際際滷

際際滷Share a Scribd company logo
Bourbon PX 105 MACS速
Series of Large Platform Supply Vessels
Bourbon Front - Bourbon Clear - Bourbon Calm - Bourbon Rainbow
Efficient and flexible solution
for the most demanding clients
w w w . b o u r b o n - o n l i n e . c o m / e n / m a r i n e - s e r v i c e s
BourbonPX105MACS速
Efficient
and flexible solution
for the most
demanding clients
MAIN PARTICULARS (US) (Metric)
Deadweight [st/mt] 4,685 4,250
Length overall [ft/m] 291.3 88.8
Breadth moulded [ft/m] 62.3 19
Depth [ft/m] 26.2 8
Max draft [ft/m] 21.7 6.6
Gross tonnage [st/mt] 4,346 3,943
Net tonnage [st/mt] 1,306 1,185
MACHINERY / PERFORMANCE (US) (Metric)
PROPULSION - MACHINERY
Main DG engines x 4 1,700 kw
Main propellers x 2 azimuth 2,500 kw
Tunnel bow thrusters x 2 1,200 kw
Retract. bow thruster x 1 azimuth 850 kw
Aux. generator x 1 425 kw
Emerg. generator x 1 160 kw
SPEED / CONSUMPTION
At 15.5 knots [USG/h-t/day] 355.9 27.8
At 12.2 knots [USG/h-t/day] 184.4 14.4
At 11.5 knots [USG/h-t/day] 107.5 8.4
Port [USG/h-t/day] 44.8 3.5
CAPACITIES (US) (Metric)
Free cargo deck area [sq.ft/m2
] 9,994 928
Deck load [st/mt] 3,108 2,820
ORO [USG/m3
] 422,192 1,598
Fresh water [USG/m3
] 143,725 544
Ballast/Drill water [USG/m3
] 1,186,522 4,491
MACS速
tanks [USG/m3
] 244,385 925
Methanol (LFL) [USG/m3
] 118,890 450
DELIVERY RATES
2 fresh water pumps (US) 1,100 USG/min at 130 psi
(Metric) 250 m3
/h at 9 bar
2 ballast pumps (US) 1,100 USG/min at 130 psi
(Metric) 250 m3
/h at 9 bar
8 MACS速
cargo pumps (US) 132 and 330 USG/min at 260 psi
+ 440 USG/min at 115 psi
(Metric) 30 and 75 m3
/h at 18 bar
+ 100 m3
/h at 8 bar
6 methanol (LFL) pumps (US) 330 USG/min at 130 psi
(Metric) 75 m3
/h at 9 bar
6 product pumps (US) 330 USG/min at 130 psi
(Metric) 75 m3
/h at 9 bar
Product tanks 2 agitators for each aft tanks
MACS速
tanks system 1 agitator for each tank
All particulars believed to be correct but not guaranteed
ACCOMMODATIONS Total = 25 persons
Single cabins (Of鍖cers) 2
Single cabins 13
2 man cabins x 5 10
Mess room (1), day rooms (2), galley (1), dry provisions (1),
cooler & freezer room (1), stores (1), hospital (1), gymnasium (1),
separate engine control / instrument rooms on main deck,
Full air-conditioned
EQUIPEMENT AND ELECTRONICS (US) (Metric)
DECK EQUIPMENT
Tuggers [lt/mt] x 2 14.8 15
One double hydraulic combined windlass / mooring winch
Deck cargo lashing winches x 12 9.8 10
Three passive roll reduction tanks
Telescopic boom crane [lt/mt] x 1 2 2
at [ft/m] 55.8 17
SAFETY EQUIPEMENT
Fire-鍖ghting class 1 with foam and waterspray
Pump [USG/min-m3
/h] x 1 14,971 3,400
Monitors [USG/min-m3
/h] x 2 5,284 1,200
Alarm, monitoring and control system for periodically unattended
machinery space.
