際際滷

際際滷Share a Scribd company logo
CURRICULUM VITAE
NAME: Wayne Alan Vause DATE OF BIRTH:27/02/69
NATIONALITY: British
TELEPHONE
07811190428
QUALIFICATIONS:
NVQ Level 3  Erecting Capital Steel Structures
D32 / D33 ECITB Training Assessor Certificates
Appointed Person  Management Of Lifting Operations
ACE Card
IOSH  Human Performance Management
A skilled and enthusiastic individual with extensive experience within the construction industry, confident and
versatile with far-reaching and varied expertise across the engineering construction, nuclear, thermal, oil &
gas and renewable energy sectors with an in-depth understanding of a range of
detailed business principles and practices.
Acknowledged as a highly focused and committed individual, able to develop and maintain strong working
relationships at all levels of seniority, including client, authorities and internal personnel, and in turn motivate
teams towards the successful execution of shared objectives.
PROFESSIONAL TRAINING
 Critical Task  Lifting Operations Date 21/11/13 Expires
21/11/16
 First Aid at Work Date 15/05/12 Expires
15/05/15
 Safe use, inspection & storage of Safety Harnesses Date 04/05/11 Expires
04/05/14
 Critical Task  Process Date 04/04/11
 Basic Lifting Equipment Inspection Date 28/01/10
 ECITB Module 3B Date 22/10/09
 ECITB Module 3A Date 20/10/09
 ECITB Module 2B Date 08/10/09
 ECITB Module 2A Date 06/10/09
 NPORS Card Date 31/07/09
 Central Branch Induction Date 31/03/08
 Supervising Safely Date 01/03/09
 Safe Working At Height Date 13/06/07
 TECSkills Coaching Workshop Date 20/11/06
 Safety Harness Training Date 11/10/0
 Scaffold Appreciation Course Date 07/07/04
 Risk Assessment Date 15/04/04
 Supervisor & Section Engineers Course Date 08/04/04
 Section Engineering Course Date 05/04/04
 ECITB  Practical Supervision Date 12/01/04
 Fork Lift  Multi discipline Date 01/11/96
Vause Wayne - 6829
DOOSAN BABCOCK  APRIL 2002 to PRESENT
( Breakdown of service )
DATES LOCATION EXPERIENCE
Nov 13 - Present
Sep 13  Nov 13
West Burton
Shell Stanlow
Section Engineer
Sites nominated Appointed person/Lifting
engineer responsible for planning and
execution of complete CMV pipe work
removal and replacement including
method statements risk assessments and
lift plans
Section Engineer
Night shift crane/lift co-ordination rigging
engineer, removal/replacement off various
parts of plant including top & tail of 45 te
cat cooler
Mar 13  Sep 13 Ratcliffe BSW Section Engineer
In charge of removal/replacement of
burners, pulverised fuel pipework major
outage, overhaul
Jul 12  Mar 13 Ironbridge Section Engineer
Sites Nominated Appointed Person,
Responsible for all lifting operations,
producing lift plans method statements
risk assessments etc. Overseeing
subcontract works. Installation of hammer
mills, air filters, pipe work, Duct work,
burner and pf pipe work overhaul.
Jan 09  Jul 12 Ratcliffe Section Engineer
Sites nominated Appointed person in
charge of all lifts
Ducting and Reactor build, responsible for
construction, loading, transportation &
installation with sections up to 90 tonne
with use of 2200 tonne PTR crane
Oct 08  Jan 09 Selby Office Training Assessor
Assessing trainees to achieve NVQ
Qualification, carry out learner progress
reviews, set targets to achieve deadlines.
DOOSAN BABCOCK  APRIL 2002 to PRESENT
( Breakdown of service )
Nov 07  Oct 08 Corus Scunthorpe
Site Manager
Installation of steam and air pipework,
erection of flare stacks, erection of steel
work day to day running of site
Jun 07  Nov 07 Drax Section Engineer
In charge of removal/replacement of
burners, pulverised fuel pipework major
outage, overhaul
Aug 06  Jun 07 Victrex Rigging Supervisor
Lifting into position all vessels and
pipework for the project including co-
ordination of crane for heavy lifts up to
250T.
