector, quality control supervisor, and assistant quantity surveyor. He is looking for new challenging assignments in quality control inspection.
Iris Thomas is a bilingual professional with experience in education and healthcare. She has a Master's degree in Educational Leadership and a Bachelor's degree in Management. Her professional experience includes roles as a Health Care Coordinator, Diversion Counselor, ESOL Teacher, Administrative Parent Liaison, Unit Director, and Home School Liaison. She has strong communication, organization, and leadership skills and experience managing multiple projects and teams.
Mapping Solutions Inc. has been providing mapping and pre-planning services, software, support and training since 1981. They offer in-vehicle mapping software, custom mapping and GIS services, pre-planning services, on-site field surveys, and drafting services. Their key products are FIREbaseMAP v.5 for in-vehicle emergency response mapping and FIREbasePIP v.8 for pre-incident planning drawing software. They also provide on-site professional pre-incident planning field services and GIS/in-vehicle mapping related services, having drawn pre-plans for over 30 years.
The document discusses several key components of a vehicle:
- A door handle is used to open and close car doors from both the inside and outside. The outside handle pulls to open, while the inside releases the latch.
- A vehicle door provides access to enter and exit, and can be opened manually or powered electronically. Powered doors are common on minivans and luxury vehicles.
- Other components discussed include alloy wheels, fenders, headlights, radiator grills, fog lights, bumpers, hoods, windshields, side mirrors, and the roof. Each plays an important role in the structure and operation of the vehicle.
The document lists 25 different types of information sources that can be used for research, including social networks, encyclopedias, search engines, magazines, newspapers, articles, pictures, maps, videos, discussions with subject matter experts, journals, dictionaries, glossaries, radio, databases, directories, historical records, reports, leaflets, songs, audio recordings, interviews, meetings and get togethers.
This document discusses the negative effects of domestic abuse on mothers and their children. It notes that domestic abuse negatively impacts the mother-child relationship, as abused mothers often lack a natural motherly instinct and bond with their children. Children who witness domestic abuse are at risk for emotional, behavioral and developmental issues that can persist into adulthood. The document also outlines interventions that can help victims of domestic abuse, such as crisis hotlines, shelters, counseling and support groups. Overall, the document examines how domestic abuse takes a toll on both the abused mothers and their children.
Misbah Amber's portfolio includes projects in interior design, product design, modeling with various materials, 2D drawings in CAD, 3D modeling in CAD, and 3D rendering in 3DS Max. Some specific projects mentioned are kiosk, outdoor seating, and cafeteria designs, as well as designs using materials like plaster of Paris, ice cream sticks, wheat straws, and bottle straws. The portfolio also includes 2D CAD drawings, 3D modeling in AutoCAD, lighting and rendering work in 3DS Max, and graphic design projects like packaging, UI, logos, and posters.
Brandon Kuehl is a sales and management professional with experience in customer service, sales, and team leadership. He has over 10 years of experience in various roles including customer service representative, restoration technician, security officer, and team sales lead. Kuehl is dedicated to customer satisfaction and effective team success through strategic planning, communication, and staff training. He has expertise in areas such as client relations, service orientation, and time management. Kuehl seeks to improve productivity, market penetration, and company profitability through utilization of new and established methodologies.
Colombia has a long history of coffee exports dating back to 1736 when coffee seeds were first brought to Popay¨¢n. By 1835, Colombia exported its first 60 kg of coffee. Currently, Colombia exports around 560,000 tonnes of coffee per year, equivalent to 85% of its production, mainly to the United States. The key characteristics that distinguish Colombian coffee include its shape, size, color, grain consistency and its uniquely natural qualities not found in other countries.
This document discusses and promotes the DNV Navigator software product. It provides port information, checklists, forms, and reports to help ships comply with regulations and reduce paperwork burdens and human error. The software draws from over 5000 checklists, 1200 forms, and 53,000 documents. It aims to save crews time on paperwork, improve safety and quality, and reduce costs from fees and subscriptions. Benefits mentioned include reducing paperwork time by 80-90%, improving port state statistics, and lessening stress from port clearance operations.
