ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
KHALID ZERROUKI: Well Test Supervisor  Petroleum Engineer
CIVIL SATUT AND CONTACT:
Date of birth: Oct 07th; 1982 Place of birth: Ouargla-Algeria.
Nationality: Algerian Availability: now.
Email: khaledp2006@yahoo.fr Phone?: +213662795557 +213663044486
DIPLOMATS:
? 2001 ¨C 2006: Petroleum Engineer from Boumerdes (Algeria)
university (option: Oil and gas production engineering).
? Final Project: well testing and their interpretations.
? 1998 ¨C 2001 Bachelors of science with good mention.
TRAININGS
? Surface well testing from Weatherford Dubai.
? New Hire Separation Orientation - Well Testing.
? Oilfield basic calculations.
? Safety awareness (H2S+Pressure¡­¡­.).at (BOOTS&COOTS).
? Manual handling.
? Job Safety Analysis / Hazard ID.
? Environmental Induction.
? EEP Competency Assessment.
? Essentials for Enterprise Excellence. Others.
PROFESSIONEL EXPERIENCE:
? Mrach 2016 till now :
KHALID ZERROUKI: Well Test Supervisor  Petroleum Engineer
Well testing service specialist with Oil Consultant OC99: Working
with Halliburton Algeria for rigless jobs.
? December 2014till Nov 2015:
Well Test Supervisor at Tetra Technologies ¨C Saudi Arabia :
Reference: Mr. Farid Bourougaa : Quality manager
fbourougaa@tetratec.com
? Lead a well test team during the well test operation onshore and insure
the well going of the operation steps respecting the client program and the
company procedures and HSE procedures and documentation, on site
Responsible for correct equipment being shipped and arriving on site for
the job or job type to be undertaken. Correct and complete inventory of
equipment recorded via material transfers and tickets upon delivery to and
receipt from The rig site.The final report of each job should be submitted in
a correct form.
? Jobs and operations:
? Well test Full package jobs high pressure & high temperature & H2S
gas (Logging + Drill stem test + surface equipments+ coiled tubing +
slick line).
? Clean up jobs , Frac acidification jobs, stimulations jobs.
? SMS (Sand Management System): using Deasander and Sand filter.
? WTS with Frac acidification jobs, stimulations jobs.
? DST jobs (Drill Stem Test).
? Inline tests and oil measuring tests.
? N2 jobs.
? High pressure jobs (15k, 10k psia).
? High H2S concentration (600 000 ppm)
? Base job (instrumentation and maintenance and job preparations).
? ESP wells, inline well test in ESP wells and function test.
? WTS with Gas lift wells.
? WTS with Dual completion wells (tubing short and tubing long)
KHALID ZERROUKI: Well Test Supervisor  Petroleum Engineer
? 2012 October till Jun 2014:
Well Test Supervisor at SPETCO Kuwait (Safwan Petroleum
Technologies Company) (KOC Kuwait Oil Company is our
customer):
Reference: Mr. V.V George, senior well test supervisor;
vvarghese@spetco.com
? Perform Daily GOR test, high pressure & high temperature & H2S gas
for different types of wells: Natural flow wells, ESP wells, PCP
wells, gas lift wells, rig jobs. Mostly conducting a heavy oil well (16 to
60 API oil density).
? N2 Jobs.
? August 2009 till January 2013:
Well test Supervisor in Weatherford Algeria:
Refernce: Mr. Chris Gnutel country manager;
Chris.Gnutel@eu.weatherford.com
? Well test Full package jobs (Logging + Drill stem test + surface
equipments+ coiled tubing + slick line).
? Prior to mobilization equipment from base to location we have to
check materials and equipment availability and we have to ensure
that all pressure control equipment have been approved and
certified (All pressure tests of individual equipment to must been
conducted to maximum allowable working pressure, in the yard).
