際際滷

際際滷Share a Scribd company logo
Timmy Giles
Summary
Dependable and hard-working very knowledgeable as a tunnel superintendent, walking boss, shifter,minor and operator
with more than 21 years in the Tunnel industry. 9 years as oil field foreman,lease operator and equipment operator.
Thrives in a fast-paced environment and works to complete projects quickly and efficiently.
Highlights
Leadership
Exceptional problem solver
Demolition
Construction machinery operation
Strong communication skills
Detail-oriented
Friendly and hardworking
Excellent driving record
Drilling and blasting
Shotcrete
Mining
Structural and architectural pre-cast concrete
Blueprint reading
Pipe laying
Accomplishments
Completed All projects assigned in 21 years, all on time and at or under budget.
Led a crew of 5-30 Tunnel and oil field construction laborers.
Received higher union starting pay grade based on previous trade knowledge and experience.
Key player on underground projects valued at and about $50,000-$100,000,000.
Experience
Minor/Shifter over grout crew(foreman)
June 1986 to October 1987
Traylor Bros. - Nie Beiber, CA
Assisted skilled workers with Tunnel construction projects in all phases of underground work.
Excavated shored and grouted 4 mile tunnel.
Cleaned all construction areas to avoid hazards.
Mixed and laid concrete involved in pouring and shotcreate Tunnel.
Mixed mortar, plaster and grout according to standard formulas.
Performed heavy labor such as ditch digging, paving and hauling.
Continually cleaned work areas and equipment.
Arranged and stored materials, machines, tools and equipment.
Cut materials to specified sizes for installation.
Completed construction projects.
Assisted large crews.
4876 N Tabby Ln, Tabiona UT 84072
Cell: 435-503-7374 - timgiles29@gmail.com
Muck Valley Nie Beiber California tunnel Project
Shifter
October 1987 to May 1992
Obyashi - San Antonio, TX
Mined 6 miles of 30 FT diameter tunnel.
Excavated 5 shafts
Installed pre cast segments, shotcrete wire bolts and grout.
Cleaned all construction areas to avoid hazards.
Mixed and laid concrete.
Mixed mortar, plaster and grout according to standard formulas.
Performed heavy labor such as ditch digging.
Mentored junior team members, providing guidance on proper techniques and safety.
Completed underground construction projects.
Continually cleaned work areas and equipment.
Arranged and stored materials, machines, tools and equipment.
Transported materials, tools and machines to installation sites.
Assisted large crews in erecting, precast segments installing lattice giders bolts and shotcrete.
Shifter
May 1992 to June 1995
Obyshai - Waxahachie, TX
Excavated a 4 mile tunnel, 2 shafts
Set pre cast segments lattice giders and bolts.
Assisted skilled workers with underground construction projects.
Cleaned all construction areas to avoid hazards.
Mixed and laid concrete.
Mixed mortar, plaster and grout according to standard formulas.
Performed heavy labor such as ditch digging, and hauling.
Mentored junior team members, providing guidance on proper techniques and safety.
Completed underground projects.
Continually cleaned work areas and equipment.
Arranged and stored materials, machines, tools and equipment.
Cut materials to specified sizes for installation.
Transported materials, tools and machines to installation sites.
Assisted large crews in erecting, pre cast segments lattice giders shotcrete bolts.
Equipment operator/laboer
June 1995 to November 1995
Haprer Construction - Waxahachie, UT
Installed culverts
operate heavy equipment
Assisted skilled workers with construction projects.
Cleaned all construction areas to avoid hazards.
Mixed and laid concrete.
Mixed mortar, plaster and grout according to standard formulas.
Performed heavy labor such as ditch digging, paving and hauling.
Mentored junior team members, providing guidance on proper techniques and safety.
Completed construction projects.
Arranged and stored materials, machines, tools and equipment.
Transported materials, tools and machines to installation sites.
Assisted large crews in all construction duties.
Operator Foreman driller
November 1995 to February 1996
Redpath Construction - Spanish Fork Canyon, Ut
Drill and re grout 6 miles of tunnel
Assisted skilled workers with construction projects in all phases.
Cleaned all construction areas to avoid hazards.
Mixed and laid concrete.
Mixed mortar, plaster and grout according to standard formulas.
