際際滷

際際滷Share a Scribd company logo
By
R. Harry Eddyarso
PT. SARIPARI PERTIWI ABADI
15 September 2006
KMI Goes to Campus Program
Komunitas Migas Indonesia  Universitas Indonesia
1. Rig Type Including Rig Lay-Out Diagram (for Land Rig & Swamp Barge)
2. Rig Size Calculation
3. Torque & Drag Calculation
4. Casing / Liner Design & Cementing Procedures
5. Wellhead Design & Installation
6. Mud Engineering & Design
7. Directional Drilling Plan & Drill String Design
8. Drilling Hydraulic Optimization
9. Bit Selection
10.Formation Evaluation (Logging, Coring)
11.BOP Stack Diagram & Well Control Procedures
12.Drill Stem Testing Procedures, Well Stimulation and or Well Completion
13.Health, Safety, Environment
14.Emergency Response Plan (ERP)
15. Etc
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
Closest location between fault and well
path at depth 3064 tvdss
Closest distance from the fault = 95 mtr.
Fault position error bar = 30 mtr.
Drilling target radius = 50 ft.
Open Hole Logging Package:
1. Resistivity / Sonic
2. Density / Porosity
3. Core Sampling
4. Dipmeter
5. RFT
6. Velocity Survey
Cased Hole Logging Package:
1. CBL/VDL/CET
Net to Gross map
Gross
Net
Net
B-29A2 Net to Gross Map
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007

More Related Content

Similar to 02 drilling preparation ui 15 sep 2007 (18)

Solid particle erosion sand monitoring and transport and erosion corrosion ...
Solid particle erosion sand monitoring and transport  and erosion corrosion  ...Solid particle erosion sand monitoring and transport  and erosion corrosion  ...
Solid particle erosion sand monitoring and transport and erosion corrosion ...
Shokrollah Hassani
borehole 2.pdf
borehole 2.pdfborehole 2.pdf
borehole 2.pdf
SheikhBajunaid
Checklist for site preparation and establishment
Checklist for site preparation and establishmentChecklist for site preparation and establishment
Checklist for site preparation and establishment
Anthony Randerson
Sand Control
Sand Control Sand Control
Sand Control
petroEDGE
Design and Planning - poeer point CE.pptx
Design and Planning - poeer point CE.pptxDesign and Planning - poeer point CE.pptx
Design and Planning - poeer point CE.pptx
VijayaChand
cv english hendra fix
cv english hendra fixcv english hendra fix
cv english hendra fix
hendra permana
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
Ghulam Asghar
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
Ghulam Asghar
Loading Facility Concept.pptx
Loading Facility Concept.pptxLoading Facility Concept.pptx
Loading Facility Concept.pptx
Taufiq380509
Conceptual and geometric design of tunnel and quantity estimation
Conceptual and geometric design of tunnel and quantity estimationConceptual and geometric design of tunnel and quantity estimation
Conceptual and geometric design of tunnel and quantity estimation
Atiqa khan
KL ITB - NTU - NUS
KL ITB - NTU - NUSKL ITB - NTU - NUS
KL ITB - NTU - NUS
Faisal Purnawarman
Foundations for New Champlain Bridge Corridor Project
Foundations for New Champlain Bridge Corridor ProjectFoundations for New Champlain Bridge Corridor Project
Foundations for New Champlain Bridge Corridor Project
Daksh Raj Chopra
Intern report - IMC
Intern report - IMCIntern report - IMC
Intern report - IMC
Kartik Sharma
Cv career history
Cv   career historyCv   career history
Cv career history
Joseph Bracic
Introduction to Mudlogging
Introduction to MudloggingIntroduction to Mudlogging
Introduction to Mudlogging
Department of Geology, Mohanlal sukhadia university, udaipur
GSA 2015 - Computer Based Facies Simulations in Orebodies: Benefits, Drawback...
GSA 2015 - Computer Based Facies Simulations in Orebodies: Benefits, Drawback...GSA 2015 - Computer Based Facies Simulations in Orebodies: Benefits, Drawback...
GSA 2015 - Computer Based Facies Simulations in Orebodies: Benefits, Drawback...
