STANDARD WORK JOB BREAKDOWN PROCEDURE
                                         522P051-01 Alt 1                                                       Page 1 of 1
                                     Flange, Outer
                                   522P051-01 Alt 1
                                     Operation 30


MACHINE:     Gantry - Integrex                                     PROCESS: Operation 30
CHANGE FROM: Operation 20                                          CHANGE TO: Operation 30
CHANGEOVER      TIME: Driven by customer demand                    FREQUENCY: 24 minutes
REVISION:001                                                       DATE: May 1, 2009

                !  ONLY PERSONS TRAINED HOW TO DO THESE TASKS ARE TO CARRY OUT TASKS  !

                                      MATERIALS/TOOLS/PPEs REQUIRED FOR TASK 

MATERIALS:          Flange outer 522P051-20

TOOLS:




PPEs:       SAFETY GLASSES

PURPOSE:        N/A

                                            SERIAL WORK INSTRUCTIONS  

     = SAFETY POINT  = QUALITY POINT 駕 = PPEs REQUIRED  = TOOLS REQUIRED  = CRITICAL NOTE

                                                                                                      PHOTOGRAPHIC
             MAJOR STEP                      KEY POINT             REASON FOR KEY POINT
                                                                                                      DESCRIPTION
      First check traveler, making     SAFETY POINT:  Eye
      sure all documentation is       protection required

      completed from prior             CRITICAL NOTE:

                                      This document must be
      operations.
                                                                   Safety, Quality and Delivery of
                                      updated during each shift
1                                                                parts to meet daily     customer
                                            QUALITY     POINT:
Production:                                  Methods:                                      Quality:
Form GV-06 Rev A (2/5/09)                                        demand
                                      Traveler must be BLUE inJob Breakdown Template
                                                  Standard Work

                                      color     to     represent
Ad

Recommended

Chapter 1 6 step design process
Chapter 1 6 step design process
dantares
Chapter 6 basic design for assembly
Chapter 6 basic design for assembly
dantares
DFM Design Principles
DFM Design Principles
NIELITA
Design for Manufacturability Guidelines Every Designer should Follow
Design for Manufacturability Guidelines Every Designer should Follow
DFMPro
DFMA
DFMA
Chirag Mascarenhas
Design for assembly
Design for assembly
udayraj more
DFMA design for manufacturing and assembly
DFMA design for manufacturing and assembly
Automated Manufacturing Engineering Dept.
Iso 9001 product_realization_deployment_flow_chart_dfc7-1
Iso 9001 product_realization_deployment_flow_chart_dfc7-1
Khellil Khellil
System Kaizen Process Feb 6 2011
System Kaizen Process Feb 6 2011
ExerciseLeanLLC
Certificate 20of 20 Participation 20 Silico 20 Petak 20 Fmea[1]
Certificate 20of 20 Participation 20 Silico 20 Petak 20 Fmea[1]
ExerciseLeanLLC
Services Of Exercise Lean Group
Services Of Exercise Lean Group
ExerciseLeanLLC
6 S System[1] In Spanish[1]
ExerciseLeanLLC
F119 Team Report Out Dec 16, 2009[1]
F119 Team Report Out Dec 16, 2009[1]
ExerciseLeanLLC
8 D Quallity Glossary
8 D Quallity Glossary
ExerciseLeanLLC
Assurion%20 Value%20 Added%20 Process%20 Steps[1]
Assurion%20 Value%20 Added%20 Process%20 Steps[1]
ExerciseLeanLLC
Rapid Site Assessment June 27 2010
Rapid Site Assessment June 27 2010
ExerciseLeanLLC
Bob (ababs) Youssef FMEA Workshop Training at Hughes rev3
Bob (ababs) Youssef FMEA Workshop Training at Hughes rev3
Abbas (Bob) Youssef MBA, PhD
Production Efficiency July 2011
Production Efficiency July 2011
ExerciseLeanLLC
8 D Training 際際滷s
8 D Training 際際滷s
ExerciseLeanLLC
Mse June 24 2011
Mse June 24 2011
ExerciseLeanLLC
Strategic Planning Overview[1]
Strategic Planning Overview[1]
ExerciseLeanLLC
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
Julian Kalac P.Eng
DFMEA: Reduce Design Errors, Time and Cost
DFMEA: Reduce Design Errors, Time and Cost
Ricardo Gonzalez Luna
How to implement an effective fmea process
How to implement an effective fmea process
ASQ Reliability Division
Innovative Approach to FMEA Facilitation
Innovative Approach to FMEA Facilitation
Govind Ramu
Recomendation Letter Trust Tech June 16 2010
Recomendation Letter Trust Tech June 16 2010
ExerciseLeanLLC
June Continuous Improvement Focus
June Continuous Improvement Focus
ExerciseLeanLLC
Lean Manufacturing Cost Cutting Methods
Lean Manufacturing Cost Cutting Methods
ExerciseLeanLLC
WQD2011 - KAIZEN - EMAL - To improve the slot cleaning quality of slotted ano...
WQD2011 - KAIZEN - EMAL - To improve the slot cleaning quality of slotted ano...
Dubai Quality Group
WQD2011 - KAIZEN - EMAL - Vibro compactor Height Gauge Junction box Relocation
WQD2011 - KAIZEN - EMAL - Vibro compactor Height Gauge Junction box Relocation
Dubai Quality Group