Performed heavy labor such as ditch digging, and hauling.
Mentored junior team members, providing guidance on proper techniques and safety.
Completed all construction projects.
Continually cleaned work areas and equipment.
Arranged and stored materials, machines, tools and equipment.
Transported materials, tools and machines to installation sites.
Assistant Tunnel superintendent
February 1996 to June 1996
Minors inc - Strawberry valley, Ut
Demo 300 Ft of old tunnel
Installed rebar, concrete connecting old tunnel to new tunnel.
Assisted skilled workers with construction projects in all phases.
Cleaned all construction areas to avoid hazards.
Mixed and laid concrete.
Mixed mortar, plaster and grout according to standard formulas.
Performed heavy labor such as ditch digging, and hauling.
Mentored junior team members, providing guidance on proper techniques and safety.
Installed, repaired and rebuilt tunnel.
Completed construction projects.
Continually cleaned work areas and equipment.
Arranged and stored materials, machines, tools and equipment.
Cut materials to specified sizes for installation.
Transported materials, tools and machines to installation sites.
Assisted crews
Labor
June 1996 to August 1996
Cultchen/Conden - Provo Caynon, Ut
Soil nail wall.
Install bolts wire grout and shotcrete into and on the wall.
Assisted skilled workers with construction projects in all phases.
Cleaned all construction areas to avoid hazards.
Mixed and laid concrete.
Mixed mortar, plaster and grout according to standard formulas.
Performed heavy labor such as ditch digging, and hauling.
Completed construction projects.
Continually cleaned work areas and equipment.
Arranged and stored materials, machines, tools and equipment.
Cut materials to specified sizes for installation.
Transported materials, tools and machines to installation sites.
Carpenter foreman
August 1996 to November 1996
Obayshi - Provo Canyon, Ut
Set forms pour concrete tie re bar for walls.
Assisted skilled workers with construction projects in all phases of rough and finish carpentry.
Assisted skilled workers with construction projects in all phases of rough and finish carpentry.
Cleaned all construction areas to avoid hazards.
Mixed and laid concrete.
Mixed mortar, plaster and grout according to standard formulas.
Performed heavy labor such as ditch digging, paving and hauling.
Mentored junior team members, providing guidance on proper techniques and safety.
Completed construction projects.
Continually cleaned work areas and equipment.
Arranged and stored materials, machines, tools and equipment.
Cut materials to specified sizes for installation.
Transported materials, tools and machines to installation sites.
Assisted large crews .
Operator/forrman
November 1996 to June 1998
Traylor Bros. - Los Angeles, Ca
500 ft Seismographic drift
Installing lattice giders swell ex bolts wire shotcrete
Assisted skilled workers with construction projects in all phases.
Cleaned all construction areas to avoid hazards.
Mixed and laid concrete.
Mixed mortar, plaster and grout according to standard formulas.
Performed heavy labor such as ditch digging, and hauling.
Mentored junior team members, providing guidance on proper techniques and safety.
Completed construction projects.
Continually cleaned work areas and equipment.
Arranged and stored materials, machines, tools and equipment.
Transported materials, tools and machines to installation sites.
Assisted large crews.
Master blaster
June 1998 to October 1998
Century 21st drilling and blasting - Provo Canyon, Ut
drill and blast road right away
Assisted skilled workers with construction projects in all phases.
Cleaned all construction areas to avoid hazards.
Completed construction projects.
Continually cleaned work areas and equipment.
Arranged and stored materials, machines, tools and equipment.
Transported materials, tools and machines to installation sites.
Driller
October 1998 to May 1999
Obyashi - Provo Canyon, UT
Drill and blast 2 highway tunnels.
Assisted skilled workers with construction projects in all phases.
Cleaned all construction areas to avoid hazards.
Mixed and laid concrete.
Mixed mortar, plaster and grout according to standard formulas.
Performed heavy labor such as ditch digging, paving and hauling.
Mentored junior team members, providing guidance on proper techniques and safety.
Completed construction projects.
Continually cleaned work areas and equipment.
Arranged and stored materials, machines, tools and equipment.
Transported materials, tools and machines to installation sites.
Assisted large crews in erecting.