Mike Bingle-Davis
FOUNDRY FORGING AND WELDING LABORATORY 2022 PART A.pdf
FOUNDRY  FORGING AND WELDING LABORATORY 2022 PART A.pdfFOUNDRY  FORGING AND WELDING LABORATORY 2022 PART A.pdf
FOUNDRY FORGING AND WELDING LABORATORY 2022 PART A.pdf
SHEKHARAPPAMALLUR1
Update - CV[2 e] - --AIS
Update - CV[2 e] - --AISUpdate - CV[2 e] - --AIS
Update - CV[2 e] - --AIS
Felix Doghudje
Solid particle erosion sand monitoring and transport and erosion corrosion ...
Solid particle erosion sand monitoring and transport  and erosion corrosion  ...Solid particle erosion sand monitoring and transport  and erosion corrosion  ...
Solid particle erosion sand monitoring and transport and erosion corrosion ...
Shokrollah Hassani
Checklist for site preparation and establishment
Checklist for site preparation and establishmentChecklist for site preparation and establishment
Checklist for site preparation and establishment
Anthony Randerson
Sand Control
Sand Control Sand Control
Sand Control
petroEDGE
Design and Planning - poeer point CE.pptx
Design and Planning - poeer point CE.pptxDesign and Planning - poeer point CE.pptx
Design and Planning - poeer point CE.pptx
VijayaChand
cv english hendra fix
cv english hendra fixcv english hendra fix
cv english hendra fix
hendra permana
Loading Facility Concept.pptx
Loading Facility Concept.pptxLoading Facility Concept.pptx
Loading Facility Concept.pptx
Taufiq380509
Conceptual and geometric design of tunnel and quantity estimation
Conceptual and geometric design of tunnel and quantity estimationConceptual and geometric design of tunnel and quantity estimation
Conceptual and geometric design of tunnel and quantity estimation
Atiqa khan
Foundations for New Champlain Bridge Corridor Project
Foundations for New Champlain Bridge Corridor ProjectFoundations for New Champlain Bridge Corridor Project
Foundations for New Champlain Bridge Corridor Project
Daksh Raj Chopra
Intern report - IMC
Intern report - IMCIntern report - IMC
Intern report - IMC
Kartik Sharma
Cv career history
Cv   career historyCv   career history
Cv career history
Joseph Bracic
GSA 2015 - Computer Based Facies Simulations in Orebodies: Benefits, Drawback...
GSA 2015 - Computer Based Facies Simulations in Orebodies: Benefits, Drawback...GSA 2015 - Computer Based Facies Simulations in Orebodies: Benefits, Drawback...
GSA 2015 - Computer Based Facies Simulations in Orebodies: Benefits, Drawback...
Mike Bingle-Davis
FOUNDRY FORGING AND WELDING LABORATORY 2022 PART A.pdf
FOUNDRY  FORGING AND WELDING LABORATORY 2022 PART A.pdfFOUNDRY  FORGING AND WELDING LABORATORY 2022 PART A.pdf
FOUNDRY FORGING AND WELDING LABORATORY 2022 PART A.pdf
SHEKHARAPPAMALLUR1
Update - CV[2 e] - --AIS
Update - CV[2 e] - --AISUpdate - CV[2 e] - --AIS
Update - CV[2 e] - --AIS
Felix Doghudje

More from yudi05 (19)

224572323-Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
224572323-Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf224572323-Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
224572323-Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
yudi05
pengukuran dg total station.pdf
pengukuran dg total station.pdfpengukuran dg total station.pdf
pengukuran dg total station.pdf
yudi05
Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdfPetunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
yudi05
MATH rekreasi.pptMATH rekreasi.ppt
MATH rekreasi.ppt
yudi05
Dasar-dasar K31_Tbg_pres..ppt
Dasar-dasar K31_Tbg_pres..pptDasar-dasar K31_Tbg_pres..ppt
