Dinesha , German, Victor,
Suganeya
HOTEL LOUISIANA
Design Procedure
 Loads
 Risa
 Slab
 Beams
 Strirrup
 Columns
 Deflection and drift
Buildings Front Frame
Building overview
Buildings Side Frame
Building overview
Design Assumptions
 Fs = 2/3fy
 All the floors behave the same
 Analyzed only B1, B2, B3, G2, G3, G5, and G6
 Wind load was assumed to be only in one
direction
 Columns came to different size than assumed.
Load Calculations
Load Calculations
Design loads on Risa software
Calculations done by RISA
Software
Slab Calculations
Our different calculations for slab were for:
 Top floor (Roof)
 Mid floors
The following figure are the moment
coefficients for service moment
calculations for the slabs.
Slab Design
Beams and Stirrup
Moment Diagram
Project 4 - Pre cast concrete 10 storey Building design
Reinforcement Bars
 Equations used
 1.2D + 1.6L
 1.2D + 1W + 1L + 0.5S
 0.9D + 1W
 1.4D Beams/Girders Selected Moment (k.ft)
ROOF
5TH
FLOOR
GROUND
FLOOR
B-1 225 377 428
B-3 374 505 583
G-1 291 382 385
G-2 261 378 376
G-5 498 658 568
G-6 429 561 560
B-2 562 604 604
Reinforcement Bars
 #8 and #10 bars are used in our design
Beams/Girders Selected Bars
ROOF 5TH FLOOR GROUND FLOOR
B-1 5 #8 7 #8 8#8
B-3 7 #8 6 #10 7 #10
G-1 6 #8 7 #8 8 #8
G-2 3 #10 7 #8 7 #8
G-5 6 #10 8#10 7 #10
G-6 9 #8 7 #10 7 #10
B-2 7 #10 7#10 7 #10
Reinforcement Bars
 Depth of compression block < 7.5in
 t > 0.005 = Tension controlled
 Sactual < Smaximum = Minimized cracking
Project 4 - Pre cast concrete 10 storey Building design
Shear forces
Project 4 - Pre cast concrete 10 storey Building design
Stirrups
 Bars used was either #3 or #4
 Spacing varied by beam
 Shear forces obtained from Risa
 Math cad made it simple to find spacing
Stirrups spacing for Hotel
Stirrups for G-5 and G-6
Member Vu (kips) Vn required Vn actual
max
spacing Spacing Stirrups
top floor51 (G5)
10th 76 101.333 102.89
11 10
#4@10
top floor52 (G6)
10th 59 78.667 79.295
11 10
#3@10
mid floor71 (G5) 5th 62 82.667 86.597 11 8 #3@8
mid floor72 (G6) 5th 64 85.333 86.597 11 8 #3@8
bottom floor 91 (G5) 66.341 88.455 91.812 11 7 #3@7
bottom floor 92 (G6) 67.85 90.467 91.812 11 7 #3@7
Math Cad Calculation sample
An example of how stirrups were
found.
Columns
Axial force
Moments
Project 4 - Pre cast concrete 10 storey Building design
Project 4 - Pre cast concrete 10 storey Building design
Columns Design
Drift and Deflections
Project 4 - Pre cast concrete 10 storey Building design
Beam Deflection
We did not calculate
deflection Because we meet
ACI requirements for beams
If we plug our values in table
9.3.1.1 we are ok according to
the code.
Maximum deflection limitation from ACI code : l/360 = 1.13 inch
Deflection of Hotel Louisiana = 0.36 inch
Drift
Same goes for drift, we found
Maximum drift limitation from ACI code : h/400 = 3.795 inch
Max Drift of Hotel Louisiana = 1.1 inch
Maximum drift limitation from ACI code :
h/400 = 3.795 inch
Max Drift of Hotel Louisiana = 1.1 inch
Conclussion
 Hotel Louisiana meets ACI requirements.
 Could have gone more cost effective design.
Thank you!
Questions?