Brandon Kuehl is a sales and management professional with experience in customer service, sales, and team leadership. He has over 10 years of experience in various roles including customer service representative, restoration technician, security officer, and team sales lead. Kuehl is dedicated to customer satisfaction and effective team success through strategic planning, communication, and staff training. He has expertise in areas such as client relations, service orientation, and time management. Kuehl seeks to improve productivity, market penetration, and company profitability through utilization of new and established methodologies.
Colombia has a long history of coffee exports dating back to 1736 when coffee seeds were first brought to Popay¨¢n. By 1835, Colombia exported its first 60 kg of coffee. Currently, Colombia exports around 560,000 tonnes of coffee per year, equivalent to 85% of its production, mainly to the United States. The key characteristics that distinguish Colombian coffee include its shape, size, color, grain consistency and its uniquely natural qualities not found in other countries.
This document discusses and promotes the DNV Navigator software product. It provides port information, checklists, forms, and reports to help ships comply with regulations and reduce paperwork burdens and human error. The software draws from over 5000 checklists, 1200 forms, and 53,000 documents. It aims to save crews time on paperwork, improve safety and quality, and reduce costs from fees and subscriptions. Benefits mentioned include reducing paperwork time by 80-90%, improving port state statistics, and lessening stress from port clearance operations.
The document provides an overview of the proposed new electricity market arrangements in Ukraine. Key points include:
1. The market will have forward bilateral contracting, a day-ahead market (DAM), and an intra-day market (IDM). In the forward market, participants bilaterally trade physical products.
2. In the DAM, suppliers and producers submit hourly bids and orders for residual volumes not contracted bilaterally. The market operator runs optimization to determine clearing prices.
3. The continuous IDM allows participants to modify positions from bilateral contracts and the DAM. The regulator may impose obligations to ensure adequate DAM liquidity.
4. Renewable and CHP generators will contract with a Guarante
Renewable energy production at the new electricity market of Ukraine - Stanis...Stanislav Masevych
?
This document discusses renewable energy production in Ukraine's new electricity market. It outlines the legal basis for renewable energy sources (RES) in Ukraine's electricity laws and market rules. RES plants can participate either outside the "green tariff" through direct market participation or under the "green tariff" via a Guaranteed Buyer. The Guaranteed Buyer is obligated to purchase all electricity from plants under the green tariff. Support instruments for RES in EU states include feed-in premiums, contracts for difference, and tenders/auctions. The document also discusses implementing balance responsibility for solar and wind plants in Ukraine's new market over time from 2020 to 2025.
Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-...Stanislav Masevych
?
This document contains a preliminary legal questionnaire regarding a feasibility study on synchronously interconnecting the power systems of Ukraine and Moldova to the ENTSO-E Continental Europe Power System. The questionnaire contains 8 sections with multiple questions seeking information on the legal and regulatory frameworks in Ukraine and Moldova related to their electricity markets, transmission system operators, unbundling requirements, regulatory authorities, technical and legal regulations, confidentiality rules, international law considerations, and any other relevant elements regarding their power systems. The responses will help identify and address key legal and regulatory issues to include in the outcome of the feasibility study.
Law on electricity market of Ukraine - English versionStanislav Masevych
?
This document defines key terms used in the Law of Ukraine "On the Electricity Market". It defines over 40 terms related to electricity generation, transmission, distribution, supply, metering, balancing, markets and system operation. Some of the key terms defined include commercial electricity metering administrator, settlements administrator, balancing group, balancing responsibility, guaranteed electricity buyer at "green tariff", ancillary services, third party access, electricity undertaking, supplier of consumers, and electricity market clearing.
2. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
THE SHORT
HISTORY OF
THE PROJECT
§¬§°§²§°§´§¬§¡
?§³§´§°§²?§Á
§±§²§°§¦§¬§´§µ
3. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
? 2005-2006 §â.§â. - negotiations on accession of
UPS of Ukraine to the synchronous zone of
UCTE (nowadays ¨C ENTSO-E). As a result,
Transelectrica has submitted an application on
accession of Ukrainian and Moldavian power
systems to the synchronous zone of UCTE.
? 03.05.2006 - the Management Authority of
UCTE (ENTSO-E) has accepted the application
on accession of Ukrainian and Moldavian power
systems to the synchronous zone of UCTE.
? 17.01.2008 - the Management Authority of
UCTE (ENTSO-E) has approved the ?Technical
Task of the Project of interconnection of
Ukrainian and Moldavian power systems to
UCTE?.