? Mobilization from/to location;
? Rig up of surface well testing equipments (prepared all the paper work before
to start the rig up or to start any work). Flowfead+ SSV+ coeflexip+ choke
manifold+ separator+ tank+ oil manifold+ gas manifold+ transfer-
pump+ flare arrestor;
KHALID ZERROUKI: Well Test Supervisor  Petroleum Engineer
? Pressure test all surface well testing equipments (All pressure tests shall be
done for 15min and must be witnessed by the client company representatives
and recorded).
? Clean-up well;
? Separation by three chokes successively;
? Buildup;
? Reverse circulating;
? Rig down all surface well test equipment;
? Supervise the well test crew;
? Prepare execute and close all the paperwork;
? Prepare the well test job report wish must contain all details of the job, and all
the results of the test;
? Ensures that all QHSE issues are followed during operational
activity, and
? Jun 2007 to May 2009:
Well service engineer at SONATRACH (Algeria oilfield customer ):
? Well test operations (Inline test and DST);
? Snubbing operations (RIN and POOH Concentric, clean wells, workover,
change wells completion, fishing, scrapage¡­)
EQUIPMENTS:
? Surface safety valve 10 k, 15 k psi.
? Choke manifold 10 k, 15 k with different valves constructor
(WOM,Cameron,FMC ..
? Expandable choke 10 k, 15 k psi.
? Flow head 10 k, 15 k psi.
? Coeflexip hoses with hob connection or hummer union 10 k, 15 k psi.
? Sand filters and desanders 10 k, 15 k psi.
? Pipes with different pressure rating and different sizes and different
KHALID ZERROUKI: Well Test Supervisor  Petroleum Engineer
constructor.
(15k, 10k, 5k, 2k) (2¡±, 3¡±, 4¡±, 6¡±).
? 5 ways diverter (oil manifold) and 2 ways diverter (gas manifold).
? 3 phase¡¯s separator 1440psi and 2160psi.
? Surge tank and shrinkage tester or vertical separators.
? High pressure pumps and centrifuges pumps, texteam pumps for chemical
injection and triplex doublex pumps.
? H2S services burner.
? Hydrometers and digital densimeter.
? Gate valves, ball valves, autoclave valves, needle valves, lo torque valves.
? Electrical and manual centrifuges for basic sediments and water BSW.
? Senior orifice meter (Daniel box).
? ESD panel.
? Laboratory equipments (Salinity measurement, PH measurement, H2S and
CO2¡­.).
SKILLS:
Computer and Microsoft
office
: Expert
Staff communication
English Good
More than 10 years on field and
administration (training of communication,
change management, team management )
French Good
Arabic Good
DIVERS
? Actif, Dynamic, Motivating,. . .
KHALID ZERROUKI: Well Test Supervisor  Petroleum Engineer
? Have a sense of responsibility and integrated easily.
? The practice of several sports.
? Passport and Algerian driving license: Available.
? Available anytime and anywhere.
? Sociable.
KHALID ZERROUKI: Well Test Supervisor  Petroleum Engineer
? Have a sense of responsibility and integrated easily.
? The practice of several sports.
? Passport and Algerian driving license: Available.
? Available anytime and anywhere.
? Sociable.

More Related Content

What's hot (16)

Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher
?
CV. P.S.MANJUNATHAN
CV. P.S.MANJUNATHANCV. P.S.MANJUNATHAN
CV. P.S.MANJUNATHAN
P.S. Manjunathan
?
Esab Autrod.PDF
Esab Autrod.PDFEsab Autrod.PDF
Esab Autrod.PDF
Esmail Moqadam
?
AhMED ABOU HAMED CV
AhMED ABOU HAMED  CVAhMED ABOU HAMED  CV
AhMED ABOU HAMED CV
Eng:Ahmed Abou Hamed
?
Steven Wilson CV New
Steven Wilson CV NewSteven Wilson CV New
Steven Wilson CV New
Steven Wilson
?
LINGAM
LINGAMLINGAM
LINGAM
Paramartha Lingom
?
William Grant c.v Jan 2016
William Grant c.v Jan 2016William Grant c.v Jan 2016
William Grant c.v Jan 2016
william grant
?