Life saving arrangement: life jackets, life buoys, immersion suits
1 fast rescue boat (for 10 persons) with davit
Prepared for 250 survivors upgrade
ELECTRONICS
Navigation: 2 radars with ARPA, 2 radars transponders, 2 GPS,
3 gyrocompasses, 1 magnetic compass, 1 echo sounder, 1 speed log,
1 autopilot, Navtex, VDR, AIS, SSAS, 4 search lights,
3 night search systems
Communication: 1 radio system compliant with GMDSS A3 rules
MF/HF radio, DCS receiver, VHF/UHF/portable, Satcom C x 2,
Fleet 77, SevSat, Intercom system
Loading & stability software: Autoload
DYNAMIC POSITIONNING SYSTEM
ERN N属 99.99.99.92
DP 2: 2 stern azimuth thrusters, 1 bow azimuth thruster, 2 bow 鍖xed thrusters
DP type: Kongsberg SDP 21, 2 operation consoles,4 references systems,
2 VRU/VMU
Norwegian flag
Classified DNV+ 1A1, SF, EO, DynPos-Autr,
Clean Design, Comf-v(3), LFL, DK(+), HL(+), Ice C, BIS,
OilRec, Naut-OSV (A), FiFi 1
Flexible under-deck cargo solutions: MACS速
Equipped with the Multi-Application Cargo Solution (MACS速
), Bourbon PX105 MACS速
series offers flexible and safe under-deck cargo solutions:
 maximizing the capacity on any product wet or dry
 carrying a wide range of products from drill cuttings, generic liquids and muds
to hazardous and special products;
 providing tanks adaptable to the whole life cycle of an oil field from exploration drilling
phases to production phases.
Exceptional maneuverability and station keeping
 Dynamic positioning system class 2 (DP2) for an exceptional station keeping ability
and precise positioning even in extremely bad weather conditions;
 Stern azimuth thrusters propulsion together with bow thrusters redundancy
(2 tunnel bow, 1 bow retractable) and DP2 system for precise positioning and high
maneuverability and reliability;
 An additional roll damping tank situated on the main deck for greater roll reduction,
increased personnel safety and facilitated crane transfer operations in a wider range
of sea conditions;
 The Schottel Twin pulling and pushing propellers for greater thrust efficiency and
reliability by reducing load on propeller and number of rotating parts.
Signi鍖cant fuel savings: diesel-electric propulsion and X-bow速
shape
Highly competitive fuel savings through:
 adapting power needs to the type of operation with diesel-electric propulsion, allowing
significant fuel consumption reduction compared to traditional vessels;
 the X-bow速
shape with outstanding stability performances in rough seas allowing
therefore speed regularity and reduced fuel consumption.
Ef鍖cient safety stand-by solution: stern 鍖re-鍖ghting and oil recovery
 Classed OIL REC with a storage capacity of more than 2,000 m3 of recovered oil
with the possibility to install booms and skimmers on clients request;
 Fire-fighting monitors located on the stern for a closer approach of the fire and better
control during emergency operations.
Maximized deck cargo and under-deck drill cuttings
Designed to provide clients with an optimized cargo capacities:
 928 m deck surface with a deck cargo load up to 2,820 tons;
 an under-deck solution for drill cuttings and hazardous products tanks, consequently
freeing space on the main deck and avoiding spillage risks.
Minimized impact on the environment: Clean Design
Classified Clean Design by DNV to comply with clients
environmental expectations:
 adapted processes for fuel oil, ballast water and sewage handling;
 hull isolated fuel and products tanks, avoiding grounding damage;
 combustion machinery emissions rules;
 reduction of emissions in compliance with applicable norms (NOx and SOx).
RELIABLE,EFFICIENTANDFLEXIBLE
Performing in rough seas and Clean Design, Bourbon Front (2011), Bourbon Clear (2012),
Bourbon Calm (2012) and Bourbon Rainbow (2013) offer clients an ultimate solution for optimized
and 鍖exible cargo transportation.
A series of 4 modern diesel-electric and DP2 platform supply vessels
meeting clients needs
PROFILE
MAIN DECK
58 m.