More Related Content

What's hot (18)

Internal Combustion Engine Fundamental Concepts
Internal Combustion Engine Fundamental ConceptsInternal Combustion Engine Fundamental Concepts
Internal Combustion Engine Fundamental Concepts
Hassan Raza
CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2
CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2
CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2
Eur Ing Valentinos Neophytou BEng (Hons), MSc, CEng MICE
Sample of Structural Steel Scheduling
Sample of Structural Steel SchedulingSample of Structural Steel Scheduling
Sample of Structural Steel Scheduling
Allan Leyte
002 - CDR CMS
002 - CDR CMS002 - CDR CMS
002 - CDR CMS
Fidel Karim
Tranmission Break
Tranmission BreakTranmission Break
Tranmission Break
Irwan Limanto
Cee311(14)
Cee311(14)Cee311(14)
Cee311(14)
apudgr8
Cee 311(4)
Cee 311(4)Cee 311(4)
Cee 311(4)
apudgr8
DT350 Portfolio (Gilmore)
DT350 Portfolio (Gilmore)DT350 Portfolio (Gilmore)
DT350 Portfolio (Gilmore)
Ron Gilmore
knight-Layout1
knight-Layout1knight-Layout1
knight-Layout1
Kristopher Thorpe
2016 optimisation of front wing ground clearance - ppt slides
2016 optimisation of front wing ground clearance - ppt slides2016 optimisation of front wing ground clearance - ppt slides
2016 optimisation of front wing ground clearance - ppt slides
Hashan Mendis
any angle lower plate-Layout1
any angle lower plate-Layout1any angle lower plate-Layout1
any angle lower plate-Layout1
Kristopher Thorpe
Rotations
RotationsRotations
Rotations
bwlomas
Rail Alliance Event on 25/02/15: Lighting Column Specification - ALC
Rail Alliance Event on 25/02/15: Lighting Column Specification - ALCRail Alliance Event on 25/02/15: Lighting Column Specification - ALC
Rail Alliance Event on 25/02/15: Lighting Column Specification - ALC
Institution of Lighting Professionals
WIND LOADING ON LIGHTING STEEL COLUMN - EN 40-3-1:2013
WIND LOADING ON LIGHTING STEEL COLUMN - EN 40-3-1:2013WIND LOADING ON LIGHTING STEEL COLUMN - EN 40-3-1:2013
WIND LOADING ON LIGHTING STEEL COLUMN - EN 40-3-1:2013
Eur Ing Valentinos Neophytou BEng (Hons), MSc, CEng MICE
003 - CMS KG
003 - CMS KG003 - CMS KG
003 - CMS KG
Fidel Karim
Worked examples - Wind webinar to AS1170.2 - ClearCalcs
Worked examples - Wind webinar to AS1170.2 - ClearCalcsWorked examples - Wind webinar to AS1170.2 - ClearCalcs
Worked examples - Wind webinar to AS1170.2 - ClearCalcs
ClearCalcs
R W V23
R W V23R W V23
R W V23
Muhammad shahid
10.01.03.083
10.01.03.08310.01.03.083
10.01.03.083
Saif Abdullah
Internal Combustion Engine Fundamental Concepts
Internal Combustion Engine Fundamental ConceptsInternal Combustion Engine Fundamental Concepts
Internal Combustion Engine Fundamental Concepts
Hassan Raza
Sample of Structural Steel Scheduling
Sample of Structural Steel SchedulingSample of Structural Steel Scheduling
Sample of Structural Steel Scheduling
Allan Leyte
002 - CDR CMS
002 - CDR CMS002 - CDR CMS
002 - CDR CMS
Fidel Karim
Tranmission Break
Tranmission BreakTranmission Break
Tranmission Break
Irwan Limanto
Cee311(14)
Cee311(14)Cee311(14)
Cee311(14)
apudgr8
Cee 311(4)
Cee 311(4)Cee 311(4)
Cee 311(4)
apudgr8
DT350 Portfolio (Gilmore)
DT350 Portfolio (Gilmore)DT350 Portfolio (Gilmore)
DT350 Portfolio (Gilmore)
Ron Gilmore
2016 optimisation of front wing ground clearance - ppt slides
2016 optimisation of front wing ground clearance - ppt slides2016 optimisation of front wing ground clearance - ppt slides
2016 optimisation of front wing ground clearance - ppt slides
Hashan Mendis
any angle lower plate-Layout1
any angle lower plate-Layout1any angle lower plate-Layout1
any angle lower plate-Layout1
Kristopher Thorpe
Rotations
RotationsRotations
Rotations
bwlomas
Rail Alliance Event on 25/02/15: Lighting Column Specification - ALC
Rail Alliance Event on 25/02/15: Lighting Column Specification - ALCRail Alliance Event on 25/02/15: Lighting Column Specification - ALC
Rail Alliance Event on 25/02/15: Lighting Column Specification - ALC
Institution of Lighting Professionals
Worked examples - Wind webinar to AS1170.2 - ClearCalcs
Worked examples - Wind webinar to AS1170.2 - ClearCalcsWorked examples - Wind webinar to AS1170.2 - ClearCalcs
Worked examples - Wind webinar to AS1170.2 - ClearCalcs