CV(Heo_Taejun)
CV(Heo_Taejun)CV(Heo_Taejun)
CV(Heo_Taejun)
Johnny(Taejun) Heo
?
Nagarajan Saravanan
Nagarajan SaravananNagarajan Saravanan
Nagarajan Saravanan
Nagarajan Saravanan
?
Nookaraju - CV
Nookaraju - CVNookaraju - CV
Nookaraju - CV
Nookaraju malle
?
Non-Destructive Testing: Using the Maturity Method & Alternatives to Coring
Non-Destructive Testing: Using the Maturity Method & Alternatives to CoringNon-Destructive Testing: Using the Maturity Method & Alternatives to Coring
Non-Destructive Testing: Using the Maturity Method & Alternatives to Coring
Jill Reeves
?
Project for OP70 operation missing- Camshaft machining
Project for OP70 operation missing- Camshaft machiningProject for OP70 operation missing- Camshaft machining
Project for OP70 operation missing- Camshaft machining
kamlashish Goswami
?
Recent Trends in Pile Foundations Auger Cast Piles for Low Noise / Low Vibration
Recent Trends in Pile Foundations Auger Cast Piles for Low Noise / Low VibrationRecent Trends in Pile Foundations Auger Cast Piles for Low Noise / Low Vibration
Recent Trends in Pile Foundations Auger Cast Piles for Low Noise / Low Vibration
American Society of Civil Engineers, Orange County Branch
?
shoukat ali zaki
shoukat ali zakishoukat ali zaki
shoukat ali zaki
shoukat ali zaki
?
E&I QC ENGINEER
E&I QC ENGINEERE&I QC ENGINEER
E&I QC ENGINEER
muhammad shoaib khan
?
rakkesh UPDATED CV(1)
rakkesh UPDATED CV(1)rakkesh UPDATED CV(1)
rakkesh UPDATED CV(1)
trakkesh thangavel
?

Similar to Zerrouki Khalid CV (20)

Commissioning Supervisor New
Commissioning Supervisor NewCommissioning Supervisor New
Commissioning Supervisor New
Joseph Jaiwin Das
?
HARIDI CV2015
HARIDI CV2015HARIDI CV2015
HARIDI CV2015
ahmed haridi
?
CV of AKRAM (2)
CV of AKRAM (2)CV of AKRAM (2)
CV of AKRAM (2)
akram eladeab
?
Chidambaram_cv
Chidambaram_cvChidambaram_cv
Chidambaram_cv
s.chidambaram saravanan
?
EKPRANGAREDDY2016
EKPRANGAREDDY2016EKPRANGAREDDY2016
EKPRANGAREDDY2016
Ekp Reddy
?
Roshdy Heikal _ CV 2015
Roshdy Heikal _ CV 2015Roshdy Heikal _ CV 2015
Roshdy Heikal _ CV 2015
Roshdy Heikal
?
Hc petroleum equipment_Manufacturer of surface test equipment for oil and gas...
Hc petroleum equipment_Manufacturer of surface test equipment for oil and gas...Hc petroleum equipment_Manufacturer of surface test equipment for oil and gas...
Hc petroleum equipment_Manufacturer of surface test equipment for oil and gas...
ssuserd552b4
?
Field Production Operator CV
Field Production Operator CVField Production Operator CV
Field Production Operator CV
Muhammad Naeem Shahzad
?
MINNAL MANI PROD TECH CV 2012
MINNAL MANI PROD TECH CV 2012MINNAL MANI PROD TECH CV 2012
MINNAL MANI PROD TECH CV 2012
Minnal Mani
?
Mechanical cv
Mechanical cvMechanical cv
Mechanical cv
Umar Faruque
?
Rafik's CV
Rafik's CVRafik's CV
Rafik's CV
RAFIK ELLAYEH
?
MR. Akhlaq Mohsin.pptx
MR. Akhlaq Mohsin.pptxMR. Akhlaq Mohsin.pptx
MR. Akhlaq Mohsin.pptx
RANA AKHLAQ MOHSIN
?
