1) Mr. Wirawit Wangkan submitted a weekly report for his engineering team that included Jane, Best, Not, Su, Nut, Love, Tew, Mut, and Benz working on a water sensor flow project. 2) The team solved a discrepancy with the water sensor joints using tape which resulted in accurate water volume measurements from the sensor connected to a microcontroller display. 3) The sensor can measure water flow through a tube at a grade 9 level of 1 liter.