ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
To Whom it May Concern:
I am seeking an HVAC Management or Lead HVAC Project Engineering position for marine,
industrial, military, healthcare, and commercial projects within the United States.
My varied career experience includes thirty plus years as an HVAC Project Manager, Lead
Engineer, and Design Engineer. Other experience also includes fire protection and plumbing
design. Each project has provided opportunities to excel in a team environment while leading
and assisting HVAC folks, coordinating with other disciplines, participating in client meetings,
providing site construction support, and creating contract documents (specifications, drawings,
and equipment schedules). The ultimate job satisfaction is obtained from executing and
completing a project with a great team and obtaining repeat client business.
There are many challenges and constantly changing priorities in my current engagement as a
lead HVAC marine engineer. Principal responsibilities include design and construction support
with large new offshore platforms living quarters (50,000 SF) and miscellaneous buildings
(18,000 SF). This assignment incorporates the HVAC discipline as one of the last disciplines
brought in to engineer and fully coordinate HVAC systems with other disciplines (electrical,
controls, fire and gas, life safety, structural) and client specific specifications in an expedited
schedule for all the HVAC deliverables (specifications, schedules, drawings, and reviewed
HVAC submittals). The expedited process is necessary to provide the HVAC systems
equipment (including all customized air cooled chillers, air handling units and air cooled
condensing units) for installation during assembly of the all seal welded metal buildings within
structural framed modules on the platform. The high profile status of this project requires
excellent written, speaking, and communication skills; superior organizational ability;
reprioritization of task work sometimes daily per evolving construction schedule demands; close
coordination with all affected disciplines; an attention to detail and big picture issues during the
project progression; and an general understanding of the major underlying platform processes
as these affect the HVAC system locations and operations. Truly this assignment has been one
of the most professionally rewarding and challenging in my career. Client satisfaction has been
so positive that I was assigned to a total of 3 new projects for new offshore platforms. This
multiple project assignment has been for 7 continuous years.
Please refer to my resume for a summary of other qualifications, achievements, experience, and
education. References and more detailed project experience are available on request.
As always, the best impression is face-to-face. I am hoping to meet with you at your earliest
convenience.
Best Regards,
Tom Johnson, P.E.

More Related Content

Viewers also liked (8)