? 09.05.2012 ¨C the Project was approved by the
EU Commission.
? 22.10.2012 ¨C the Grant Contract was signed in
Cisenau (Moldova) between applicants and JMA
of Cross Border Cooperation of ENPI.
? 2005-2006 §â.§â. - §á§Ö§â§Ö§Ô§à§Ó§à§â§Ú §ë§à§Õ§à §Ó§ã§ä§å§á§å §°§¦§³
§µ§Ü§â§Ñ?§ß§Ú §Õ§à §ã§Ú§ß§ç§â§à§ß§ß§à? §Ù§à§ß§Ú UCTE (§ß§Ñ §Õ§Ñ§ß§Ú§Û §é§Ñ§ã ¨C
ENTSO-E). §£ §â§Ö§Ù§å§Ý§î§ä§Ñ§ä? §á§Ö§â§Ö§Ô§à§Ó§à§â?§Ó §Ü§à§Þ§á§Ñ§ß?§ñ
Transelectrica §á§à§Õ§Ñ§Ý§Ñ §à§æ?§è?§Û§ß§å §Ù§Ñ§ñ§Ó§Ü§å §ß§Ñ §Ó§ã§ä§å§á
§°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §ä§Ñ §¦§³ §®§à§Ý§Õ§à§Ó§Ú §Õ§à §ã§Ú§ß§ç§â§à§ß§ß§à? §Ù§à§ß§Ú
UCTE.
? 03.05.2006 - §¬§Ö§â§å§ð§é§Ú§Û §Ü§à§Þ?§ä§Ö§ä UCTE (ENTSO-E)
§Ñ§Ü§è§Ö§á§ä§å§Ó§Ñ§Ó §Ù§Ñ§ñ§Ó§Ü§å §ß§Ñ §Ó§ã§ä§å§á §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §ä§Ñ §¦§³
§®§à§Ý§Õ§à§Ó§Ú §Õ§à §ã§Ú§ß§ç§â§à§ß§ß§à? §Ù§à§ß§Ú UCTE.
? 17.01.2008 - §¬§Ö§â§å§ð§é§Ú§Û §Ü§à§Þ?§ä§Ö§ä UCTE (ENTSO-E)
§Ù§Ñ§ä§Ó§Ö§â§Õ§Ú§Ó §á?§Õ§Ô§à§ä§à§Ó§Ý§Ö§ß§Ö §±§â§à§Ö§Ü§ä§ß§à§ð §Ô§â§å§á§à§ð
?§´§Ö§ç§ß?§é§ß§Ö §Ù§Ñ§Ó§Õ§Ñ§ß§ß§ñ §±§â§à§Ö§Ü§ä§å §á§â§Ú?§Õ§ß§Ñ§ß§ß§ñ §µ§Ü§â§Ñ?§ß§Ú §ä§Ñ
§®§à§Ý§Õ§à§Ó§Ú §Õ§à §Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§à? §ã§Ú§ã§ä§Ö§Þ§Ú UCTE?.
? 09.05.2012 - §±§â§à§Ö§Ü§ä §à§ä§â§Ú§Þ§Ñ§Ó §ã§ç§Ó§Ñ§Ý§Ö§ß§ß§ñ
?§Ó§â§à§á§Ö§Û§ã§î§Ü§à? §¬§à§Þ?§ã??.
? 22.10.2013 ¨C §±?§Õ§á§Ú§ã§Ñ§ß§ß§ñ §¤§â§Ñ§ß§ä§à§Ó§à? §µ§Ô§à§Õ§Ú §Ó §Þ.
§¬§Ú§ê§Ú§ß?§Ó (§®§à§Ý§Õ§à§Ó§Ñ) §Þ?§Ø §Ñ§á§Ý?§Ü§Ñ§ß§ä§Ñ§Þ§Ú §ä§Ñ §³§á?§Ý§î§ß§Ú§Þ
§°§â§Ô§Ñ§ß§à§Þ §µ§á§â§Ñ§Ó§Ý?§ß§ß§ñ §±§â§à§Ô§â§Ñ§Þ§Ú §´§â§Ñ§ß§ã§Ü§à§â§Õ§à§ß§ß§à§Ô§à
§³§á?§Ó§â§à§Ò?§ä§ß§Ú§è§ä§Ó§Ñ ??§³§±.
4. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
PARTNERS OF
THE PROJECT
§±§¡§²§´§¯§¦§²§ª
§±§²§°§¦§¬§´§µ
5. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
MINISTRY OF ECONOMIC OF THE
REPUBLIC OF MOLDOVA ¨C LEAD
PARTNER
MINISTRY OF ECONOMIC OF
ROMANIA ¨C PARTNER 1
MINISTRY OF ENERGY AN COAL
INDUSTRY OF UKRAINE ¨C PARTNER
2
§®?§¯?§³§´§¦§²§³§´§£§° §¦§¬§°§¯§°§®?§¬§ª
§²§¦§³§±§µ§¢§?§¬§ª §®§°§§¥§°§£§¡ ¨C §¤§°§§°§£§¯§ª§«
§±§¡§²§´§¯§¦§²
§®?§¯?§³§´§¦§²§³§´§£§° §¦§¬§°§¯§°§®?§¬§ª §²§µ§®§µ§¯?? ¨C
§±§¡§²§´§¯§¦§² 1
§®?§¯?§³§´§¦§²§³§´§£§° §¦§¯§¦§²§¤§¦§´§ª§¬§ª §´§¡
§£§µ§¤?§§¾§¯§°? §±§²§°§®§ª§³§§°§£§°§³§´?
§µ§¬§²§¡?§¯§ª ¨C§±§¡§²§´§¯§¦§² 2
6. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
GRANTOR AND
MANAGEMENT
OF THE
PROJECT
§¤§²§¡§¯§´§°§¥§¡§£§¦§¸§¾
§´§¡
§¬§¦§²?§£§¯§ª§¸§´§£§°
§±§²§°§¦§¬§´§°§®
7. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
GRANTOR:
MANAGEMENT:
§¤§²§¡§¯§´§°§¥§¡§£§¦§¸§¾:
§¬§¦§²?§£§¯§ª§¸§´§£§°:
European Commission - Joint
Operational Programme Romania-
Ukraine-Republic of Moldova 2007-2013
(European Neighborhood and
Partnership Instrument)
JOINT MANAGEMENT AUTHORITY
(Ministry of regional development and
public administration)
JOINT TECHNICAL SECRETARIAT
(Regional office of Cross Border
Cooperation Program, Romania)
?§Ó§â§à§á§Ö§Û§ã§î§Ü§Ñ §Ü§à§Þ?§ã?§ñ ¨C §³§á?§Ý§î§ß§Ñ §â§à§Ò§à§é§Ñ
§á§â§à§Ô§â§Ñ§Þ§Ñ §²§å§Þ§å§ß?§ñ-§µ§Ü§â§Ñ?§ß§Ñ-§²§Ö§ã§á§å§Ò§Ý?§Ü§Ñ
§®§à§Ý§Õ§à§Ó§Ñ 2007-2013 (?§Ó§â§à§á§Ö§Û§ã§î§Ü§Ö
§ã§å§ã?§Õ§ã§ä§Ó§à §ä§Ñ §á§Ñ§â§ä§ß§Ö§â§ã§ä§Ó§à)
§³§±?§§¾§¯§ª§« §°§²§¡§¯ §µ§¬§±§²§¡§£§?§¯§¯§Á
(§®?§ß?§ã§ä§Ö§â§ã§ä§Ó§à §â§Ö§Ô?§à§ß§Ñ§Ý§î§ß§à§Ô§à §â§à§Ù§Ó§Ú§ä§å
§ä§Ñ §á§å§Ò§Ý?§é§ß§à§Ô§à §å§á§â§Ñ§Ó§Ý?§ß§ß§ñ §²§å§Þ§å§ß??)