Dasar-dasar K31_Tbg_pres..ppt
yudi05
Yosemite national park
Yosemite national parkYosemite national park
Yosemite national park
yudi05
Vincent van gogh
Vincent van goghVincent van gogh
Vincent van gogh
yudi05
Teknik peledakan
Teknik peledakanTeknik peledakan
Teknik peledakan
yudi05
Soal tambang terbuka
Soal tambang terbukaSoal tambang terbuka
Soal tambang terbuka
yudi05
Tata surya
Tata suryaTata surya
Tata surya
yudi05
06 hydraulic workover unit trisakti 25 nov 2007
06 hydraulic workover unit   trisakti 25 nov 200706 hydraulic workover unit   trisakti 25 nov 2007
06 hydraulic workover unit trisakti 25 nov 2007
yudi05
05 well testing trisakti 25 nov 2007
05 well testing   trisakti 25 nov 200705 well testing   trisakti 25 nov 2007
05 well testing trisakti 25 nov 2007
yudi05
03 drilling recent development ui 17 sep 2007
03 drilling recent development   ui 17 sep 200703 drilling recent development   ui 17 sep 2007
03 drilling recent development ui 17 sep 2007
yudi05
Math rekreasiMath rekreasi
Math rekreasi
yudi05
Usaha cucian motor
Usaha cucian motorUsaha cucian motor
Usaha cucian motor
yudi05
Pelajaran bahasa-arab-kelas-iii-sd
Pelajaran bahasa-arab-kelas-iii-sdPelajaran bahasa-arab-kelas-iii-sd
Pelajaran bahasa-arab-kelas-iii-sd
yudi05
Buku bahasa arab_mi_4_siswa
Buku bahasa arab_mi_4_siswaBuku bahasa arab_mi_4_siswa
Buku bahasa arab_mi_4_siswa
yudi05
Buku bahasa arab_mi_1_siswa
Buku bahasa arab_mi_1_siswaBuku bahasa arab_mi_1_siswa
Buku bahasa arab_mi_1_siswa
yudi05
Alfred nobel penemu dinamit
Alfred nobel penemu dinamitAlfred nobel penemu dinamit
Alfred nobel penemu dinamit
yudi05
224572323-Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
224572323-Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf224572323-Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
224572323-Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
yudi05
pengukuran dg total station.pdf
pengukuran dg total station.pdfpengukuran dg total station.pdf
pengukuran dg total station.pdf
yudi05
Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdfPetunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
yudi05
MATH rekreasi.pptMATH rekreasi.ppt
MATH rekreasi.ppt
yudi05
Dasar-dasar K31_Tbg_pres..ppt
Dasar-dasar K31_Tbg_pres..pptDasar-dasar K31_Tbg_pres..ppt
Dasar-dasar K31_Tbg_pres..ppt
yudi05
Yosemite national park
Yosemite national parkYosemite national park
Yosemite national park
yudi05
Vincent van gogh
Vincent van goghVincent van gogh
Vincent van gogh
yudi05
Teknik peledakan
Teknik peledakanTeknik peledakan
Teknik peledakan
yudi05
Soal tambang terbuka
Soal tambang terbukaSoal tambang terbuka
Soal tambang terbuka
yudi05
Tata surya
Tata suryaTata surya
Tata surya
yudi05
06 hydraulic workover unit trisakti 25 nov 2007
06 hydraulic workover unit   trisakti 25 nov 200706 hydraulic workover unit   trisakti 25 nov 2007
06 hydraulic workover unit trisakti 25 nov 2007
yudi05
05 well testing trisakti 25 nov 2007
05 well testing   trisakti 25 nov 200705 well testing   trisakti 25 nov 2007
05 well testing trisakti 25 nov 2007
yudi05
03 drilling recent development ui 17 sep 2007
03 drilling recent development   ui 17 sep 200703 drilling recent development   ui 17 sep 2007
03 drilling recent development ui 17 sep 2007
yudi05
Math rekreasiMath rekreasi
Math rekreasi
yudi05
Usaha cucian motor
Usaha cucian motorUsaha cucian motor
Usaha cucian motor
yudi05
Pelajaran bahasa-arab-kelas-iii-sd