Sw3 ÂÄšs•ø
Sw3 ÂÄšs•øSw3 ÂÄšs•ø
Sw3 ÂÄšs•ø
YumiMatsui
?
Advertising in disguise can you tell the difference
Advertising in disguise can you tell the differenceAdvertising in disguise can you tell the difference
Advertising in disguise can you tell the difference
Heba Hashem
?
Tabla multiplicar
Tabla multiplicarTabla multiplicar
Tabla multiplicar
kibagami64
?
§Ú§ã§ä§à§â§Ú§ñ §â§Ñ§Ù§Ó§Ú§ä§Ú§ñ §ã§à§Ó§Ö§ä§ã§Ü§à§Û §Ü§à§ã§Þ§à§ß§Ñ§Ó§ä§Ú§Ü§Ú
§Ú§ã§ä§à§â§Ú§ñ §â§Ñ§Ù§Ó§Ú§ä§Ú§ñ §ã§à§Ó§Ö§ä§ã§Ü§à§Û §Ü§à§ã§Þ§à§ß§Ñ§Ó§ä§Ú§Ü§Ú§Ú§ã§ä§à§â§Ú§ñ §â§Ñ§Ù§Ó§Ú§ä§Ú§ñ §ã§à§Ó§Ö§ä§ã§Ü§à§Û §Ü§à§ã§Þ§à§ß§Ñ§Ó§ä§Ú§Ü§Ú
§Ú§ã§ä§à§â§Ú§ñ §â§Ñ§Ù§Ó§Ú§ä§Ú§ñ §ã§à§Ó§Ö§ä§ã§Ü§à§Û §Ü§à§ã§Þ§à§ß§Ñ§Ó§ä§Ú§Ü§Ú
§¥§Ö§ß§Ú§ã §³§à§Ü§à§Ý§Ö§ß§Ü§à
?
Resume MV 2016 rev
Resume MV 2016 revResume MV 2016 rev
Resume MV 2016 rev
Manuel J Valido
?
Careers in Education - Independent Schools
Careers in Education - Independent SchoolsCareers in Education - Independent Schools
Careers in Education - Independent Schools
Peter Hunt
?
Aaker Brand Equity Model
Aaker Brand Equity Model Aaker Brand Equity Model
Aaker Brand Equity Model
Pawan Negi
?
§ª§ß§æ§Ñ§â§Ü§ä §Þ§Ú§à§Ü§Ñ§â§Õ§Ñ. §°§ã§ß§à§Ó§ß§í§Ö §á§Ñ§ä§à§Ô§Ö§ß§Ö§ä§Ú§é§Ö§ã§Ü§Ú§Ö §Þ§Ö§ç§Ñ§ß§Ú§Ù§Þ§í
§ª§ß§æ§Ñ§â§Ü§ä §Þ§Ú§à§Ü§Ñ§â§Õ§Ñ. §°§ã§ß§à§Ó§ß§í§Ö §á§Ñ§ä§à§Ô§Ö§ß§Ö§ä§Ú§é§Ö§ã§Ü§Ú§Ö §Þ§Ö§ç§Ñ§ß§Ú§Ù§Þ§í§ª§ß§æ§Ñ§â§Ü§ä §Þ§Ú§à§Ü§Ñ§â§Õ§Ñ. §°§ã§ß§à§Ó§ß§í§Ö §á§Ñ§ä§à§Ô§Ö§ß§Ö§ä§Ú§é§Ö§ã§Ü§Ú§Ö §Þ§Ö§ç§Ñ§ß§Ú§Ù§Þ§í
§ª§ß§æ§Ñ§â§Ü§ä §Þ§Ú§à§Ü§Ñ§â§Õ§Ñ. §°§ã§ß§à§Ó§ß§í§Ö §á§Ñ§ä§à§Ô§Ö§ß§Ö§ä§Ú§é§Ö§ã§Ü§Ú§Ö §Þ§Ö§ç§Ñ§ß§Ú§Ù§Þ§í
crasgmu
?
Advertising in disguise can you tell the difference
Advertising in disguise can you tell the differenceAdvertising in disguise can you tell the difference
Advertising in disguise can you tell the difference
Heba Hashem
?
Tabla multiplicar
Tabla multiplicarTabla multiplicar
Tabla multiplicar
kibagami64
?
§Ú§ã§ä§à§â§Ú§ñ §â§Ñ§Ù§Ó§Ú§ä§Ú§ñ §ã§à§Ó§Ö§ä§ã§Ü§à§Û §Ü§à§ã§Þ§à§ß§Ñ§Ó§ä§Ú§Ü§Ú
§Ú§ã§ä§à§â§Ú§ñ §â§Ñ§Ù§Ó§Ú§ä§Ú§ñ §ã§à§Ó§Ö§ä§ã§Ü§à§Û §Ü§à§ã§Þ§à§ß§Ñ§Ó§ä§Ú§Ü§Ú§Ú§ã§ä§à§â§Ú§ñ §â§Ñ§Ù§Ó§Ú§ä§Ú§ñ §ã§à§Ó§Ö§ä§ã§Ü§à§Û §Ü§à§ã§Þ§à§ß§Ñ§Ó§ä§Ú§Ü§Ú
§Ú§ã§ä§à§â§Ú§ñ §â§Ñ§Ù§Ó§Ú§ä§Ú§ñ §ã§à§Ó§Ö§ä§ã§Ü§à§Û §Ü§à§ã§Þ§à§ß§Ñ§Ó§ä§Ú§Ü§Ú
§¥§Ö§ß§Ú§ã §³§à§Ü§à§Ý§Ö§ß§Ü§à
?
Careers in Education - Independent Schools
Careers in Education - Independent SchoolsCareers in Education - Independent Schools
Careers in Education - Independent Schools
Peter Hunt
?
Aaker Brand Equity Model
Aaker Brand Equity Model Aaker Brand Equity Model
Aaker Brand Equity Model
Pawan Negi
?
§ª§ß§æ§Ñ§â§Ü§ä §Þ§Ú§à§Ü§Ñ§â§Õ§Ñ. §°§ã§ß§à§Ó§ß§í§Ö §á§Ñ§ä§à§Ô§Ö§ß§Ö§ä§Ú§é§Ö§ã§Ü§Ú§Ö §Þ§Ö§ç§Ñ§ß§Ú§Ù§Þ§í
§ª§ß§æ§Ñ§â§Ü§ä §Þ§Ú§à§Ü§Ñ§â§Õ§Ñ. §°§ã§ß§à§Ó§ß§í§Ö §á§Ñ§ä§à§Ô§Ö§ß§Ö§ä§Ú§é§Ö§ã§Ü§Ú§Ö §Þ§Ö§ç§Ñ§ß§Ú§Ù§Þ§í§ª§ß§æ§Ñ§â§Ü§ä §Þ§Ú§à§Ü§Ñ§â§Õ§Ñ. §°§ã§ß§à§Ó§ß§í§Ö §á§Ñ§ä§à§Ô§Ö§ß§Ö§ä§Ú§é§Ö§ã§Ü§Ú§Ö §Þ§Ö§ç§Ñ§ß§Ú§Ù§Þ§í
§ª§ß§æ§Ñ§â§Ü§ä §Þ§Ú§à§Ü§Ñ§â§Õ§Ñ. §°§ã§ß§à§Ó§ß§í§Ö §á§Ñ§ä§à§Ô§Ö§ß§Ö§ä§Ú§é§Ö§ã§Ü§Ú§Ö §Þ§Ö§ç§Ñ§ß§Ú§Ù§Þ§í
crasgmu
?