More Related Content

Viewers also liked (20)

System Kaizen Process Feb 6 2011
System Kaizen Process Feb 6 2011
ExerciseLeanLLC
Certificate 20of 20 Participation 20 Silico 20 Petak 20 Fmea[1]
Certificate 20of 20 Participation 20 Silico 20 Petak 20 Fmea[1]
ExerciseLeanLLC
Services Of Exercise Lean Group
Services Of Exercise Lean Group
ExerciseLeanLLC
6 S System[1] In Spanish[1]
ExerciseLeanLLC
F119 Team Report Out Dec 16, 2009[1]
F119 Team Report Out Dec 16, 2009[1]
ExerciseLeanLLC
8 D Quallity Glossary
8 D Quallity Glossary
ExerciseLeanLLC
Assurion%20 Value%20 Added%20 Process%20 Steps[1]
Assurion%20 Value%20 Added%20 Process%20 Steps[1]
ExerciseLeanLLC
Rapid Site Assessment June 27 2010
Rapid Site Assessment June 27 2010
ExerciseLeanLLC
Bob (ababs) Youssef FMEA Workshop Training at Hughes rev3
Bob (ababs) Youssef FMEA Workshop Training at Hughes rev3
Abbas (Bob) Youssef MBA, PhD
Production Efficiency July 2011
Production Efficiency July 2011
ExerciseLeanLLC
8 D Training 際際滷s
8 D Training 際際滷s
ExerciseLeanLLC
Mse June 24 2011
Mse June 24 2011
ExerciseLeanLLC
Strategic Planning Overview[1]
Strategic Planning Overview[1]
ExerciseLeanLLC
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
Julian Kalac P.Eng
DFMEA: Reduce Design Errors, Time and Cost
DFMEA: Reduce Design Errors, Time and Cost
Ricardo Gonzalez Luna
How to implement an effective fmea process
How to implement an effective fmea process
ASQ Reliability Division
Innovative Approach to FMEA Facilitation
Innovative Approach to FMEA Facilitation
Govind Ramu
Recomendation Letter Trust Tech June 16 2010
Recomendation Letter Trust Tech June 16 2010
ExerciseLeanLLC
June Continuous Improvement Focus
June Continuous Improvement Focus
ExerciseLeanLLC
Lean Manufacturing Cost Cutting Methods
Lean Manufacturing Cost Cutting Methods
ExerciseLeanLLC
System Kaizen Process Feb 6 2011
System Kaizen Process Feb 6 2011
ExerciseLeanLLC
Certificate 20of 20 Participation 20 Silico 20 Petak 20 Fmea[1]
Certificate 20of 20 Participation 20 Silico 20 Petak 20 Fmea[1]
ExerciseLeanLLC
Services Of Exercise Lean Group
Services Of Exercise Lean Group
ExerciseLeanLLC
6 S System[1] In Spanish[1]
ExerciseLeanLLC
F119 Team Report Out Dec 16, 2009[1]
F119 Team Report Out Dec 16, 2009[1]
ExerciseLeanLLC
8 D Quallity Glossary
8 D Quallity Glossary
ExerciseLeanLLC
Assurion%20 Value%20 Added%20 Process%20 Steps[1]
Assurion%20 Value%20 Added%20 Process%20 Steps[1]
ExerciseLeanLLC
Rapid Site Assessment June 27 2010
Rapid Site Assessment June 27 2010
ExerciseLeanLLC
Bob (ababs) Youssef FMEA Workshop Training at Hughes rev3
Bob (ababs) Youssef FMEA Workshop Training at Hughes rev3
Abbas (Bob) Youssef MBA, PhD
Production Efficiency July 2011
Production Efficiency July 2011
ExerciseLeanLLC
8 D Training 際際滷s
8 D Training 際際滷s
ExerciseLeanLLC
Strategic Planning Overview[1]
Strategic Planning Overview[1]
ExerciseLeanLLC
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
Julian Kalac P.Eng
DFMEA: Reduce Design Errors, Time and Cost
DFMEA: Reduce Design Errors, Time and Cost
Ricardo Gonzalez Luna
How to implement an effective fmea process
How to implement an effective fmea process
ASQ Reliability Division
Innovative Approach to FMEA Facilitation
Innovative Approach to FMEA Facilitation
Govind Ramu
Recomendation Letter Trust Tech June 16 2010
Recomendation Letter Trust Tech June 16 2010
ExerciseLeanLLC
June Continuous Improvement Focus
June Continuous Improvement Focus
ExerciseLeanLLC
Lean Manufacturing Cost Cutting Methods
Lean Manufacturing Cost Cutting Methods
ExerciseLeanLLC