Pelajaran bahasa-arab-kelas-iii-sdPelajaran bahasa-arab-kelas-iii-sd
Pelajaran bahasa-arab-kelas-iii-sd
yudi05
Buku bahasa arab_mi_4_siswa
Buku bahasa arab_mi_4_siswaBuku bahasa arab_mi_4_siswa
Buku bahasa arab_mi_4_siswa
yudi05
Buku bahasa arab_mi_1_siswa
Buku bahasa arab_mi_1_siswaBuku bahasa arab_mi_1_siswa
Buku bahasa arab_mi_1_siswa
yudi05
Alfred nobel penemu dinamit
Alfred nobel penemu dinamitAlfred nobel penemu dinamit
Alfred nobel penemu dinamit
yudi05

Recently uploaded (20)

IoT-based-Electrical-Motor-Fault-Detection-System.pptx
IoT-based-Electrical-Motor-Fault-Detection-System.pptxIoT-based-Electrical-Motor-Fault-Detection-System.pptx
IoT-based-Electrical-Motor-Fault-Detection-System.pptx
atharvapardeshi03
Environmental Product Declaration - Uni Bell
Environmental Product Declaration - Uni BellEnvironmental Product Declaration - Uni Bell
Environmental Product Declaration - Uni Bell
ManishPatel169454
Cloud Cost Optimization for GCP, AWS, Azure
Cloud Cost Optimization for GCP, AWS, AzureCloud Cost Optimization for GCP, AWS, Azure
Cloud Cost Optimization for GCP, AWS, Azure
vinothsk19
AIR FILTER system in internal combustion engine system.ppt
AIR FILTER system in internal combustion engine system.pptAIR FILTER system in internal combustion engine system.ppt
AIR FILTER system in internal combustion engine system.ppt
thisisparthipan1
INVESTIGATION OF PUEA IN COGNITIVE RADIO NETWORKS USING ENERGY DETECTION IN D...
INVESTIGATION OF PUEA IN COGNITIVE RADIO NETWORKS USING ENERGY DETECTION IN D...INVESTIGATION OF PUEA IN COGNITIVE RADIO NETWORKS USING ENERGY DETECTION IN D...
INVESTIGATION OF PUEA IN COGNITIVE RADIO NETWORKS USING ENERGY DETECTION IN D...
csijjournal
Biases, our brain and software development
Biases, our brain and software developmentBiases, our brain and software development
Biases, our brain and software development
Matias Iacono
INTERNET OF THINGSSSSSSSSSSSSSSSSSSSSSSSSS.pptx
INTERNET OF THINGSSSSSSSSSSSSSSSSSSSSSSSSS.pptxINTERNET OF THINGSSSSSSSSSSSSSSSSSSSSSSSSS.pptx
INTERNET OF THINGSSSSSSSSSSSSSSSSSSSSSSSSS.pptx
bmit1
Soil Properties and Methods of Determination
Soil Properties and  Methods of DeterminationSoil Properties and  Methods of Determination
Soil Properties and Methods of Determination
Rajani Vyawahare
GE 6B GT Ratcheting Animation- Hemananda Chinara.ppsx
GE 6B GT Ratcheting Animation- Hemananda Chinara.ppsxGE 6B GT Ratcheting Animation- Hemananda Chinara.ppsx
GE 6B GT Ratcheting Animation- Hemananda Chinara.ppsx
Hemananda Chinara
Practice Head Torpedo - Neometrix Defence.pptx
Practice Head Torpedo - Neometrix Defence.pptxPractice Head Torpedo - Neometrix Defence.pptx
Practice Head Torpedo - Neometrix Defence.pptx
Neometrix_Engineering_Pvt_Ltd
direct current machine first part about machine.pdf
direct current machine first part about machine.pdfdirect current machine first part about machine.pdf
direct current machine first part about machine.pdf
sahilshah890338
Renewable-Energy-Powering-Mozambiques-Economic-Growth.pptx
Renewable-Energy-Powering-Mozambiques-Economic-Growth.pptxRenewable-Energy-Powering-Mozambiques-Economic-Growth.pptx
Renewable-Energy-Powering-Mozambiques-Economic-Growth.pptx
Rofino Licuco
TASK-DECOMPOSITION BASED ANOMALY DETECTION OF MASSIVE AND HIGH-VOLATILITY SES...
TASK-DECOMPOSITION BASED ANOMALY DETECTION OF MASSIVE AND HIGH-VOLATILITY SES...TASK-DECOMPOSITION BASED ANOMALY DETECTION OF MASSIVE AND HIGH-VOLATILITY SES...