Similar to TJJ Linked in Cover Letter 3.19.16 (20)

T. Luoma_project_engineer_Instrumentation_Automation_controls
T. Luoma_project_engineer_Instrumentation_Automation_controlsT. Luoma_project_engineer_Instrumentation_Automation_controls
T. Luoma_project_engineer_Instrumentation_Automation_controls
Tero Luoma
?
TJJ Master Resume 4.08.16
TJJ Master Resume 4.08.16TJJ Master Resume 4.08.16
TJJ Master Resume 4.08.16
Tom Johnson
?
TJJ Linked In Resume 3.20.16
TJJ Linked In Resume 3.20.16TJJ Linked In Resume 3.20.16
TJJ Linked In Resume 3.20.16
Tom Johnson
?
mechenical engineer 123
mechenical engineer 123mechenical engineer 123
mechenical engineer 123
abdul suboor
?
Res414
Res414Res414
Res414
pgh35757
?
CV@JOMY NEW
CV@JOMY NEWCV@JOMY NEW
CV@JOMY NEW
Jomy Thalakkottur
?
Bio - Resume
Bio - ResumeBio - Resume
Bio - Resume
Steve Cruse
?
RESUME 06.01.2016......
RESUME  06.01.2016......RESUME  06.01.2016......
RESUME 06.01.2016......
Amirthalingam palanichamy
?
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
Nour Eldin Ahmed, AMIMechE
?
Braun
BraunBraun
Braun
N. Chad Braun
?
Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template
Dr. Mohamed A. El-Reedy
?
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar Sheikh
?
glossary-of-construction-terms.pdf
glossary-of-construction-terms.pdfglossary-of-construction-terms.pdf
glossary-of-construction-terms.pdf
CarlStevenAtencio
?
DHindmon_Resume2016
DHindmon_Resume2016DHindmon_Resume2016
DHindmon_Resume2016
DAVID HINDMON
?
CURRICULAM VITAE for Jomy@25-04-2016
CURRICULAM VITAE for Jomy@25-04-2016CURRICULAM VITAE for Jomy@25-04-2016
CURRICULAM VITAE for Jomy@25-04-2016
Jomy Thalakkottur
?
Integrated Approach To Health Facility Planning
Integrated Approach To Health Facility PlanningIntegrated Approach To Health Facility Planning
Integrated Approach To Health Facility Planning
Rick Jones
?
cv PERWEZ
cv PERWEZcv PERWEZ
cv PERWEZ
PERWEZ AKHTAR
?
cv PERWEZ
cv PERWEZcv PERWEZ
cv PERWEZ
PERWEZ AKHTAR
?
Gary Armstrong Resume-2
Gary Armstrong Resume-2Gary Armstrong Resume-2
Gary Armstrong Resume-2
Gary Armstrong
?
CHANGE ORDER MANAGEMENT TO PROJECT SUCCESS
CHANGE ORDER MANAGEMENT TO PROJECT SUCCESSCHANGE ORDER MANAGEMENT TO PROJECT SUCCESS
CHANGE ORDER MANAGEMENT TO PROJECT SUCCESS
Ashok Kumar Suwalka
?
T. Luoma_project_engineer_Instrumentation_Automation_controls
T. Luoma_project_engineer_Instrumentation_Automation_controlsT. Luoma_project_engineer_Instrumentation_Automation_controls
T. Luoma_project_engineer_Instrumentation_Automation_controls
Tero Luoma
?
TJJ Master Resume 4.08.16
TJJ Master Resume 4.08.16TJJ Master Resume 4.08.16
TJJ Master Resume 4.08.16
Tom Johnson
?
TJJ Linked In Resume 3.20.16
TJJ Linked In Resume 3.20.16TJJ Linked In Resume 3.20.16
TJJ Linked In Resume 3.20.16
Tom Johnson
?
mechenical engineer 123
mechenical engineer 123mechenical engineer 123
mechenical engineer 123
abdul suboor
?
Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template
Dr. Mohamed A. El-Reedy
?
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar Sheikh
?
glossary-of-construction-terms.pdf
glossary-of-construction-terms.pdfglossary-of-construction-terms.pdf
glossary-of-construction-terms.pdf
CarlStevenAtencio
?
CURRICULAM VITAE for Jomy@25-04-2016
CURRICULAM VITAE for Jomy@25-04-2016CURRICULAM VITAE for Jomy@25-04-2016
CURRICULAM VITAE for Jomy@25-04-2016
Jomy Thalakkottur
?
Integrated Approach To Health Facility Planning
Integrated Approach To Health Facility PlanningIntegrated Approach To Health Facility Planning
Integrated Approach To Health Facility Planning
Rick Jones
?
CHANGE ORDER MANAGEMENT TO PROJECT SUCCESS
CHANGE ORDER MANAGEMENT TO PROJECT SUCCESSCHANGE ORDER MANAGEMENT TO PROJECT SUCCESS
CHANGE ORDER MANAGEMENT TO PROJECT SUCCESS
Ashok Kumar Suwalka
?