Concrete superintendent
May 1999 to August 2000
Obyashi - Provo Canyon, UT
set slip forms and re bars for tunnel and outside structure.
Assisted skilled workers with construction projects in all phases.
Cleaned all construction areas to avoid hazards.
Mixed and laid concrete.
Mixed mortar, plaster and grout according to standard formulas.
Performed heavy labor such as ditch digging, and hauling.
Mentored junior team members, providing guidance on proper techniques and safety.
Completed construction projects.
Continually cleaned work areas and equipment.
Arranged and stored materials, machines, tools and equipment.
Transported materials, tools and machines to installation sites.
Assisted large crews.
Foreman
August 2000 to April 2001
Bob Ford's Construction - 9 western states, Ut
remodeled Albertson's stores
Driller
April 2001 to September 2001
Drill Tech - Wolf creek, Ut
Drilled installed ans shotcreted 7 walls
Assisted skilled workers with construction projects in all phases.
Cleaned all construction areas to avoid hazards.
Mixed and laid concrete.
Mixed mortar, plaster and grout according to standard formulas.
Mentored junior team members, providing guidance on proper techniques and safety.
Completed construction projects.
Continually cleaned work areas and equipment.
Arranged and stored materials, machines, tools and equipment.
Transported materials, tools and machines to installation sites.
Assisted large crews
Tunnel Shifter
September 2001 to July 2003
Obishyi /W.W. Clyde - Diamond Fork , Ut
Completed all aspects of 4 miles of tunnel.
Assisted skilled workers with construction projects in all phases.
Cleaned all construction areas to avoid hazards.
Mixed and laid concrete.
Mixed mortar, plaster and grout according to standard formulas.
Performed heavy labor such as ditch digging, paving and hauling.
Completed construction projects.
Continually cleaned work areas and equipment.
Arranged and stored materials, machines, tools and equipment.
Transported materials, tools and machines to installation sites.
Assisted large crews
General Tunnel superintendent
July 2003 to September 2007
Drill Tech - Anitoch, Ca
Excavated 3 wine caves
Lattice giders shotcrete wires bolts.
Drill and blasted 1 90 ft shaft.
Refurbished 300 ft tunnel for Union Pacific
Regrouted 300 tunnel for PG&E
Shotcreted and regrouted 3 tunnels in San Francisco
Excavted and shotcreted and drilled 120 ft shaft in Fair field Ca for water control.
Refurbished 1 tunnel for union Pacific pulled timbers shotcrete and grout.
Drilled shotcrete and wired soilnail walls in Las Vegas NV
Several soil nail walls in between tunnel jobs in different cities.
Assisted skilled workers with construction projects in all phases.
Cleaned all construction areas to avoid hazards.
Mixed and laid concrete.
Mixed mortar, plaster and grout according to standard formulas.
Performed heavy labor such as ditch digging, paving and hauling.
Mentored junior team members, providing guidance on proper techniques and safety.
Completed construction projects.
Continually cleaned work areas and equipment.
Arranged and stored materials, machines, tools and equipment.
Transported materials, tools and machines to installation sites.
Assisted large crews in erecting.
Construction Foreman
September 2007 to October 2008
Tracy Monks/Western States - Roosevelt , Ut
residential sewer water
Parking lots, fill
Drill and blast oilfield locations
Operated heavy equipment,blades trackhoe,backhoe,etc.
Cleaned all construction areas to avoid hazards.
Assisted skilled workers with construction projects in all phases.
Mixed and laid concrete.
Mixed mortar, plaster and grout according to standard formulas.
Performed heavy labor such as ditch digging, paving and hauling.
Mentored junior team members, providing guidance on proper techniques and safety.
Completed construction projects.
Continually cleaned work areas and equipment.
Arranged and stored materials, machines, tools and equipment.
Transported materials, tools and machines to installation sites.
Assisted large crews.
Foreman
October 2008 to October 2013
Newfield - Myton, Ut
Blade operator moved into lead position for construction of roads and locations.
Assisted skilled workers with construction projects in all phases.
Cleaned all construction areas to avoid hazards.
Mentored junior team members, providing guidance on proper techniques and safety.
Completed construction projects.
Transported materials, tools and machines to installation sites.
Assisted large crews.
Lease operator/Foreman
October 2013 to Current
Fish's Oilfield - Roosevelt, Ut
Pumper
Flowback
Education
High School Diploma : General, 1986
Tabiona - Tabiona, UT, USA

More Related Content

What's hot (18)

DOCX
David Stone Resume 1-1
David Stone
PDF
I-95 HOV HOT Lanes
Ryan R. Smith, EIT
DOC
BUSINESS KENT KAVANAGH RESUME 121516
Kent Kavanagh
PDF
Ricky Resume
ricky kinsella
PDF
Resume
Andre Key
DOC
Resume_Wizard
Brian Burnett
DOCX
docs-1
lance Robertson
PDF
Barry-Knight-5
barry knight
DOC
wattie pukeke cv
Wattie Pukeke
DOCX
ALEX KALAJ resume
Alex Kalaj
PDF
Dwayne Payne Resume Feb 2016 No ID
Dwayne Payne
PDF
John Hanson
John Hanson
PDF
KEVIN CRUDELI - 17_April15
Kevin Crudeli
DOCX
Treveton, Luke - Resume new
luke treveton
DOCX
Updated Resume May 2016 Neil Chadwick
neil chadwick
PDF
Kevin Ionta Resume 1-2016
Kevin Ionta
DOCX
resume
Armando Bonilla
DOCX
Joseph_Lott_OIM HPHT1
Joe Lott
David Stone Resume 1-1
David Stone
I-95 HOV HOT Lanes
Ryan R. Smith, EIT
BUSINESS KENT KAVANAGH RESUME 121516
Kent Kavanagh
Ricky Resume
ricky kinsella
Resume
Andre Key
Resume_Wizard
Brian Burnett
Barry-Knight-5
barry knight
wattie pukeke cv
Wattie Pukeke
ALEX KALAJ resume
Alex Kalaj
Dwayne Payne Resume Feb 2016 No ID
Dwayne Payne
John Hanson
John Hanson
KEVIN CRUDELI - 17_April15
Kevin Crudeli
Treveton, Luke - Resume new
luke treveton
Updated Resume May 2016 Neil Chadwick
neil chadwick
Kevin Ionta Resume 1-2016
Kevin Ionta
Joseph_Lott_OIM HPHT1
Joe Lott

Similar to Timmy Giles Resume (20)

PDF
Dwains resume final
Dwain Burpee
PDF
Dwains Resume Final
Dwain Burpee
DOCX
Resume_Mark_Rowell_Nov_2015.v1
Mark Rowell
PDF
Troy Ens Resume
Troy Ens
DOCX
Jerry Wilhite Resume
Jerry Wilhite
DOC
Newby Resume 2015
Steve Newby
DOC
Jason Tate Resume
jasont8er
DOCX
John Keenan - Resume
John Keenan
PDF
MICHAEL A DOWNS
michael downs
DOC
Oberto Scotts resume 1
Lewis Jones
DOCX
kshirleyresume1
Kris Shirley
DOC
Hartman, John - 2016 Resume
John Hartman
DOCX
WILLIAM HILDING RESUME
William Hilding
DOCX
Ryan Ministrelli Resume 2016
Ryan Ministrelli
PDF
Resume
Robert Buckles
DOC
Rudy's Resume for safetyman
Robert ( Rudy) Wilson
PDF
DOM TANNER CV 2015
Dom Tanner
DOC
k.Ramakkannu cv 06 jan2016
kandasamy Ramakkannu PMP
DOCX
Resume - Ken Pelletier - 2015-10-10 (1)
Ken Pelletier
Dwains resume final
Dwain Burpee
Dwains Resume Final
Dwain Burpee
Resume_Mark_Rowell_Nov_2015.v1
Mark Rowell
Troy Ens Resume
Troy Ens
Jerry Wilhite Resume
Jerry Wilhite
Newby Resume 2015
Steve Newby
Jason Tate Resume
jasont8er
John Keenan - Resume
John Keenan
MICHAEL A DOWNS
michael downs
Oberto Scotts resume 1
Lewis Jones
kshirleyresume1
Kris Shirley
Hartman, John - 2016 Resume
John Hartman
WILLIAM HILDING RESUME
William Hilding
Ryan Ministrelli Resume 2016
Ryan Ministrelli
Rudy's Resume for safetyman
Robert ( Rudy) Wilson
DOM TANNER CV 2015
Dom Tanner
k.Ramakkannu cv 06 jan2016
kandasamy Ramakkannu PMP
Resume - Ken Pelletier - 2015-10-10 (1)
Ken Pelletier
Ad

Timmy Giles Resume

  • 1. Timmy Giles Summary Dependable and hard-working very knowledgeable as a tunnel superintendent, walking boss, shifter,minor and operator with more than 21 years in the Tunnel industry. 9 years as oil field foreman,lease operator and equipment operator. Thrives in a fast-paced environment and works to complete projects quickly and efficiently. Highlights Leadership Exceptional problem solver Demolition Construction machinery operation Strong communication skills Detail-oriented Friendly and hardworking Excellent driving record Drilling and blasting Shotcrete Mining Structural and architectural pre-cast concrete Blueprint reading Pipe laying Accomplishments Completed All projects assigned in 21 years, all on time and at or under budget. Led a crew of 5-30 Tunnel and oil field construction laborers. Received higher