ClearCalcs

Viewers also liked (20)

Renovia Apartment Case study 7-15
Renovia Apartment Case study  7-15Renovia Apartment Case study  7-15
Renovia Apartment Case study 7-15
Brian Johnson
Present status of apartment building approval and construction
Present status of apartment building approval and constructionPresent status of apartment building approval and construction
Present status of apartment building approval and construction
Binay Shrestha
Concrete Restoration
Concrete RestorationConcrete Restoration
Concrete Restoration
Amy Lin
Preventive Maintenance: Tips to Reduce Facility Costs and Breakdowns
Preventive Maintenance: Tips to Reduce Facility Costs and Breakdowns Preventive Maintenance: Tips to Reduce Facility Costs and Breakdowns
Preventive Maintenance: Tips to Reduce Facility Costs and Breakdowns
Facility Masters
building services
building servicesbuilding services
building services
Erlina Bunga
Start & Maintain an Energy Management Plan: It Makes Good Sense (from ASBO MD...
Start & Maintain an Energy Management Plan: It Makes Good Sense (from ASBO MD...Start & Maintain an Energy Management Plan: It Makes Good Sense (from ASBO MD...
Start & Maintain an Energy Management Plan: It Makes Good Sense (from ASBO MD...
SchoolDude
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
Rohit Bisht
STAAD PRO STAAD PRO
STAAD PRO
Adan Vazquez Rodriguez
staad pro v8i ss6 analysis and design of r.c.c. structure
staad pro v8i ss6 analysis and design of r.c.c. structurestaad pro v8i ss6 analysis and design of r.c.c. structure
staad pro v8i ss6 analysis and design of r.c.c. structure
Chaitanya Raval
Prof. Dr. Aziz I. Abdulla C.V., English Edition
Prof. Dr. Aziz I. Abdulla C.V., English EditionProf. Dr. Aziz I. Abdulla C.V., English Edition
Prof. Dr. Aziz I. Abdulla C.V., English Edition
University of Tikrit
Promoting preventive mitigation of buildings against hurricanes
Promoting preventive mitigation of buildings against hurricanesPromoting preventive mitigation of buildings against hurricanes
Promoting preventive mitigation of buildings against hurricanes
Bejoy Alduse
Maintenance work
Maintenance workMaintenance work
Maintenance work
E-one K Rizuwan
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
Association for Project Management
Ferrouscementhouse 2
Ferrouscementhouse 2Ferrouscementhouse 2
Ferrouscementhouse 2
poreddy jeevanreddy
High rise construction
High rise constructionHigh rise construction
High rise construction
akkshay jawlekar
Staad. pro tuto
Staad. pro tutoStaad. pro tuto
Staad. pro tuto
Ramil Artates
Steel Jacketed Rc Column
Steel Jacketed Rc ColumnSteel Jacketed Rc Column
Steel Jacketed Rc Column
Mahmoud Sayed Ahmed
flexural behaviour of ferrocement
flexural behaviour of ferrocementflexural behaviour of ferrocement
flexural behaviour of ferrocement
swapna porandla
Practical project risk assessment, Simon White
Practical project risk assessment, Simon WhitePractical project risk assessment, Simon White
Practical project risk assessment, Simon White
Association for Project Management
Maintenance Management (presentation)
Maintenance Management (presentation)Maintenance Management (presentation)
Maintenance Management (presentation)
kabul university
Renovia Apartment Case study 7-15
Renovia Apartment Case study  7-15Renovia Apartment Case study  7-15
Renovia Apartment Case study 7-15
Brian Johnson
Present status of apartment building approval and construction
Present status of apartment building approval and constructionPresent status of apartment building approval and construction
Present status of apartment building approval and construction
Binay Shrestha
Concrete Restoration
Concrete RestorationConcrete Restoration
Concrete Restoration
Amy Lin
Preventive Maintenance: Tips to Reduce Facility Costs and Breakdowns
Preventive Maintenance: Tips to Reduce Facility Costs and Breakdowns Preventive Maintenance: Tips to Reduce Facility Costs and Breakdowns
Preventive Maintenance: Tips to Reduce Facility Costs and Breakdowns
Facility Masters
building services
building servicesbuilding services
building services
Erlina Bunga
Start & Maintain an Energy Management Plan: It Makes Good Sense (from ASBO MD...