TJJ Linked in Cover Letter 3.19.16

  • 1. To Whom it May Concern: I am seeking an HVAC Management or Lead HVAC Project Engineering position for marine, industrial, military, healthcare, and commercial projects within the United States. My varied career experience includes thirty plus years as an HVAC Project Manager, Lead Engineer, and Design Engineer. Other experience also includes fire protection and plumbing design. Each project has provided opportunities to excel in a team environment while leading and assisting HVAC folks, coordinating with other disciplines, participating in client meetings, providing site construction support, and creating contract documents (specifications, drawings, and equipment schedules). The ultimate job satisfaction is obtained from executing and completing a project with a great team and obtaining repeat client business. There are many challenges and constantly changing priorities in my current engagement as a lead HVAC marine engineer. Principal responsibilities include design and construction support with large new offshore platforms living quarters (50,000 SF) and miscellaneous buildings (18,000 SF). This assignment incorporates the HVAC discipline as one of the last disciplines brought in to engineer and fully coordinate HVAC systems with other disciplines (electrical, controls, fire and gas, life safety, structural) and client specific specifications in an expedited schedule for all the HVAC deliverables (specifications, schedules, drawings, and reviewed HVAC submittals). The expedited process is necessary to provide the HVAC systems equipment (including all customized air cooled chillers, air handling units and air cooled condensing units) for installation during assembly of the all seal welded metal buildings within structural framed modules on the platform. The high profile status of this project requires excellent written, speaking, and communication skills; superior organizational ability; reprioritization of task work sometimes daily per evolving construction schedule demands; close coordination with all affected disciplines; an attention to detail and big picture issues during the project progression; and an general understanding of the major underlying platform processes as these affect the HVAC system locations and operations. Truly this assignment has been one of the most professionally rewarding and challenging in my career. Client satisfaction has been so positive that I was assigned to a total of 3 new projects for new offshore platforms. This multiple project assignment has been for 7 continuous years. Please refer to my resume for a summary of other qualifications, achievements, experience, and education. References and more detailed project experience are available on request. As always, the best impression is face-to-face. I am hoping to meet with you at your earliest convenience. Best Regards, Tom Johnson, P.E.