16m. B-DECKC-DECKBRIDGE DECK
DG/Mud
Dry Bulk
DG/Mud
Dry Bulk
Mud/Brine
Tank
Mud/Brine
Tank
WT WT
TYPICAL CLEAN CLASS CROSS SECTION
TANK TOP
RORO stern door
Rainbow
148, rue Sainte
13007 Marseille
France
T : +33 (0)4 91 13 08 00
F : +33 (0)4 91 13 07 90
Contact:
marketing@bourbon-marine-services.com
EVASIONCOMMUNICATION-PhotosBOURBON-Triptyque-2013.06.30.JJ-BAC-PX105MACS速
www.bourbon-online.com

More Related Content

What's hot (13)

FAST Ship 際際滷s B
FAST Ship 際際滷s BFAST Ship 際際滷s B
FAST Ship 際際滷s B
1st_TSG_Airborne
Dive Vessel for a job in Brazil. Contact me.
Dive Vessel for a job in Brazil. Contact me.Dive Vessel for a job in Brazil. Contact me.
Dive Vessel for a job in Brazil. Contact me.
Joe Rosen
S3000
S3000S3000
S3000
I単igo Sanz
101st Airborne (Air Assault) Spearhead 際際滷
101st Airborne (Air Assault) Spearhead 際際滷101st Airborne (Air Assault) Spearhead 際際滷
101st Airborne (Air Assault) Spearhead 際際滷
1st_TSG_Airborne
AMS New Appx B7-10
AMS New Appx B7-10AMS New Appx B7-10
AMS New Appx B7-10
1st_TSG_Airborne
Maersk rig fleet
Maersk rig fleetMaersk rig fleet
Maersk rig fleet
Dinh Quang Chung
Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014
Anatolijs Krjucenkovs
Aircraft Cargo Winch Cunico
Aircraft Cargo Winch  CunicoAircraft Cargo Winch  Cunico
Aircraft Cargo Winch Cunico
CunicoCorp
SARAH DESGAGNES details
SARAH DESGAGNES detailsSARAH DESGAGNES details
SARAH DESGAGNES details
Douglas Hankinson, B.Sc., P.Eng.
Deepwater Nautilus
Deepwater NautilusDeepwater Nautilus
Deepwater Nautilus
Jason Yoakum
Seven Falcon
Seven FalconSeven Falcon
Seven Falcon
Barry Gray
Technical sem v22
Technical sem v22Technical sem v22
Technical sem v22
Kartik HM
V-22 Osprey program history and systems overview
V-22 Osprey program history and systems overviewV-22 Osprey program history and systems overview
V-22 Osprey program history and systems overview
Mersie Amha Melke
Dive Vessel for a job in Brazil. Contact me.
Dive Vessel for a job in Brazil. Contact me.Dive Vessel for a job in Brazil. Contact me.
Dive Vessel for a job in Brazil. Contact me.
Joe Rosen
101st Airborne (Air Assault) Spearhead 際際滷
101st Airborne (Air Assault) Spearhead 際際滷101st Airborne (Air Assault) Spearhead 際際滷
101st Airborne (Air Assault) Spearhead 際際滷
1st_TSG_Airborne
Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014
Anatolijs Krjucenkovs
Aircraft Cargo Winch Cunico
Aircraft Cargo Winch  CunicoAircraft Cargo Winch  Cunico
Aircraft Cargo Winch Cunico
CunicoCorp
Deepwater Nautilus
Deepwater NautilusDeepwater Nautilus
Deepwater Nautilus
Jason Yoakum
Seven Falcon
Seven FalconSeven Falcon
Seven Falcon
Barry Gray
Technical sem v22
Technical sem v22Technical sem v22
Technical sem v22
Kartik HM
V-22 Osprey program history and systems overview
V-22 Osprey program history and systems overviewV-22 Osprey program history and systems overview
V-22 Osprey program history and systems overview
Mersie Amha Melke

Similar to Rainbow (20)

Norshore Atlantic specifications
Norshore Atlantic specificationsNorshore Atlantic specifications
Norshore Atlantic specifications
Erik-Andr辿 Albrecht
Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)
Abdul Basith C
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
coderweb
Drillship Specifications Explained
Drillship Specifications ExplainedDrillship Specifications Explained
Drillship Specifications Explained
Giridhar Gopu
Nh90 brochure 2016
Nh90 brochure 2016Nh90 brochure 2016
Nh90 brochure 2016
jihoon lee
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTXCopy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