Feb  July 06 Drax Supervisor
In charge of removal and renewal of low
nox burners, pulverised fuel pipework.
November 05  Feb
06
Lindsey Oil Refinery ECITB ACE
Assessing existing workers.
August  November
05
Tilbury SubContracts Engineer
In charge of removal and renewal of
condensers, burners, pulverised fuel
pipework, ash hopper expansion joints,
primary air, forced draught ducting.
May  August 05 Drax Power Station Supervisor
In charge of removal and renewal of low
nox burners, pulverised fuel pipework.
Nov 04  May 05 Edmonton Power Station Supervisor
Responsible for removal and renewal of
main feed hoppers and 12 tonne rollers,
erection of ductings, steelwork and
renewal of gearboxes.
March  November
04
Drax Power Station Supervisor
Responsible for removal and renewal of
pulverised fuel pipework.
April 03  March 04 Novartis, Grimsby Supervisor
Involved in new build of a pharmaceutical
plant including steel erection installation
of heavy plant and equipment, various
pipe racks and lines.
December 02 
April 03
NRG Killingholme PS Chargehand
Inspection of Unit 1 works including strip
down and overhaul of combustor gas
turbine, compressor and generator. Also
responsible for assessing trainees in
pursuit of NVQs.
November 
December 02
Ferrybridge C PS Chargehand Rigger
Involved with site establishment,
supervising the erection of temporary
accommodation, also responsible for
assessing trainees in their pursuit of
NVQs.
October 
November 02
Total Oil Refinery, Vlissingen,
Holland
Chargehand Rigger
Installation of 84 burners, 44 tonne
header, outlet pigtails and catalyst tubes.
Responsible for assessing trainees in
pursuit of NVQs.
September 
October 02
Conoco  Humber Refinery Chargehand Rigger
Clean Fuels Plant  installation of new
pipework [2OD  60OD] and valves.
Also responsible for trainees in their
pursuit of NVQs.
August 
September 02
Drax Power Station Chargehand Rigger
Responsible for assessing existing
workers in their pursuit of National
Vocational Qualifications. This was the
ECITB / Doosan Babcock pilot scheme for
Assuring Competence in Engineering
[ACE].
August 02 Keadby CCGT PS
Chargehand Rigger
Responsible for assessing existing
workers in their pursuit of National
Vocational Qualifications. This was the
ECITB / Doosan Babcock pilot scheme for
Assuring Competence in Engineering
[ACE].
July  August 02 Drax Power Station Chargehand Rigger
Responsible for removal, inspection and
reinstallation of new and existing
pulverised fuel pipework and removal,
overhaul and replacement of burners.
Also for assessing existing workers in
their pursuit of National Vocational
Qualifications  this was the ECITB /
Doosan Babcock pilot scheme for
Assuring Competence in Engineering
[ACE].
April  July 02 Ferrybridge C PS Chargehand Rigger
Total renewal of bottom bank elements
and selective renewal of top bank
elements.
Also for assessing existing workers in
their pursuit of National Vocational
Qualifications  this was the ECITB /
Doosan Babcock pilot scheme for
Assuring Competence in Engineering
[ACE].
Jan 02  Apr 02 Drax Chargehand Rigger
Pre outage works including establishment
of outage storage area and off loading of
replacement elements.
PRIOR EXPERIENCE AT DOOSAN BABCOCK
November 97  Oct
01
Various sites Chargehand Rigger
Working on various sites in the UK  Coal
fired / nuclear / petrochem/ steelworks.
May 95  November
97
UK Sites Rigger
Worked on various sites in the UK
including Thornhill CCGT PS and Drax
PS; HumberBank and Teesside.
January 91  May
95 NER Sites + Castle Peak PS,
Hong Kong.
Trainee Rigger
Gaining experience on a variety of power
stations, refineries and steelworks
including Castle Peak PS in Hong Kong.
September 2013

More Related Content

What's hot (20)

A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
Abdel Sattar Bugti [Al Balushi]
Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)
Eduardo Parisca
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
Abdel Sattar Bugti [Al Balushi]
Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)
Nitin Lonkar
Sobhy C V 2015 Rev Q S
Sobhy C V  2015 Rev  Q S  Sobhy C V  2015 Rev  Q S
Sobhy C V 2015 Rev Q S
sobhey ahmed
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
Tarun Sharna
CV - AGK LinkedIn
CV - AGK LinkedInCV - AGK LinkedIn
CV - AGK LinkedIn
Anteneh Getachew Getachew
GEC presentation
GEC  presentationGEC  presentation
GEC presentation
rickyhargrove
RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527
Rob Smith
John Benson CV 2016 1
John Benson CV 2016 1John Benson CV 2016 1
John Benson CV 2016 1
John Benson
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
Karl Keller
John Benson CV 2016 1
John Benson CV 2016 1John Benson CV 2016 1
John Benson CV 2016 1
John Benson
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
Jefferson Tomas Tulabot
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
Abdel Sattar Bugti [Al Balushi]
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
Edward Byrne
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey Australia
MichaelUberti
Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015
Shahzad Mughal
Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15
Mike Syslak
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
surajit das
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland
Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)
Eduardo Parisca
Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)
Nitin Lonkar
Sobhy C V 2015 Rev Q S
Sobhy C V  2015 Rev  Q S  Sobhy C V  2015 Rev  Q S
Sobhy C V 2015 Rev Q S
sobhey ahmed
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
Tarun Sharna
RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527
Rob Smith
John Benson CV 2016 1
John Benson CV 2016 1John Benson CV 2016 1
John Benson CV 2016 1
John Benson
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
Karl Keller
John Benson CV 2016 1
John Benson CV 2016 1John Benson CV 2016 1
John Benson CV 2016 1
John Benson
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
Edward Byrne
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey Australia
MichaelUberti
Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015
Shahzad Mughal
Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15
Mike Syslak
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
surajit das
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland

Similar to Vause Wayne - 6829 (20)

peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017
Peter Fitzpatrick
Stephen Brooks CV
Stephen Brooks CVStephen Brooks CV
Stephen Brooks CV
Stephen Brooks (s.brooks1863@gmail.com and 07773021741)
TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015
Terry Barwick
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
TREVOR KEMP
stevenfrench_coordinator
stevenfrench_coordinatorstevenfrench_coordinator
stevenfrench_coordinator
steven french
scooby cv4
scooby cv4scooby cv4
scooby cv4
lea thomas murdoch
Russell bruce cv 2016.
Russell bruce cv 2016.Russell bruce cv 2016.
Russell bruce cv 2016.
Russell Bruce
C.V.
C.V.C.V.
C.V.
Kenny Taylor
CV - Martin Bennie- commissioning manager
CV - Martin Bennie-  commissioning managerCV - Martin Bennie-  commissioning manager
CV - Martin Bennie- commissioning manager
Martin Bennie
sharndencv
sharndencvsharndencv
sharndencv
Shaun Harnden
CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014
Manuel Bartilotti
Phillips Howard
Phillips HowardPhillips Howard
Phillips Howard
Howard Phillips
richie CV 2015
richie CV 2015richie CV 2015
richie CV 2015
Richie Hackett
richie CV 2015
richie CV 2015richie CV 2015
richie CV 2015
Richie Hackett
cv march 2014
cv march 2014cv march 2014
cv march 2014
kevin Norton
Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland
Stephen Jones October 2016
Stephen Jones October 2016Stephen Jones October 2016
Stephen Jones October 2016
Stephen Jones
Arun Resume .
Arun Resume .Arun Resume .
Arun Resume .
Arun (kurup)
Darrell Resume2014
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
Darrell Darrell
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
Stewart Kane

Vause Wayne - 6829

  • 1. CURRICULUM VITAE NAME: Wayne Alan Vause DATE OF BIRTH:27/02/69 NATIONALITY: British TELEPHONE 07811190428
  • 2. QUALIFICATIONS: NVQ Level 3 Erecting Capital Steel Structures D32 / D33 ECITB Training Assessor Certificates Appointed Person Management Of Lifting Operations ACE Card IOSH Human Performance Management A skilled and enthusiastic individual with extensive experience within the construction industry, confident and versatile with far-reaching and varied expertise across the engineering construction, nuclear, thermal, oil & gas and renewable energy sectors with an in-depth understanding of a range of detailed business principles and practices. Acknowledged as a highly focused and committed individual, able to develop and maintain strong working relationships at all levels of seniority, including client, authorities and internal personnel, and in turn motivate teams towards the successful execution of shared objectives. PROFESSIONAL TRAINING Critical Task Lifting Operations Date 21/11/13 Expires 21/11/16 First Aid at Work Date 15/05/12 Expires 15/05/15 Safe use, inspection & storage of Safety Harnesses Date 04/05/11 Expires 04/05/14 Critical Task Process Date 04/04/11 Basic Lifting Equipment Inspection Date 28/01/10 ECITB Module 3B Date 22/10/09 ECITB Module 3A Date 20/10/09 ECITB Module 2B Date 08/10/09 ECITB Module 2A Date 06/10/09 NPORS Card Date 31/07/09 Central Branch Induction Date 31/03/08 Supervising Safely Date 01/03/09 Safe Working At Height Date 13/06/07 TECSkills Coaching Workshop Date 20/11/06 Safety Harness Training Date 11/10/0 Scaffold Appreciation Course Date 07/07/04 Risk Assessment Date 15/04/04 Supervisor & Section Engineers Course Date 08/04/04 Section Engineering Course Date 05/04/04 ECITB Practical Supervision Date 12/01/04 Fork Lift Multi discipline Date 01/11/96
  • 4. DOOSAN BABCOCK APRIL 2002 to PRESENT ( Breakdown of service ) DATES LOCATION EXPERIENCE Nov 13 - Present Sep 13 Nov 13 West Burton Shell Stanlow Section Engineer Sites nominated Appointed person/Lifting engineer responsible for planning and execution of complete CMV pipe work removal and replacement including method statements risk assessments and lift plans Section Engineer Night shift crane/lift co-ordination rigging engineer, removal/replacement off various parts of plant including top & tail of 45 te cat cooler Mar 13 Sep 13 Ratcliffe BSW Section Engineer In charge of removal/replacement of burners, pulverised fuel pipework major outage, overhaul Jul 12 Mar 13 Ironbridge Section Engineer Sites Nominated Appointed Person, Responsible for all lifting operations, producing lift plans method statements risk assessments etc. Overseeing subcontract works. Installation of hammer mills, air filters, pipe work, Duct work, burner and pf pipe work overhaul. Jan 09 Jul 12 Ratcliffe Section Engineer Sites nominated Appointed person in charge of all lifts Ducting and Reactor build, responsible for construction, loading, transportation & installation with sections up to 90 tonne with use of 2200 tonne PTR crane Oct 08 Jan 09 Selby Office Training Assessor Assessing trainees to achieve NVQ Qualification, carry out learner progress reviews, set targets to achieve deadlines.