union starting pay grade based on previous trade knowledge and experience. Key player on underground projects valued at and about $50,000-$100,000,000. Experience Minor/Shifter over grout crew(foreman) June 1986 to October 1987 Traylor Bros. - Nie Beiber, CA Assisted skilled workers with Tunnel construction projects in all phases of underground work. Excavated shored and grouted 4 mile tunnel. Cleaned all construction areas to avoid hazards. Mixed and laid concrete involved in pouring and shotcreate Tunnel. Mixed mortar, plaster and grout according to standard formulas. Performed heavy labor such as ditch digging, paving and hauling. Continually cleaned work areas and equipment. Arranged and stored materials, machines, tools and equipment. Cut materials to specified sizes for installation. Completed construction projects. Assisted large crews. 4876 N Tabby Ln, Tabiona UT 84072 Cell: 435-503-7374 - timgiles29@gmail.com
  • 2. Muck Valley Nie Beiber California tunnel Project Shifter October 1987 to May 1992 Obyashi - San Antonio, TX Mined 6 miles of 30 FT diameter tunnel. Excavated 5 shafts Installed pre cast segments, shotcrete wire bolts and grout. Cleaned all construction areas to avoid hazards. Mixed and laid concrete. Mixed mortar, plaster and grout according to standard formulas. Performed heavy labor such as ditch digging. Mentored junior team members, providing guidance on proper techniques and safety. Completed underground construction projects. Continually cleaned work areas and equipment. Arranged and stored materials, machines, tools and equipment. Transported materials, tools and machines to installation sites. Assisted large crews in erecting, precast segments installing lattice giders bolts and shotcrete. Shifter May 1992 to June 1995 Obyshai - Waxahachie, TX Excavated a 4 mile tunnel, 2 shafts Set pre cast segments lattice giders and bolts. Assisted skilled workers with underground construction projects. Cleaned all construction areas to avoid hazards. Mixed and laid concrete. Mixed mortar, plaster and grout according to standard formulas. Performed heavy labor such as ditch digging, and hauling. Mentored junior team members, providing guidance on proper techniques and safety. Completed underground projects.
  • 3. Continually cleaned work areas and equipment. Arranged and stored materials, machines, tools and equipment. Cut materials to specified sizes for installation. Transported materials, tools and machines to installation sites. Assisted large crews in erecting, pre cast segments lattice giders shotcrete bolts. Equipment operator/laboer June 1995 to November 1995 Haprer Construction - Waxahachie, UT Installed culverts operate heavy equipment Assisted skilled workers with construction projects. Cleaned all construction areas to avoid hazards. Mixed and laid concrete. Mixed mortar, plaster and grout according to standard formulas. Performed heavy labor such as ditch digging, paving and hauling. Mentored junior team members, providing guidance on proper techniques and safety. Completed construction projects. Arranged and stored materials, machines, tools and equipment. Transported materials, tools and machines to installation sites. Assisted large crews in all construction duties. Operator Foreman driller November 1995 to February 1996 Redpath Construction - Spanish Fork Canyon, Ut Drill and re grout 6 miles of tunnel Assisted skilled workers with construction projects in all phases. Cleaned all construction areas to avoid hazards. Mixed and laid concrete. Mixed mortar, plaster and grout according to standard formulas. Performed heavy labor such as ditch digging, and hauling. Mentored junior team members, providing guidance on proper techniques and safety. Completed all construction projects.
  • 4. Continually cleaned work areas and equipment. Arranged and stored materials, machines, tools and equipment. Transported materials, tools and machines to installation sites. Assistant Tunnel superintendent February 1996 to June 1996 Minors inc - Strawberry valley, Ut Demo 300 Ft of old tunnel Installed rebar, concrete connecting old tunnel to new tunnel. Assisted skilled workers with construction projects in all phases. Cleaned all construction areas to avoid hazards. Mixed and laid concrete. Mixed mortar, plaster and grout according to standard formulas. Performed heavy labor such as ditch digging, and hauling. Mentored junior team members, providing guidance on proper techniques and safety. Installed, repaired and rebuilt tunnel. Completed construction projects. Continually cleaned work areas and equipment. Arranged and stored materials, machines, tools and equipment. Cut materials to specified sizes for installation. Transported materials, tools and machines to installation sites. Assisted crews Labor June 1996 to August 1996 Cultchen/Conden - Provo Caynon, Ut Soil nail wall. Install bolts wire grout and shotcrete into and on the wall. Assisted skilled workers with construction projects in all phases. Cleaned all construction areas to avoid hazards. Mixed and laid concrete. Mixed mortar, plaster and grout according to standard formulas.
  • 5. Performed heavy labor such as ditch digging, and hauling. Completed construction projects. Continually cleaned work areas and equipment. Arranged and stored materials, machines, tools and equipment. Cut materials to specified sizes for installation. Transported materials, tools and machines to installation sites. Carpenter foreman August 1996 to November 1996 Obayshi - Provo Canyon, Ut Set forms pour concrete tie re bar for walls. Assisted skilled workers with construction projects in all phases of rough and finish carpentry. Assisted skilled workers with construction projects in all phases of rough and finish carpentry. Cleaned all construction areas to avoid hazards. Mixed and laid concrete. Mixed mortar, plaster and grout according to standard formulas. Performed heavy labor such as ditch digging, paving and hauling. Mentored junior team members, providing guidance on proper techniques and safety. Completed construction projects. Continually cleaned work areas and equipment. Arranged and stored materials, machines, tools and equipment. Cut materials to specified sizes for installation. Transported materials, tools and machines to installation sites. Assisted large crews . Operator/forrman November 1996 to June 1998 Traylor Bros. - Los Angeles, Ca 500 ft Seismographic drift Installing lattice giders swell ex bolts wire shotcrete Assisted skilled workers with construction projects in all phases.
  • 6. Cleaned all construction areas to avoid hazards. Mixed and laid concrete. Mixed mortar, plaster and grout according to standard formulas. Performed heavy labor such as ditch digging, and hauling. Mentored junior team members, providing guidance on proper techniques and safety. Completed construction projects. Continually cleaned work areas and equipment. Arranged and stored materials, machines, tools and equipment. Transported materials, tools and machines to installation sites. Assisted large crews. Master blaster June 1998 to October 1998 Century 21st drilling and blasting - Provo Canyon, Ut drill and blast road right away Assisted skilled workers with construction projects in all phases. Cleaned all construction areas to avoid hazards. Completed construction projects. Continually cleaned work areas and equipment. Arranged and stored materials, machines, tools and equipment. Transported materials, tools and machines to installation sites. Driller October 1998 to May 1999 Obyashi - Provo Canyon, UT Drill and blast 2 highway tunnels. Assisted skilled workers with construction projects in all phases. Cleaned all construction areas to avoid hazards. Mixed and laid concrete. Mixed mortar, plaster and grout according to standard formulas. Performed heavy labor such as ditch digging, paving and hauling. Mentored junior team members, providing guidance on proper techniques and safety.