§³§±?§§¾§¯§ª§« §´§¦§·§¯?§¹§¯§ª§« §³§¦§¬§²§¦§´§¡§²?§¡§´
(§²§Ö§Ô?§à§ß§Ñ§Ý§î§ß§Ú§Û §à§æ?§ã §±§â§à§Ô§â§Ñ§Þ§Ú
§´§â§Ñ§ß§ã§Ü§à§â§Õ§à§ß§ß§à§Ô§à §³§á?§Ó§â§à§Ò?§ä§ß§Ú§è§ä§Ó§Ñ,
§²§å§Þ§å§ß?§ñ)
8. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
THE MEMBERS
(CONTRACTORS)
OF THE PROJECT
FROM ENTSO-E
§µ§¹§¡§³§¯§ª§¬§ª
(§±?§¥§²§Á§¥§¯§ª§¬§ª)
§±§²§°§¦§¬§´§µ §£?§¥
ENTSO-E
9. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
TRANSELECTRICA (Romania)
MAVIR (Hungary)
PSE (Poland)
ESO EAD (Bulgaria)
EMS (Serbia)
Bernard Energy Advocacy
(Belgium)
TRANSELECTRICA (§²§å§Þ§å§ß?§ñ)
MAVIR (§µ§Ô§à§â§ë§Ú§ß§Ñ)
PSE (§±§à§Ý§î§ë§Ñ)
ESO EAD (§¢§à§Ý§Ô§Ñ§â?§ñ)
EMC (§³§Ö§â§Ò?§ñ)
Bernard Energy Advocacy
(§¢§Ö§Ý§î§Ô?§ñ)
11. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
§®?§¯?§³§´§¦§²§³§´§£§° §¦§¯§¦§²§¤§¦§´§ª§¬§ª §´§¡
§£§µ§¤?§§¾§¯§°? §±§®§ª§®§³§§°§£§°§³§´?
§µ§¬§²§¡?§¯§ª ¨C §±§¡§²§´§¯§¦§² 2
§¯§¦§¬ ¡°§µ§¬§²§¦§¯§¦§²§¤§°¡±
CZECHPOL ENERGY
MINISTRY OF ENERGY AND
COAL INDUSTRY OF UKRAINE ¨C
PARTNER 2
NEC ¡°UEKENERGO¡±
CZECHPOL ENERGY
13. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
STAGE A.
Preparation of the Agreement, which will
be signed by UE / Moldelectrica and
UCTE (ENTSO-E), which will include:
technical specifications and operational
aspects, including the agreement
between the UE and Moldelectrica on
maintaining of the control unit; separation
conditions,operating the congestion
regime ; legal / regulatory framework.
The result ¨C all technical and legal
requirements for the full accession of the
Ukrainian and Moldovan electric power to
the electricity grid UCTE must be carried
out.;
§³§´§¡§¥?§Á §¡.
§±?§Õ§Ô§à§ä§à§Ó§Ü§Ñ §µ§Ô§à§Õ§Ú, §ñ§Ü§å §Þ§Ñ§ð§ä§î §á?§Õ§á§Ú§ã§Ñ§ä§Ú
§µ§Ü§â§Ö§ß§Ö§â§Ô§à/Moldelectrica §ä§Ñ ENTSO-E, §ñ§Ü§Ñ
§Ó§Ü§Ý§ð§é§Ñ§ä§Ú§Þ§Ö: §ä§Ö§ç§ß?§é§ß? §å§Þ§à§Ó§Ú §Û
§Ö§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?§Û§ß? §Ñ§ã§á§Ö§Ü§ä§Ú, §å §ä§à§Þ§å §é§Ú§ã§Ý? §å§Ô§à§Õ§å
§Þ?§Ø §µ§Ü§â§Ö§ß§Ö§â§Ô§à §ä§Ñ Moldelectrica §Ù
§Ö§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?? §Ü§à§ß§ä§â§à§Ý§î§ß§à§Ô§à §Ò§Ý§à§Ü§å; §å§Þ§à§Ó§Ú
§â§à§Ù§Þ§Ö§Ø§å§Ó§Ñ§ß§ß§ñ; §Ó§Ö§Õ§Ö§ß§ß§ñ §â§Ö§Ø§Ú§Þ§å
§á§Ö§â§Ö§Ó§Ñ§ß§ä§Ñ§Ø§Ö§ß§ß§ñ; §ð§â§Ú§Õ§Ú§é§ß?/§â§Ö§Ô§å§Ý§ñ§ä§à§â§ß?
§å§Þ§à§Ó§Ú.