01-Mamdouh CV-2015
01-Mamdouh CV-201501-Mamdouh CV-2015
01-Mamdouh CV-2015
Mamdouh Youssef
?
HAREESH PILLAI S
HAREESH PILLAI SHAREESH PILLAI S
HAREESH PILLAI S
Hareesh Pillai
?
Chidambaram_cv sr,mech
Chidambaram_cv sr,mechChidambaram_cv sr,mech
Chidambaram_cv sr,mech
s.chidambaram saravanan
?
MAMDOUH_CV
MAMDOUH_CVMAMDOUH_CV
MAMDOUH_CV
mohamed elgohary
?
navjay
navjaynavjay
navjay
baskaran sanjeevi
?
AJITHKUMAR -Lead Production Operator
AJITHKUMAR -Lead Production OperatorAJITHKUMAR -Lead Production Operator
AJITHKUMAR -Lead Production Operator
Ajith Kumar
?
m.bendris
m.bendrism.bendris
m.bendris
mohamed bendris
?
anil
anilanil
anil
anil chauhan
?

Zerrouki Khalid CV

  • 1. KHALID ZERROUKI: Well Test Supervisor Petroleum Engineer CIVIL SATUT AND CONTACT: Date of birth: Oct 07th; 1982 Place of birth: Ouargla-Algeria. Nationality: Algerian Availability: now. Email: khaledp2006@yahoo.fr Phone?: +213662795557 +213663044486 DIPLOMATS: ? 2001 ¨C 2006: Petroleum Engineer from Boumerdes (Algeria) university (option: Oil and gas production engineering). ? Final Project: well testing and their interpretations. ? 1998 ¨C 2001 Bachelors of science with good mention. TRAININGS ? Surface well testing from Weatherford Dubai. ? New Hire Separation Orientation - Well Testing. ? Oilfield basic calculations. ? Safety awareness (H2S+Pressure¡­¡­.).at (BOOTS&COOTS). ? Manual handling. ? Job Safety Analysis / Hazard ID. ? Environmental Induction. ? EEP Competency Assessment. ? Essentials for Enterprise Excellence. Others. PROFESSIONEL EXPERIENCE: ? Mrach 2016 till now :
  • 2. KHALID ZERROUKI: Well Test Supervisor Petroleum Engineer Well testing service specialist with Oil Consultant OC99: Working with Halliburton Algeria for rigless jobs. ? December 2014till Nov 2015: Well Test Supervisor at Tetra Technologies ¨C Saudi Arabia : Reference: Mr. Farid Bourougaa : Quality manager fbourougaa@tetratec.com ? Lead a well test team during the well test operation onshore and insure the well going of the operation steps respecting the client program and the company procedures and HSE procedures and documentation, on site Responsible for correct equipment being shipped and arriving on site for the job or job type to be undertaken. Correct and complete inventory of equipment recorded via material transfers and tickets upon delivery to and receipt from The rig site.The final report of each job should be submitted in a correct form. ? Jobs and operations: ? Well test Full package jobs high pressure & high temperature & H2S gas (Logging + Drill stem test + surface equipments+ coiled tubing + slick line). ? Clean up jobs , Frac acidification jobs, stimulations jobs. ? SMS (Sand Management System): using Deasander and Sand filter. ? WTS with Frac acidification jobs, stimulations jobs. ? DST jobs (Drill Stem Test). ? Inline tests and oil measuring tests. ? N2 jobs. ? High pressure jobs (15k, 10k psia). ? High H2S concentration (600 000 ppm) ? Base job (instrumentation and maintenance and job preparations). ? ESP wells, inline well test in ESP wells and function test. ? WTS with Gas lift wells. ? WTS with Dual completion wells (tubing short and tubing long)
