際際滷

際際滷Share a Scribd company logo
By
R. Harry Eddyarso
PT. SARIPARI PERTIWI ABADI
15 September 2006
KMI Goes to Campus Program
Komunitas Migas Indonesia  Universitas Indonesia
1. Rig Type Including Rig Lay-Out Diagram (for Land Rig & Swamp Barge)
2. Rig Size Calculation
3. Torque & Drag Calculation
4. Casing / Liner Design & Cementing Procedures
5. Wellhead Design & Installation
6. Mud Engineering & Design
7. Directional Drilling Plan & Drill String Design
8. Drilling Hydraulic Optimization
9. Bit Selection
10.Formation Evaluation (Logging, Coring)
11.BOP Stack Diagram & Well Control Procedures
12.Drill Stem Testing Procedures, Well Stimulation and or Well Completion
13.Health, Safety, Environment
14.Emergency Response Plan (ERP)
15. Etc
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
Closest location between fault and well
path at depth 3064 tvdss
Closest distance from the fault = 95 mtr.
Fault position error bar = 30 mtr.
Drilling target radius = 50 ft.
Open Hole Logging Package:
1. Resistivity / Sonic
2. Density / Porosity
3. Core Sampling
4. Dipmeter
5. RFT
6. