Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to
ENTSO-E Continental Europe Power System
MIS ETC code: 2739
Ministry of energy and coal industry of
Ukraine
The content and implementation of the
project ¡°Feasibility Study on
Synchronous Interconnection of
Ukrainian and Moldovan Power
Systems to ENTSO-E Continental
Europe Power System¡±
MIS ETC code: 2739
Reporter
Stanislav Masevych
Lawyer at the Project
§®?§ß?§ã§ä§Ö§â§ã§ä§Ó§à §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú §ä§Ñ §Ó§å§Ô?§Ý§î§ß§à?
§á§â§à§Þ§Ú§ã§Ý§à§Ó§à§ã§ä? §µ§Ü§â§Ñ?§ß§Ú
§©§Þ?§ã§ä §ä§Ñ §ã§ä§Ñ§ß §â§Ö§Ñ§Ý?§Ù§Ñ§è?? §á§â§à§Ö§Ü§ä§å
?§¥§à§ã§Ý?§Õ§Ø§Ö§ß§ß§ñ §Þ§à§Ø§Ý§Ú§Ó§à§ã§ä?
§ã§Ú§ß§ç§â§à§ß§ß§à§Ô§à §à§Ò¡¯?§Õ§ß§Ñ§ß§ß§ñ §å§Ü§â§Ñ?§ß§ã§î§Ü§à? ?
§Þ§à§Ý§Õ§à§Ó§ã§î§Ü§à? §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ú §Ù
§Ü§à§ß§ä§Ú§ß§Ö§ß§ä§Ñ§Ý§î§ß§à§ð ?§Ó§â§à§á§Ö§Û§ã§î§Ü§à§ð
§Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§à§ð ENTSO-E?
MIS ETC code: 2739
§¥§à§á§à§Ó?§Õ§Ñ§é
§®§Ñ§ã§Ö§Ó§Ú§é §³§ä§Ñ§ß?§ã§Ý§Ñ§Ó
§À§â§Ú§ã§ä §±§â§à§Ö§Ü§ä§å
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
THE SHORT
HISTORY OF
THE PROJECT
§¬§°§²§°§´§¬§¡
?§³§´§°§²?§Á
§±§²§°§¦§¬§´§µ
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
? 2005-2006 §â.§â. - negotiations on accession of
UPS of Ukraine to the synchronous zone of
UCTE (nowadays ¨C ENTSO-E). As a result,
Transelectrica has submitted an application on
accession of Ukrainian and Moldavian power
systems to the synchronous zone of UCTE.
? 03.05.2006 - the Management Authority of
UCTE (ENTSO-E) has accepted the application
on accession of Ukrainian and Moldavian power
systems to the synchronous zone of UCTE.
? 17.01.2008 - the Management Authority of
UCTE (ENTSO-E) has approved the ?Technical
Task of the Project of interconnection of
Ukrainian and Moldavian power systems to
UCTE?.
? 09.05.2012 ¨C the Project was approved by the
EU Commission.
? 22.10.2012 ¨C the Grant Contract was signed in
Cisenau (Moldova) between applicants and JMA
of Cross Border Cooperation of ENPI.
? 2005-2006 §â.§â. - §á§Ö§â§Ö§Ô§à§Ó§à§â§Ú §ë§à§Õ§à §Ó§ã§ä§å§á§å §°§¦§³
§µ§Ü§â§Ñ?§ß§Ú §Õ§à §ã§Ú§ß§ç§â§à§ß§ß§à? §Ù§à§ß§Ú UCTE (§ß§Ñ §Õ§Ñ§ß§Ú§Û §é§Ñ§ã ¨C
ENTSO-E). §£ §â§Ö§Ù§å§Ý§î§ä§Ñ§ä? §á§Ö§â§Ö§Ô§à§Ó§à§â?§Ó §Ü§à§Þ§á§Ñ§ß?§ñ
Transelectrica §á§à§Õ§Ñ§Ý§Ñ §à§æ?§è?§Û§ß§å §Ù§Ñ§ñ§Ó§Ü§å §ß§Ñ §Ó§ã§ä§å§á
§°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §ä§Ñ §¦§³ §®§à§Ý§Õ§à§Ó§Ú §Õ§à §ã§Ú§ß§ç§â§à§ß§ß§à? §Ù§à§ß§Ú
UCTE.
? 03.05.2006 - §¬§Ö§â§å§ð§é§Ú§Û §Ü§à§Þ?§ä§Ö§ä UCTE (ENTSO-E)
§Ñ§Ü§è§Ö§á§ä§å§Ó§Ñ§Ó §Ù§Ñ§ñ§Ó§Ü§å §ß§Ñ §Ó§ã§ä§å§á §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §ä§Ñ §¦§³
§®§à§Ý§Õ§à§Ó§Ú §Õ§à §ã§Ú§ß§ç§â§à§ß§ß§à? §Ù§à§ß§Ú UCTE.
? 17.01.2008 - §¬§Ö§â§å§ð§é§Ú§Û §Ü§à§Þ?§ä§Ö§ä UCTE (ENTSO-E)
§Ù§Ñ§ä§Ó§Ö§â§Õ§Ú§Ó §á?§Õ§Ô§à§ä§à§Ó§Ý§Ö§ß§Ö §±§â§à§Ö§Ü§ä§ß§à§ð §Ô§â§å§á§à§ð
?§´§Ö§ç§ß?§é§ß§Ö §Ù§Ñ§Ó§Õ§Ñ§ß§ß§ñ §±§â§à§Ö§Ü§ä§å §á§â§Ú?§Õ§ß§Ñ§ß§ß§ñ §µ§Ü§â§Ñ?§ß§Ú §ä§Ñ
§®§à§Ý§Õ§à§Ó§Ú §Õ§à §Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§à? §ã§Ú§ã§ä§Ö§Þ§Ú UCTE?.
? 09.05.2012 - §±§â§à§Ö§Ü§ä §à§ä§â§Ú§Þ§Ñ§Ó §ã§ç§Ó§Ñ§Ý§Ö§ß§ß§ñ
?§Ó§â§à§á§Ö§Û§ã§î§Ü§à? §¬§à§Þ?§ã??.
? 22.10.2013 ¨C §±?§Õ§á§Ú§ã§Ñ§ß§ß§ñ §¤§â§Ñ§ß§ä§à§Ó§à? §µ§Ô§à§Õ§Ú §Ó §Þ.
§¬§Ú§ê§Ú§ß?§Ó (§®§à§Ý§Õ§à§Ó§Ñ) §Þ?§Ø §Ñ§á§Ý?§Ü§Ñ§ß§ä§Ñ§Þ§Ú §ä§Ñ §³§á?§Ý§î§ß§Ú§Þ
§°§â§Ô§Ñ§ß§à§Þ §µ§á§â§Ñ§Ó§Ý?§ß§ß§ñ §±§â§à§Ô§â§Ñ§Þ§Ú §´§â§Ñ§ß§ã§Ü§à§â§Õ§à§ß§ß§à§Ô§à
§³§á?§Ó§â§à§Ò?§ä§ß§Ú§è§ä§Ó§Ñ ??§³§±.
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
PARTNERS OF
THE PROJECT
§±§¡§²§´§¯§¦§²§ª
§±§²§°§¦§¬§´§µ
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
MINISTRY OF ECONOMIC OF THE
REPUBLIC OF MOLDOVA ¨C LEAD
PARTNER
MINISTRY OF ECONOMIC OF
ROMANIA ¨C PARTNER 1
MINISTRY OF ENERGY AN COAL
INDUSTRY OF UKRAINE ¨C PARTNER
2
§®?§¯?§³§´§¦§²§³§´§£§° §¦§¬§°§¯§°§®?§¬§ª
§²§¦§³§±§µ§¢§­?§¬§ª §®§°§­§¥§°§£§¡ ¨C §¤§°§­§°§£§¯§ª§«
§±§¡§²§´§¯§¦§²
§®?§¯?§³§´§¦§²§³§´§£§° §¦§¬§°§¯§°§®?§¬§ª §²§µ§®§µ§¯?? ¨C
§±§¡§²§´§¯§¦§² 1
§®?§¯?§³§´§¦§²§³§´§£§° §¦§¯§¦§²§¤§¦§´§ª§¬§ª §´§¡
§£§µ§¤?§­§¾§¯§°? §±§²§°§®§ª§³§­§°§£§°§³§´?
§µ§¬§²§¡?§¯§ª ¨C§±§¡§²§´§¯§¦§² 2
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
GRANTOR AND
MANAGEMENT
OF THE
PROJECT
§¤§²§¡§¯§´§°§¥§¡§£§¦§¸§¾
§´§¡
§¬§¦§²?§£§¯§ª§¸§´§£§°
§±§²§°§¦§¬§´§°§®
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
GRANTOR:
MANAGEMENT:
§¤§²§¡§¯§´§°§¥§¡§£§¦§¸§¾:
§¬§¦§²?§£§¯§ª§¸§´§£§°:
European Commission - Joint
Operational Programme Romania-
Ukraine-Republic of Moldova 2007-2013
(European Neighborhood and
Partnership Instrument)
JOINT MANAGEMENT AUTHORITY
(Ministry of regional development and
public administration)
JOINT TECHNICAL SECRETARIAT
(Regional office of Cross Border
Cooperation Program, Romania)
?§Ó§â§à§á§Ö§Û§ã§î§Ü§Ñ §Ü§à§Þ?§ã?§ñ ¨C §³§á?§Ý§î§ß§Ñ §â§à§Ò§à§é§Ñ
§á§â§à§Ô§â§Ñ§Þ§Ñ §²§å§Þ§å§ß?§ñ-§µ§Ü§â§Ñ?§ß§Ñ-§²§Ö§ã§á§å§Ò§Ý?§Ü§Ñ
§®§à§Ý§Õ§à§Ó§Ñ 2007-2013 (?§Ó§â§à§á§Ö§Û§ã§î§Ü§Ö
§ã§å§ã?§Õ§ã§ä§Ó§à §ä§Ñ §á§Ñ§â§ä§ß§Ö§â§ã§ä§Ó§à)
§³§±?§­§¾§¯§ª§« §°§²§¡§¯ §µ§¬§±§²§¡§£§­?§¯§¯§Á
(§®?§ß?§ã§ä§Ö§â§ã§ä§Ó§à §â§Ö§Ô?§à§ß§Ñ§Ý§î§ß§à§Ô§à §â§à§Ù§Ó§Ú§ä§å
§ä§Ñ §á§å§Ò§Ý?§é§ß§à§Ô§à §å§á§â§Ñ§Ó§Ý?§ß§ß§ñ §²§å§Þ§å§ß??)
§³§±?§­§¾§¯§ª§« §´§¦§·§¯?§¹§¯§ª§« §³§¦§¬§²§¦§´§¡§²?§¡§´
(§²§Ö§Ô?§à§ß§Ñ§Ý§î§ß§Ú§Û §à§æ?§ã §±§â§à§Ô§â§Ñ§Þ§Ú
§´§â§Ñ§ß§ã§Ü§à§â§Õ§à§ß§ß§à§Ô§à §³§á?§Ó§â§à§Ò?§ä§ß§Ú§è§ä§Ó§Ñ,
§²§å§Þ§å§ß?§ñ)
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
THE MEMBERS
(CONTRACTORS)
OF THE PROJECT
FROM ENTSO-E
§µ§¹§¡§³§¯§ª§¬§ª
(§±?§¥§²§Á§¥§¯§ª§¬§ª)
§±§²§°§¦§¬§´§µ §£?§¥
ENTSO-E
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
TRANSELECTRICA (Romania)
MAVIR (Hungary)
PSE (Poland)
ESO EAD (Bulgaria)
EMS (Serbia)
Bernard Energy Advocacy
(Belgium)
TRANSELECTRICA (§²§å§Þ§å§ß?§ñ)
MAVIR (§µ§Ô§à§â§ë§Ú§ß§Ñ)
PSE (§±§à§Ý§î§ë§Ñ)
ESO EAD (§¢§à§Ý§Ô§Ñ§â?§ñ)
EMC (§³§Ö§â§Ò?§ñ)
Bernard Energy Advocacy
(§¢§Ö§Ý§î§Ô?§ñ)
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
THE STRUCTURE
OF PROJECT
IMPLEMENTATION
IN UKRAINE
§³§´§²§µ§¬§´§µ§²§¡
§²§¦§¡§­?§©§¡§¸??
§±§²§°§¦§¬§´§µ §£
§µ§¬§²§¡?§¯?
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
§®?§¯?§³§´§¦§²§³§´§£§° §¦§¯§¦§²§¤§¦§´§ª§¬§ª §´§¡
§£§µ§¤?§­§¾§¯§°? §±§®§ª§®§³§­§°§£§°§³§´?
§µ§¬§²§¡?§¯§ª ¨C §±§¡§²§´§¯§¦§² 2
§¯§¦§¬ ¡°§µ§¬§²§¦§¯§¦§²§¤§°¡±
CZECHPOL ENERGY
MINISTRY OF ENERGY AND
COAL INDUSTRY OF UKRAINE ¨C
PARTNER 2
NEC ¡°UEKENERGO¡±
CZECHPOL ENERGY
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
STAGES OF
INTERCONNECTION OF
ENERGY SYSTEMS OF
UKRAINE AND
MOLDOVA WITH THE
ENTSO-E SYSTEM
§³§´§¡§¥?? §°§¢¡¯?§¥§¯§¡§¯§¯§Á
§¦§¯§¦§²§¤§°§³§ª§³§´§¦§®
§µ§¬§²§¡?§¯§ª §´§¡
§®§°§­§¥§°§£§ª §©
§³§ª§³§´§¦§®§°§À ENTSO-E
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
STAGE A.
Preparation of the Agreement, which will
be signed by UE / Moldelectrica and
UCTE (ENTSO-E), which will include:
technical specifications and operational
aspects, including the agreement
between the UE and Moldelectrica on
maintaining of the control unit; separation
conditions,operating the congestion
regime ; legal / regulatory framework.
The result ¨C all technical and legal
requirements for the full accession of the
Ukrainian and Moldovan electric power to
the electricity grid UCTE must be carried
out.;
§³§´§¡§¥?§Á §¡.
§±?§Õ§Ô§à§ä§à§Ó§Ü§Ñ §µ§Ô§à§Õ§Ú, §ñ§Ü§å §Þ§Ñ§ð§ä§î §á?§Õ§á§Ú§ã§Ñ§ä§Ú
§µ§Ü§â§Ö§ß§Ö§â§Ô§à/Moldelectrica §ä§Ñ ENTSO-E, §ñ§Ü§Ñ
§Ó§Ü§Ý§ð§é§Ñ§ä§Ú§Þ§Ö: §ä§Ö§ç§ß?§é§ß? §å§Þ§à§Ó§Ú §Û
§Ö§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?§Û§ß? §Ñ§ã§á§Ö§Ü§ä§Ú, §å §ä§à§Þ§å §é§Ú§ã§Ý? §å§Ô§à§Õ§å
§Þ?§Ø §µ§Ü§â§Ö§ß§Ö§â§Ô§à §ä§Ñ Moldelectrica §Ù
§Ö§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?? §Ü§à§ß§ä§â§à§Ý§î§ß§à§Ô§à §Ò§Ý§à§Ü§å; §å§Þ§à§Ó§Ú
§â§à§Ù§Þ§Ö§Ø§å§Ó§Ñ§ß§ß§ñ; §Ó§Ö§Õ§Ö§ß§ß§ñ §â§Ö§Ø§Ú§Þ§å
§á§Ö§â§Ö§Ó§Ñ§ß§ä§Ñ§Ø§Ö§ß§ß§ñ; §ð§â§Ú§Õ§Ú§é§ß?/§â§Ö§Ô§å§Ý§ñ§ä§à§â§ß?
§å§Þ§à§Ó§Ú.
§²§Ö§Ù§å§Ý§î§ä§Ñ§ä ¨C §á?§Õ§Ô§à§ä§à§Ó§Ý§Ö§ß? §ä§Ö§ç§ß?§é§ß? §ä§Ñ
§ð§â§Ú§Õ§Ú§é§ß? §Ó§Ú§Þ§à§Ô§Ú §Õ§Ý§ñ §á§à§Ó§ß§à§Ô§à §á§â§Ú?§Õ§ß§Ñ§ß§ß§ñ
§å§Ü§â§Ñ?§ß§ã§î§Ü§à? §Û §Þ§à§Ý§Õ§à§Ó§ã§î§Ü§à? §Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§Ú§ç
§Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ §Õ§à §Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§à?
§Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ú ENTSO-E;
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
STAGE B.
Implementation of the Agreement in
Ukrainian and Moldovan sides. During
the second phase all the technical and
organizational measures should be
implemented in order to meet standards
under the User's Guide ENTSO-E.
The end result will be a report prepared
for the Steering Committee of ENTSO-
E, and preparation of the requests to
switch to stage "C ¡±.
§³§´§¡§¥?§Á B.
§£§á§â§à§Ó§Ñ§Õ§Ø§Ö§ß§ß§ñ §á§à§Ý§à§Ø§Ö§ß§î §µ§Ô§à§Õ§Ú
§å§Ü§â§Ñ?§ß§ã§î§Ü§à§ð §ä§Ñ §Þ§à§Ý§Õ§Ñ§Ó§ã§î§Ü§à§ð §ã§ä§à§â§à§ß§Ñ§Þ§Ú.
§±§â§à§ä§ñ§Ô§à§Þ §Õ§â§å§Ô§à§Ô§à §Ö§ä§Ñ§á§å §Þ§Ñ§ð§ä§î §Ò§å§ä§Ú
§Ó§á§â§à§Ó§Ñ§Õ§Ø§Ö§ß? §Ó§ã? §ä§Ö§ç§ß?§é§ß? §ä§Ñ §à§â§Ô§Ñ§ß?§Ù§Ñ§è?§Û§ß?
§Ù§Ñ§ç§à§Õ§Ú, §ë§à§Ò §Þ§Ñ§ä§Ú §Ù§Þ§à§Ô§å §Ù§Ñ§Õ§à§Ó§à§Ý§î§ß§ñ§ä§Ú
§ã§ä§Ñ§ß§Õ§Ñ§â§ä§Ñ§Þ §Ó?§Õ§á§à§Ó?§Õ§ß§à §Õ§à §±§à§ã?§Ò§ß§Ú§Ü§Ñ §Ù
§Ö§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?? ENTSO-E.
§¬?§ß§è§Ö§Ó§Ú§Þ §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§à§Þ §Ò§å§Õ§Ö §Ù§Ó?§ä,
§á?§Õ§Ô§à§ä§à§Ó§Ý§Ö§ß§Ú§Û §Õ§Ý§ñ §¬§Ö§â?§Ó§ß§à§Ô§à §Ü§à§Þ?§ä§Ö§ä§å
ENTSO-E, §ä§Ñ §á?§Õ§Ô§à§ä§à§Ó§Ü§Ñ §Ù§Ñ§á§Ú§ä§å §Õ§Ý§ñ
§á§Ö§â§Ö§ç§à§Õ§å §Õ§à §ã§ä§Ñ§Õ?? "§³¡±.
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
STAGE C.
Preparation and testing in regime of
separate work and regime of connected
power systems. Evaluation of test
results. The next step should be
resolution of the test and testing using
the synchronous interconnection of the
area.
§³§´§¡§¥?§Á C.
§±?§Õ§Ô§à§ä§à§Ó§Ü§Ñ §Û §á§â§à§Ó§Ö§Õ§Ö§ß§ß§ñ §Ó§Ú§á§â§à§Ò§å§Ó§Ñ§ß§î §å
§â§Ö§Ø§Ú§Þ§Ñ§ç §â§à§Ù§Õ?§Ý§î§ß§à? §â§à§Ò§à§ä§Ú §ä§Ñ
§à§Ò'?§Õ§ß§Ñ§ß§ß§ñ §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ. §°§è?§ß§Ü§Ñ
§â§Ö§Ù§å§Ý§î§ä§Ñ§ä?§Ó §Ó§Ú§á§â§à§Ò§å§Ó§Ñ§ß§î. §¯§Ñ§ã§ä§å§á§ß§Ú§Þ
§Ü§â§à§Ü§à§Þ §Þ§Ñ? §Ò§å§ä§Ú §á§â§à§Ó§Ö§Õ§Ö§ß§ß§ñ
§Ó§Ú§á§â§à§Ò§å§Ó§Ñ§ß§î §â§à§Ù§Õ?§Ý§î§ß§à? §â§à§Ò§à§ä§Ú §Û
§Ó§Ú§á§â§à§Ò§å§Ó§Ñ§ß§ß§ñ §Ó §â§Ö§Ø§Ú§Þ? §à§Ò'?§Õ§ß§Ñ§ß§ß§ñ
§Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ ?§Ù §ã§Ú§ß§ç§â§à§ß§ß§à§ð §Ù§à§ß§à§ð.
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
THE MAIN
PRINCIPLES OF
PARTNERSHIP
§°§³§¯§°§£§¯?
§±§²§ª§¯§¸§ª§±§ª
§³§±?§£§²§°§¢?§´§¯§ª§¸§´§£§¡
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
? The possibility of providing funds to 90%
of the project under the European
Neighbourhood Policy and the
partnership program by CBC Romania-
Ukraine-Moldova 2007 ¨C 2013 was
determined. The remaining 10% of the
project should be divided between the
ministries of Moldova, Ukraine and
Romania.
? It is agreed that Moldova will submit an
application for funding on behalf of two
other beneficiaries. Proposals were
presented on March 31, 2011 to the Joint
Steering Committee of the Joint
Operational Programme, which is located
in the Ministry of Regional Development
in Romania.
? §±§à§Ô§à§Õ§Ø§Ö§ß§à, §ë§à 90% §Ó§Ñ§â§ä§à§ã§ä? §á§â§à§Ö§Ü§ä§å §Ó
§â§Ñ§Þ§Ü§Ñ§ç ?§ß§ã§ä§â§å§Þ§Ö§ß§ä§å ?§Ó§â§à§á§Ö§Û§ã§î§Ü§à? §á§à§Ý?§ä§Ú§Ü§Ú
§ã§å§ã?§Õ§ã§ä§Ó§Ñ §ä§Ñ §á§Ñ§â§ä§ß§Ö§â§ã§ä§Ó§Ñ §Ù§Ñ §â§Ñ§ç§å§ß§à§Ü
§á§â§à§Ô§â§Ñ§Þ§Ú §á§â§Ú§Ü§à§â§Õ§à§ß§ß§à§Ô§à §ã§á?§Ó§â§à§Ò?§ä§ß§Ú§è§ä§Ó§Ñ
§²§å§Þ§å§ß?§ñ-§µ§Ü§â§Ñ?§ß§Ñ-§®§à§Ý§Õ§à§Ó§Ñ 2007- 2013.
§²§Ö§ê§ä§Ñ 10% §Ó§Ñ§â§ä§à§ã§ä? §á§â§à§Ö§Ü§ä§å §Þ§Ñ? §Ò§å§ä§Ú
§Ó§Ú§Õ?§Ý§Ö§ß§Ñ §Þ?§ß?§ã§ä§Ö§â§ã§ä§Ó§Ñ§Þ§Ú §®§à§Ý§Õ§à§Ó§Ú,
§µ§Ü§â§Ñ?§ß§Ú ? §²§å§Þ§å§ß??.
? §±§à§Ô§à§Õ§Ø§Ö§ß§à, §ë§à §®§à§Ý§Õ§à§Ó§Ñ §á§à§Õ§Ñ§Ó§Ñ§ä§Ú§Þ§Ö
§Ù§Ñ§ñ§Ó§Ü§å §ß§Ñ §à§ä§â§Ú§Þ§Ñ§ß§ß§ñ §Ü§à§ê§ä?§Ó §Ó?§Õ ?§Þ§Ö§ß? §Õ§Ó§à§ç
?§ß§ê§Ú§ç §Ò§Ö§ß§Ö§æ?§è?§Ñ§â?§Ó. §±§â§à§Ö§Ü§ä§ß? §á§â§à§á§à§Ù§Ú§è??
§Ò§å§Ý§Ú §á§â§Ö§Õ§ã§ä§Ñ§Ó§Ý§Ö§ß? 31 §Ò§Ö§â§Ö§Ù§ß§ñ 2011 §â.
§³§á?§Ý§î§ß§à§Þ§å §Ü§Ö§â§å§ð§é§à§Þ§å §Ü§à§Þ?§ä§Ö§ä§å §³§á?§Ý§î§ß§à?
§à§á§Ö§â§Ñ§ä§Ú§Ó§ß§à? §á§â§à§Ô§â§Ñ§Þ§Ú, §ñ§Ü§Ú§Û §Ù§ß§Ñ§ç§à§Õ§Ú§ä§î§ã§ñ §Ó
§®?§ß?§ã§ä§Ö§â§ã§ä§Ó? §â§Ö§Ô?§à§ß§Ñ§Ý§î§ß§à§Ô§à §â§à§Ù§Ó§Ú§ä§Ü§å §Ó
§²§å§Þ§å§ß??.
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
? The Project implementation involves 4
work groups ¨C steady analysis, dynamic
analysis, operational issues,
legal/regulatory issues.
? Moldova as the Lead Partner shall submit
to JMA of the Joint Operational Program
all reports prepared by the Partner 2
(Ukraine).
? The work results of all 4 work groups
shall be submitted to the Leaders-
ENTSO-e within each work group.
? §±§à§Ô§à§Õ§Ø§Ö§ß§à, §ë§à §á§â§Ú §â§Ö§Ñ§Ý?§Ù§Ñ§è?? §±§â§à§Ö§Ü§ä§å
§Õ?§ð§ä§î 4 §â§à§Ò§à§é§Ú§ç §Ô§â§å§á§Ú ¨C §ã§ä§Ñ§ä§Ú§é§ß§Ú§Û §Ñ§ß§Ñ§Ý?§Ù,
§Õ§Ú§ß§Ñ§Þ?§é§ß§Ú§Û §Ñ§ß§Ñ§Ý?§Ù, §à§á§Ö§â§Ñ§è?§Û§ß? §á§Ú§ä§Ñ§ß§ß§ñ,
§â§Ö§Ô§å§Ý§ñ§ä§à§â§ß?/§ð§â§Ú§Õ§Ú§é§ß? §á§Ú§ä§Ñ§ß§ß§ñ.
? §±§à§Ô§à§Õ§Ø§Ö§ß§à, §ë§à §®§à§Ý§Õ§à§Ó§Ñ §ñ§Ü §¤§à§Ý§à§Ó§ß§Ú§Û
§±§Ñ§â§ä§ß§Ö§â §Ò§å§Õ§Ö §á§à§Õ§Ñ§Ó§Ñ§ä§Ú §Õ§à§Ü§å§Þ§Ö§ß§ä§Ú
§Ù§Ó?§ä§ß§à§ã§ä? §Ù§Ñ §Ó§Ú§Ü§à§ß§Ñ§ß? §â§à§Ò§à§ä§Ú §±§Ñ§â§ä§ß§Ö§â§Ñ 2
(§µ§Ü§â§Ñ?§ß§Ñ) §Ó §Þ§Ö§Ø§Ñ§ç §â§à§Ò§à§é§Ú§ç §Ô§â§å§á §³§á?§Ý§î§ß§à§Þ§å
§Ü§Ö§â§å§ð§é§à§Þ§å §Ü§à§Þ?§ä§Ö§ä§å §³§á?§Ý§î§ß§à? §à§á§Ö§â§Ñ§ä§Ú§Ó§ß§à?
§á§â§à§Ô§â§Ñ§Þ§Ú.
? §±§à§Ô§à§Õ§Ø§Ö§ß§à, §ë§à §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§Ú §â§à§Ò?§ä, §Ó§Ú§Ü§à§ß§Ñ§ß?
§Ó §Þ§Ö§Ø§Ñ§ç 4 §â§à§Ò§à§é§Ú§ç §Ô§â§å§á, §á§Ö§â§Ö§Õ§Ñ§ð§ä§î§ã§ñ
§­?§Õ§Ö§â§Ñ§Þ-ENTSO-E §Ü§à§Ø§ß§à? §â§à§Ò§à§é§à? §Ô§â§å§á§Ú.
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
ORGANISATION
OF THE PROJECT
IMPLEMENTATION
§°§²§¤§¡§¯?§©§¡§¸?§Á
§£§ª§¬§°§¯§¡§¯§¯§Á
§±§²§°§¦§¬§´§µ
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
WG1L
(EMS)
WG2L
(PSE)
WG3L
(ESO
EAD)
WG4L
(BEA)
CONSORTIUM OF TSOs -
ENTSO-E
(Work Group Leaders-ENTSO-
E)
WG1
Steady
State
analysis
WG2
Dynamic
analysis
WG3
Operational
issues
WG4
Regulatory
/Legal
issues
§¬§°§¯§³§°§²§¸?§µ§® §°§±§¦§²§¡§´§°§²?§£
ENTSO-E
§­?§Õ§Ö§â§Ú §â§à§Ò§à§é§Ú§ç §Ô§â§å§á ENTSO-E
§²§¤ 1
§­?§Õ§Ö§â
(EMS)
§²§¤ 2
§­?§Õ§Ö§â
(PSE)
§²§¤3
§­?§Õ§Ö§â
(ESO-EAD)
§²§¤4
§­?§Õ§Ö§â
(BEA)
§²§¤ 1
§³§ä§Ñ§ä§Ú§é§ß§Ú§Û
§Ñ§ß§Ñ§Ý?§Ù
§²§¤ 2
§¥§Ú§ß§Ñ§Þ?§é§ß§Ú§Û
§Ñ§ß§Ñ§Ý?§Ù
§²§¤ 3
§¦§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è
?§Û§ß? §Ñ§ã§á§Ö§Ü§ä§Ú
§²§¤ 4
§²§Ö§Ô§å§Ý§ñ§ä§à§â§ß?/
§À§â§Ú§Õ§Ú§é§ß?
§á§Ú§ä§Ñ§ß§ß§ñ
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
THE FIRST
RESULTS OF
PROJECT
IMPLEMENTATION
BY THE PARTNER
2 (UKRAINE)
§±§¦§²§º?
§²§¦§©§µ§­§¾§´§¡§´§ª
§£§±§²§°§£§¡§¥§¨§¦§¯§¯§Á
§±§²§°§¦§¬§´§µ
§±§¡§²§´§¯§¦§²§°§® 2
(§µ§¬§²§¡?§¯§°§À)
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
WORK GROUP 1
(Steady analysis)
1. GENERAL GROUP TASK ¨C providing a steady
state analysis as for synchronous work at
interconnection of energy system ENTSO-E with
the energy systems of Ukraine and Moldova.
2. CURRENT GROUP TASK ¨C to prepare the joint
digital model of trunk transmission grids of the
Eastern European countries involving Ukrainian
and Moldavian models that could be applicable for
steady state analysis.
3. HEAD OF THE WORK GROUP ¨C Nenand
Shiiakovych (EMS ¨C the TSO of Serbia).
DONE as of 16.03.2015: prepared two models of
trunk transmission grids of the energy system of
Ukraine for 2020 110 kW and more: winter and
summer peaks in 2020. These models of Ukrainian
electricity system includes 8 energy systems:
North, Donbass, Dniprovska, Crimean, South,
Central, South-West and West.
§²§°§¢§°§¹§¡ §¤§²§µ§±§¡ 1
(§³§ä§Ñ§ä§Ú§é§ß§Ú§Û §Ñ§ß§Ñ§Ý?§Ù)
1. §©§¡§¤§¡§­§¾§¯§¦ §©§¡§£§¥§¡§¯§¯§Á §¤§²§µ§±§ª ¨C §Ó§Ú§Ü§à§ß§Ñ§ß§ß§ñ
§Õ§à§ã§Ý?§Õ§Ø§Ö§ß§î §å§ã§ä§Ñ§Ý§Ö§ß§Ú§ç §â§Ö§Ø§Ú§Þ?§Ó §á§â§Ú §à§Ò¡¯?§Õ§ß§Ñ§ß?
§Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ ENTSO-E §Ù §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ñ§Þ§Ú §µ§Ü§â§Ñ?§ß§Ú
§ä§Ñ §®§à§Ý§Õ§à§Ó§Ú §ß§Ñ §ã§Ú§ß§ç§â§à§ß§ß§å §â§à§Ò§à§ä§å.
2. §±§°§´§°§¹§¯§¦ §©§¡§£§¥§¡§¯§¯§Á §¤§²§µ§±§ª ¨C §á?§Õ§Ô§à§ä§å§Ó§Ñ§ä§Ú
§à§Ò¡¯?§Õ§ß§Ñ§ß§å §è§Ú§æ§â§à§Ó§å §Þ§à§Õ§Ö§Ý§î §Þ§Ñ§Ô?§ã§ä§â§Ñ§Ý§î§ß§Ú§ç
§Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§Ú§ç §Þ§Ö§â§Ö§Ø §Ü§â§Ñ?§ß §ã§ç?§Õ§ß§à? ?§Ó§â§à§á§Ú,
§Ó§Ü§Ý§ð§é§Ñ§ð§é§Ú §Þ§à§Õ§Ö§Ý? §µ§Ü§â§Ñ?§ß§Ú §ä§Ñ §®§à§Ý§Õ§à§Ó§Ú §á§â§Ú§Õ§Ñ§ä§ß§å
§Õ§Ý§ñ §Õ§à§ã§Ý?§Õ§Ø§Ö§ß§î §å§ã§ä§Ñ§Ý§Ö§ß§Ú§ç §â§Ö§Ø§Ú§Þ?§Ó.
3. §¬§¦§²?§£§¯§ª§¬ §²§°§¢§°§¹§°? §¤§²§µ§±§ª - §¯§Ö§ß§Ñ§ß§Õ §º§Ú§ñ§Ü§à§Ó§Ú§é
(EMS ¨C §ã§Ú§ã§ä§Ö§Þ§ß§Ú§Û §à§á§Ö§â§Ñ§ä§à§â §³§Ö§â§Ò??).
§£§ª§¬§°§¯§¡§¯§° §ã§ä§Ñ§ß§à§Þ §ß§Ñ 16.03.2015: §â§à§Ù§â§à§Ò§Ý§Ö§ß§à §Õ§Ó?
§Þ§à§Õ§Ö§Ý? §Þ§Ñ§Ô?§ã§ä§â§Ñ§Ý§î§ß§Ú§ç §Þ§Ö§â§Ö§Ø §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §ß§Ñ 2020
110 §Ü§£ §ä§Ñ §Ó§Ú§ë§Ö: §Ù§Ú§Þ§à§Ó§Ú§Û §ä§Ñ §Ý?§ä§ß?§Û §Þ§Ñ§Ü§ã§Ú§Þ§å§Þ§Ú
§ß§Ñ§Ó§Ñ§ß§ä§Ñ§Ø§Ö§ß§î 2020 §â§à§Ü§å. §µ §Õ§Ñ§ß§Ú§ç §Þ§à§Õ§Ö§Ý§ñ§ç §°§¦§³
§µ§Ü§â§Ñ?§ß§Ú §á§â§Ö§Õ§ã§ä§Ñ§Ó§Ý§Ö§ß§Ñ 8 §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ñ§Þ§Ú:
§±?§Ó§ß?§é§ß§à§ð, §¥§à§ß§Ò§Ñ§ã§î§Ü§à§ð, §¥§ß?§á§â§à§Ó§ã§î§Ü§à§ð, §¬§â§Ú§Þ§ã§î§Ü§à§ð,
§±?§Ó§Õ§Ö§ß§ß§à§ð, §¸§Ö§ß§ä§â§Ñ§Ý§î§ß§à§ð, §±?§Ó§Õ§Ö§ß§ß§à-§©§Ñ§ç?§Õ§ß§à§ð §ä§Ñ
§©§Ñ§ç?§Õ§ß§à§ð.
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
WORK GROUP 2
(Dynamic analysis)
1. GENERAL GROUP TASK ¨C providing a
transitional process analysis and analysis of steady
state stability as for synchronous work at
interconnection of energy system ENTSO-E with
the energy systems of Ukraine and Moldova.
2. CURRENT GROUP TASK ¨C to prepare the
dynamic model which could be applicable for
transitional process analysis and analysis of steady
state stability based on the joint digital model of
trunk transmission grids of the Eastern European
countries involving Ukrainian and Moldavian
models.
3. HEAD OF THE WORK GROUP ¨C Robert Trebski
(PSE S.A. ¨C the TSO of Poland).
DONE as of 16.03.2015: prepared the project of the
basic model of the electricity system of Ukraine for
calculation of the dynamic stability taking into
account the basis of project¡¯s model ¡°
Chornomorskii circle¡±, after updating of the dynamic
model it shall be verified with application of WAMS
data.
§²§°§¢§°§¹§¡ §¤§²§µ§±§¡ 2
(§¥§Ú§ß§Ñ§Þ?§é§ß§Ú§Û §Ñ§ß§Ñ§Ý?§Ù)
1. §©§¡§¤§¡§­§¾§¯§¦ §©§¡§£§¥§¡§¯§¯§Á §¤§²§µ§±§ª ¨C §Ó§Ú§Ü§à§ß§Ñ§ß§ß§ñ
§Õ§à§ã§Ý?§Õ§Ø§Ö§ß§î §á§Ö§â§Ö§ç?§Õ§ß§Ú§ç §á§â§à§è§Ö§ã?§Ó §ä§Ñ §ã§ä?§Û§Ü§à§ã§ä?
§â§Ö§Ø§Ú§Þ?§Ó §á§â§Ú §à§Ò¡¯?§Õ§ß§Ñ§ß? §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ ENTSO-E §Ù
§Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ñ§Þ§Ú §µ§Ü§â§Ñ?§ß§Ú §ä§Ñ §®§à§Ý§Õ§à§Ó§Ú §ß§Ñ §ã§Ú§ß§ç§â§à§ß§ß§å
§â§à§Ò§à§ä§å.
2. §±§°§´§°§¹§¯§¦ §©§¡§£§¥§¡§¯§¯§Á §¤§²§µ§±§ª ¨C §ß§Ñ §á?§Õ§ã§ä§Ñ§Ó?
§à§Ò¡¯?§Õ§ß§Ñ§ß§à? §è§Ú§æ§â§à§Ó§à? §Þ§à§Õ§Ö§Ý? §Þ§Ñ§Ô?§ã§ä§â§Ñ§Ý§î§ß§Ú§ç
§Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§Ú§ç §Þ§Ö§â§Ö§Ø §Ü§â§Ñ?§ß §ã§ç?§Õ§ß§à? ?§Ó§â§à§á§Ú,
§Ó§Ü§Ý§ð§é§Ñ§ð§é§Ú §Þ§à§Õ§Ö§Ý? §µ§Ü§â§Ñ?§ß§Ú §ä§Ñ §®§à§Ý§Õ§à§Ó§Ú §á?§Õ§Ô§à§ä§å§Ó§Ñ§ä§Ú
§Õ§Ú§ß§Ñ§Þ?§é§ß§å §Þ§à§Õ§Ö§Ý§î §á§â§Ú§Õ§Ñ§ä§ß§å §Õ§Ý§ñ §Õ§à§ã§Ý?§Õ§Ø§Ö§ß§î
§á§Ö§â§Ö§ç?§Õ§ß§Ú§ç §á§â§à§è§Ö§ã?§Ó §ä§Ñ §ã§ä?§Û§Ü§à§ã§ä? §â§Ö§Ø§Ú§Þ?§Ó.
3. §¬§¦§²?§£§¯§ª§¬ §²§°§¢§°§¹§°? §¤§²§µ§±§ª - §²§à§Ò§Ö§â§ä §´§â§Ö§Ò§ã§Ü?
(PSE S.A. ¨C §ã§Ú§ã§ä§Ö§Þ§ß§Ú§Û §à§á§Ö§â§Ñ§ä§à§â §±§à§Ý§î§ë?).
§£§ª§¬§°§¯§¡§¯§° §ã§ä§Ñ§ß§à§Þ §ß§Ñ 16.03.2015:
§â§à§Ù§â§à§Ò§Ý§Ö§ß§à §á§â§à§Ö§Ü§ä §Ò§Ñ§Ù§à§Ó§à? §Þ§à§Õ§Ö§Ý? §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Õ§Ý§ñ
§â§à§Ù§â§Ñ§ç§å§ß§Ü§å §Õ§Ú§ß§Ñ§Þ?§é§ß§à§ð §ã§ä?§Û§Ü§à§ã§ä?, §Ó §ñ§Ü§å §Ó§Ù§ñ§ä§à §Ù§Ñ
§à§ã§ß§à§Ó§å §Þ§à§Õ§Ö§Ý§î §á§à §á§â§à§Ö§Ü§ä§å ?§¹§à§â§ß§à§Þ§à§â§ã§î§Ü§à§Ô§à
§Ü?§Ý§î§è§ñ?;§á?§ã§Ý§ñ §Õ§à§à§á§â§Ñ§è§ð§Ó§Ñ§ß§ß§ñ §Õ§Ú§ß§Ñ§Þ?§é§ß§à? §Þ§à§Õ§Ö§Ý?
§Ó§à§ß§Ñ §Ò§å§Õ§Ö §Ó§Ö§â§Ú§æ?§Ü§à§Ó§Ñ§ß§Ñ §Ù §Ó§Ú§Ü§à§â§Ú§ã§ä§Ñ§ß§ß§ñ§Þ §Õ§Ñ§ß§Ú§ç
§ã§Ú§ã§ä§Ö§Þ§Ú WAMS.
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
WORK GROUP 3
(Operational issues)
1. GENERAL GROUP TASK ¨C preparation of the
system of exploitation and management of the United
Power System of Ukraine at the time of synchronous
working with ENTSO-E.
2. CURRENT GROUP TASK ¨C defining the key
directions related to adaptation of the system of
exploitation and management of the United Power
System of Ukraine to the ENTSO-E rules.
3. HEAD OF THE WORK GROUP ¨C Dimitar Zarchev,
the head of department of automatic dispatch
engineering of TSO EAD, Bolgaria.
DONE as of 16.03.2015:
Organizational dispatching structure of Ukraine;
Plan of recovery a normal regime and Security Plan;
Filled 3rd Package of Questionnaire and
Questionnaire of self-assessment of conformity to
¡°Instruction on exploitation of ENTSO-E power
systems¡±.
§²§°§¢§°§¹§¡ §¤§²§µ§±§¡ 3
(§¦§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?§Û§ß? §Ñ§ã§á§Ö§Ü§ä§Ú)
1. §©§¡§¤§¡§­§¾§¯§¦ §©§¡§£§¥§¡§¯§¯§Á §¤§²§µ§±§ª ¨C §â§à§Ù§â§à§Ò§Ü§Ñ
§ã§Ú§ã§ä§Ö§Þ§Ú §Ö§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?? §ä§Ñ §å§á§â§Ñ§Ó§Ý?§ß§ß§ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú
§á?§Õ §é§Ñ§ã §ã§Ú§ß§ç§â§à§ß§ß§à? §â§à§Ò§à§ä§Ú §Ù ENTSO-E.
2. §±§°§´§°§¹§¯§¦ §©§¡§£§¥§¡§¯§¯§Á §¤§²§µ§±§ª ¨C §Ó§Ú§Ù§ß§Ñ§é§Ö§ß§ß§ñ
§à§ã§ß§à§Ó§ß§Ú§ç §ß§Ñ§á§â§ñ§Þ?§Ó §Ñ§Õ§Ñ§á§ä§Ñ§è?? §ã§Ú§ã§ä§Ö§Þ§Ú §Ö§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è??
§ä§Ñ §å§á§â§Ñ§Ó§Ý?§ß§ß§ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Õ§à §ß§à§â§Þ ENTSO-E.
3.§¬§¦§²?§£§¯§ª§¬ §²§°§¢§°§¹§°? §¤§²§µ§±§ª - §¥?§Þ?§ä§Ñ§â §©§Ñ§â§é§Ö§Ó,
§Ü§Ö§â?§Ó§ß§Ú§Ü §Õ§Ö§á§Ñ§â§ä§Ñ§Þ§Ö§ß§ä§å §ã§Ú§ã§ä§Ö§Þ §Õ§Ú§ã§á§Ö§ä§é§Ö§â§ã§î§Ü§à?
§Ñ§Ó§ä§à§Þ§Ñ§ä§Ú§Ü§Ú TSO EAD, §¢§à§Ý§Ô§Ñ§â?§ñ.
§£§ª§¬§°§¯§¡§¯§° §ã§ä§Ñ§ß§à§Þ §ß§Ñ 16.03.2015:
§°§â§Ô§Ñ§ß?§Ù§Ñ§è?§Û§ß§Ñ §ã§ä§â§å§Ü§ä§å§â§Ñ §Õ§Ú§ã§á§Ö§ä§é§Ú§ß§Ô§å §µ§Ü§â§Ñ?§ß§Ú;
§±§Ý§Ñ§ß §Ó?§Õ§ß§à§Ó§Ý§Ö§ß§ß§ñ §ß§à§â§Þ§Ñ§Ý§î§ß§à§Ô§à §â§Ö§Ø§Ú§Þ§å §ä§Ñ §±§Ý§Ñ§ß
§Ù§Ñ§ç§Ú§ã§ä§å;
§©§Ñ§á§à§Ó§ß§Ö§ß§Ú§Û ??? §±§Ñ§Ü§Ö§ä §à§á§Ú§ä§å§Ó§Ñ§Ý§î§ß§Ú§Ü§Ñ §ä§Ñ
§à§á§Ú§ä§å§Ó§Ñ§Ý§î§ß§Ú§Ü §ã§Ñ§Þ§à§à§è?§ß§ð§Ó§Ñ§ß§ß§ñ §Ó?§Õ§á§à§Ó?§Õ§ß§à§ã§ä?
¡°?§ß§ã§ä§â§å§Ü§è?? §Ù §Ö§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?? §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ú ENTSO-E¡±
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
WORK GROUP 4
(Regulatory/Legal issues)
1. GENERAL GROUP TASK ¨C preparation of
Agreement on interconnection of electricity systems
with all technical and legal provisions that should
be signed between NEC Ukrenergo/Moldelectrica
and ENTSO-E.
2. CURRENT GROUP TASK ¨C to identify the key
legal issues in the electricity legislation of Ukraine
taking into account the EU regulation (Third Energy
Package).
3. HEAD OF THE WORK GROUP ¨C Pierre
Bernard, the founder of Bernard Energy Advocacy
(Brussels, Belgium).
DONE as of 16.03.2015: the Legal Questionnaire
has been prepared where it is analysed the key
issues on electricity grid ownership and its
management, functioning of the wholesale
electricity market, the new model of electricity
market and its implementation, competition issues,
international agreements and others.
§²§°§¢§°§¹§¡ §¤§²§µ§±§¡ 4
(§²§Ö§Ô§å§Ý§ñ§ä§à§â§ß?/§À§â§Ú§Õ§Ú§é§ß? §á§Ú§ä§Ñ§ß§ß§ñ)
1. §©§¡§¤§¡§­§¾§¯§¦ §©§¡§£§¥§¡§¯§¯§Á §¤§²§µ§±§ª ¨C §á?§Õ§Ô§à§ä§à§Ó§Ü§Ñ
§µ§Ô§à§Õ§Ú, §ñ§Ü§å §Þ§Ñ§ð§ä§î §á?§Õ§á§Ú§ã§Ñ§ä§Ú §µ§Ü§â§Ö§ß§Ö§â§Ô§à/Moldelectrica
§ä§Ñ ENTSO-E, §ñ§Ü§Ñ §Ó§Ü§Ý§ð§é§Ñ§ä§Ú§Þ§Ö §Ó§ã? §ä§Ö§ç§ß?§é§ß? §ä§Ñ
§ð§â§Ú§Õ§Ú§é§ß? §å§Þ§à§Ó§Ú §à§Ò?§Õ§ß§Ñ§ß§ß§ñ §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ.
2. §±§°§´§°§¹§¯§¦ §©§¡§£§¥§¡§¯§¯§Á §¤§²§µ§±§ª ¨C §Ó§Ú§ñ§Ó§Ú§ä§Ú
§á§â§à§Ò§Ý§Ö§Þ§ß? §á§à§Ý§à§Ø§Ö§ß§ß§ñ §Ó §Ù§Ñ§Ü§à§ß§à§Õ§Ñ§Ó§ã§ä§Ó? §µ§Ü§â§Ñ?§ß§Ú §Ù
§á§Ú§ä§Ñ§ß§î §Ö§Ý§Ö§Ü§ä§â§à§Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú §ä§Ñ §Ó§â§Ñ§ç§å§Ó§Ñ§ä§Ú §á§à§Ý§à§Ø§Ö§ß§ß§ñ
§Ù§Ñ§Ü§à§ß§à§Õ§Ñ§Ó§ã§ä§Ó§Ñ ?§³ (§´§â§Ö§ä?§Û §Ö§ß§Ö§â§Ô§à§á§Ñ§Ü§Ö§ä).
3. §¬§¦§²?§£§¯§ª§¬ §²§°§¢§°§¹§°? §¤§²§µ§±§ª ¨C §±?§â §¢§Ö§â§ß§Ñ§â§Õ,
§Ù§Ñ§ã§ß§à§Ó§ß§Ú§Ü §Ü§à§Þ§á§Ñ§ß?? Bernard Energy Advocacy
(Brussels, Belgium).
§£§ª§¬§°§¯§¡§¯§° §ã§ä§Ñ§ß§à§Þ §ß§Ñ 16.03.2015:
§±?§Õ§Ô§à§ä§à§Ó§Ý§Ö§ß§Ú§Û §À§â§Ú§Õ§Ú§é§ß§Ú§Û §°§á§Ú§ä§å§Ó§Ñ§Ý§î§ß§Ú§Ü, §Õ§Ö
§á§â§à§Ó§à§Õ§Ú§ä§î§ã§ñ a§ß§Ñ§Ý?§Ù §Ü§Ý§ð§é§à§Ó§Ú§ç §á§Ú§ä§Ñ§ß§î §ë§à§Õ§à
§Ó§Ý§Ñ§ã§ß§à§ã§ä? §ß§Ñ §Ö§Ý§Ö§Ü§ä§â§à§Þ§Ö§â§Ö§Ø? §ä§Ñ §å§á§â§Ñ§Ó§Ý?§ß§ß§ñ §ß§Ú§Þ§Ú,
§æ§å§ß§Ü§è?§à§ß§å§Ó§Ñ§ß§ß§ñ §â§Ú§ß§Ü§å §à§á§ä§à§Ó§à? §ä§à§â§Ô?§Ó§Ý?, §ß§à§Ó§Ñ §Þ§à§Õ§Ö§Ý§î
§â§Ú§ß§Ü§å §Ö§Ý§Ö§Ü§ä§â§à§Ö§ß§Ö§â§Ô?? §ä§Ñ §á§à§â§ñ§Õ§à§Ü ?? §Ó§á§â§à§Ó§Ñ§Õ§Ø§Ö§ß§ß§ñ,
§á§Ú§ä§Ñ§ß§ß§ñ §Ü§à§ß§Ü§å§â§Ö§ß§è?? §ß§Ñ §â§Ú§ß§Ü§å, §Þ?§Ø§ß§Ñ§â§à§Õ§ß§Ú§ç
§Õ§à§Ô§à§Ó§à§â?§Ó §Ó §Ô§Ñ§Ý§å§Ù? §ä§Ñ §ß§Ú§Ù§Ü§Ñ ?§ß§ê§Ú§ç §á§Ú§ä§Ñ§ß§î.
Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E
Continental Europe Power System
MIS ETC code: 2739
THANK YOU!
§¥§Á§¬§µ§À!

More Related Content

Viewers also liked (6)

Brandon Kuehl
Brandon KuehlBrandon Kuehl
Brandon Kuehl
Brandon Kuehl
?
OSC2 Climate Collaborative and Regen Program
OSC2 Climate Collaborative and Regen Program OSC2 Climate Collaborative and Regen Program
OSC2 Climate Collaborative and Regen Program
Lara Jackle Dickinson
?
The coffee ingles,
The coffee  ingles,The coffee  ingles,
The coffee ingles,
Yayiis Embajadora
?
DNV Navigator
DNV NavigatorDNV Navigator
DNV Navigator
Cristina Lie
?
Perubahan dan pengembangan organisasi
Perubahan dan pengembangan organisasiPerubahan dan pengembangan organisasi
Perubahan dan pengembangan organisasi
Cendekiawan16
?

Similar to Presentation_Synchronous interconnection of Ukrainian and Moldovan power systems to ENTSO-E (1) (20)

§±§Ý§Ñ§ß??§ß§ä§Ö§Ô§â§Ñ§è?? §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Ó ENTSO-E
§±§Ý§Ñ§ß??§ß§ä§Ö§Ô§â§Ñ§è?? §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Ó ENTSO-E§±§Ý§Ñ§ß??§ß§ä§Ö§Ô§â§Ñ§è?? §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Ó ENTSO-E
§±§Ý§Ñ§ß??§ß§ä§Ö§Ô§â§Ñ§è?? §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Ó ENTSO-E
NPC Ukrenergo
?
?§ß§ä§Ö§Ô§â§Ñ§è?§ñ §Õ§à ENTSO-E. §¬§Ý§ð§é§à§Ó? §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§Ú §Ù§Ñ §Õ§Ó§Ñ §â§à§Ü§Ú
?§ß§ä§Ö§Ô§â§Ñ§è?§ñ §Õ§à ENTSO-E. §¬§Ý§ð§é§à§Ó? §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§Ú §Ù§Ñ §Õ§Ó§Ñ §â§à§Ü§Ú?§ß§ä§Ö§Ô§â§Ñ§è?§ñ §Õ§à ENTSO-E. §¬§Ý§ð§é§à§Ó? §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§Ú §Ù§Ñ §Õ§Ó§Ñ §â§à§Ü§Ú
?§ß§ä§Ö§Ô§â§Ñ§è?§ñ §Õ§à ENTSO-E. §¬§Ý§ð§é§à§Ó? §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§Ú §Ù§Ñ §Õ§Ó§Ñ §â§à§Ü§Ú
§¯§¦§¬ §µ§Ü§â§Ö§ß§Ö§â§Ô§à - NPC Ukrenergo
?
§±§â§Ö§Ù§Ö§ß§ä§Ñ§è?§ñ §Õ§à §Ó§Ú§ã§ä§å§á§å §á§â§Ö§Ù§Ú§Õ§Ö§ß§ä§Ñ §¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ§Ñ §À§â?§ñ §¯§Ö§Õ§Ñ§ê§Ü§à§Ó§ã§î§Ü§à§Ô§à §ß§Ñ §µ§Ü§â§Ñ?§ß§ã§î...
§±§â§Ö§Ù§Ö§ß§ä§Ñ§è?§ñ §Õ§à §Ó§Ú§ã§ä§å§á§å §á§â§Ö§Ù§Ú§Õ§Ö§ß§ä§Ñ §¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ§Ñ §À§â?§ñ §¯§Ö§Õ§Ñ§ê§Ü§à§Ó§ã§î§Ü§à§Ô§à §ß§Ñ §µ§Ü§â§Ñ?§ß§ã§î...§±§â§Ö§Ù§Ö§ß§ä§Ñ§è?§ñ §Õ§à §Ó§Ú§ã§ä§å§á§å §á§â§Ö§Ù§Ú§Õ§Ö§ß§ä§Ñ §¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ§Ñ §À§â?§ñ §¯§Ö§Õ§Ñ§ê§Ü§à§Ó§ã§î§Ü§à§Ô§à §ß§Ñ §µ§Ü§â§Ñ?§ß§ã§î...
§±§â§Ö§Ù§Ö§ß§ä§Ñ§è?§ñ §Õ§à §Ó§Ú§ã§ä§å§á§å §á§â§Ö§Ù§Ú§Õ§Ö§ß§ä§Ñ §¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ§Ñ §À§â?§ñ §¯§Ö§Õ§Ñ§ê§Ü§à§Ó§ã§î§Ü§à§Ô§à §ß§Ñ §µ§Ü§â§Ñ?§ß§ã§î...
§¯§¡§¦§¬ ?§¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ?
?
Connection agreement 28062017 !!
Connection agreement 28062017 !!Connection agreement 28062017 !!
Connection agreement 28062017 !!
§À§Ý?§ñ §³§à§Ü§à§Ý§à§Ó§Ñ
?
§±§Ñ§ß§Ö§Ý§î§ß§Ñ §Õ§Ú§ã§Ü§å§ã?§ñ ??§ß§ä§Ö§Ô§â§Ñ§è?§ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Õ§à ENTSO-E: §Ü§Ý§ð§é§à§Ó? §Ó§Ú§Ü§Ý§Ú§Ü§Ú §ä§Ñ §Ù§Ñ§Ó§Õ...
§±§Ñ§ß§Ö§Ý§î§ß§Ñ §Õ§Ú§ã§Ü§å§ã?§ñ ??§ß§ä§Ö§Ô§â§Ñ§è?§ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Õ§à ENTSO-E: §Ü§Ý§ð§é§à§Ó? §Ó§Ú§Ü§Ý§Ú§Ü§Ú §ä§Ñ §Ù§Ñ§Ó§Õ...§±§Ñ§ß§Ö§Ý§î§ß§Ñ §Õ§Ú§ã§Ü§å§ã?§ñ ??§ß§ä§Ö§Ô§â§Ñ§è?§ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Õ§à ENTSO-E: §Ü§Ý§ð§é§à§Ó? §Ó§Ú§Ü§Ý§Ú§Ü§Ú §ä§Ñ §Ù§Ñ§Ó§Õ...
§±§Ñ§ß§Ö§Ý§î§ß§Ñ §Õ§Ú§ã§Ü§å§ã?§ñ ??§ß§ä§Ö§Ô§â§Ñ§è?§ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Õ§à ENTSO-E: §Ü§Ý§ð§é§à§Ó? §Ó§Ú§Ü§Ý§Ú§Ü§Ú §ä§Ñ §Ù§Ñ§Ó§Õ...
§¯§¦§¬ §µ§Ü§â§Ö§ß§Ö§â§Ô§à - NPC Ukrenergo
?
?§Ó§â§à?§ß§ä§Ö§Ô§â§Ñ§è?§Û§ß§Ú§Û §Ó§Ö§Ü§ä§à§â §â§à§Ù§Ó§Ú§ä§Ü§å §¥§± ?§¯§¦§¬ ?§µ§Ü§â§Ö§ß§Ö§â§Ô§à??§ä§Ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú
?§Ó§â§à?§ß§ä§Ö§Ô§â§Ñ§è?§Û§ß§Ú§Û §Ó§Ö§Ü§ä§à§â §â§à§Ù§Ó§Ú§ä§Ü§å §¥§± ?§¯§¦§¬ ?§µ§Ü§â§Ö§ß§Ö§â§Ô§à??§ä§Ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú?§Ó§â§à?§ß§ä§Ö§Ô§â§Ñ§è?§Û§ß§Ú§Û §Ó§Ö§Ü§ä§à§â §â§à§Ù§Ó§Ú§ä§Ü§å §¥§± ?§¯§¦§¬ ?§µ§Ü§â§Ö§ß§Ö§â§Ô§à??§ä§Ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú
?§Ó§â§à?§ß§ä§Ö§Ô§â§Ñ§è?§Û§ß§Ú§Û §Ó§Ö§Ü§ä§à§â §â§à§Ù§Ó§Ú§ä§Ü§å §¥§± ?§¯§¦§¬ ?§µ§Ü§â§Ö§ß§Ö§â§Ô§à??§ä§Ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú
§¯§¦§¬ §µ§Ü§â§Ö§ß§Ö§â§Ô§à - NPC Ukrenergo
?
?§Ó§â§à§á§Ö§Û§ã§î§Ü§Ö §Ö§ß§Ö§â§Ô§Ö§ä§Ú§é§ß§Ö §ã§á?§Ó§ä§à§Ó§Ñ§â§Ú§ã§ä§Ó§à: §Ó§Ú§Þ§à§Ô§Ú §Õ§à §å§Ü§â§Ñ?§ß§ã§î§Ü§à? §Ö§Ý§Ö§Ü§ä§â§à§Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú
?§Ó§â§à§á§Ö§Û§ã§î§Ü§Ö §Ö§ß§Ö§â§Ô§Ö§ä§Ú§é§ß§Ö §ã§á?§Ó§ä§à§Ó§Ñ§â§Ú§ã§ä§Ó§à: §Ó§Ú§Þ§à§Ô§Ú §Õ§à §å§Ü§â§Ñ?§ß§ã§î§Ü§à? §Ö§Ý§Ö§Ü§ä§â§à§Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú?§Ó§â§à§á§Ö§Û§ã§î§Ü§Ö §Ö§ß§Ö§â§Ô§Ö§ä§Ú§é§ß§Ö §ã§á?§Ó§ä§à§Ó§Ñ§â§Ú§ã§ä§Ó§à: §Ó§Ú§Þ§à§Ô§Ú §Õ§à §å§Ü§â§Ñ?§ß§ã§î§Ü§à? §Ö§Ý§Ö§Ü§ä§â§à§Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú
?§Ó§â§à§á§Ö§Û§ã§î§Ü§Ö §Ö§ß§Ö§â§Ô§Ö§ä§Ú§é§ß§Ö §ã§á?§Ó§ä§à§Ó§Ñ§â§Ú§ã§ä§Ó§à: §Ó§Ú§Þ§à§Ô§Ú §Õ§à §å§Ü§â§Ñ?§ß§ã§î§Ü§à? §Ö§Ý§Ö§Ü§ä§â§à§Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú
§ª§â§Ú§ß§Ñ §³§Ú§ß§î§Ü§à
?
Sektor enerhoefektyvnosti ta zakhystu klimatu Giz
Sektor enerhoefektyvnosti ta zakhystu klimatu Giz  Sektor enerhoefektyvnosti ta zakhystu klimatu Giz
Sektor enerhoefektyvnosti ta zakhystu klimatu Giz
EnergyEfficiencyplat
?
?§¦§¯§¦§²§¤§¦§´§ª§¹§¯§ª§« §®?§³§´ ?§µ§¬§²§¡?§¯§¡ ¨C ?§³? - §±§¦§²§º§ª§« §¬§²§°§¬ §¯§¡ §º§­§Á§·§µ §³§´§²§¡§´§¦§¤?§¹§¯§°? §³§ª§¯§·...
?§¦§¯§¦§²§¤§¦§´§ª§¹§¯§ª§« §®?§³§´ ?§µ§¬§²§¡?§¯§¡ ¨C ?§³? -   §±§¦§²§º§ª§« §¬§²§°§¬ §¯§¡ §º§­§Á§·§µ  §³§´§²§¡§´§¦§¤?§¹§¯§°? §³§ª§¯§·...?§¦§¯§¦§²§¤§¦§´§ª§¹§¯§ª§« §®?§³§´ ?§µ§¬§²§¡?§¯§¡ ¨C ?§³? -   §±§¦§²§º§ª§« §¬§²§°§¬ §¯§¡ §º§­§Á§·§µ  §³§´§²§¡§´§¦§¤?§¹§¯§°? §³§ª§¯§·...
?§¦§¯§¦§²§¤§¦§´§ª§¹§¯§ª§« §®?§³§´ ?§µ§¬§²§¡?§¯§¡ ¨C ?§³? - §±§¦§²§º§ª§« §¬§²§°§¬ §¯§¡ §º§­§Á§·§µ §³§´§²§¡§´§¦§¤?§¹§¯§°? §³§ª§¯§·...
energydialog
?
§µ§Ü§â§Ö§ß§Ö§â§Ô§à-2017: §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§Ú §á§Ö§â§ê§Ú§ç §â§Ö§æ§à§â§Þ
§µ§Ü§â§Ö§ß§Ö§â§Ô§à-2017: §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§Ú §á§Ö§â§ê§Ú§ç §â§Ö§æ§à§â§Þ§µ§Ü§â§Ö§ß§Ö§â§Ô§à-2017: §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§Ú §á§Ö§â§ê§Ú§ç §â§Ö§æ§à§â§Þ
§µ§Ü§â§Ö§ß§Ö§â§Ô§à-2017: §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§Ú §á§Ö§â§ê§Ú§ç §â§Ö§æ§à§â§Þ
§¯§¦§¬ §µ§Ü§â§Ö§ß§Ö§â§Ô§à - NPC Ukrenergo
?
?§ß§ä§Ö§Ô§â§Ñ§è?§ñ §å§Ü§â§Ñ?§ß§ã§î§Ü§à? §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ú §Õ§à §¦NTSO-E: §Þ§à§Ø§Ý§Ú§Ó§à§ã§ä? §ä§Ñ §Ù§Ñ§Ó§Õ§Ñ§ß§ß§ñ
?§ß§ä§Ö§Ô§â§Ñ§è?§ñ §å§Ü§â§Ñ?§ß§ã§î§Ü§à? §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ú §Õ§à §¦NTSO-E: §Þ§à§Ø§Ý§Ú§Ó§à§ã§ä? §ä§Ñ §Ù§Ñ§Ó§Õ§Ñ§ß§ß§ñ?§ß§ä§Ö§Ô§â§Ñ§è?§ñ §å§Ü§â§Ñ?§ß§ã§î§Ü§à? §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ú §Õ§à §¦NTSO-E: §Þ§à§Ø§Ý§Ú§Ó§à§ã§ä? §ä§Ñ §Ù§Ñ§Ó§Õ§Ñ§ß§ß§ñ
?§ß§ä§Ö§Ô§â§Ñ§è?§ñ §å§Ü§â§Ñ?§ß§ã§î§Ü§à? §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ú §Õ§à §¦NTSO-E: §Þ§à§Ø§Ý§Ú§Ó§à§ã§ä? §ä§Ñ §Ù§Ñ§Ó§Õ§Ñ§ß§ß§ñ
§¯§¦§¬ §µ§Ü§â§Ö§ß§Ö§â§Ô§à - NPC Ukrenergo
?
§³§å§é§Ñ§ã§ß§Ú§Û §ã§ä§Ñ§ß §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú. §±§Ö§â§ã§á§Ö§Ü§ä§Ú§Ó§Ú (§¦§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?§ñ, §á?§Õ§Ó§Ú§ë§Ö§ß§ß§ñ §â?§Ó§ß§ñ...
§³§å§é§Ñ§ã§ß§Ú§Û §ã§ä§Ñ§ß §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú. §±§Ö§â§ã§á§Ö§Ü§ä§Ú§Ó§Ú (§¦§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?§ñ, §á?§Õ§Ó§Ú§ë§Ö§ß§ß§ñ §â?§Ó§ß§ñ...§³§å§é§Ñ§ã§ß§Ú§Û §ã§ä§Ñ§ß §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú. §±§Ö§â§ã§á§Ö§Ü§ä§Ú§Ó§Ú (§¦§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?§ñ, §á?§Õ§Ó§Ú§ë§Ö§ß§ß§ñ §â?§Ó§ß§ñ...
§³§å§é§Ñ§ã§ß§Ú§Û §ã§ä§Ñ§ß §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú. §±§Ö§â§ã§á§Ö§Ü§ä§Ú§Ó§Ú (§¦§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?§ñ, §á?§Õ§Ó§Ú§ë§Ö§ß§ß§ñ §â?§Ó§ß§ñ...
§¯§¡§¦§¬ ?§¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ?
?
§¥§Ö§ß§î §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú 2017: §¤§Ñ§ß§ã §º§Ó§Ö§Û§Ü§Ñ§â§Õ§ä - §¦§ß§Ö§â§Ô§Ö§ä§Ú§é§ß§Ú§Û §Þ?§ã§ä "§µ§Ü§â§Ñ?§ß§Ñ ¨C ?§³"
§¥§Ö§ß§î §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú 2017: §¤§Ñ§ß§ã §º§Ó§Ö§Û§Ü§Ñ§â§Õ§ä - §¦§ß§Ö§â§Ô§Ö§ä§Ú§é§ß§Ú§Û §Þ?§ã§ä "§µ§Ü§â§Ñ?§ß§Ñ ¨C ?§³"§¥§Ö§ß§î §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú 2017: §¤§Ñ§ß§ã §º§Ó§Ö§Û§Ü§Ñ§â§Õ§ä - §¦§ß§Ö§â§Ô§Ö§ä§Ú§é§ß§Ú§Û §Þ?§ã§ä "§µ§Ü§â§Ñ?§ß§Ñ ¨C ?§³"
§¥§Ö§ß§î §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú 2017: §¤§Ñ§ß§ã §º§Ó§Ö§Û§Ü§Ñ§â§Õ§ä - §¦§ß§Ö§â§Ô§Ö§ä§Ú§é§ß§Ú§Û §Þ?§ã§ä "§µ§Ü§â§Ñ?§ß§Ñ ¨C ?§³"
§¯§¡§¦§¬ ?§¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ?
?
§±§â§à?§Ü§ä GIZ "§±§â§à§ã§å§Ó§Ñ§ß§ß§ñ §Ö§ß§Ö§â§Ô§à§Ö§æ§Ö§Ü§ä§Ú§Ó§ß§à§ã§ä? §ä§Ñ ?§Þ§á§Ý§Ö§Þ§Ö§ß§ä§Ñ§è?? §¥§Ú§â§Ö§Ü§ä§Ú§Ó§Ú ?§³ §á§â§à §Ö...
§±§â§à?§Ü§ä GIZ "§±§â§à§ã§å§Ó§Ñ§ß§ß§ñ §Ö§ß§Ö§â§Ô§à§Ö§æ§Ö§Ü§ä§Ú§Ó§ß§à§ã§ä? §ä§Ñ ?§Þ§á§Ý§Ö§Þ§Ö§ß§ä§Ñ§è?? §¥§Ú§â§Ö§Ü§ä§Ú§Ó§Ú ?§³ §á§â§à §Ö...§±§â§à?§Ü§ä GIZ "§±§â§à§ã§å§Ó§Ñ§ß§ß§ñ §Ö§ß§Ö§â§Ô§à§Ö§æ§Ö§Ü§ä§Ú§Ó§ß§à§ã§ä? §ä§Ñ ?§Þ§á§Ý§Ö§Þ§Ö§ß§ä§Ñ§è?? §¥§Ú§â§Ö§Ü§ä§Ú§Ó§Ú ?§³ §á§â§à §Ö...
§±§â§à?§Ü§ä GIZ "§±§â§à§ã§å§Ó§Ñ§ß§ß§ñ §Ö§ß§Ö§â§Ô§à§Ö§æ§Ö§Ü§ä§Ú§Ó§ß§à§ã§ä? §ä§Ñ ?§Þ§á§Ý§Ö§Þ§Ö§ß§ä§Ñ§è?? §¥§Ú§â§Ö§Ü§ä§Ú§Ó§Ú ?§³ §á§â§à §Ö...
§¥§Ö§â§Ø§Ñ§Ó§ß§Ö §Ñ§Ô§Ö§ß§ä§ã§ä§Ó§à §Ù §Ö§ß§Ö§â§Ô§à§Ö§æ§Ö§Ü§ä§Ú§Ó§ß§à§ã§ä? §ä§Ñ §Ö§ß§Ö§â§Ô§à§Ù§Ò§Ö§â§Ö§Ø§Ö§ß§ß§ñ §µ§Ü§â§Ñ?§ß§Ú (§¥§Ö§â§Ø§Ö§ß§Ö§â§Ô§à§Ö§æ§Ö§Ü§ä§Ú§Ó§ß§à§ã§ä?)
?
§³§ä§â§Ñ§ä§Ö§Ô?§é§ß§Ú§Û §â§à§Ù§Ó§Ú§ä§à§Ü §ñ§Õ§Ö§â§ß§à? §Ô§Ñ§Ý§å§Ù?. §±§â§à§Ò§Ý§Ö§Þ§ß? §á§Ú§ä§Ñ§ß§ß§ñ
§³§ä§â§Ñ§ä§Ö§Ô?§é§ß§Ú§Û §â§à§Ù§Ó§Ú§ä§à§Ü §ñ§Õ§Ö§â§ß§à? §Ô§Ñ§Ý§å§Ù?. §±§â§à§Ò§Ý§Ö§Þ§ß? §á§Ú§ä§Ñ§ß§ß§ñ§³§ä§â§Ñ§ä§Ö§Ô?§é§ß§Ú§Û §â§à§Ù§Ó§Ú§ä§à§Ü §ñ§Õ§Ö§â§ß§à? §Ô§Ñ§Ý§å§Ù?. §±§â§à§Ò§Ý§Ö§Þ§ß? §á§Ú§ä§Ñ§ß§ß§ñ
§³§ä§â§Ñ§ä§Ö§Ô?§é§ß§Ú§Û §â§à§Ù§Ó§Ú§ä§à§Ü §ñ§Õ§Ö§â§ß§à? §Ô§Ñ§Ý§å§Ù?. §±§â§à§Ò§Ý§Ö§Þ§ß? §á§Ú§ä§Ñ§ß§ß§ñ
§¯§¡§¦§¬ ?§¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ?
?
§±§â?§à§â§Ú§ä§Ö§ä§ß§Ú§Û §â§à§Ù§Ó§Ú§ä§à§Ü §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú: §ß§Ñ §é§à§Þ§å §ä§â§Ö§Ò§Ñ §á§à§ã§ä§Ñ§Ó§Ú§ä§Ú §Ñ§Ü§è§Ö§ß§ä§Ú §å §¦...
§±§â?§à§â§Ú§ä§Ö§ä§ß§Ú§Û §â§à§Ù§Ó§Ú§ä§à§Ü §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú: §ß§Ñ §é§à§Þ§å §ä§â§Ö§Ò§Ñ §á§à§ã§ä§Ñ§Ó§Ú§ä§Ú §Ñ§Ü§è§Ö§ß§ä§Ú §å §¦...§±§â?§à§â§Ú§ä§Ö§ä§ß§Ú§Û §â§à§Ù§Ó§Ú§ä§à§Ü §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú: §ß§Ñ §é§à§Þ§å §ä§â§Ö§Ò§Ñ §á§à§ã§ä§Ñ§Ó§Ú§ä§Ú §Ñ§Ü§è§Ö§ß§ä§Ú §å §¦...
§±§â?§à§â§Ú§ä§Ö§ä§ß§Ú§Û §â§à§Ù§Ó§Ú§ä§à§Ü §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú: §ß§Ñ §é§à§Þ§å §ä§â§Ö§Ò§Ñ §á§à§ã§ä§Ñ§Ó§Ú§ä§Ú §Ñ§Ü§è§Ö§ß§ä§Ú §å §¦...
§¯§¡§¦§¬ ?§¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ?
?
?§ß§Ó§Ö§ã§ä§Ú§è§Ú§Û§ß? §á§â§à§Ö§Ü§ä§Ú §¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ§Ñ 2015
?§ß§Ó§Ö§ã§ä§Ú§è§Ú§Û§ß? §á§â§à§Ö§Ü§ä§Ú §¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ§Ñ 2015?§ß§Ó§Ö§ã§ä§Ú§è§Ú§Û§ß? §á§â§à§Ö§Ü§ä§Ú §¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ§Ñ 2015
?§ß§Ó§Ö§ã§ä§Ú§è§Ú§Û§ß? §á§â§à§Ö§Ü§ä§Ú §¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ§Ñ 2015
§¯§¡§¦§¬ ?§¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ?
?
§¡§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: ?§ß§Ó§Ö§ã§ä§Ú§è?? §Ó §Þ§Ñ§Û§Ò§å§ä§ß? §µ§Ü§â§Ñ?§ß§Ú
§¡§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: ?§ß§Ó§Ö§ã§ä§Ú§è?? §Ó §Þ§Ñ§Û§Ò§å§ä§ß? §µ§Ü§â§Ñ?§ß§Ú§¡§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: ?§ß§Ó§Ö§ã§ä§Ú§è?? §Ó §Þ§Ñ§Û§Ò§å§ä§ß? §µ§Ü§â§Ñ?§ß§Ú
§¡§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: ?§ß§Ó§Ö§ã§ä§Ú§è?? §Ó §Þ§Ñ§Û§Ò§å§ä§ß? §µ§Ü§â§Ñ?§ß§Ú
NGO "Youth Energy Community"
?
§¥§Ö§ß§î §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú 2015. "§£?§Õ§ß§à§Ó§Ý§ð§Ó§Ñ§ß§Ñ §ä§Ñ §Ñ§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: §â§Ñ§Ù§à§Þ §é§Ú §á§â...
§¥§Ö§ß§î §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú 2015. "§£?§Õ§ß§à§Ó§Ý§ð§Ó§Ñ§ß§Ñ §ä§Ñ §Ñ§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: §â§Ñ§Ù§à§Þ §é§Ú §á§â...§¥§Ö§ß§î §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú 2015. "§£?§Õ§ß§à§Ó§Ý§ð§Ó§Ñ§ß§Ñ §ä§Ñ §Ñ§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: §â§Ñ§Ù§à§Þ §é§Ú §á§â...
§¥§Ö§ß§î §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú 2015. "§£?§Õ§ß§à§Ó§Ý§ð§Ó§Ñ§ß§Ñ §ä§Ñ §Ñ§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: §â§Ñ§Ù§à§Þ §é§Ú §á§â...
§¯§¡§¦§¬ ?§¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ?
?
§£?§Õ§ß§à§Ó§Ý§ð§Ó§Ñ§ß§Ñ §ä§Ñ §Ñ§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: §â§Ñ§Ù§à§Þ §é§Ú §á§â§à§ä§Ú? ?§Ó§â§à§á§Ö§Û§ã§î§Ü? §ä§â§Ö§ß§Õ§Ú §ä§Ñ §å§Ü§â...
§£?§Õ§ß§à§Ó§Ý§ð§Ó§Ñ§ß§Ñ §ä§Ñ §Ñ§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: §â§Ñ§Ù§à§Þ §é§Ú §á§â§à§ä§Ú? ?§Ó§â§à§á§Ö§Û§ã§î§Ü? §ä§â§Ö§ß§Õ§Ú §ä§Ñ §å§Ü§â...§£?§Õ§ß§à§Ó§Ý§ð§Ó§Ñ§ß§Ñ §ä§Ñ §Ñ§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: §â§Ñ§Ù§à§Þ §é§Ú §á§â§à§ä§Ú? ?§Ó§â§à§á§Ö§Û§ã§î§Ü? §ä§â§Ö§ß§Õ§Ú §ä§Ñ §å§Ü§â...
§£?§Õ§ß§à§Ó§Ý§ð§Ó§Ñ§ß§Ñ §ä§Ñ §Ñ§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: §â§Ñ§Ù§à§Þ §é§Ú §á§â§à§ä§Ú? ?§Ó§â§à§á§Ö§Û§ã§î§Ü? §ä§â§Ö§ß§Õ§Ú §ä§Ñ §å§Ü§â...
Oleksii Khabatiuk
?
§±§Ý§Ñ§ß??§ß§ä§Ö§Ô§â§Ñ§è?? §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Ó ENTSO-E
§±§Ý§Ñ§ß??§ß§ä§Ö§Ô§â§Ñ§è?? §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Ó ENTSO-E§±§Ý§Ñ§ß??§ß§ä§Ö§Ô§â§Ñ§è?? §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Ó ENTSO-E
§±§Ý§Ñ§ß??§ß§ä§Ö§Ô§â§Ñ§è?? §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Ó ENTSO-E
NPC Ukrenergo
?
?§ß§ä§Ö§Ô§â§Ñ§è?§ñ §Õ§à ENTSO-E. §¬§Ý§ð§é§à§Ó? §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§Ú §Ù§Ñ §Õ§Ó§Ñ §â§à§Ü§Ú
?§ß§ä§Ö§Ô§â§Ñ§è?§ñ §Õ§à ENTSO-E. §¬§Ý§ð§é§à§Ó? §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§Ú §Ù§Ñ §Õ§Ó§Ñ §â§à§Ü§Ú?§ß§ä§Ö§Ô§â§Ñ§è?§ñ §Õ§à ENTSO-E. §¬§Ý§ð§é§à§Ó? §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§Ú §Ù§Ñ §Õ§Ó§Ñ §â§à§Ü§Ú
?§ß§ä§Ö§Ô§â§Ñ§è?§ñ §Õ§à ENTSO-E. §¬§Ý§ð§é§à§Ó? §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§Ú §Ù§Ñ §Õ§Ó§Ñ §â§à§Ü§Ú
§¯§¦§¬ §µ§Ü§â§Ö§ß§Ö§â§Ô§à - NPC Ukrenergo
?
§±§â§Ö§Ù§Ö§ß§ä§Ñ§è?§ñ §Õ§à §Ó§Ú§ã§ä§å§á§å §á§â§Ö§Ù§Ú§Õ§Ö§ß§ä§Ñ §¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ§Ñ §À§â?§ñ §¯§Ö§Õ§Ñ§ê§Ü§à§Ó§ã§î§Ü§à§Ô§à §ß§Ñ §µ§Ü§â§Ñ?§ß§ã§î...
§±§â§Ö§Ù§Ö§ß§ä§Ñ§è?§ñ §Õ§à §Ó§Ú§ã§ä§å§á§å §á§â§Ö§Ù§Ú§Õ§Ö§ß§ä§Ñ §¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ§Ñ §À§â?§ñ §¯§Ö§Õ§Ñ§ê§Ü§à§Ó§ã§î§Ü§à§Ô§à §ß§Ñ §µ§Ü§â§Ñ?§ß§ã§î...§±§â§Ö§Ù§Ö§ß§ä§Ñ§è?§ñ §Õ§à §Ó§Ú§ã§ä§å§á§å §á§â§Ö§Ù§Ú§Õ§Ö§ß§ä§Ñ §¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ§Ñ §À§â?§ñ §¯§Ö§Õ§Ñ§ê§Ü§à§Ó§ã§î§Ü§à§Ô§à §ß§Ñ §µ§Ü§â§Ñ?§ß§ã§î...
§±§â§Ö§Ù§Ö§ß§ä§Ñ§è?§ñ §Õ§à §Ó§Ú§ã§ä§å§á§å §á§â§Ö§Ù§Ú§Õ§Ö§ß§ä§Ñ §¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ§Ñ §À§â?§ñ §¯§Ö§Õ§Ñ§ê§Ü§à§Ó§ã§î§Ü§à§Ô§à §ß§Ñ §µ§Ü§â§Ñ?§ß§ã§î...
§¯§¡§¦§¬ ?§¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ?
?
§±§Ñ§ß§Ö§Ý§î§ß§Ñ §Õ§Ú§ã§Ü§å§ã?§ñ ??§ß§ä§Ö§Ô§â§Ñ§è?§ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Õ§à ENTSO-E: §Ü§Ý§ð§é§à§Ó? §Ó§Ú§Ü§Ý§Ú§Ü§Ú §ä§Ñ §Ù§Ñ§Ó§Õ...
§±§Ñ§ß§Ö§Ý§î§ß§Ñ §Õ§Ú§ã§Ü§å§ã?§ñ ??§ß§ä§Ö§Ô§â§Ñ§è?§ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Õ§à ENTSO-E: §Ü§Ý§ð§é§à§Ó? §Ó§Ú§Ü§Ý§Ú§Ü§Ú §ä§Ñ §Ù§Ñ§Ó§Õ...§±§Ñ§ß§Ö§Ý§î§ß§Ñ §Õ§Ú§ã§Ü§å§ã?§ñ ??§ß§ä§Ö§Ô§â§Ñ§è?§ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Õ§à ENTSO-E: §Ü§Ý§ð§é§à§Ó? §Ó§Ú§Ü§Ý§Ú§Ü§Ú §ä§Ñ §Ù§Ñ§Ó§Õ...
§±§Ñ§ß§Ö§Ý§î§ß§Ñ §Õ§Ú§ã§Ü§å§ã?§ñ ??§ß§ä§Ö§Ô§â§Ñ§è?§ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Õ§à ENTSO-E: §Ü§Ý§ð§é§à§Ó? §Ó§Ú§Ü§Ý§Ú§Ü§Ú §ä§Ñ §Ù§Ñ§Ó§Õ...
§¯§¦§¬ §µ§Ü§â§Ö§ß§Ö§â§Ô§à - NPC Ukrenergo
?
?§Ó§â§à?§ß§ä§Ö§Ô§â§Ñ§è?§Û§ß§Ú§Û §Ó§Ö§Ü§ä§à§â §â§à§Ù§Ó§Ú§ä§Ü§å §¥§± ?§¯§¦§¬ ?§µ§Ü§â§Ö§ß§Ö§â§Ô§à??§ä§Ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú
?§Ó§â§à?§ß§ä§Ö§Ô§â§Ñ§è?§Û§ß§Ú§Û §Ó§Ö§Ü§ä§à§â §â§à§Ù§Ó§Ú§ä§Ü§å §¥§± ?§¯§¦§¬ ?§µ§Ü§â§Ö§ß§Ö§â§Ô§à??§ä§Ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú?§Ó§â§à?§ß§ä§Ö§Ô§â§Ñ§è?§Û§ß§Ú§Û §Ó§Ö§Ü§ä§à§â §â§à§Ù§Ó§Ú§ä§Ü§å §¥§± ?§¯§¦§¬ ?§µ§Ü§â§Ö§ß§Ö§â§Ô§à??§ä§Ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú
?§Ó§â§à?§ß§ä§Ö§Ô§â§Ñ§è?§Û§ß§Ú§Û §Ó§Ö§Ü§ä§à§â §â§à§Ù§Ó§Ú§ä§Ü§å §¥§± ?§¯§¦§¬ ?§µ§Ü§â§Ö§ß§Ö§â§Ô§à??§ä§Ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú
§¯§¦§¬ §µ§Ü§â§Ö§ß§Ö§â§Ô§à - NPC Ukrenergo
?
?§Ó§â§à§á§Ö§Û§ã§î§Ü§Ö §Ö§ß§Ö§â§Ô§Ö§ä§Ú§é§ß§Ö §ã§á?§Ó§ä§à§Ó§Ñ§â§Ú§ã§ä§Ó§à: §Ó§Ú§Þ§à§Ô§Ú §Õ§à §å§Ü§â§Ñ?§ß§ã§î§Ü§à? §Ö§Ý§Ö§Ü§ä§â§à§Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú
?§Ó§â§à§á§Ö§Û§ã§î§Ü§Ö §Ö§ß§Ö§â§Ô§Ö§ä§Ú§é§ß§Ö §ã§á?§Ó§ä§à§Ó§Ñ§â§Ú§ã§ä§Ó§à: §Ó§Ú§Þ§à§Ô§Ú §Õ§à §å§Ü§â§Ñ?§ß§ã§î§Ü§à? §Ö§Ý§Ö§Ü§ä§â§à§Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú?§Ó§â§à§á§Ö§Û§ã§î§Ü§Ö §Ö§ß§Ö§â§Ô§Ö§ä§Ú§é§ß§Ö §ã§á?§Ó§ä§à§Ó§Ñ§â§Ú§ã§ä§Ó§à: §Ó§Ú§Þ§à§Ô§Ú §Õ§à §å§Ü§â§Ñ?§ß§ã§î§Ü§à? §Ö§Ý§Ö§Ü§ä§â§à§Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú
?§Ó§â§à§á§Ö§Û§ã§î§Ü§Ö §Ö§ß§Ö§â§Ô§Ö§ä§Ú§é§ß§Ö §ã§á?§Ó§ä§à§Ó§Ñ§â§Ú§ã§ä§Ó§à: §Ó§Ú§Þ§à§Ô§Ú §Õ§à §å§Ü§â§Ñ?§ß§ã§î§Ü§à? §Ö§Ý§Ö§Ü§ä§â§à§Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú
§ª§â§Ú§ß§Ñ §³§Ú§ß§î§Ü§à
?
Sektor enerhoefektyvnosti ta zakhystu klimatu Giz
Sektor enerhoefektyvnosti ta zakhystu klimatu Giz  Sektor enerhoefektyvnosti ta zakhystu klimatu Giz
Sektor enerhoefektyvnosti ta zakhystu klimatu Giz
EnergyEfficiencyplat
?
?§¦§¯§¦§²§¤§¦§´§ª§¹§¯§ª§« §®?§³§´ ?§µ§¬§²§¡?§¯§¡ ¨C ?§³? - §±§¦§²§º§ª§« §¬§²§°§¬ §¯§¡ §º§­§Á§·§µ §³§´§²§¡§´§¦§¤?§¹§¯§°? §³§ª§¯§·...
?§¦§¯§¦§²§¤§¦§´§ª§¹§¯§ª§« §®?§³§´ ?§µ§¬§²§¡?§¯§¡ ¨C ?§³? -   §±§¦§²§º§ª§« §¬§²§°§¬ §¯§¡ §º§­§Á§·§µ  §³§´§²§¡§´§¦§¤?§¹§¯§°? §³§ª§¯§·...?§¦§¯§¦§²§¤§¦§´§ª§¹§¯§ª§« §®?§³§´ ?§µ§¬§²§¡?§¯§¡ ¨C ?§³? -   §±§¦§²§º§ª§« §¬§²§°§¬ §¯§¡ §º§­§Á§·§µ  §³§´§²§¡§´§¦§¤?§¹§¯§°? §³§ª§¯§·...
?§¦§¯§¦§²§¤§¦§´§ª§¹§¯§ª§« §®?§³§´ ?§µ§¬§²§¡?§¯§¡ ¨C ?§³? - §±§¦§²§º§ª§« §¬§²§°§¬ §¯§¡ §º§­§Á§·§µ §³§´§²§¡§´§¦§¤?§¹§¯§°? §³§ª§¯§·...
energydialog
?
§µ§Ü§â§Ö§ß§Ö§â§Ô§à-2017: §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§Ú §á§Ö§â§ê§Ú§ç §â§Ö§æ§à§â§Þ
§µ§Ü§â§Ö§ß§Ö§â§Ô§à-2017: §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§Ú §á§Ö§â§ê§Ú§ç §â§Ö§æ§à§â§Þ§µ§Ü§â§Ö§ß§Ö§â§Ô§à-2017: §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§Ú §á§Ö§â§ê§Ú§ç §â§Ö§æ§à§â§Þ
§µ§Ü§â§Ö§ß§Ö§â§Ô§à-2017: §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§Ú §á§Ö§â§ê§Ú§ç §â§Ö§æ§à§â§Þ
§¯§¦§¬ §µ§Ü§â§Ö§ß§Ö§â§Ô§à - NPC Ukrenergo
?
?§ß§ä§Ö§Ô§â§Ñ§è?§ñ §å§Ü§â§Ñ?§ß§ã§î§Ü§à? §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ú §Õ§à §¦NTSO-E: §Þ§à§Ø§Ý§Ú§Ó§à§ã§ä? §ä§Ñ §Ù§Ñ§Ó§Õ§Ñ§ß§ß§ñ
?§ß§ä§Ö§Ô§â§Ñ§è?§ñ §å§Ü§â§Ñ?§ß§ã§î§Ü§à? §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ú §Õ§à §¦NTSO-E: §Þ§à§Ø§Ý§Ú§Ó§à§ã§ä? §ä§Ñ §Ù§Ñ§Ó§Õ§Ñ§ß§ß§ñ?§ß§ä§Ö§Ô§â§Ñ§è?§ñ §å§Ü§â§Ñ?§ß§ã§î§Ü§à? §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ú §Õ§à §¦NTSO-E: §Þ§à§Ø§Ý§Ú§Ó§à§ã§ä? §ä§Ñ §Ù§Ñ§Ó§Õ§Ñ§ß§ß§ñ
?§ß§ä§Ö§Ô§â§Ñ§è?§ñ §å§Ü§â§Ñ?§ß§ã§î§Ü§à? §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ú §Õ§à §¦NTSO-E: §Þ§à§Ø§Ý§Ú§Ó§à§ã§ä? §ä§Ñ §Ù§Ñ§Ó§Õ§Ñ§ß§ß§ñ
§¯§¦§¬ §µ§Ü§â§Ö§ß§Ö§â§Ô§à - NPC Ukrenergo
?
§³§å§é§Ñ§ã§ß§Ú§Û §ã§ä§Ñ§ß §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú. §±§Ö§â§ã§á§Ö§Ü§ä§Ú§Ó§Ú (§¦§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?§ñ, §á?§Õ§Ó§Ú§ë§Ö§ß§ß§ñ §â?§Ó§ß§ñ...
§³§å§é§Ñ§ã§ß§Ú§Û §ã§ä§Ñ§ß §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú. §±§Ö§â§ã§á§Ö§Ü§ä§Ú§Ó§Ú (§¦§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?§ñ, §á?§Õ§Ó§Ú§ë§Ö§ß§ß§ñ §â?§Ó§ß§ñ...§³§å§é§Ñ§ã§ß§Ú§Û §ã§ä§Ñ§ß §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú. §±§Ö§â§ã§á§Ö§Ü§ä§Ú§Ó§Ú (§¦§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?§ñ, §á?§Õ§Ó§Ú§ë§Ö§ß§ß§ñ §â?§Ó§ß§ñ...
§³§å§é§Ñ§ã§ß§Ú§Û §ã§ä§Ñ§ß §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú. §±§Ö§â§ã§á§Ö§Ü§ä§Ú§Ó§Ú (§¦§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?§ñ, §á?§Õ§Ó§Ú§ë§Ö§ß§ß§ñ §â?§Ó§ß§ñ...
§¯§¡§¦§¬ ?§¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ?
?
§¥§Ö§ß§î §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú 2017: §¤§Ñ§ß§ã §º§Ó§Ö§Û§Ü§Ñ§â§Õ§ä - §¦§ß§Ö§â§Ô§Ö§ä§Ú§é§ß§Ú§Û §Þ?§ã§ä "§µ§Ü§â§Ñ?§ß§Ñ ¨C ?§³"
§¥§Ö§ß§î §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú 2017: §¤§Ñ§ß§ã §º§Ó§Ö§Û§Ü§Ñ§â§Õ§ä - §¦§ß§Ö§â§Ô§Ö§ä§Ú§é§ß§Ú§Û §Þ?§ã§ä "§µ§Ü§â§Ñ?§ß§Ñ ¨C ?§³"§¥§Ö§ß§î §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú 2017: §¤§Ñ§ß§ã §º§Ó§Ö§Û§Ü§Ñ§â§Õ§ä - §¦§ß§Ö§â§Ô§Ö§ä§Ú§é§ß§Ú§Û §Þ?§ã§ä "§µ§Ü§â§Ñ?§ß§Ñ ¨C ?§³"
§¥§Ö§ß§î §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú 2017: §¤§Ñ§ß§ã §º§Ó§Ö§Û§Ü§Ñ§â§Õ§ä - §¦§ß§Ö§â§Ô§Ö§ä§Ú§é§ß§Ú§Û §Þ?§ã§ä "§µ§Ü§â§Ñ?§ß§Ñ ¨C ?§³"
§¯§¡§¦§¬ ?§¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ?
?
§³§ä§â§Ñ§ä§Ö§Ô?§é§ß§Ú§Û §â§à§Ù§Ó§Ú§ä§à§Ü §ñ§Õ§Ö§â§ß§à? §Ô§Ñ§Ý§å§Ù?. §±§â§à§Ò§Ý§Ö§Þ§ß? §á§Ú§ä§Ñ§ß§ß§ñ
§³§ä§â§Ñ§ä§Ö§Ô?§é§ß§Ú§Û §â§à§Ù§Ó§Ú§ä§à§Ü §ñ§Õ§Ö§â§ß§à? §Ô§Ñ§Ý§å§Ù?. §±§â§à§Ò§Ý§Ö§Þ§ß? §á§Ú§ä§Ñ§ß§ß§ñ§³§ä§â§Ñ§ä§Ö§Ô?§é§ß§Ú§Û §â§à§Ù§Ó§Ú§ä§à§Ü §ñ§Õ§Ö§â§ß§à? §Ô§Ñ§Ý§å§Ù?. §±§â§à§Ò§Ý§Ö§Þ§ß? §á§Ú§ä§Ñ§ß§ß§ñ
§³§ä§â§Ñ§ä§Ö§Ô?§é§ß§Ú§Û §â§à§Ù§Ó§Ú§ä§à§Ü §ñ§Õ§Ö§â§ß§à? §Ô§Ñ§Ý§å§Ù?. §±§â§à§Ò§Ý§Ö§Þ§ß? §á§Ú§ä§Ñ§ß§ß§ñ
§¯§¡§¦§¬ ?§¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ?
?
§±§â?§à§â§Ú§ä§Ö§ä§ß§Ú§Û §â§à§Ù§Ó§Ú§ä§à§Ü §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú: §ß§Ñ §é§à§Þ§å §ä§â§Ö§Ò§Ñ §á§à§ã§ä§Ñ§Ó§Ú§ä§Ú §Ñ§Ü§è§Ö§ß§ä§Ú §å §¦...
§±§â?§à§â§Ú§ä§Ö§ä§ß§Ú§Û §â§à§Ù§Ó§Ú§ä§à§Ü §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú: §ß§Ñ §é§à§Þ§å §ä§â§Ö§Ò§Ñ §á§à§ã§ä§Ñ§Ó§Ú§ä§Ú §Ñ§Ü§è§Ö§ß§ä§Ú §å §¦...§±§â?§à§â§Ú§ä§Ö§ä§ß§Ú§Û §â§à§Ù§Ó§Ú§ä§à§Ü §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú: §ß§Ñ §é§à§Þ§å §ä§â§Ö§Ò§Ñ §á§à§ã§ä§Ñ§Ó§Ú§ä§Ú §Ñ§Ü§è§Ö§ß§ä§Ú §å §¦...
§±§â?§à§â§Ú§ä§Ö§ä§ß§Ú§Û §â§à§Ù§Ó§Ú§ä§à§Ü §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú: §ß§Ñ §é§à§Þ§å §ä§â§Ö§Ò§Ñ §á§à§ã§ä§Ñ§Ó§Ú§ä§Ú §Ñ§Ü§è§Ö§ß§ä§Ú §å §¦...
§¯§¡§¦§¬ ?§¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ?
?
?§ß§Ó§Ö§ã§ä§Ú§è§Ú§Û§ß? §á§â§à§Ö§Ü§ä§Ú §¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ§Ñ 2015
?§ß§Ó§Ö§ã§ä§Ú§è§Ú§Û§ß? §á§â§à§Ö§Ü§ä§Ú §¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ§Ñ 2015?§ß§Ó§Ö§ã§ä§Ú§è§Ú§Û§ß? §á§â§à§Ö§Ü§ä§Ú §¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ§Ñ 2015
?§ß§Ó§Ö§ã§ä§Ú§è§Ú§Û§ß? §á§â§à§Ö§Ü§ä§Ú §¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ§Ñ 2015
§¯§¡§¦§¬ ?§¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ?
?
§¡§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: ?§ß§Ó§Ö§ã§ä§Ú§è?? §Ó §Þ§Ñ§Û§Ò§å§ä§ß? §µ§Ü§â§Ñ?§ß§Ú
§¡§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: ?§ß§Ó§Ö§ã§ä§Ú§è?? §Ó §Þ§Ñ§Û§Ò§å§ä§ß? §µ§Ü§â§Ñ?§ß§Ú§¡§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: ?§ß§Ó§Ö§ã§ä§Ú§è?? §Ó §Þ§Ñ§Û§Ò§å§ä§ß? §µ§Ü§â§Ñ?§ß§Ú
§¡§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: ?§ß§Ó§Ö§ã§ä§Ú§è?? §Ó §Þ§Ñ§Û§Ò§å§ä§ß? §µ§Ü§â§Ñ?§ß§Ú
NGO "Youth Energy Community"
?
§¥§Ö§ß§î §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú 2015. "§£?§Õ§ß§à§Ó§Ý§ð§Ó§Ñ§ß§Ñ §ä§Ñ §Ñ§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: §â§Ñ§Ù§à§Þ §é§Ú §á§â...
§¥§Ö§ß§î §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú 2015. "§£?§Õ§ß§à§Ó§Ý§ð§Ó§Ñ§ß§Ñ §ä§Ñ §Ñ§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: §â§Ñ§Ù§à§Þ §é§Ú §á§â...§¥§Ö§ß§î §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú 2015. "§£?§Õ§ß§à§Ó§Ý§ð§Ó§Ñ§ß§Ñ §ä§Ñ §Ñ§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: §â§Ñ§Ù§à§Þ §é§Ú §á§â...
§¥§Ö§ß§î §Ñ§ä§à§Þ§ß§à? §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú 2015. "§£?§Õ§ß§à§Ó§Ý§ð§Ó§Ñ§ß§Ñ §ä§Ñ §Ñ§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: §â§Ñ§Ù§à§Þ §é§Ú §á§â...
§¯§¡§¦§¬ ?§¦§ß§Ö§â§Ô§à§Ñ§ä§à§Þ?
?
§£?§Õ§ß§à§Ó§Ý§ð§Ó§Ñ§ß§Ñ §ä§Ñ §Ñ§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: §â§Ñ§Ù§à§Þ §é§Ú §á§â§à§ä§Ú? ?§Ó§â§à§á§Ö§Û§ã§î§Ü? §ä§â§Ö§ß§Õ§Ú §ä§Ñ §å§Ü§â...
§£?§Õ§ß§à§Ó§Ý§ð§Ó§Ñ§ß§Ñ §ä§Ñ §Ñ§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: §â§Ñ§Ù§à§Þ §é§Ú §á§â§à§ä§Ú? ?§Ó§â§à§á§Ö§Û§ã§î§Ü? §ä§â§Ö§ß§Õ§Ú §ä§Ñ §å§Ü§â...§£?§Õ§ß§à§Ó§Ý§ð§Ó§Ñ§ß§Ñ §ä§Ñ §Ñ§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: §â§Ñ§Ù§à§Þ §é§Ú §á§â§à§ä§Ú? ?§Ó§â§à§á§Ö§Û§ã§î§Ü? §ä§â§Ö§ß§Õ§Ú §ä§Ñ §å§Ü§â...
§£?§Õ§ß§à§Ó§Ý§ð§Ó§Ñ§ß§Ñ §ä§Ñ §Ñ§ä§à§Þ§ß§Ñ §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ñ: §â§Ñ§Ù§à§Þ §é§Ú §á§â§à§ä§Ú? ?§Ó§â§à§á§Ö§Û§ã§î§Ü? §ä§â§Ö§ß§Õ§Ú §ä§Ñ §å§Ü§â...
Oleksii Khabatiuk
?

More from Stanislav Masevych (6)

Concept desing of new electricity market of Ukraine
Concept desing of new electricity market of UkraineConcept desing of new electricity market of Ukraine
Concept desing of new electricity market of Ukraine
Stanislav Masevych
?
§©§µ §±§â§à §â§Ú§ß§à§Ü §Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§à? §Ö§ß§Ö§â§Ô??_§¬§®§µ_02.03.2016
§©§µ §±§â§à §â§Ú§ß§à§Ü §Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§à? §Ö§ß§Ö§â§Ô??_§¬§®§µ_02.03.2016§©§µ §±§â§à §â§Ú§ß§à§Ü §Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§à? §Ö§ß§Ö§â§Ô??_§¬§®§µ_02.03.2016
§©§µ §±§â§à §â§Ú§ß§à§Ü §Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§à? §Ö§ß§Ö§â§Ô??_§¬§®§µ_02.03.2016
Stanislav Masevych
?
Renewable energy production at the new electricity market of Ukraine - Stanis...
Renewable energy production at the new electricity market of Ukraine - Stanis...Renewable energy production at the new electricity market of Ukraine - Stanis...
Renewable energy production at the new electricity market of Ukraine - Stanis...
Stanislav Masevych
?
Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-...
Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-...Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-...
Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-...
Stanislav Masevych
?
Law on electricity market of Ukraine - English version
Law on electricity market of Ukraine - English versionLaw on electricity market of Ukraine - English version
Law on electricity market of Ukraine - English version
Stanislav Masevych
?
§°§ã§ß§à§Ó§ß? §á§à§Ý§à§Ø§Ö§ß§ß§ñ §±§â§à§Ö§Ü§ä§å §©§µ §±§â§à §â§Ú§ß§à§Ü §Ö§Ö §µ§Ü§â§Ñ?§ß§Ú_18 06 2015
§°§ã§ß§à§Ó§ß? §á§à§Ý§à§Ø§Ö§ß§ß§ñ §±§â§à§Ö§Ü§ä§å §©§µ §±§â§à §â§Ú§ß§à§Ü §Ö§Ö §µ§Ü§â§Ñ?§ß§Ú_18 06 2015§°§ã§ß§à§Ó§ß? §á§à§Ý§à§Ø§Ö§ß§ß§ñ §±§â§à§Ö§Ü§ä§å §©§µ §±§â§à §â§Ú§ß§à§Ü §Ö§Ö §µ§Ü§â§Ñ?§ß§Ú_18 06 2015
§°§ã§ß§à§Ó§ß? §á§à§Ý§à§Ø§Ö§ß§ß§ñ §±§â§à§Ö§Ü§ä§å §©§µ §±§â§à §â§Ú§ß§à§Ü §Ö§Ö §µ§Ü§â§Ñ?§ß§Ú_18 06 2015
Stanislav Masevych
?
Concept desing of new electricity market of Ukraine
Concept desing of new electricity market of UkraineConcept desing of new electricity market of Ukraine
Concept desing of new electricity market of Ukraine
Stanislav Masevych
?
§©§µ §±§â§à §â§Ú§ß§à§Ü §Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§à? §Ö§ß§Ö§â§Ô??_§¬§®§µ_02.03.2016
§©§µ §±§â§à §â§Ú§ß§à§Ü §Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§à? §Ö§ß§Ö§â§Ô??_§¬§®§µ_02.03.2016§©§µ §±§â§à §â§Ú§ß§à§Ü §Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§à? §Ö§ß§Ö§â§Ô??_§¬§®§µ_02.03.2016
§©§µ §±§â§à §â§Ú§ß§à§Ü §Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§à? §Ö§ß§Ö§â§Ô??_§¬§®§µ_02.03.2016
Stanislav Masevych
?
Renewable energy production at the new electricity market of Ukraine - Stanis...
Renewable energy production at the new electricity market of Ukraine - Stanis...Renewable energy production at the new electricity market of Ukraine - Stanis...
Renewable energy production at the new electricity market of Ukraine - Stanis...
Stanislav Masevych
?
Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-...
Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-...Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-...
Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-...
Stanislav Masevych
?
Law on electricity market of Ukraine - English version
Law on electricity market of Ukraine - English versionLaw on electricity market of Ukraine - English version
Law on electricity market of Ukraine - English version
Stanislav Masevych
?
§°§ã§ß§à§Ó§ß? §á§à§Ý§à§Ø§Ö§ß§ß§ñ §±§â§à§Ö§Ü§ä§å §©§µ §±§â§à §â§Ú§ß§à§Ü §Ö§Ö §µ§Ü§â§Ñ?§ß§Ú_18 06 2015
§°§ã§ß§à§Ó§ß? §á§à§Ý§à§Ø§Ö§ß§ß§ñ §±§â§à§Ö§Ü§ä§å §©§µ §±§â§à §â§Ú§ß§à§Ü §Ö§Ö §µ§Ü§â§Ñ?§ß§Ú_18 06 2015§°§ã§ß§à§Ó§ß? §á§à§Ý§à§Ø§Ö§ß§ß§ñ §±§â§à§Ö§Ü§ä§å §©§µ §±§â§à §â§Ú§ß§à§Ü §Ö§Ö §µ§Ü§â§Ñ?§ß§Ú_18 06 2015
§°§ã§ß§à§Ó§ß? §á§à§Ý§à§Ø§Ö§ß§ß§ñ §±§â§à§Ö§Ü§ä§å §©§µ §±§â§à §â§Ú§ß§à§Ü §Ö§Ö §µ§Ü§â§Ñ?§ß§Ú_18 06 2015
Stanislav Masevych
?

Presentation_Synchronous interconnection of Ukrainian and Moldovan power systems to ENTSO-E (1)

  • 1. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 Ministry of energy and coal industry of Ukraine The content and implementation of the project ¡°Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System¡± MIS ETC code: 2739 Reporter Stanislav Masevych Lawyer at the Project §®?§ß?§ã§ä§Ö§â§ã§ä§Ó§à §Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú §ä§Ñ §Ó§å§Ô?§Ý§î§ß§à? §á§â§à§Þ§Ú§ã§Ý§à§Ó§à§ã§ä? §µ§Ü§â§Ñ?§ß§Ú §©§Þ?§ã§ä §ä§Ñ §ã§ä§Ñ§ß §â§Ö§Ñ§Ý?§Ù§Ñ§è?? §á§â§à§Ö§Ü§ä§å ?§¥§à§ã§Ý?§Õ§Ø§Ö§ß§ß§ñ §Þ§à§Ø§Ý§Ú§Ó§à§ã§ä? §ã§Ú§ß§ç§â§à§ß§ß§à§Ô§à §à§Ò¡¯?§Õ§ß§Ñ§ß§ß§ñ §å§Ü§â§Ñ?§ß§ã§î§Ü§à? ? §Þ§à§Ý§Õ§à§Ó§ã§î§Ü§à? §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ú §Ù §Ü§à§ß§ä§Ú§ß§Ö§ß§ä§Ñ§Ý§î§ß§à§ð ?§Ó§â§à§á§Ö§Û§ã§î§Ü§à§ð §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§à§ð ENTSO-E? MIS ETC code: 2739 §¥§à§á§à§Ó?§Õ§Ñ§é §®§Ñ§ã§Ö§Ó§Ú§é §³§ä§Ñ§ß?§ã§Ý§Ñ§Ó §À§â§Ú§ã§ä §±§â§à§Ö§Ü§ä§å
  • 2. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 THE SHORT HISTORY OF THE PROJECT §¬§°§²§°§´§¬§¡ ?§³§´§°§²?§Á §±§²§°§¦§¬§´§µ
  • 3. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 ? 2005-2006 §â.§â. - negotiations on accession of UPS of Ukraine to the synchronous zone of UCTE (nowadays ¨C ENTSO-E). As a result, Transelectrica has submitted an application on accession of Ukrainian and Moldavian power systems to the synchronous zone of UCTE. ? 03.05.2006 - the Management Authority of UCTE (ENTSO-E) has accepted the application on accession of Ukrainian and Moldavian power systems to the synchronous zone of UCTE. ? 17.01.2008 - the Management Authority of UCTE (ENTSO-E) has approved the ?Technical Task of the Project of interconnection of Ukrainian and Moldavian power systems to UCTE?. ? 09.05.2012 ¨C the Project was approved by the EU Commission. ? 22.10.2012 ¨C the Grant Contract was signed in Cisenau (Moldova) between applicants and JMA of Cross Border Cooperation of ENPI. ? 2005-2006 §â.§â. - §á§Ö§â§Ö§Ô§à§Ó§à§â§Ú §ë§à§Õ§à §Ó§ã§ä§å§á§å §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Õ§à §ã§Ú§ß§ç§â§à§ß§ß§à? §Ù§à§ß§Ú UCTE (§ß§Ñ §Õ§Ñ§ß§Ú§Û §é§Ñ§ã ¨C ENTSO-E). §£ §â§Ö§Ù§å§Ý§î§ä§Ñ§ä? §á§Ö§â§Ö§Ô§à§Ó§à§â?§Ó §Ü§à§Þ§á§Ñ§ß?§ñ Transelectrica §á§à§Õ§Ñ§Ý§Ñ §à§æ?§è?§Û§ß§å §Ù§Ñ§ñ§Ó§Ü§å §ß§Ñ §Ó§ã§ä§å§á §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §ä§Ñ §¦§³ §®§à§Ý§Õ§à§Ó§Ú §Õ§à §ã§Ú§ß§ç§â§à§ß§ß§à? §Ù§à§ß§Ú UCTE. ? 03.05.2006 - §¬§Ö§â§å§ð§é§Ú§Û §Ü§à§Þ?§ä§Ö§ä UCTE (ENTSO-E) §Ñ§Ü§è§Ö§á§ä§å§Ó§Ñ§Ó §Ù§Ñ§ñ§Ó§Ü§å §ß§Ñ §Ó§ã§ä§å§á §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §ä§Ñ §¦§³ §®§à§Ý§Õ§à§Ó§Ú §Õ§à §ã§Ú§ß§ç§â§à§ß§ß§à? §Ù§à§ß§Ú UCTE. ? 17.01.2008 - §¬§Ö§â§å§ð§é§Ú§Û §Ü§à§Þ?§ä§Ö§ä UCTE (ENTSO-E) §Ù§Ñ§ä§Ó§Ö§â§Õ§Ú§Ó §á?§Õ§Ô§à§ä§à§Ó§Ý§Ö§ß§Ö §±§â§à§Ö§Ü§ä§ß§à§ð §Ô§â§å§á§à§ð ?§´§Ö§ç§ß?§é§ß§Ö §Ù§Ñ§Ó§Õ§Ñ§ß§ß§ñ §±§â§à§Ö§Ü§ä§å §á§â§Ú?§Õ§ß§Ñ§ß§ß§ñ §µ§Ü§â§Ñ?§ß§Ú §ä§Ñ §®§à§Ý§Õ§à§Ó§Ú §Õ§à §Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§à? §ã§Ú§ã§ä§Ö§Þ§Ú UCTE?. ? 09.05.2012 - §±§â§à§Ö§Ü§ä §à§ä§â§Ú§Þ§Ñ§Ó §ã§ç§Ó§Ñ§Ý§Ö§ß§ß§ñ ?§Ó§â§à§á§Ö§Û§ã§î§Ü§à? §¬§à§Þ?§ã??. ? 22.10.2013 ¨C §±?§Õ§á§Ú§ã§Ñ§ß§ß§ñ §¤§â§Ñ§ß§ä§à§Ó§à? §µ§Ô§à§Õ§Ú §Ó §Þ. §¬§Ú§ê§Ú§ß?§Ó (§®§à§Ý§Õ§à§Ó§Ñ) §Þ?§Ø §Ñ§á§Ý?§Ü§Ñ§ß§ä§Ñ§Þ§Ú §ä§Ñ §³§á?§Ý§î§ß§Ú§Þ §°§â§Ô§Ñ§ß§à§Þ §µ§á§â§Ñ§Ó§Ý?§ß§ß§ñ §±§â§à§Ô§â§Ñ§Þ§Ú §´§â§Ñ§ß§ã§Ü§à§â§Õ§à§ß§ß§à§Ô§à §³§á?§Ó§â§à§Ò?§ä§ß§Ú§è§ä§Ó§Ñ ??§³§±.
  • 4. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 PARTNERS OF THE PROJECT §±§¡§²§´§¯§¦§²§ª §±§²§°§¦§¬§´§µ
  • 5. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 MINISTRY OF ECONOMIC OF THE REPUBLIC OF MOLDOVA ¨C LEAD PARTNER MINISTRY OF ECONOMIC OF ROMANIA ¨C PARTNER 1 MINISTRY OF ENERGY AN COAL INDUSTRY OF UKRAINE ¨C PARTNER 2 §®?§¯?§³§´§¦§²§³§´§£§° §¦§¬§°§¯§°§®?§¬§ª §²§¦§³§±§µ§¢§­?§¬§ª §®§°§­§¥§°§£§¡ ¨C §¤§°§­§°§£§¯§ª§« §±§¡§²§´§¯§¦§² §®?§¯?§³§´§¦§²§³§´§£§° §¦§¬§°§¯§°§®?§¬§ª §²§µ§®§µ§¯?? ¨C §±§¡§²§´§¯§¦§² 1 §®?§¯?§³§´§¦§²§³§´§£§° §¦§¯§¦§²§¤§¦§´§ª§¬§ª §´§¡ §£§µ§¤?§­§¾§¯§°? §±§²§°§®§ª§³§­§°§£§°§³§´? §µ§¬§²§¡?§¯§ª ¨C§±§¡§²§´§¯§¦§² 2
  • 6. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 GRANTOR AND MANAGEMENT OF THE PROJECT §¤§²§¡§¯§´§°§¥§¡§£§¦§¸§¾ §´§¡ §¬§¦§²?§£§¯§ª§¸§´§£§° §±§²§°§¦§¬§´§°§®
  • 7. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 GRANTOR: MANAGEMENT: §¤§²§¡§¯§´§°§¥§¡§£§¦§¸§¾: §¬§¦§²?§£§¯§ª§¸§´§£§°: European Commission - Joint Operational Programme Romania- Ukraine-Republic of Moldova 2007-2013 (European Neighborhood and Partnership Instrument) JOINT MANAGEMENT AUTHORITY (Ministry of regional development and public administration) JOINT TECHNICAL SECRETARIAT (Regional office of Cross Border Cooperation Program, Romania) ?§Ó§â§à§á§Ö§Û§ã§î§Ü§Ñ §Ü§à§Þ?§ã?§ñ ¨C §³§á?§Ý§î§ß§Ñ §â§à§Ò§à§é§Ñ §á§â§à§Ô§â§Ñ§Þ§Ñ §²§å§Þ§å§ß?§ñ-§µ§Ü§â§Ñ?§ß§Ñ-§²§Ö§ã§á§å§Ò§Ý?§Ü§Ñ §®§à§Ý§Õ§à§Ó§Ñ 2007-2013 (?§Ó§â§à§á§Ö§Û§ã§î§Ü§Ö §ã§å§ã?§Õ§ã§ä§Ó§à §ä§Ñ §á§Ñ§â§ä§ß§Ö§â§ã§ä§Ó§à) §³§±?§­§¾§¯§ª§« §°§²§¡§¯ §µ§¬§±§²§¡§£§­?§¯§¯§Á (§®?§ß?§ã§ä§Ö§â§ã§ä§Ó§à §â§Ö§Ô?§à§ß§Ñ§Ý§î§ß§à§Ô§à §â§à§Ù§Ó§Ú§ä§å §ä§Ñ §á§å§Ò§Ý?§é§ß§à§Ô§à §å§á§â§Ñ§Ó§Ý?§ß§ß§ñ §²§å§Þ§å§ß??) §³§±?§­§¾§¯§ª§« §´§¦§·§¯?§¹§¯§ª§« §³§¦§¬§²§¦§´§¡§²?§¡§´ (§²§Ö§Ô?§à§ß§Ñ§Ý§î§ß§Ú§Û §à§æ?§ã §±§â§à§Ô§â§Ñ§Þ§Ú §´§â§Ñ§ß§ã§Ü§à§â§Õ§à§ß§ß§à§Ô§à §³§á?§Ó§â§à§Ò?§ä§ß§Ú§è§ä§Ó§Ñ, §²§å§Þ§å§ß?§ñ)
  • 8. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 THE MEMBERS (CONTRACTORS) OF THE PROJECT FROM ENTSO-E §µ§¹§¡§³§¯§ª§¬§ª (§±?§¥§²§Á§¥§¯§ª§¬§ª) §±§²§°§¦§¬§´§µ §£?§¥ ENTSO-E
  • 9. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 TRANSELECTRICA (Romania) MAVIR (Hungary) PSE (Poland) ESO EAD (Bulgaria) EMS (Serbia) Bernard Energy Advocacy (Belgium) TRANSELECTRICA (§²§å§Þ§å§ß?§ñ) MAVIR (§µ§Ô§à§â§ë§Ú§ß§Ñ) PSE (§±§à§Ý§î§ë§Ñ) ESO EAD (§¢§à§Ý§Ô§Ñ§â?§ñ) EMC (§³§Ö§â§Ò?§ñ) Bernard Energy Advocacy (§¢§Ö§Ý§î§Ô?§ñ)
  • 10. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 THE STRUCTURE OF PROJECT IMPLEMENTATION IN UKRAINE §³§´§²§µ§¬§´§µ§²§¡ §²§¦§¡§­?§©§¡§¸?? §±§²§°§¦§¬§´§µ §£ §µ§¬§²§¡?§¯?
  • 11. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 §®?§¯?§³§´§¦§²§³§´§£§° §¦§¯§¦§²§¤§¦§´§ª§¬§ª §´§¡ §£§µ§¤?§­§¾§¯§°? §±§®§ª§®§³§­§°§£§°§³§´? §µ§¬§²§¡?§¯§ª ¨C §±§¡§²§´§¯§¦§² 2 §¯§¦§¬ ¡°§µ§¬§²§¦§¯§¦§²§¤§°¡± CZECHPOL ENERGY MINISTRY OF ENERGY AND COAL INDUSTRY OF UKRAINE ¨C PARTNER 2 NEC ¡°UEKENERGO¡± CZECHPOL ENERGY
  • 12. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 STAGES OF INTERCONNECTION OF ENERGY SYSTEMS OF UKRAINE AND MOLDOVA WITH THE ENTSO-E SYSTEM §³§´§¡§¥?? §°§¢¡¯?§¥§¯§¡§¯§¯§Á §¦§¯§¦§²§¤§°§³§ª§³§´§¦§® §µ§¬§²§¡?§¯§ª §´§¡ §®§°§­§¥§°§£§ª §© §³§ª§³§´§¦§®§°§À ENTSO-E
  • 13. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 STAGE A. Preparation of the Agreement, which will be signed by UE / Moldelectrica and UCTE (ENTSO-E), which will include: technical specifications and operational aspects, including the agreement between the UE and Moldelectrica on maintaining of the control unit; separation conditions,operating the congestion regime ; legal / regulatory framework. The result ¨C all technical and legal requirements for the full accession of the Ukrainian and Moldovan electric power to the electricity grid UCTE must be carried out.; §³§´§¡§¥?§Á §¡. §±?§Õ§Ô§à§ä§à§Ó§Ü§Ñ §µ§Ô§à§Õ§Ú, §ñ§Ü§å §Þ§Ñ§ð§ä§î §á?§Õ§á§Ú§ã§Ñ§ä§Ú §µ§Ü§â§Ö§ß§Ö§â§Ô§à/Moldelectrica §ä§Ñ ENTSO-E, §ñ§Ü§Ñ §Ó§Ü§Ý§ð§é§Ñ§ä§Ú§Þ§Ö: §ä§Ö§ç§ß?§é§ß? §å§Þ§à§Ó§Ú §Û §Ö§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?§Û§ß? §Ñ§ã§á§Ö§Ü§ä§Ú, §å §ä§à§Þ§å §é§Ú§ã§Ý? §å§Ô§à§Õ§å §Þ?§Ø §µ§Ü§â§Ö§ß§Ö§â§Ô§à §ä§Ñ Moldelectrica §Ù §Ö§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?? §Ü§à§ß§ä§â§à§Ý§î§ß§à§Ô§à §Ò§Ý§à§Ü§å; §å§Þ§à§Ó§Ú §â§à§Ù§Þ§Ö§Ø§å§Ó§Ñ§ß§ß§ñ; §Ó§Ö§Õ§Ö§ß§ß§ñ §â§Ö§Ø§Ú§Þ§å §á§Ö§â§Ö§Ó§Ñ§ß§ä§Ñ§Ø§Ö§ß§ß§ñ; §ð§â§Ú§Õ§Ú§é§ß?/§â§Ö§Ô§å§Ý§ñ§ä§à§â§ß? §å§Þ§à§Ó§Ú. §²§Ö§Ù§å§Ý§î§ä§Ñ§ä ¨C §á?§Õ§Ô§à§ä§à§Ó§Ý§Ö§ß? §ä§Ö§ç§ß?§é§ß? §ä§Ñ §ð§â§Ú§Õ§Ú§é§ß? §Ó§Ú§Þ§à§Ô§Ú §Õ§Ý§ñ §á§à§Ó§ß§à§Ô§à §á§â§Ú?§Õ§ß§Ñ§ß§ß§ñ §å§Ü§â§Ñ?§ß§ã§î§Ü§à? §Û §Þ§à§Ý§Õ§à§Ó§ã§î§Ü§à? §Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§Ú§ç §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ §Õ§à §Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§à? §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ú ENTSO-E;
  • 14. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 STAGE B. Implementation of the Agreement in Ukrainian and Moldovan sides. During the second phase all the technical and organizational measures should be implemented in order to meet standards under the User's Guide ENTSO-E. The end result will be a report prepared for the Steering Committee of ENTSO- E, and preparation of the requests to switch to stage "C ¡±. §³§´§¡§¥?§Á B. §£§á§â§à§Ó§Ñ§Õ§Ø§Ö§ß§ß§ñ §á§à§Ý§à§Ø§Ö§ß§î §µ§Ô§à§Õ§Ú §å§Ü§â§Ñ?§ß§ã§î§Ü§à§ð §ä§Ñ §Þ§à§Ý§Õ§Ñ§Ó§ã§î§Ü§à§ð §ã§ä§à§â§à§ß§Ñ§Þ§Ú. §±§â§à§ä§ñ§Ô§à§Þ §Õ§â§å§Ô§à§Ô§à §Ö§ä§Ñ§á§å §Þ§Ñ§ð§ä§î §Ò§å§ä§Ú §Ó§á§â§à§Ó§Ñ§Õ§Ø§Ö§ß? §Ó§ã? §ä§Ö§ç§ß?§é§ß? §ä§Ñ §à§â§Ô§Ñ§ß?§Ù§Ñ§è?§Û§ß? §Ù§Ñ§ç§à§Õ§Ú, §ë§à§Ò §Þ§Ñ§ä§Ú §Ù§Þ§à§Ô§å §Ù§Ñ§Õ§à§Ó§à§Ý§î§ß§ñ§ä§Ú §ã§ä§Ñ§ß§Õ§Ñ§â§ä§Ñ§Þ §Ó?§Õ§á§à§Ó?§Õ§ß§à §Õ§à §±§à§ã?§Ò§ß§Ú§Ü§Ñ §Ù §Ö§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?? ENTSO-E. §¬?§ß§è§Ö§Ó§Ú§Þ §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§à§Þ §Ò§å§Õ§Ö §Ù§Ó?§ä, §á?§Õ§Ô§à§ä§à§Ó§Ý§Ö§ß§Ú§Û §Õ§Ý§ñ §¬§Ö§â?§Ó§ß§à§Ô§à §Ü§à§Þ?§ä§Ö§ä§å ENTSO-E, §ä§Ñ §á?§Õ§Ô§à§ä§à§Ó§Ü§Ñ §Ù§Ñ§á§Ú§ä§å §Õ§Ý§ñ §á§Ö§â§Ö§ç§à§Õ§å §Õ§à §ã§ä§Ñ§Õ?? "§³¡±.
  • 15. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 STAGE C. Preparation and testing in regime of separate work and regime of connected power systems. Evaluation of test results. The next step should be resolution of the test and testing using the synchronous interconnection of the area. §³§´§¡§¥?§Á C. §±?§Õ§Ô§à§ä§à§Ó§Ü§Ñ §Û §á§â§à§Ó§Ö§Õ§Ö§ß§ß§ñ §Ó§Ú§á§â§à§Ò§å§Ó§Ñ§ß§î §å §â§Ö§Ø§Ú§Þ§Ñ§ç §â§à§Ù§Õ?§Ý§î§ß§à? §â§à§Ò§à§ä§Ú §ä§Ñ §à§Ò'?§Õ§ß§Ñ§ß§ß§ñ §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ. §°§è?§ß§Ü§Ñ §â§Ö§Ù§å§Ý§î§ä§Ñ§ä?§Ó §Ó§Ú§á§â§à§Ò§å§Ó§Ñ§ß§î. §¯§Ñ§ã§ä§å§á§ß§Ú§Þ §Ü§â§à§Ü§à§Þ §Þ§Ñ? §Ò§å§ä§Ú §á§â§à§Ó§Ö§Õ§Ö§ß§ß§ñ §Ó§Ú§á§â§à§Ò§å§Ó§Ñ§ß§î §â§à§Ù§Õ?§Ý§î§ß§à? §â§à§Ò§à§ä§Ú §Û §Ó§Ú§á§â§à§Ò§å§Ó§Ñ§ß§ß§ñ §Ó §â§Ö§Ø§Ú§Þ? §à§Ò'?§Õ§ß§Ñ§ß§ß§ñ §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ ?§Ù §ã§Ú§ß§ç§â§à§ß§ß§à§ð §Ù§à§ß§à§ð.
  • 16. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 THE MAIN PRINCIPLES OF PARTNERSHIP §°§³§¯§°§£§¯? §±§²§ª§¯§¸§ª§±§ª §³§±?§£§²§°§¢?§´§¯§ª§¸§´§£§¡
  • 17. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 ? The possibility of providing funds to 90% of the project under the European Neighbourhood Policy and the partnership program by CBC Romania- Ukraine-Moldova 2007 ¨C 2013 was determined. The remaining 10% of the project should be divided between the ministries of Moldova, Ukraine and Romania. ? It is agreed that Moldova will submit an application for funding on behalf of two other beneficiaries. Proposals were presented on March 31, 2011 to the Joint Steering Committee of the Joint Operational Programme, which is located in the Ministry of Regional Development in Romania. ? §±§à§Ô§à§Õ§Ø§Ö§ß§à, §ë§à 90% §Ó§Ñ§â§ä§à§ã§ä? §á§â§à§Ö§Ü§ä§å §Ó §â§Ñ§Þ§Ü§Ñ§ç ?§ß§ã§ä§â§å§Þ§Ö§ß§ä§å ?§Ó§â§à§á§Ö§Û§ã§î§Ü§à? §á§à§Ý?§ä§Ú§Ü§Ú §ã§å§ã?§Õ§ã§ä§Ó§Ñ §ä§Ñ §á§Ñ§â§ä§ß§Ö§â§ã§ä§Ó§Ñ §Ù§Ñ §â§Ñ§ç§å§ß§à§Ü §á§â§à§Ô§â§Ñ§Þ§Ú §á§â§Ú§Ü§à§â§Õ§à§ß§ß§à§Ô§à §ã§á?§Ó§â§à§Ò?§ä§ß§Ú§è§ä§Ó§Ñ §²§å§Þ§å§ß?§ñ-§µ§Ü§â§Ñ?§ß§Ñ-§®§à§Ý§Õ§à§Ó§Ñ 2007- 2013. §²§Ö§ê§ä§Ñ 10% §Ó§Ñ§â§ä§à§ã§ä? §á§â§à§Ö§Ü§ä§å §Þ§Ñ? §Ò§å§ä§Ú §Ó§Ú§Õ?§Ý§Ö§ß§Ñ §Þ?§ß?§ã§ä§Ö§â§ã§ä§Ó§Ñ§Þ§Ú §®§à§Ý§Õ§à§Ó§Ú, §µ§Ü§â§Ñ?§ß§Ú ? §²§å§Þ§å§ß??. ? §±§à§Ô§à§Õ§Ø§Ö§ß§à, §ë§à §®§à§Ý§Õ§à§Ó§Ñ §á§à§Õ§Ñ§Ó§Ñ§ä§Ú§Þ§Ö §Ù§Ñ§ñ§Ó§Ü§å §ß§Ñ §à§ä§â§Ú§Þ§Ñ§ß§ß§ñ §Ü§à§ê§ä?§Ó §Ó?§Õ ?§Þ§Ö§ß? §Õ§Ó§à§ç ?§ß§ê§Ú§ç §Ò§Ö§ß§Ö§æ?§è?§Ñ§â?§Ó. §±§â§à§Ö§Ü§ä§ß? §á§â§à§á§à§Ù§Ú§è?? §Ò§å§Ý§Ú §á§â§Ö§Õ§ã§ä§Ñ§Ó§Ý§Ö§ß? 31 §Ò§Ö§â§Ö§Ù§ß§ñ 2011 §â. §³§á?§Ý§î§ß§à§Þ§å §Ü§Ö§â§å§ð§é§à§Þ§å §Ü§à§Þ?§ä§Ö§ä§å §³§á?§Ý§î§ß§à? §à§á§Ö§â§Ñ§ä§Ú§Ó§ß§à? §á§â§à§Ô§â§Ñ§Þ§Ú, §ñ§Ü§Ú§Û §Ù§ß§Ñ§ç§à§Õ§Ú§ä§î§ã§ñ §Ó §®?§ß?§ã§ä§Ö§â§ã§ä§Ó? §â§Ö§Ô?§à§ß§Ñ§Ý§î§ß§à§Ô§à §â§à§Ù§Ó§Ú§ä§Ü§å §Ó §²§å§Þ§å§ß??.
  • 18. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 ? The Project implementation involves 4 work groups ¨C steady analysis, dynamic analysis, operational issues, legal/regulatory issues. ? Moldova as the Lead Partner shall submit to JMA of the Joint Operational Program all reports prepared by the Partner 2 (Ukraine). ? The work results of all 4 work groups shall be submitted to the Leaders- ENTSO-e within each work group. ? §±§à§Ô§à§Õ§Ø§Ö§ß§à, §ë§à §á§â§Ú §â§Ö§Ñ§Ý?§Ù§Ñ§è?? §±§â§à§Ö§Ü§ä§å §Õ?§ð§ä§î 4 §â§à§Ò§à§é§Ú§ç §Ô§â§å§á§Ú ¨C §ã§ä§Ñ§ä§Ú§é§ß§Ú§Û §Ñ§ß§Ñ§Ý?§Ù, §Õ§Ú§ß§Ñ§Þ?§é§ß§Ú§Û §Ñ§ß§Ñ§Ý?§Ù, §à§á§Ö§â§Ñ§è?§Û§ß? §á§Ú§ä§Ñ§ß§ß§ñ, §â§Ö§Ô§å§Ý§ñ§ä§à§â§ß?/§ð§â§Ú§Õ§Ú§é§ß? §á§Ú§ä§Ñ§ß§ß§ñ. ? §±§à§Ô§à§Õ§Ø§Ö§ß§à, §ë§à §®§à§Ý§Õ§à§Ó§Ñ §ñ§Ü §¤§à§Ý§à§Ó§ß§Ú§Û §±§Ñ§â§ä§ß§Ö§â §Ò§å§Õ§Ö §á§à§Õ§Ñ§Ó§Ñ§ä§Ú §Õ§à§Ü§å§Þ§Ö§ß§ä§Ú §Ù§Ó?§ä§ß§à§ã§ä? §Ù§Ñ §Ó§Ú§Ü§à§ß§Ñ§ß? §â§à§Ò§à§ä§Ú §±§Ñ§â§ä§ß§Ö§â§Ñ 2 (§µ§Ü§â§Ñ?§ß§Ñ) §Ó §Þ§Ö§Ø§Ñ§ç §â§à§Ò§à§é§Ú§ç §Ô§â§å§á §³§á?§Ý§î§ß§à§Þ§å §Ü§Ö§â§å§ð§é§à§Þ§å §Ü§à§Þ?§ä§Ö§ä§å §³§á?§Ý§î§ß§à? §à§á§Ö§â§Ñ§ä§Ú§Ó§ß§à? §á§â§à§Ô§â§Ñ§Þ§Ú. ? §±§à§Ô§à§Õ§Ø§Ö§ß§à, §ë§à §â§Ö§Ù§å§Ý§î§ä§Ñ§ä§Ú §â§à§Ò?§ä, §Ó§Ú§Ü§à§ß§Ñ§ß? §Ó §Þ§Ö§Ø§Ñ§ç 4 §â§à§Ò§à§é§Ú§ç §Ô§â§å§á, §á§Ö§â§Ö§Õ§Ñ§ð§ä§î§ã§ñ §­?§Õ§Ö§â§Ñ§Þ-ENTSO-E §Ü§à§Ø§ß§à? §â§à§Ò§à§é§à? §Ô§â§å§á§Ú.