MrbThinh
Nordica_Spec_2016-esite pieni versio
Nordica_Spec_2016-esite pieni versioNordica_Spec_2016-esite pieni versio
Nordica_Spec_2016-esite pieni versio
Matti Westerlund
RedFox Brochure
RedFox BrochureRedFox Brochure
RedFox Brochure
Miguel Angelo Vieira
Master pr辰sentation pal sys-ship
Master pr辰sentation pal sys-shipMaster pr辰sentation pal sys-ship
Master pr辰sentation pal sys-ship
Benji George
OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2
Anthony Brewer
2848spm_norMAXIMUS
2848spm_norMAXIMUS2848spm_norMAXIMUS
2848spm_norMAXIMUS
Ilona Romanova
WY-Segments
WY-SegmentsWY-Segments
WY-Segments
Alfred Hong
DeesideSeaways MPSS Presentation Ver 3
DeesideSeaways MPSS  Presentation Ver 3DeesideSeaways MPSS  Presentation Ver 3
DeesideSeaways MPSS Presentation Ver 3
Craig Lang
CCC PPT Jan2017
CCC PPT Jan2017CCC PPT Jan2017
CCC PPT Jan2017
Eugene Yeo
STG_Jascon 18_Vessel_Leaflet_4Pag
STG_Jascon 18_Vessel_Leaflet_4PagSTG_Jascon 18_Vessel_Leaflet_4Pag
STG_Jascon 18_Vessel_Leaflet_4Pag
Jarek Wittbrodt
thyssenkrupp Marine Systems
thyssenkrupp Marine Systemsthyssenkrupp Marine Systems
thyssenkrupp Marine Systems
ThyssenKrupp-India
OIL & GAS OFFSHORE PLATFORM overview with details
OIL & GAS OFFSHORE PLATFORM overview with detailsOIL & GAS OFFSHORE PLATFORM overview with details
OIL & GAS OFFSHORE PLATFORM overview with details
tusharmha
The Right Tray for your distillation processes
The Right Tray  for your distillation processesThe Right Tray  for your distillation processes
The Right Tray for your distillation processes
Wei Chiao Kuo
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Gerald Patrick Soriano
deep_orient
deep_orientdeep_orient
deep_orient
Dmytro Chuyko
Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)
Abdul Basith C
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
coderweb
Drillship Specifications Explained
Drillship Specifications ExplainedDrillship Specifications Explained
Drillship Specifications Explained
Giridhar Gopu
Nh90 brochure 2016
Nh90 brochure 2016Nh90 brochure 2016
Nh90 brochure 2016
jihoon lee
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTXCopy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
MrbThinh
Nordica_Spec_2016-esite pieni versio
Nordica_Spec_2016-esite pieni versioNordica_Spec_2016-esite pieni versio
Nordica_Spec_2016-esite pieni versio
Matti Westerlund
Master pr辰sentation pal sys-ship
Master pr辰sentation pal sys-shipMaster pr辰sentation pal sys-ship
Master pr辰sentation pal sys-ship
Benji George
OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2
Anthony Brewer
DeesideSeaways MPSS Presentation Ver 3
DeesideSeaways MPSS  Presentation Ver 3DeesideSeaways MPSS  Presentation Ver 3
DeesideSeaways MPSS Presentation Ver 3
Craig Lang
CCC PPT Jan2017
CCC PPT Jan2017CCC PPT Jan2017
CCC PPT Jan2017
Eugene Yeo
STG_Jascon 18_Vessel_Leaflet_4Pag
STG_Jascon 18_Vessel_Leaflet_4PagSTG_Jascon 18_Vessel_Leaflet_4Pag
STG_Jascon 18_Vessel_Leaflet_4Pag
Jarek Wittbrodt
thyssenkrupp Marine Systems
thyssenkrupp Marine Systemsthyssenkrupp Marine Systems
thyssenkrupp Marine Systems
ThyssenKrupp-India
OIL & GAS OFFSHORE PLATFORM overview with details
OIL & GAS OFFSHORE PLATFORM overview with detailsOIL & GAS OFFSHORE PLATFORM overview with details
OIL & GAS OFFSHORE PLATFORM overview with details
tusharmha
The Right Tray for your distillation processes
The Right Tray  for your distillation processesThe Right Tray  for your distillation processes
The Right Tray for your distillation processes
Wei Chiao Kuo