TASK-DECOMPOSITION BASED ANOMALY DETECTION OF MASSIVE AND HIGH-VOLATILITY SES...
samueljackson3773
Design and Analysis of Algorithms Unit 5
Design and Analysis of Algorithms Unit 5Design and Analysis of Algorithms Unit 5
Design and Analysis of Algorithms Unit 5
sureshkumara29
Helium Boosting & Decanting With Hydro Test Machine
Helium Boosting & Decanting With Hydro Test MachineHelium Boosting & Decanting With Hydro Test Machine
Helium Boosting & Decanting With Hydro Test Machine
Paskals Fluid Systems Pvt. Ltd.
Taykon-Kalite belgeleri
Taykon-Kalite belgeleriTaykon-Kalite belgeleri
Taykon-Kalite belgeleri
TAYKON
Data recovery and Digital evidence controls in digital frensics.pdf
Data recovery and Digital evidence controls in digital frensics.pdfData recovery and Digital evidence controls in digital frensics.pdf
Data recovery and Digital evidence controls in digital frensics.pdf
Abhijit Bodhe
Sppu engineering artificial intelligence and data science semester 6th Artif...
Sppu engineering  artificial intelligence and data science semester 6th Artif...Sppu engineering  artificial intelligence and data science semester 6th Artif...
Sppu engineering artificial intelligence and data science semester 6th Artif...
pawaletrupti434
AI-Powered Power Converter Design Workflow.pdf
AI-Powered Power Converter Design Workflow.pdfAI-Powered Power Converter Design Workflow.pdf
AI-Powered Power Converter Design Workflow.pdf
Aleksandr Terlo
Instruction execution cycle _
Instruction execution cycle                  _Instruction execution cycle                  _
Instruction execution cycle _
SwatiHans10
IoT-based-Electrical-Motor-Fault-Detection-System.pptx
IoT-based-Electrical-Motor-Fault-Detection-System.pptxIoT-based-Electrical-Motor-Fault-Detection-System.pptx
IoT-based-Electrical-Motor-Fault-Detection-System.pptx
atharvapardeshi03
Environmental Product Declaration - Uni Bell
Environmental Product Declaration - Uni BellEnvironmental Product Declaration - Uni Bell
Environmental Product Declaration - Uni Bell
ManishPatel169454
Cloud Cost Optimization for GCP, AWS, Azure
Cloud Cost Optimization for GCP, AWS, AzureCloud Cost Optimization for GCP, AWS, Azure
Cloud Cost Optimization for GCP, AWS, Azure
vinothsk19
AIR FILTER system in internal combustion engine system.ppt
AIR FILTER system in internal combustion engine system.pptAIR FILTER system in internal combustion engine system.ppt
AIR FILTER system in internal combustion engine system.ppt
thisisparthipan1
INVESTIGATION OF PUEA IN COGNITIVE RADIO NETWORKS USING ENERGY DETECTION IN D...
INVESTIGATION OF PUEA IN COGNITIVE RADIO NETWORKS USING ENERGY DETECTION IN D...INVESTIGATION OF PUEA IN COGNITIVE RADIO NETWORKS USING ENERGY DETECTION IN D...
INVESTIGATION OF PUEA IN COGNITIVE RADIO NETWORKS USING ENERGY DETECTION IN D...