  • 19. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 ORGANISATION OF THE PROJECT IMPLEMENTATION §°§²§¤§¡§¯?§©§¡§¸?§Á §£§ª§¬§°§¯§¡§¯§¯§Á §±§²§°§¦§¬§´§µ
  • 20. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 WG1L (EMS) WG2L (PSE) WG3L (ESO EAD) WG4L (BEA) CONSORTIUM OF TSOs - ENTSO-E (Work Group Leaders-ENTSO- E) WG1 Steady State analysis WG2 Dynamic analysis WG3 Operational issues WG4 Regulatory /Legal issues §¬§°§¯§³§°§²§¸?§µ§® §°§±§¦§²§¡§´§°§²?§£ ENTSO-E §­?§Õ§Ö§â§Ú §â§à§Ò§à§é§Ú§ç §Ô§â§å§á ENTSO-E §²§¤ 1 §­?§Õ§Ö§â (EMS) §²§¤ 2 §­?§Õ§Ö§â (PSE) §²§¤3 §­?§Õ§Ö§â (ESO-EAD) §²§¤4 §­?§Õ§Ö§â (BEA) §²§¤ 1 §³§ä§Ñ§ä§Ú§é§ß§Ú§Û §Ñ§ß§Ñ§Ý?§Ù §²§¤ 2 §¥§Ú§ß§Ñ§Þ?§é§ß§Ú§Û §Ñ§ß§Ñ§Ý?§Ù §²§¤ 3 §¦§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è ?§Û§ß? §Ñ§ã§á§Ö§Ü§ä§Ú §²§¤ 4 §²§Ö§Ô§å§Ý§ñ§ä§à§â§ß?/ §À§â§Ú§Õ§Ú§é§ß? §á§Ú§ä§Ñ§ß§ß§ñ
  • 21. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 THE FIRST RESULTS OF PROJECT IMPLEMENTATION BY THE PARTNER 2 (UKRAINE) §±§¦§²§º? §²§¦§©§µ§­§¾§´§¡§´§ª §£§±§²§°§£§¡§¥§¨§¦§¯§¯§Á §±§²§°§¦§¬§´§µ §±§¡§²§´§¯§¦§²§°§® 2 (§µ§¬§²§¡?§¯§°§À)
  • 22. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 WORK GROUP 1 (Steady analysis) 1. GENERAL GROUP TASK ¨C providing a steady state analysis as for synchronous work at interconnection of energy system ENTSO-E with the energy systems of Ukraine and Moldova. 2. CURRENT GROUP TASK ¨C to prepare the joint digital model of trunk transmission grids of the Eastern European countries involving Ukrainian and Moldavian models that could be applicable for steady state analysis. 3. HEAD OF THE WORK GROUP ¨C Nenand Shiiakovych (EMS ¨C the TSO of Serbia). DONE as of 16.03.2015: prepared two models of trunk transmission grids of the energy system of Ukraine for 2020 110 kW and more: winter and summer peaks in 2020. These models of Ukrainian electricity system includes 8 energy systems: North, Donbass, Dniprovska, Crimean, South, Central, South-West and West. §²§°§¢§°§¹§¡ §¤§²§µ§±§¡ 1 (§³§ä§Ñ§ä§Ú§é§ß§Ú§Û §Ñ§ß§Ñ§Ý?§Ù) 1. §©§¡§¤§¡§­§¾§¯§¦ §©§¡§£§¥§¡§¯§¯§Á §¤§²§µ§±§ª ¨C §Ó§Ú§Ü§à§ß§Ñ§ß§ß§ñ §Õ§à§ã§Ý?§Õ§Ø§Ö§ß§î §å§ã§ä§Ñ§Ý§Ö§ß§Ú§ç §â§Ö§Ø§Ú§Þ?§Ó §á§â§Ú §à§Ò¡¯?§Õ§ß§Ñ§ß? §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ ENTSO-E §Ù §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ñ§Þ§Ú §µ§Ü§â§Ñ?§ß§Ú §ä§Ñ §®§à§Ý§Õ§à§Ó§Ú §ß§Ñ §ã§Ú§ß§ç§â§à§ß§ß§å §â§à§Ò§à§ä§å. 2. §±§°§´§°§¹§¯§¦ §©§¡§£§¥§¡§¯§¯§Á §¤§²§µ§±§ª ¨C §á?§Õ§Ô§à§ä§å§Ó§Ñ§ä§Ú §à§Ò¡¯?§Õ§ß§Ñ§ß§å §è§Ú§æ§â§à§Ó§å §Þ§à§Õ§Ö§Ý§î §Þ§Ñ§Ô?§ã§ä§â§Ñ§Ý§î§ß§Ú§ç §Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§Ú§ç §Þ§Ö§â§Ö§Ø §Ü§â§Ñ?§ß §ã§ç?§Õ§ß§à? ?§Ó§â§à§á§Ú, §Ó§Ü§Ý§ð§é§Ñ§ð§é§Ú §Þ§à§Õ§Ö§Ý? §µ§Ü§â§Ñ?§ß§Ú §ä§Ñ §®§à§Ý§Õ§à§Ó§Ú §á§â§Ú§Õ§Ñ§ä§ß§å §Õ§Ý§ñ §Õ§à§ã§Ý?§Õ§Ø§Ö§ß§î §å§ã§ä§Ñ§Ý§Ö§ß§Ú§ç §â§Ö§Ø§Ú§Þ?§Ó. 3. §¬§¦§²?§£§¯§ª§¬ §²§°§¢§°§¹§°? §¤§²§µ§±§ª - §¯§Ö§ß§Ñ§ß§Õ §º§Ú§ñ§Ü§à§Ó§Ú§é (EMS ¨C §ã§Ú§ã§ä§Ö§Þ§ß§Ú§Û §à§á§Ö§â§Ñ§ä§à§â §³§Ö§â§Ò??). §£§ª§¬§°§¯§¡§¯§° §ã§ä§Ñ§ß§à§Þ §ß§Ñ 16.03.2015: §â§à§Ù§â§à§Ò§Ý§Ö§ß§à §Õ§Ó? §Þ§à§Õ§Ö§Ý? §Þ§Ñ§Ô?§ã§ä§â§Ñ§Ý§î§ß§Ú§ç §Þ§Ö§â§Ö§Ø §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §ß§Ñ 2020 110 §Ü§£ §ä§Ñ §Ó§Ú§ë§Ö: §Ù§Ú§Þ§à§Ó§Ú§Û §ä§Ñ §Ý?§ä§ß?§Û §Þ§Ñ§Ü§ã§Ú§Þ§å§Þ§Ú §ß§Ñ§Ó§Ñ§ß§ä§Ñ§Ø§Ö§ß§î 2020 §â§à§Ü§å. §µ §Õ§Ñ§ß§Ú§ç §Þ§à§Õ§Ö§Ý§ñ§ç §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §á§â§Ö§Õ§ã§ä§Ñ§Ó§Ý§Ö§ß§Ñ 8 §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ñ§Þ§Ú: §±?§Ó§ß?§é§ß§à§ð, §¥§à§ß§Ò§Ñ§ã§î§Ü§à§ð, §¥§ß?§á§â§à§Ó§ã§î§Ü§à§ð, §¬§â§Ú§Þ§ã§î§Ü§à§ð, §±?§Ó§Õ§Ö§ß§ß§à§ð, §¸§Ö§ß§ä§â§Ñ§Ý§î§ß§à§ð, §±?§Ó§Õ§Ö§ß§ß§à-§©§Ñ§ç?§Õ§ß§à§ð §ä§Ñ §©§Ñ§ç?§Õ§ß§à§ð.
  • 23. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 WORK GROUP 2 (Dynamic analysis) 1. GENERAL GROUP TASK ¨C providing a transitional process analysis and analysis of steady state stability as for synchronous work at interconnection of energy system ENTSO-E with the energy systems of Ukraine and Moldova. 2. CURRENT GROUP TASK ¨C to prepare the dynamic model which could be applicable for transitional process analysis and analysis of steady state stability based on the joint digital model of trunk transmission grids of the Eastern European countries involving Ukrainian and Moldavian models. 3. HEAD OF THE WORK GROUP ¨C Robert Trebski (PSE S.A. ¨C the TSO of Poland). DONE as of 16.03.2015: prepared the project of the basic model of the electricity system of Ukraine for calculation of the dynamic stability taking into account the basis of project¡¯s model ¡° Chornomorskii circle¡±, after updating of the dynamic model it shall be verified with application of WAMS data. §²§°§¢§°§¹§¡ §¤§²§µ§±§¡ 2 (§¥§Ú§ß§Ñ§Þ?§é§ß§Ú§Û §Ñ§ß§Ñ§Ý?§Ù) 1. §©§¡§¤§¡§­§¾§¯§¦ §©§¡§£§¥§¡§¯§¯§Á §¤§²§µ§±§ª ¨C §Ó§Ú§Ü§à§ß§Ñ§ß§ß§ñ §Õ§à§ã§Ý?§Õ§Ø§Ö§ß§î §á§Ö§â§Ö§ç?§Õ§ß§Ú§ç §á§â§à§è§Ö§ã?§Ó §ä§Ñ §ã§ä?§Û§Ü§à§ã§ä? §â§Ö§Ø§Ú§Þ?§Ó §á§â§Ú §à§Ò¡¯?§Õ§ß§Ñ§ß? §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ ENTSO-E §Ù §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ñ§Þ§Ú §µ§Ü§â§Ñ?§ß§Ú §ä§Ñ §®§à§Ý§Õ§à§Ó§Ú §ß§Ñ §ã§Ú§ß§ç§â§à§ß§ß§å §â§à§Ò§à§ä§å. 2. §±§°§´§°§¹§¯§¦ §©§¡§£§¥§¡§¯§¯§Á §¤§²§µ§±§ª ¨C §ß§Ñ §á?§Õ§ã§ä§Ñ§Ó? §à§Ò¡¯?§Õ§ß§Ñ§ß§à? §è§Ú§æ§â§à§Ó§à? §Þ§à§Õ§Ö§Ý? §Þ§Ñ§Ô?§ã§ä§â§Ñ§Ý§î§ß§Ú§ç §Ö§Ý§Ö§Ü§ä§â§Ú§é§ß§Ú§ç §Þ§Ö§â§Ö§Ø §Ü§â§Ñ?§ß §ã§ç?§Õ§ß§à? ?§Ó§â§à§á§Ú, §Ó§Ü§Ý§ð§é§Ñ§ð§é§Ú §Þ§à§Õ§Ö§Ý? §µ§Ü§â§Ñ?§ß§Ú §ä§Ñ §®§à§Ý§Õ§à§Ó§Ú §á?§Õ§Ô§à§ä§å§Ó§Ñ§ä§Ú §Õ§Ú§ß§Ñ§Þ?§é§ß§å §Þ§à§Õ§Ö§Ý§î §á§â§Ú§Õ§Ñ§ä§ß§å §Õ§Ý§ñ §Õ§à§ã§Ý?§Õ§Ø§Ö§ß§î §á§Ö§â§Ö§ç?§Õ§ß§Ú§ç §á§â§à§è§Ö§ã?§Ó §ä§Ñ §ã§ä?§Û§Ü§à§ã§ä? §â§Ö§Ø§Ú§Þ?§Ó. 3. §¬§¦§²?§£§¯§ª§¬ §²§°§¢§°§¹§°? §¤§²§µ§±§ª - §²§à§Ò§Ö§â§ä §´§â§Ö§Ò§ã§Ü? (PSE S.A. ¨C §ã§Ú§ã§ä§Ö§Þ§ß§Ú§Û §à§á§Ö§â§Ñ§ä§à§â §±§à§Ý§î§ë?). §£§ª§¬§°§¯§¡§¯§° §ã§ä§Ñ§ß§à§Þ §ß§Ñ 16.03.2015: §â§à§Ù§â§à§Ò§Ý§Ö§ß§à §á§â§à§Ö§Ü§ä §Ò§Ñ§Ù§à§Ó§à? §Þ§à§Õ§Ö§Ý? §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Õ§Ý§ñ §â§à§Ù§â§Ñ§ç§å§ß§Ü§å §Õ§Ú§ß§Ñ§Þ?§é§ß§à§ð §ã§ä?§Û§Ü§à§ã§ä?, §Ó §ñ§Ü§å §Ó§Ù§ñ§ä§à §Ù§Ñ §à§ã§ß§à§Ó§å §Þ§à§Õ§Ö§Ý§î §á§à §á§â§à§Ö§Ü§ä§å ?§¹§à§â§ß§à§Þ§à§â§ã§î§Ü§à§Ô§à §Ü?§Ý§î§è§ñ?;§á?§ã§Ý§ñ §Õ§à§à§á§â§Ñ§è§ð§Ó§Ñ§ß§ß§ñ §Õ§Ú§ß§Ñ§Þ?§é§ß§à? §Þ§à§Õ§Ö§Ý? §Ó§à§ß§Ñ §Ò§å§Õ§Ö §Ó§Ö§â§Ú§æ?§Ü§à§Ó§Ñ§ß§Ñ §Ù §Ó§Ú§Ü§à§â§Ú§ã§ä§Ñ§ß§ß§ñ§Þ §Õ§Ñ§ß§Ú§ç §ã§Ú§ã§ä§Ö§Þ§Ú WAMS.
  • 24. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 WORK GROUP 3 (Operational issues) 1. GENERAL GROUP TASK ¨C preparation of the system of exploitation and management of the United Power System of Ukraine at the time of synchronous working with ENTSO-E. 2. CURRENT GROUP TASK ¨C defining the key directions related to adaptation of the system of exploitation and management of the United Power System of Ukraine to the ENTSO-E rules. 3. HEAD OF THE WORK GROUP ¨C Dimitar Zarchev, the head of department of automatic dispatch engineering of TSO EAD, Bolgaria. DONE as of 16.03.2015: Organizational dispatching structure of Ukraine; Plan of recovery a normal regime and Security Plan; Filled 3rd Package of Questionnaire and Questionnaire of self-assessment of conformity to ¡°Instruction on exploitation of ENTSO-E power systems¡±. §²§°§¢§°§¹§¡ §¤§²§µ§±§¡ 3 (§¦§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?§Û§ß? §Ñ§ã§á§Ö§Ü§ä§Ú) 1. §©§¡§¤§¡§­§¾§¯§¦ §©§¡§£§¥§¡§¯§¯§Á §¤§²§µ§±§ª ¨C §â§à§Ù§â§à§Ò§Ü§Ñ §ã§Ú§ã§ä§Ö§Þ§Ú §Ö§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?? §ä§Ñ §å§á§â§Ñ§Ó§Ý?§ß§ß§ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §á?§Õ §é§Ñ§ã §ã§Ú§ß§ç§â§à§ß§ß§à? §â§à§Ò§à§ä§Ú §Ù ENTSO-E. 2. §±§°§´§°§¹§¯§¦ §©§¡§£§¥§¡§¯§¯§Á §¤§²§µ§±§ª ¨C §Ó§Ú§Ù§ß§Ñ§é§Ö§ß§ß§ñ §à§ã§ß§à§Ó§ß§Ú§ç §ß§Ñ§á§â§ñ§Þ?§Ó §Ñ§Õ§Ñ§á§ä§Ñ§è?? §ã§Ú§ã§ä§Ö§Þ§Ú §Ö§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?? §ä§Ñ §å§á§â§Ñ§Ó§Ý?§ß§ß§ñ §°§¦§³ §µ§Ü§â§Ñ?§ß§Ú §Õ§à §ß§à§â§Þ ENTSO-E. 3.§¬§¦§²?§£§¯§ª§¬ §²§°§¢§°§¹§°? §¤§²§µ§±§ª - §¥?§Þ?§ä§Ñ§â §©§Ñ§â§é§Ö§Ó, §Ü§Ö§â?§Ó§ß§Ú§Ü §Õ§Ö§á§Ñ§â§ä§Ñ§Þ§Ö§ß§ä§å §ã§Ú§ã§ä§Ö§Þ §Õ§Ú§ã§á§Ö§ä§é§Ö§â§ã§î§Ü§à? §Ñ§Ó§ä§à§Þ§Ñ§ä§Ú§Ü§Ú TSO EAD, §¢§à§Ý§Ô§Ñ§â?§ñ. §£§ª§¬§°§¯§¡§¯§° §ã§ä§Ñ§ß§à§Þ §ß§Ñ 16.03.2015: §°§â§Ô§Ñ§ß?§Ù§Ñ§è?§Û§ß§Ñ §ã§ä§â§å§Ü§ä§å§â§Ñ §Õ§Ú§ã§á§Ö§ä§é§Ú§ß§Ô§å §µ§Ü§â§Ñ?§ß§Ú; §±§Ý§Ñ§ß §Ó?§Õ§ß§à§Ó§Ý§Ö§ß§ß§ñ §ß§à§â§Þ§Ñ§Ý§î§ß§à§Ô§à §â§Ö§Ø§Ú§Þ§å §ä§Ñ §±§Ý§Ñ§ß §Ù§Ñ§ç§Ú§ã§ä§å; §©§Ñ§á§à§Ó§ß§Ö§ß§Ú§Û ??? §±§Ñ§Ü§Ö§ä §à§á§Ú§ä§å§Ó§Ñ§Ý§î§ß§Ú§Ü§Ñ §ä§Ñ §à§á§Ú§ä§å§Ó§Ñ§Ý§î§ß§Ú§Ü §ã§Ñ§Þ§à§à§è?§ß§ð§Ó§Ñ§ß§ß§ñ §Ó?§Õ§á§à§Ó?§Õ§ß§à§ã§ä? ¡°?§ß§ã§ä§â§å§Ü§è?? §Ù §Ö§Ü§ã§á§Ý§å§Ñ§ä§Ñ§è?? §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ§Ú ENTSO-E¡±
  • 25. Feasibility Study on Synchronous Interconnection of Ukrainian and Moldovan Power Systems to ENTSO-E Continental Europe Power System MIS ETC code: 2739 WORK GROUP 4 (Regulatory/Legal issues) 1. GENERAL GROUP TASK ¨C preparation of Agreement on interconnection of electricity systems with all technical and legal provisions that should be signed between NEC Ukrenergo/Moldelectrica and ENTSO-E. 2. CURRENT GROUP TASK ¨C to identify the key legal issues in the electricity legislation of Ukraine taking into account the EU regulation (Third Energy Package). 3. HEAD OF THE WORK GROUP ¨C Pierre Bernard, the founder of Bernard Energy Advocacy (Brussels, Belgium). DONE as of 16.03.2015: the Legal Questionnaire has been prepared where it is analysed the key issues on electricity grid ownership and its management, functioning of the wholesale electricity market, the new model of electricity market and its implementation, competition issues, international agreements and others. §²§°§¢§°§¹§¡ §¤§²§µ§±§¡ 4 (§²§Ö§Ô§å§Ý§ñ§ä§à§â§ß?/§À§â§Ú§Õ§Ú§é§ß? §á§Ú§ä§Ñ§ß§ß§ñ) 1. §©§¡§¤§¡§­§¾§¯§¦ §©§¡§£§¥§¡§¯§¯§Á §¤§²§µ§±§ª ¨C §á?§Õ§Ô§à§ä§à§Ó§Ü§Ñ §µ§Ô§à§Õ§Ú, §ñ§Ü§å §Þ§Ñ§ð§ä§î §á?§Õ§á§Ú§ã§Ñ§ä§Ú §µ§Ü§â§Ö§ß§Ö§â§Ô§à/Moldelectrica §ä§Ñ ENTSO-E, §ñ§Ü§Ñ §Ó§Ü§Ý§ð§é§Ñ§ä§Ú§Þ§Ö §Ó§ã? §ä§Ö§ç§ß?§é§ß? §ä§Ñ §ð§â§Ú§Õ§Ú§é§ß? §å§Þ§à§Ó§Ú §à§Ò?§Õ§ß§Ñ§ß§ß§ñ §Ö§ß§Ö§â§Ô§à§ã§Ú§ã§ä§Ö§Þ. 2. §±§°§´§°§¹§¯§¦ §©§¡§£§¥§¡§¯§¯§Á §¤§²§µ§±§ª ¨C §Ó§Ú§ñ§Ó§Ú§ä§Ú §á§â§à§Ò§Ý§Ö§Þ§ß? §á§à§Ý§à§Ø§Ö§ß§ß§ñ §Ó §Ù§Ñ§Ü§à§ß§à§Õ§Ñ§Ó§ã§ä§Ó? §µ§Ü§â§Ñ?§ß§Ú §Ù §á§Ú§ä§Ñ§ß§î §Ö§Ý§Ö§Ü§ä§â§à§Ö§ß§Ö§â§Ô§Ö§ä§Ú§Ü§Ú §ä§Ñ §Ó§â§Ñ§ç§å§Ó§Ñ§ä§Ú §á§à§Ý§à§Ø§Ö§ß§ß§ñ §Ù§Ñ§Ü§à§ß§à§Õ§Ñ§Ó§ã§ä§Ó§Ñ ?§³ (§´§â§Ö§ä?§Û §Ö§ß§Ö§â§Ô§à§á§Ñ§Ü§Ö§ä). 3. §¬§¦§²?§£§¯§ª§¬ §²§°§¢§°§¹§°? §¤§²§µ§±§ª ¨C §±?§â §¢§Ö§â§ß§Ñ§â§Õ, §Ù§Ñ§ã§ß§à§Ó§ß§Ú§Ü §Ü§à§Þ§á§Ñ§ß?? Bernard Energy Advocacy (Brussels, Belgium). §£§ª§¬§°§¯§¡§¯§° §ã§ä§Ñ§ß§à§Þ §ß§Ñ 16.03.2015: §±?§Õ§Ô§à§ä§à§Ó§Ý§Ö§ß§Ú§Û §À§â§Ú§Õ§Ú§é§ß§Ú§Û §°§á§Ú§ä§å§Ó§Ñ§Ý§î§ß§Ú§Ü, §Õ§Ö §á§â§à§Ó§à§Õ§Ú§ä§î§ã§ñ a§ß§Ñ§Ý?§Ù §Ü§Ý§ð§é§à§Ó§Ú§ç §á§Ú§ä§Ñ§ß§î §ë§à§Õ§à §Ó§Ý§Ñ§ã§ß§à§ã§ä? §ß§Ñ §Ö§Ý§Ö§Ü§ä§â§à§Þ§Ö§â§Ö§Ø? §ä§Ñ §å§á§â§Ñ§Ó§Ý?§ß§ß§ñ §ß§Ú§Þ§Ú, §æ§å§ß§Ü§è?§à§ß§å§Ó§Ñ§ß§ß§ñ §â§Ú§ß§Ü§å §à§á§ä§à§Ó§à? §ä§à§â§Ô?§Ó§Ý?, §ß§à§Ó§Ñ §Þ§à§Õ§Ö§Ý§î §â§Ú§ß§Ü§å §Ö§Ý§Ö§Ü§ä§â§à§Ö§ß§Ö§â§Ô?? §ä§Ñ §á§à§â§ñ§Õ§à§Ü ?? §Ó§á§â§à§Ó§Ñ§Õ§Ø§Ö§ß§ß§ñ, §á§Ú§ä§Ñ§ß§ß§ñ §Ü§à§ß§Ü§å§â§Ö§ß§è?? §ß§Ñ §â§Ú§ß§Ü§å, §Þ?§Ø§ß§Ñ§â§à§Õ§ß§Ú§ç §Õ§à§Ô§à§Ó§à§â?§Ó §Ó §Ô§Ñ§Ý§å§Ù? §ä§Ñ §ß§Ú§Ù§Ü§Ñ ?§ß§ê§Ú§ç §á§Ú§ä§Ñ§ß§î.