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Gerald Patrick Soriano

Rainbow

  • 1. Bourbon PX 105 MACS速 Series of Large Platform Supply Vessels Bourbon Front - Bourbon Clear - Bourbon Calm - Bourbon Rainbow Efficient and flexible solution for the most demanding clients
  • 2. w w w . b o u r b o n - o n l i n e . c o m / e n / m a r i n e - s e r v i c e s BourbonPX105MACS速 Efficient and flexible solution for the most demanding clients MAIN PARTICULARS (US) (Metric) Deadweight [st/mt] 4,685 4,250 Length overall [ft/m] 291.3 88.8 Breadth moulded [ft/m] 62.3 19 Depth [ft/m] 26.2 8 Max draft [ft/m] 21.7 6.6 Gross tonnage [st/mt] 4,346 3,943 Net tonnage [st/mt] 1,306 1,185 MACHINERY / PERFORMANCE (US) (Metric) PROPULSION - MACHINERY Main DG engines x 4 1,700 kw Main propellers x 2 azimuth 2,500 kw Tunnel bow thrusters x 2 1,200 kw Retract. bow thruster x 1 azimuth 850 kw Aux. generator x 1 425 kw Emerg. generator x 1 160 kw SPEED / CONSUMPTION At 15.5 knots [USG/h-t/day] 355.9 27.8 At 12.2 knots [USG/h-t/day] 184.4 14.4 At 11.5 knots [USG/h-t/day] 107.5 8.4 Port [USG/h-t/day] 44.8 3.5 CAPACITIES (US) (Metric) Free cargo deck area [sq.ft/m2 ] 9,994 928 Deck load [st/mt] 3,108 2,820 ORO [USG/m3 ] 422,192 1,598 Fresh water [USG/m3 ] 143,725 544 Ballast/Drill water [USG/m3 ] 1,186,522 4,491 MACS速 tanks [USG/m3 ] 244,385 925 Methanol (LFL) [USG/m3 ] 118,890 450 DELIVERY RATES 2 fresh water pumps (US) 1,100 USG/min at 130 psi (Metric) 250 m3 /h at 9 bar 2 ballast pumps (US) 1,100 USG/min at 130 psi (Metric) 250 m3 /h at 9 bar 8 MACS速 cargo pumps (US) 132 and 330 USG/min at 260 psi + 440 USG/min at 115 psi (Metric) 30 and 75 m3 /h at 18 bar + 100 m3 /h at 8 bar 6 methanol (LFL) pumps (US) 330 USG/min at 130 psi (Metric) 75 m3 /h at 9 bar 6 product pumps (US) 330 USG/min at 130 psi (Metric) 75 m3 /h at 9 bar Product tanks 2 agitators for each aft tanks MACS速 tanks system 1 agitator for each tank All particulars believed to be correct but not guaranteed ACCOMMODATIONS Total = 25 persons Single cabins (Of鍖cers) 2 Single cabins 13 2 man cabins x 5 10 Mess room (1), day rooms (2), galley (1), dry provisions (1), cooler & freezer room (1), stores (1), hospital (1), gymnasium (1), separate engine control / instrument rooms on main deck, Full air-conditioned EQUIPEMENT AND ELECTRONICS (US) (Metric) DECK EQUIPMENT Tuggers [lt/mt] x 2 14.8 15 One double hydraulic combined windlass / mooring winch Deck cargo lashing winches x 12 9.8 10 Three passive roll reduction tanks Telescopic boom crane [lt/mt] x 1 2 2 at [ft/m] 55.8 17 SAFETY EQUIPEMENT Fire-鍖ghting class 1 with foam and waterspray Pump [USG/min-m3 /h] x 1 14,971 3,400 Monitors [USG/min-m3 /h] x 2 5,284 1,200 Alarm, monitoring and control system for periodically unattended machinery space. Life saving arrangement: life jackets, life buoys, immersion suits 1 fast rescue boat (for 10 persons) with davit Prepared for 250 survivors upgrade ELECTRONICS Navigation: 2 radars with ARPA, 2 radars transponders, 2 GPS, 3 gyrocompasses, 1 magnetic compass, 1 echo sounder, 1 speed log, 1 autopilot, Navtex, VDR, AIS, SSAS, 4 search lights, 3 night search systems Communication: 1 radio system compliant with GMDSS A3 rules MF/HF radio, DCS receiver, VHF/UHF/portable, Satcom C x 2, Fleet 77, SevSat, Intercom system Loading & stability software: Autoload DYNAMIC POSITIONNING SYSTEM ERN N属 99.99.99.92 DP 2: 2 stern azimuth thrusters, 1 bow azimuth thruster, 2 bow 鍖xed thrusters DP type: Kongsberg SDP 21, 2 operation consoles,4 references systems, 2 VRU/VMU Norwegian flag Classified DNV+ 1A1, SF, EO, DynPos-Autr, Clean Design, Comf-v(3), LFL, DK(+), HL(+), Ice C, BIS, OilRec, Naut-OSV (A), FiFi 1
