1) The document presents a technical summary of a power flow analysis for a system consisting of 5 generating stations providing power to a collector substation through a 34.5 KV cable. 2) An initial case with 0 load found no contingency violations, allowing further analysis. A case with assumed loads of 2.5 MVA for the wind turbine and 100 MVA for other equipment found 10 contingency violations. 3) Upgrading the transformer connecting the wind turbine to 25.5 MVA eliminated contingency violations and overloads, providing a solution to safely operate the system within equipment ratings.