  • 5. DOOSAN BABCOCK APRIL 2002 to PRESENT ( Breakdown of service ) Nov 07 Oct 08 Corus Scunthorpe Site Manager Installation of steam and air pipework, erection of flare stacks, erection of steel work day to day running of site Jun 07 Nov 07 Drax Section Engineer In charge of removal/replacement of burners, pulverised fuel pipework major outage, overhaul Aug 06 Jun 07 Victrex Rigging Supervisor Lifting into position all vessels and pipework for the project including co- ordination of crane for heavy lifts up to 250T. Feb July 06 Drax Supervisor In charge of removal and renewal of low nox burners, pulverised fuel pipework.
  • 6. November 05 Feb 06 Lindsey Oil Refinery ECITB ACE Assessing existing workers. August November 05 Tilbury SubContracts Engineer In charge of removal and renewal of condensers, burners, pulverised fuel pipework, ash hopper expansion joints, primary air, forced draught ducting. May August 05 Drax Power Station Supervisor In charge of removal and renewal of low nox burners, pulverised fuel pipework. Nov 04 May 05 Edmonton Power Station Supervisor Responsible for removal and renewal of main feed hoppers and 12 tonne rollers, erection of ductings, steelwork and renewal of gearboxes. March November 04 Drax Power Station Supervisor Responsible for removal and renewal of pulverised fuel pipework. April 03 March 04 Novartis, Grimsby Supervisor Involved in new build of a pharmaceutical plant including steel erection installation of heavy plant and equipment, various pipe racks and lines. December 02 April 03 NRG Killingholme PS Chargehand Inspection of Unit 1 works including strip down and overhaul of combustor gas turbine, compressor and generator. Also responsible for assessing trainees in pursuit of NVQs. November December 02 Ferrybridge C PS Chargehand Rigger Involved with site establishment, supervising the erection of temporary accommodation, also responsible for assessing trainees in their pursuit of NVQs. October November 02 Total Oil Refinery, Vlissingen, Holland Chargehand Rigger Installation of 84 burners, 44 tonne header, outlet pigtails and catalyst tubes. Responsible for assessing trainees in pursuit of NVQs.
  • 7. September October 02 Conoco Humber Refinery Chargehand Rigger Clean Fuels Plant installation of new pipework [2OD 60OD] and valves. Also responsible for trainees in their pursuit of NVQs. August September 02 Drax Power Station Chargehand Rigger Responsible for assessing existing workers in their pursuit of National Vocational Qualifications. This was the ECITB / Doosan Babcock pilot scheme for Assuring Competence in Engineering [ACE]. August 02 Keadby CCGT PS Chargehand Rigger Responsible for assessing existing workers in their pursuit of National Vocational Qualifications. This was the ECITB / Doosan Babcock pilot scheme for Assuring Competence in Engineering [ACE]. July August 02 Drax Power Station Chargehand Rigger Responsible for removal, inspection and reinstallation of new and existing pulverised fuel pipework and removal, overhaul and replacement of burners. Also for assessing existing workers in their pursuit of National Vocational Qualifications this was the ECITB / Doosan Babcock pilot scheme for Assuring Competence in Engineering [ACE]. April July 02 Ferrybridge C PS Chargehand Rigger Total renewal of bottom bank elements and selective renewal of top bank elements. Also for assessing existing workers in their pursuit of National Vocational Qualifications this was the ECITB / Doosan Babcock pilot scheme for Assuring Competence in Engineering [ACE]. Jan 02 Apr 02 Drax Chargehand Rigger Pre outage works including establishment of outage storage area and off loading of replacement elements.
  • 8. PRIOR EXPERIENCE AT DOOSAN BABCOCK November 97 Oct 01 Various sites Chargehand Rigger Working on various sites in the UK Coal fired / nuclear / petrochem/ steelworks. May 95 November 97 UK Sites Rigger Worked on various sites in the UK including Thornhill CCGT PS and Drax PS; HumberBank and Teesside. January 91 May 95 NER Sites + Castle Peak PS, Hong Kong. Trainee Rigger Gaining experience on a variety of power stations, refineries and steelworks including Castle Peak PS in Hong Kong. September 2013