§²§Ö§Ù§å§Ý§î§ä§Ñ§ä ¨C §á?§Õ§Ô§à§ä§à§Ó§Ý§Ö§ß? §ä§Ö§ç§ß?§é§ß? §ä§Ñ
§ð§â§Ú§Õ§Ú§é§ß? §Ó§Ú§Þ§à§Ô§Ú §Õ§Ý§ñ §á§à§Ó§ß§à§Ô§à §á§â§Ú?§Õ§ß§Ñ§ß§ß§ñ
§å§Ü§â§Ñ?§ß§ã§î§Ü§à? §Û §Þ§à§Ý§Õ§à§Ó§ã§î§Ü§à? §Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§Ú§ç
§Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ §Õ§à §Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§à?
§Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ú ENTSO-E;
14. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
STAGE B.
Implementation of the Agreement in
Ukrainian and Moldovan sides. During
the second phase all the technical and
organizational measures should be
implemented in order to meet standards
under the User's Guide ENTSO-E.
The end result will be a report prepared
for the Steering Committee of ENTSO-
E, and preparation of the requests to
switch to stage "C ¡±.
§³§´§¡§¥?§Á B.
§£§á§â§à§Ó§Ñ§Õ§Ø§Ö§ß§ß§ñ §á§à§Ý§à§Ø§Ö§ß§î §µ§Ô§à§Õ§Ú
§å§Ü§â§Ñ?§ß§ã§î§Ü§à§ð §ä§Ñ §Þ§à§Ý§Õ§Ñ§Ó§ã§î§Ü§à§ð §ã§ä§à§â§à§ß§Ñ§Þ§Ú.
§±§â§à§ä§ñ§Ô§à§Þ §Õ§â§å§Ô§à§Ô§à §Ö§ä§Ñ§á§å §Þ§Ñ§ð§ä§î §Ò§å§ä§Ú
§Ó§á§â§à§Ó§Ñ§Õ§Ø§Ö§ß? §Ó§ã? §ä§Ö§ç§ß?§é§ß? §ä§Ñ §à§â§Ô§Ñ§ß?§Ù§Ñ§è?§Û§ß?
§Ù§Ñ§ç§à§Õ§Ú, §ë§à§Ò §Þ§Ñ§ä§Ú §Ù§Þ§à§Ô§å §Ù§Ñ§Õ§à§Ó§à§Ý§î§ß§ñ§ä§Ú
§ã§ä§Ñ§ß§Õ§Ñ§â§ä§Ñ§Þ §Ó?§Õ§á§à§Ó?§Õ§ß§à §Õ§à §±§à§ã?§Ò§ß§Ú§Ü§Ñ §Ù
§Ö§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?? ENTSO-E.
§¬?§ß§è§Ö§Ó§Ú§Þ §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§à§Þ §Ò§å§Õ§Ö §Ù§Ó?§ä,
§á?§Õ§Ô§à§ä§à§Ó§Ý§Ö§ß§Ú§Û §Õ§Ý§ñ §¬§Ö§â?§Ó§ß§à§Ô§à §Ü§à§Þ?§ä§Ö§ä§å
ENTSO-E, §ä§Ñ §á?§Õ§Ô§à§ä§à§Ó§Ü§Ñ §Ù§Ñ§á§Ú§ä§å §Õ§Ý§ñ
§á§Ö§â§Ö§ç§à§Õ§å §Õ§à §ã§ä§Ñ§Õ?? "§³¡±.
15. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
STAGE C.
Preparation and testing in regime of
separate work and regime of connected
power systems. Evaluation of test
results. The next step should be
resolution of the test and testing using
the synchronous interconnection of the
area.
§³§´§¡§¥?§Á C.