  • 3. Flexible under-deck cargo solutions: MACS速 Equipped with the Multi-Application Cargo Solution (MACS速 ), Bourbon PX105 MACS速 series offers flexible and safe under-deck cargo solutions: maximizing the capacity on any product wet or dry carrying a wide range of products from drill cuttings, generic liquids and muds to hazardous and special products; providing tanks adaptable to the whole life cycle of an oil field from exploration drilling phases to production phases. Exceptional maneuverability and station keeping Dynamic positioning system class 2 (DP2) for an exceptional station keeping ability and precise positioning even in extremely bad weather conditions; Stern azimuth thrusters propulsion together with bow thrusters redundancy (2 tunnel bow, 1 bow retractable) and DP2 system for precise positioning and high maneuverability and reliability; An additional roll damping tank situated on the main deck for greater roll reduction, increased personnel safety and facilitated crane transfer operations in a wider range of sea conditions; The Schottel Twin pulling and pushing propellers for greater thrust efficiency and reliability by reducing load on propeller and number of rotating parts. Signi鍖cant fuel savings: diesel-electric propulsion and X-bow速 shape Highly competitive fuel savings through: adapting power needs to the type of operation with diesel-electric propulsion, allowing significant fuel consumption reduction compared to traditional vessels; the X-bow速 shape with outstanding stability performances in rough seas allowing therefore speed regularity and reduced fuel consumption. Ef鍖cient safety stand-by solution: stern 鍖re-鍖ghting and oil recovery Classed OIL REC with a storage capacity of more than 2,000 m3 of recovered oil with the possibility to install booms and skimmers on clients request; Fire-fighting monitors located on the stern for a closer approach of the fire and better control during emergency operations. Maximized deck cargo and under-deck drill cuttings Designed to provide clients with an optimized cargo capacities: 928 m deck surface with a deck cargo load up to 2,820 tons; an under-deck solution for drill cuttings and hazardous products tanks, consequently freeing space on the main deck and avoiding spillage risks. Minimized impact on the environment: Clean Design Classified Clean Design by DNV to comply with clients environmental expectations: adapted processes for fuel oil, ballast water and sewage handling; hull isolated fuel and products tanks, avoiding grounding damage; combustion machinery emissions rules; reduction of emissions in compliance with applicable norms (NOx and SOx). RELIABLE,EFFICIENTANDFLEXIBLE Performing in rough seas and Clean Design, Bourbon Front (2011), Bourbon Clear (2012), Bourbon Calm (2012) and Bourbon Rainbow (2013) offer clients an ultimate solution for optimized and 鍖exible cargo transportation. A series of 4 modern diesel-electric and DP2 platform supply vessels meeting clients needs
  • 4. PROFILE MAIN DECK 58 m. 16m. B-DECKC-DECKBRIDGE DECK DG/Mud Dry Bulk DG/Mud Dry Bulk Mud/Brine Tank Mud/Brine Tank WT WT TYPICAL CLEAN CLASS CROSS SECTION TANK TOP RORO stern door
  • 6. 148, rue Sainte 13007 Marseille France T : +33 (0)4 91 13 08 00 F : +33 (0)4 91 13 07 90 Contact: marketing@bourbon-marine-services.com EVASIONCOMMUNICATION-PhotosBOURBON-Triptyque-2013.06.30.JJ-BAC-PX105MACS速 www.bourbon-online.com