Start & Maintain an Energy Management Plan: It Makes Good Sense (from ASBO MD...Start & Maintain an Energy Management Plan: It Makes Good Sense (from ASBO MD...
Start & Maintain an Energy Management Plan: It Makes Good Sense (from ASBO MD...
SchoolDude
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
Rohit Bisht
staad pro v8i ss6 analysis and design of r.c.c. structure
staad pro v8i ss6 analysis and design of r.c.c. structurestaad pro v8i ss6 analysis and design of r.c.c. structure
staad pro v8i ss6 analysis and design of r.c.c. structure
Chaitanya Raval
Prof. Dr. Aziz I. Abdulla C.V., English Edition
Prof. Dr. Aziz I. Abdulla C.V., English EditionProf. Dr. Aziz I. Abdulla C.V., English Edition
Prof. Dr. Aziz I. Abdulla C.V., English Edition
University of Tikrit
Promoting preventive mitigation of buildings against hurricanes
Promoting preventive mitigation of buildings against hurricanesPromoting preventive mitigation of buildings against hurricanes
Promoting preventive mitigation of buildings against hurricanes
Bejoy Alduse
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
Association for Project Management
flexural behaviour of ferrocement
flexural behaviour of ferrocementflexural behaviour of ferrocement
flexural behaviour of ferrocement
swapna porandla
Maintenance Management (presentation)
Maintenance Management (presentation)Maintenance Management (presentation)
Maintenance Management (presentation)
kabul university

Similar to Project 4 - Pre cast concrete 10 storey Building design (20)

gradution_presentation-gradution_presentation.pptx
gradution_presentation-gradution_presentation.pptxgradution_presentation-gradution_presentation.pptx
gradution_presentation-gradution_presentation.pptx
BehairyAhmed2
Camber design
Camber designCamber design
Camber design
Sushil Dhungana
MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)
sufiyan shaikh
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdfLecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdf
ssuser2c4126
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdfLecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
ssuserd8a85b
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdfLecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
ssuserd8a85b
Design Assessment and Parametric Study of Expansion Bellow
Design Assessment and Parametric Study of Expansion BellowDesign Assessment and Parametric Study of Expansion Bellow
Design Assessment and Parametric Study of Expansion Bellow
IRJET Journal
ppt.pptx
ppt.pptxppt.pptx
ppt.pptx
Tafara13
Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...
Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...
Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...