§±?§Õ§Ô§à§ä§à§Ó§Ü§Ñ §Û §á§â§à§Ó§Ö§Õ§Ö§ß§ß§ñ §Ó§Ú§á§â§à§Ò§å§Ó§Ñ§ß§î §å
§â§Ö§Ø§Ú§Þ§Ñ§ç §â§à§Ù§Õ?§Ý§î§ß§à? §â§à§Ò§à§ä§Ú §ä§Ñ
§à§Ò'?§Õ§ß§Ñ§ß§ß§ñ §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ. §°§è?§ß§Ü§Ñ
§â§Ö§Ù§å§Ý§î§ä§Ñ§ä?§Ó §Ó§Ú§á§â§à§Ò§å§Ó§Ñ§ß§î. §¯§Ñ§ã§ä§å§á§ß§Ú§Þ
§Ü§â§à§Ü§à§Þ §Þ§Ñ? §Ò§å§ä§Ú §á§â§à§Ó§Ö§Õ§Ö§ß§ß§ñ
§Ó§Ú§á§â§à§Ò§å§Ó§Ñ§ß§î §â§à§Ù§Õ?§Ý§î§ß§à? §â§à§Ò§à§ä§Ú §Û
§Ó§Ú§á§â§à§Ò§å§Ó§Ñ§ß§ß§ñ §Ó §â§Ö§Ø§Ú§Þ? §à§Ò'?§Õ§ß§Ñ§ß§ß§ñ
§Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ ?§Ù §ã§Ú§ß§ç§â§à§ß§ß§à§ð §Ù§à§ß§à§ð.
16. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
THE MAIN
PRINCIPLES OF
PARTNERSHIP
§°§³§¯§°§£§¯?
§±§²§ª§¯§¸§ª§±§ª
§³§±?§£§²§°§¢?§´§¯§ª§¸§´§£§¡
17. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
? The possibility of providing funds to 90%
of the project under the European
Neighbourhood Policy and the
partnership program by CBC Romania-
Ukraine-Moldova 2007 ¨C 2013 was
determined. The remaining 10% of the
project should be divided between the
ministries of Moldova, Ukraine and
Romania.
? It is agreed that Moldova will submit an
application for funding on behalf of two
other beneficiaries. Proposals were
presented on March 31, 2011 to the Joint
Steering Committee of the Joint
Operational Programme, which is located
in the Ministry of Regional Development
in Romania.
? §±§à§Ô§à§Õ§Ø§Ö§ß§à, §ë§à 90% §Ó§Ñ§â§ä§à§ã§ä? §á§â§à§Ö§Ü§ä§å §Ó
§â§Ñ§Þ§Ü§Ñ§ç ?§ß§ã§ä§â§å§Þ§Ö§ß§ä§å ?§Ó§â§à§á§Ö§Û§ã§î§Ü§à? §á§à§Ý?§ä§Ú§Ü§Ú
§ã§å§ã?§Õ§ã§ä§Ó§Ñ §ä§Ñ §á§Ñ§â§ä§ß§Ö§â§ã§ä§Ó§Ñ §Ù§Ñ §â§Ñ§ç§å§ß§à§Ü
§á§â§à§Ô§â§Ñ§Þ§Ú §á§â§Ú§Ü§à§â§Õ§à§ß§ß§à§Ô§à §ã§á?§Ó§â§à§Ò?§ä§ß§Ú§è§ä§Ó§Ñ
§²§å§Þ§å§ß?§ñ-§µ§Ü§â§Ñ?§ß§Ñ-§®§à§Ý§Õ§à§Ó§Ñ 2007- 2013.
§²§Ö§ê§ä§Ñ 10% §Ó§Ñ§â§ä§à§ã§ä? §á§â§à§Ö§Ü§ä§å §Þ§Ñ? §Ò§å§ä§Ú
§Ó§Ú§Õ?§Ý§Ö§ß§Ñ §Þ?§ß?§ã§ä§Ö§â§ã§ä§Ó§Ñ§Þ§Ú §®§à§Ý§Õ§à§Ó§Ú,
§µ§Ü§â§Ñ?§ß§Ú ? §²§å§Þ§å§ß??.
? §±§à§Ô§à§Õ§Ø§Ö§ß§à, §ë§à §®§à§Ý§Õ§à§Ó§Ñ §á§à§Õ§Ñ§Ó§Ñ§ä§Ú§Þ§Ö
§Ù§Ñ§ñ§Ó§Ü§å §ß§Ñ §à§ä§â§Ú§Þ§Ñ§ß§ß§ñ §Ü§à§ê§ä?§Ó §Ó?§Õ ?§Þ§Ö§ß? §Õ§Ó§à§ç
?§ß§ê§Ú§ç §Ò§Ö§ß§Ö§æ?§è?§Ñ§â?§Ó. §±§â§à§Ö§Ü§ä§ß? §á§â§à§á§à§Ù§Ú§è??