csijjournal
Biases, our brain and software development
Biases, our brain and software developmentBiases, our brain and software development
Biases, our brain and software development
Matias Iacono
INTERNET OF THINGSSSSSSSSSSSSSSSSSSSSSSSSS.pptx
INTERNET OF THINGSSSSSSSSSSSSSSSSSSSSSSSSS.pptxINTERNET OF THINGSSSSSSSSSSSSSSSSSSSSSSSSS.pptx
INTERNET OF THINGSSSSSSSSSSSSSSSSSSSSSSSSS.pptx
bmit1
Soil Properties and Methods of Determination
Soil Properties and  Methods of DeterminationSoil Properties and  Methods of Determination
Soil Properties and Methods of Determination
Rajani Vyawahare
GE 6B GT Ratcheting Animation- Hemananda Chinara.ppsx
GE 6B GT Ratcheting Animation- Hemananda Chinara.ppsxGE 6B GT Ratcheting Animation- Hemananda Chinara.ppsx
GE 6B GT Ratcheting Animation- Hemananda Chinara.ppsx
Hemananda Chinara
direct current machine first part about machine.pdf
direct current machine first part about machine.pdfdirect current machine first part about machine.pdf
direct current machine first part about machine.pdf
sahilshah890338
Renewable-Energy-Powering-Mozambiques-Economic-Growth.pptx
Renewable-Energy-Powering-Mozambiques-Economic-Growth.pptxRenewable-Energy-Powering-Mozambiques-Economic-Growth.pptx
Renewable-Energy-Powering-Mozambiques-Economic-Growth.pptx
Rofino Licuco
TASK-DECOMPOSITION BASED ANOMALY DETECTION OF MASSIVE AND HIGH-VOLATILITY SES...
TASK-DECOMPOSITION BASED ANOMALY DETECTION OF MASSIVE AND HIGH-VOLATILITY SES...TASK-DECOMPOSITION BASED ANOMALY DETECTION OF MASSIVE AND HIGH-VOLATILITY SES...
TASK-DECOMPOSITION BASED ANOMALY DETECTION OF MASSIVE AND HIGH-VOLATILITY SES...
samueljackson3773
Design and Analysis of Algorithms Unit 5
Design and Analysis of Algorithms Unit 5Design and Analysis of Algorithms Unit 5
Design and Analysis of Algorithms Unit 5
sureshkumara29
Taykon-Kalite belgeleri
Taykon-Kalite belgeleriTaykon-Kalite belgeleri
Taykon-Kalite belgeleri
TAYKON
Data recovery and Digital evidence controls in digital frensics.pdf
Data recovery and Digital evidence controls in digital frensics.pdfData recovery and Digital evidence controls in digital frensics.pdf
Data recovery and Digital evidence controls in digital frensics.pdf
Abhijit Bodhe
Sppu engineering artificial intelligence and data science semester 6th Artif...
Sppu engineering  artificial intelligence and data science semester 6th Artif...Sppu engineering  artificial intelligence and data science semester 6th Artif...
Sppu engineering artificial intelligence and data science semester 6th Artif...
pawaletrupti434
AI-Powered Power Converter Design Workflow.pdf
AI-Powered Power Converter Design Workflow.pdfAI-Powered Power Converter Design Workflow.pdf
AI-Powered Power Converter Design Workflow.pdf
Aleksandr Terlo
Instruction execution cycle _
Instruction execution cycle                  _Instruction execution cycle                  _
Instruction execution cycle _
SwatiHans10

02 drilling preparation ui 15 sep 2007

  • 1. By R. Harry Eddyarso PT. SARIPARI PERTIWI ABADI 15 September 2006 KMI Goes to Campus Program Komunitas Migas Indonesia Universitas Indonesia
  • 2. 1. Rig Type Including Rig Lay-Out Diagram (for Land Rig & Swamp Barge) 2. Rig Size Calculation 3. Torque & Drag Calculation 4. Casing / Liner Design & Cementing Procedures 5. Wellhead Design & Installation 6. Mud Engineering & Design 7. Directional Drilling Plan & Drill String Design 8. Drilling Hydraulic Optimization 9. Bit Selection 10.Formation Evaluation (Logging, Coring) 11.BOP Stack Diagram & Well Control Procedures 12.Drill Stem Testing Procedures, Well Stimulation and or Well Completion 13.Health, Safety, Environment 14.Emergency Response Plan (ERP) 15. Etc
  • 10. Closest location between fault and well path at depth 3064 tvdss Closest distance from the fault = 95 mtr. Fault position error bar = 30 mtr. Drilling target radius = 50 ft.
  • 11. Open Hole Logging Package: 1. Resistivity / Sonic 2. Density / Porosity 3. Core Sampling 4. Dipmeter 5. RFT 6. Velocity Survey Cased Hole Logging Package: 1. CBL/VDL/CET
  • 12. Net to Gross map Gross Net Net B-29A2 Net to Gross Map