IRJET Journal
Tower smart tower_detailing_tips_series_2
Tower smart tower_detailing_tips_series_2Tower smart tower_detailing_tips_series_2
Tower smart tower_detailing_tips_series_2
stan gad
Die design optimization and die stress analysis of control arm by simulation
Die design optimization and die stress analysis of control arm by simulation Die design optimization and die stress analysis of control arm by simulation
Die design optimization and die stress analysis of control arm by simulation
Kundan Kumar
Design of a Gear Reducer for a Tractor
Design of a Gear Reducer for a TractorDesign of a Gear Reducer for a Tractor
Design of a Gear Reducer for a Tractor
fodork6
One way
One wayOne way
One way
Assem Diab
22.sesmic analysis of building.pdf
22.sesmic analysis of building.pdf22.sesmic analysis of building.pdf
22.sesmic analysis of building.pdf
Chandrasekaran A
22.sesmic analysis of building.pdf
22.sesmic analysis of building.pdf22.sesmic analysis of building.pdf
22.sesmic analysis of building.pdf
ArjunanChandrasekara
Development of mathematical using doe to analyse the ang (1)
Development of mathematical using doe to analyse the ang (1)Development of mathematical using doe to analyse the ang (1)
Development of mathematical using doe to analyse the ang (1)
Sudhakaran Sudhakaran.R(KCT)
IRJET- Analysis and Design of High-Rise RC Structure in Different Seismic Zones
IRJET- Analysis and Design of High-Rise RC Structure in Different Seismic ZonesIRJET- Analysis and Design of High-Rise RC Structure in Different Seismic Zones
IRJET- Analysis and Design of High-Rise RC Structure in Different Seismic Zones
IRJET Journal
gp2_2.pptx
gp2_2.pptxgp2_2.pptx
gp2_2.pptx
GoneJustin
CNC Machining of Face Cam on a Cylindrical Sector
CNC Machining of Face Cam on a Cylindrical SectorCNC Machining of Face Cam on a Cylindrical Sector
CNC Machining of Face Cam on a Cylindrical Sector
IJERA Editor
INTRODUCTION TO STRUCUTRAL DESIGN RCC PRESENTATION
INTRODUCTION TO STRUCUTRAL DESIGN RCC PRESENTATIONINTRODUCTION TO STRUCUTRAL DESIGN RCC PRESENTATION
INTRODUCTION TO STRUCUTRAL DESIGN RCC PRESENTATION
jay sinha
gradution_presentation-gradution_presentation.pptx
gradution_presentation-gradution_presentation.pptxgradution_presentation-gradution_presentation.pptx
gradution_presentation-gradution_presentation.pptx
BehairyAhmed2
MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)
sufiyan shaikh
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdfLecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdf
ssuser2c4126
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdfLecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
ssuserd8a85b
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdfLecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
ssuserd8a85b
Design Assessment and Parametric Study of Expansion Bellow
Design Assessment and Parametric Study of Expansion BellowDesign Assessment and Parametric Study of Expansion Bellow
Design Assessment and Parametric Study of Expansion Bellow
IRJET Journal
ppt.pptx
ppt.pptxppt.pptx
ppt.pptx
Tafara13
Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...
Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...
Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...
IRJET Journal
Tower smart tower_detailing_tips_series_2
Tower smart tower_detailing_tips_series_2Tower smart tower_detailing_tips_series_2
Tower smart tower_detailing_tips_series_2
stan gad
Die design optimization and die stress analysis of control arm by simulation
Die design optimization and die stress analysis of control arm by simulation Die design optimization and die stress analysis of control arm by simulation
Die design optimization and die stress analysis of control arm by simulation
Kundan Kumar
Design of a Gear Reducer for a Tractor
Design of a Gear Reducer for a TractorDesign of a Gear Reducer for a Tractor
Design of a Gear Reducer for a Tractor
fodork6
22.sesmic analysis of building.pdf
22.sesmic analysis of building.pdf22.sesmic analysis of building.pdf
22.sesmic analysis of building.pdf
Chandrasekaran A
22.sesmic analysis of building.pdf
22.sesmic analysis of building.pdf22.sesmic analysis of building.pdf
22.sesmic analysis of building.pdf
ArjunanChandrasekara
Development of mathematical using doe to analyse the ang (1)
Development of mathematical using doe to analyse the ang (1)Development of mathematical using doe to analyse the ang (1)
Development of mathematical using doe to analyse the ang (1)
Sudhakaran Sudhakaran.R(KCT)
IRJET- Analysis and Design of High-Rise RC Structure in Different Seismic Zones
IRJET- Analysis and Design of High-Rise RC Structure in Different Seismic ZonesIRJET- Analysis and Design of High-Rise RC Structure in Different Seismic Zones
IRJET- Analysis and Design of High-Rise RC Structure in Different Seismic Zones
IRJET Journal
CNC Machining of Face Cam on a Cylindrical Sector
CNC Machining of Face Cam on a Cylindrical SectorCNC Machining of Face Cam on a Cylindrical Sector
CNC Machining of Face Cam on a Cylindrical Sector
IJERA Editor
INTRODUCTION TO STRUCUTRAL DESIGN RCC PRESENTATION
INTRODUCTION TO STRUCUTRAL DESIGN RCC PRESENTATIONINTRODUCTION TO STRUCUTRAL DESIGN RCC PRESENTATION
INTRODUCTION TO STRUCUTRAL DESIGN RCC PRESENTATION
jay sinha

Project 4 - Pre cast concrete 10 storey Building design