§Ò§å§Ý§Ú §á§â§Ö§Õ§ã§ä§Ñ§Ó§Ý§Ö§ß? 31 §Ò§Ö§â§Ö§Ù§ß§ñ 2011 §â.
§³§á?§Ý§î§ß§à§Þ§å §Ü§Ö§â§å§ð§é§à§Þ§å §Ü§à§Þ?§ä§Ö§ä§å §³§á?§Ý§î§ß§à?
§à§á§Ö§â§Ñ§ä§Ú§Ó§ß§à? §á§â§à§Ô§â§Ñ§Þ§Ú, §ñ§Ü§Ú§Û §Ù§ß§Ñ§ç§à§Õ§Ú§ä§î§ã§ñ §Ó
§®?§ß?§ã§ä§Ö§â§ã§ä§Ó? §â§Ö§Ô?§à§ß§Ñ§Ý§î§ß§à§Ô§à §â§à§Ù§Ó§Ú§ä§Ü§å §Ó
§²§å§Þ§å§ß??.
18. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
? The Project implementation involves 4
work groups ¨C steady analysis, dynamic
analysis, operational issues,
legal/regulatory issues.
? Moldova as the Lead Partner shall submit
to JMA of the Joint Operational Program
all reports prepared by the Partner 2
(Ukraine).
? The work results of all 4 work groups
shall be submitted to the Leaders-
ENTSO-e within each work group.
? §±§à§Ô§à§Õ§Ø§Ö§ß§à, §ë§à §á§â§Ú §â§Ö§Ñ§Ý?§Ù§Ñ§è?? §±§â§à§Ö§Ü§ä§å
§Õ?§ð§ä§î 4 §â§à§Ò§à§é§Ú§ç §Ô§â§å§á§Ú ¨C §ã§ä§Ñ§ä§Ú§é§ß§Ú§Û §Ñ§ß§Ñ§Ý?§Ù,
§Õ§Ú§ß§Ñ§Þ?§é§ß§Ú§Û §Ñ§ß§Ñ§Ý?§Ù, §à§á§Ö§â§Ñ§è?§Û§ß? §á§Ú§ä§Ñ§ß§ß§ñ,
§â§Ö§Ô§å§Ý§ñ§ä§à§â§ß?/§ð§â§Ú§Õ§Ú§é§ß? §á§Ú§ä§Ñ§ß§ß§ñ.
? §±§à§Ô§à§Õ§Ø§Ö§ß§à, §ë§à §®§à§Ý§Õ§à§Ó§Ñ §ñ§Ü §¤§à§Ý§à§Ó§ß§Ú§Û
§±§Ñ§â§ä§ß§Ö§â §Ò§å§Õ§Ö §á§à§Õ§Ñ§Ó§Ñ§ä§Ú §Õ§à§Ü§å§Þ§Ö§ß§ä§Ú
§Ù§Ó?§ä§ß§à§ã§ä? §Ù§Ñ §Ó§Ú§Ü§à§ß§Ñ§ß? §â§à§Ò§à§ä§Ú §±§Ñ§â§ä§ß§Ö§â§Ñ 2
(§µ§Ü§â§Ñ?§ß§Ñ) §Ó §Þ§Ö§Ø§Ñ§ç §â§à§Ò§à§é§Ú§ç §Ô§â§å§á §³§á?§Ý§î§ß§à§Þ§å
§Ü§Ö§â§å§ð§é§à§Þ§å §Ü§à§Þ?§ä§Ö§ä§å §³§á?§Ý§î§ß§à? §à§á§Ö§â§Ñ§ä§Ú§Ó§ß§à?
§á§â§à§Ô§â§Ñ§Þ§Ú.
? §±§à§Ô§à§Õ§Ø§Ö§ß§à, §ë§à §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§Ú §â§à§Ò?§ä, §Ó§Ú§Ü§à§ß§Ñ§ß?
§Ó §Þ§Ö§Ø§Ñ§ç 4 §â§à§Ò§à§é§Ú§ç §Ô§â§å§á, §á§Ö§â§Ö§Õ§Ñ§ð§ä§î§ã§ñ
§?§Õ§Ö§â§Ñ§Þ-ENTSO-E §Ü§à§Ø§ß§à? §â§à§Ò§à§é§à? §Ô§â§å§á§Ú.
26. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
THANK YOU!
§¥§Á§¬§µ§À!