  • 7. Completed construction projects. Continually cleaned work areas and equipment. Arranged and stored materials, machines, tools and equipment. Transported materials, tools and machines to installation sites. Assisted large crews in erecting. Concrete superintendent May 1999 to August 2000 Obyashi - Provo Canyon, UT set slip forms and re bars for tunnel and outside structure. Assisted skilled workers with construction projects in all phases. Cleaned all construction areas to avoid hazards. Mixed and laid concrete. Mixed mortar, plaster and grout according to standard formulas. Performed heavy labor such as ditch digging, and hauling. Mentored junior team members, providing guidance on proper techniques and safety. Completed construction projects. Continually cleaned work areas and equipment. Arranged and stored materials, machines, tools and equipment. Transported materials, tools and machines to installation sites. Assisted large crews. Foreman August 2000 to April 2001 Bob Ford's Construction - 9 western states, Ut remodeled Albertson's stores Driller April 2001 to September 2001 Drill Tech - Wolf creek, Ut Drilled installed ans shotcreted 7 walls Assisted skilled workers with construction projects in all phases. Cleaned all construction areas to avoid hazards. Mixed and laid concrete. Mixed mortar, plaster and grout according to standard formulas. Mentored junior team members, providing guidance on proper techniques and safety.
  • 8. Completed construction projects. Continually cleaned work areas and equipment. Arranged and stored materials, machines, tools and equipment. Transported materials, tools and machines to installation sites. Assisted large crews Tunnel Shifter September 2001 to July 2003 Obishyi /W.W. Clyde - Diamond Fork , Ut Completed all aspects of 4 miles of tunnel. Assisted skilled workers with construction projects in all phases. Cleaned all construction areas to avoid hazards. Mixed and laid concrete. Mixed mortar, plaster and grout according to standard formulas. Performed heavy labor such as ditch digging, paving and hauling. Completed construction projects. Continually cleaned work areas and equipment. Arranged and stored materials, machines, tools and equipment. Transported materials, tools and machines to installation sites. Assisted large crews General Tunnel superintendent July 2003 to September 2007 Drill Tech - Anitoch, Ca Excavated 3 wine caves Lattice giders shotcrete wires bolts. Drill and blasted 1 90 ft shaft. Refurbished 300 ft tunnel for Union Pacific Regrouted 300 tunnel for PG&E Shotcreted and regrouted 3 tunnels in San Francisco Excavted and shotcreted and drilled 120 ft shaft in Fair field Ca for water control. Refurbished 1 tunnel for union Pacific pulled timbers shotcrete and grout.
  • 9. Drilled shotcrete and wired soilnail walls in Las Vegas NV Several soil nail walls in between tunnel jobs in different cities. Assisted skilled workers with construction projects in all phases. Cleaned all construction areas to avoid hazards. Mixed and laid concrete. Mixed mortar, plaster and grout according to standard formulas. Performed heavy labor such as ditch digging, paving and hauling. Mentored junior team members, providing guidance on proper techniques and safety. Completed construction projects. Continually cleaned work areas and equipment. Arranged and stored materials, machines, tools and equipment. Transported materials, tools and machines to installation sites. Assisted large crews in erecting. Construction Foreman September 2007 to October 2008 Tracy Monks/Western States - Roosevelt , Ut residential sewer water Parking lots, fill Drill and blast oilfield locations Operated heavy equipment,blades trackhoe,backhoe,etc. Cleaned all construction areas to avoid hazards. Assisted skilled workers with construction projects in all phases. Mixed and laid concrete. Mixed mortar, plaster and grout according to standard formulas. Performed heavy labor such as ditch digging, paving and hauling. Mentored junior team members, providing guidance on proper techniques and safety. Completed construction projects. Continually cleaned work areas and equipment. Arranged and stored materials, machines, tools and equipment.
  • 10. Transported materials, tools and machines to installation sites. Assisted large crews. Foreman October 2008 to October 2013 Newfield - Myton, Ut Blade operator moved into lead position for construction of roads and locations. Assisted skilled workers with construction projects in all phases. Cleaned all construction areas to avoid hazards. Mentored junior team members, providing guidance on proper techniques and safety. Completed construction projects. Transported materials, tools and machines to installation sites. Assisted large crews. Lease operator/Foreman October 2013 to Current Fish's Oilfield - Roosevelt, Ut Pumper Flowback Education High School Diploma : General, 1986 Tabiona - Tabiona, UT, USA