Similar to Std Wk Job Breakdown 522 P051 30 (20)

WQD2011 - KAIZEN - EMAL - To improve the slot cleaning quality of slotted ano...
WQD2011 - KAIZEN - EMAL - To improve the slot cleaning quality of slotted ano...
Dubai Quality Group
WQD2011 - KAIZEN - EMAL - Vibro compactor Height Gauge Junction box Relocation
WQD2011 - KAIZEN - EMAL - Vibro compactor Height Gauge Junction box Relocation
Dubai Quality Group
3. quality management manual
3. quality management manual
zemm1
WQD2011 - KAIZEN - EMAL - Core Cutting Machine (Tech. Lab.) Safety Modification
WQD2011 - KAIZEN - EMAL - Core Cutting Machine (Tech. Lab.) Safety Modification
Dubai Quality Group
Fmea Presentation 2
Fmea Presentation 2
Subikash Roy
Jic advance copy
Jic advance copy
chethu_vini
6 sigma rollators update for my blog
6 sigma rollators update for my blog
Mario Ruiz Felix
Marpol regs4ships
Marpol regs4ships
ravi6543
Reliability Engineering Maturity Matrix
Reliability Engineering Maturity Matrix
Ricky Smith CMRP, CMRT
Reliability Engineering Maturity Matrix
Reliability Engineering Maturity Matrix
Ricky Smith CMRP, CMRT
Reliability Engineering Maturity Matrix
Reliability Engineering Maturity Matrix
Ricky Smith CMRP, CMRT
WQD2011 - KAIZEN - SRF Oversear Ltd - Set up time reduction in loom during st...
WQD2011 - KAIZEN - SRF Oversear Ltd - Set up time reduction in loom during st...
Dubai Quality Group
Practice Proces Analysis Mini Kata more often
Practice Proces Analysis Mini Kata more often
EmielVanEst
Test Procedure
Test Procedure
ceti colomos
Our Improvement Story Board
Our Improvement Story Board
EmielVanEst
Reliability Tasks - Maintenance Engr, Reliability Engr, Maintenance Planner
Reliability Tasks - Maintenance Engr, Reliability Engr, Maintenance Planner
Ricky Smith CMRP, CMRT
Marpol Excellence 2011
Marpol Excellence 2011
Aadrianna
223.0.bon.working on steep batters
223.0.bon.working on steep batters
Paul100177
TALAT Lecture 2102.01: A Floodlight for an Offshore Oil Platform, Special Stu...
TALAT Lecture 2102.01: A Floodlight for an Offshore Oil Platform, Special Stu...
CORE-Materials
SOPs - Improving Facilities Operations
SOPs - Improving Facilities Operations
Faith Youngsville, NC
WQD2011 - KAIZEN - EMAL - To improve the slot cleaning quality of slotted ano...
WQD2011 - KAIZEN - EMAL - To improve the slot cleaning quality of slotted ano...
Dubai Quality Group
WQD2011 - KAIZEN - EMAL - Vibro compactor Height Gauge Junction box Relocation
WQD2011 - KAIZEN - EMAL - Vibro compactor Height Gauge Junction box Relocation
Dubai Quality Group
3. quality management manual
3. quality management manual
zemm1
WQD2011 - KAIZEN - EMAL - Core Cutting Machine (Tech. Lab.) Safety Modification
WQD2011 - KAIZEN - EMAL - Core Cutting Machine (Tech. Lab.) Safety Modification
Dubai Quality Group
Fmea Presentation 2
Fmea Presentation 2
Subikash Roy
Jic advance copy
Jic advance copy
chethu_vini
6 sigma rollators update for my blog
6 sigma rollators update for my blog
Mario Ruiz Felix
Marpol regs4ships
Marpol regs4ships
ravi6543
Reliability Engineering Maturity Matrix
Reliability Engineering Maturity Matrix
Ricky Smith CMRP, CMRT
Reliability Engineering Maturity Matrix
Reliability Engineering Maturity Matrix
Ricky Smith CMRP, CMRT
Reliability Engineering Maturity Matrix
Reliability Engineering Maturity Matrix
Ricky Smith CMRP, CMRT
WQD2011 - KAIZEN - SRF Oversear Ltd - Set up time reduction in loom during st...
WQD2011 - KAIZEN - SRF Oversear Ltd - Set up time reduction in loom during st...
Dubai Quality Group
Practice Proces Analysis Mini Kata more often
Practice Proces Analysis Mini Kata more often
EmielVanEst
Our Improvement Story Board
Our Improvement Story Board
EmielVanEst
Reliability Tasks - Maintenance Engr, Reliability Engr, Maintenance Planner
Reliability Tasks - Maintenance Engr, Reliability Engr, Maintenance Planner
Ricky Smith CMRP, CMRT
Marpol Excellence 2011
Marpol Excellence 2011
Aadrianna
223.0.bon.working on steep batters
223.0.bon.working on steep batters
Paul100177
TALAT Lecture 2102.01: A Floodlight for an Offshore Oil Platform, Special Stu...
TALAT Lecture 2102.01: A Floodlight for an Offshore Oil Platform, Special Stu...
CORE-Materials
SOPs - Improving Facilities Operations
SOPs - Improving Facilities Operations
Faith Youngsville, NC
Ad

More from ExerciseLeanLLC (16)