  • 3. KHALID ZERROUKI: Well Test Supervisor Petroleum Engineer ? 2012 October till Jun 2014: Well Test Supervisor at SPETCO Kuwait (Safwan Petroleum Technologies Company) (KOC Kuwait Oil Company is our customer): Reference: Mr. V.V George, senior well test supervisor; vvarghese@spetco.com ? Perform Daily GOR test, high pressure & high temperature & H2S gas for different types of wells: Natural flow wells, ESP wells, PCP wells, gas lift wells, rig jobs. Mostly conducting a heavy oil well (16 to 60 API oil density). ? N2 Jobs. ? August 2009 till January 2013: Well test Supervisor in Weatherford Algeria: Refernce: Mr. Chris Gnutel country manager; Chris.Gnutel@eu.weatherford.com ? Well test Full package jobs (Logging + Drill stem test + surface equipments+ coiled tubing + slick line). ? Prior to mobilization equipment from base to location we have to check materials and equipment availability and we have to ensure that all pressure control equipment have been approved and certified (All pressure tests of individual equipment to must been conducted to maximum allowable working pressure, in the yard). ? Mobilization from/to location; ? Rig up of surface well testing equipments (prepared all the paper work before to start the rig up or to start any work). Flowfead+ SSV+ coeflexip+ choke manifold+ separator+ tank+ oil manifold+ gas manifold+ transfer- pump+ flare arrestor;
  • 4. KHALID ZERROUKI: Well Test Supervisor Petroleum Engineer ? Pressure test all surface well testing equipments (All pressure tests shall be done for 15min and must be witnessed by the client company representatives and recorded). ? Clean-up well; ? Separation by three chokes successively; ? Buildup; ? Reverse circulating; ? Rig down all surface well test equipment; ? Supervise the well test crew; ? Prepare execute and close all the paperwork; ? Prepare the well test job report wish must contain all details of the job, and all the results of the test; ? Ensures that all QHSE issues are followed during operational activity, and ? Jun 2007 to May 2009: Well service engineer at SONATRACH (Algeria oilfield customer ): ? Well test operations (Inline test and DST); ? Snubbing operations (RIN and POOH Concentric, clean wells, workover, change wells completion, fishing, scrapage¡­) EQUIPMENTS: ? Surface safety valve 10 k, 15 k psi. ? Choke manifold 10 k, 15 k with different valves constructor (WOM,Cameron,FMC .. ? Expandable choke 10 k, 15 k psi. ? Flow head 10 k, 15 k psi. ? Coeflexip hoses with hob connection or hummer union 10 k, 15 k psi. ? Sand filters and desanders 10 k, 15 k psi. ? Pipes with different pressure rating and different sizes and different
  • 5. KHALID ZERROUKI: Well Test Supervisor Petroleum Engineer constructor. (15k, 10k, 5k, 2k) (2¡±, 3¡±, 4¡±, 6¡±). ? 5 ways diverter (oil manifold) and 2 ways diverter (gas manifold). ? 3 phase¡¯s separator 1440psi and 2160psi. ? Surge tank and shrinkage tester or vertical separators. ? High pressure pumps and centrifuges pumps, texteam pumps for chemical injection and triplex doublex pumps. ? H2S services burner. ? Hydrometers and digital densimeter. ? Gate valves, ball valves, autoclave valves, needle valves, lo torque valves. ? Electrical and manual centrifuges for basic sediments and water BSW. ? Senior orifice meter (Daniel box). ? ESD panel. ? Laboratory equipments (Salinity measurement, PH measurement, H2S and CO2¡­.). SKILLS: Computer and Microsoft office : Expert Staff communication English Good More than 10 years on field and administration (training of communication, change management, team management ) French Good Arabic Good DIVERS ? Actif, Dynamic, Motivating,. . .
  • 6. KHALID ZERROUKI: Well Test Supervisor Petroleum Engineer ? Have a sense of responsibility and integrated easily. ? The practice of several sports. ? Passport and Algerian driving license: Available. ? Available anytime and anywhere. ? Sociable.
  • 7. KHALID ZERROUKI: Well Test Supervisor Petroleum Engineer ? Have a sense of responsibility and integrated easily. ? The practice of several sports. ? Passport and Algerian driving license: Available. ? Available anytime and anywhere. ? Sociable.