Warwick Lean Agenda Aug Wk1 July 12 2010
Warwick Lean Agenda Aug Wk1 July 12 2010
ExerciseLeanLLC
El Llc Six Sigma June 2011
El Llc Six Sigma June 2011
ExerciseLeanLLC
Exercise Lean Llc Revised Brochure July 11 2011
Exercise Lean Llc Revised Brochure July 11 2011
ExerciseLeanLLC
Lean Manufacturing Exam Questions Mar 2011
Lean Manufacturing Exam Questions Mar 2011
ExerciseLeanLLC
Fmea Handbook V4.1[1][1]
Fmea Handbook V4.1[1][1]
ExerciseLeanLLC
John F Petak Resume July 2011
John F Petak Resume July 2011
ExerciseLeanLLC
Trust Tech F119 Rapid Assessment & Hoshin Workshop Report Out
Trust Tech F119 Rapid Assessment & Hoshin Workshop Report Out
ExerciseLeanLLC
F119 Analysis Recommendations.Pptx [Autosaved]
F119 Analysis Recommendations.Pptx [Autosaved]
ExerciseLeanLLC
Mse
Mse
ExerciseLeanLLC
Kan Ban & Standardize Work Overview Feb 2011
Kan Ban & Standardize Work Overview Feb 2011
ExerciseLeanLLC
Gas Nozzle Team Report Out January 31 2008
Gas Nozzle Team Report Out January 31 2008
ExerciseLeanLLC
5 Why Training 際際滷s Oct 14, 2009
5 Why Training 際際滷s Oct 14, 2009
ExerciseLeanLLC
Tpm Presentation
Tpm Presentation
ExerciseLeanLLC
Exercise Lean Feb 27 2010
Exercise Lean Feb 27 2010
ExerciseLeanLLC
Work Content Feb 18 2010
Work Content Feb 18 2010
ExerciseLeanLLC
Hoshin Presentation Example June 7 2010
Hoshin Presentation Example June 7 2010
ExerciseLeanLLC
Warwick Lean Agenda Aug Wk1 July 12 2010
Warwick Lean Agenda Aug Wk1 July 12 2010
ExerciseLeanLLC
El Llc Six Sigma June 2011
El Llc Six Sigma June 2011
ExerciseLeanLLC
Exercise Lean Llc Revised Brochure July 11 2011
Exercise Lean Llc Revised Brochure July 11 2011
ExerciseLeanLLC
Lean Manufacturing Exam Questions Mar 2011
Lean Manufacturing Exam Questions Mar 2011
ExerciseLeanLLC
Fmea Handbook V4.1[1][1]
Fmea Handbook V4.1[1][1]
ExerciseLeanLLC
John F Petak Resume July 2011
John F Petak Resume July 2011
ExerciseLeanLLC
Trust Tech F119 Rapid Assessment & Hoshin Workshop Report Out
Trust Tech F119 Rapid Assessment & Hoshin Workshop Report Out
ExerciseLeanLLC
F119 Analysis Recommendations.Pptx [Autosaved]
F119 Analysis Recommendations.Pptx [Autosaved]
ExerciseLeanLLC
Kan Ban & Standardize Work Overview Feb 2011
Kan Ban & Standardize Work Overview Feb 2011
ExerciseLeanLLC
Gas Nozzle Team Report Out January 31 2008
Gas Nozzle Team Report Out January 31 2008
ExerciseLeanLLC
5 Why Training 際際滷s Oct 14, 2009
5 Why Training 際際滷s Oct 14, 2009
ExerciseLeanLLC
Exercise Lean Feb 27 2010
Exercise Lean Feb 27 2010
ExerciseLeanLLC
Work Content Feb 18 2010
Work Content Feb 18 2010
ExerciseLeanLLC
Hoshin Presentation Example June 7 2010
Hoshin Presentation Example June 7 2010
ExerciseLeanLLC
Ad

Std Wk Job Breakdown 522 P051 30

  • 1. STANDARD WORK JOB BREAKDOWN PROCEDURE 522P051-01 Alt 1 Page 1 of 1 Flange, Outer 522P051-01 Alt 1 Operation 30 MACHINE: Gantry - Integrex PROCESS: Operation 30 CHANGE FROM: Operation 20 CHANGE TO: Operation 30 CHANGEOVER TIME: Driven by customer demand FREQUENCY: 24 minutes REVISION:001 DATE: May 1, 2009 ! ONLY PERSONS TRAINED HOW TO DO THESE TASKS ARE TO CARRY OUT TASKS ! MATERIALS/TOOLS/PPEs REQUIRED FOR TASK MATERIALS: Flange outer 522P051-20 TOOLS: PPEs: SAFETY GLASSES PURPOSE: N/A SERIAL WORK INSTRUCTIONS = SAFETY POINT = QUALITY POINT 駕 = PPEs REQUIRED = TOOLS REQUIRED = CRITICAL NOTE PHOTOGRAPHIC MAJOR STEP KEY POINT REASON FOR KEY POINT DESCRIPTION First check traveler, making SAFETY POINT: Eye sure all documentation is protection required completed from prior CRITICAL NOTE: This document must be operations. Safety, Quality and Delivery of updated during each shift 1 parts to meet daily customer QUALITY POINT: Production: Methods: Quality: Form GV-06 Rev A (2/5/09) demand Traveler must be BLUE inJob Breakdown Template Standard Work color to represent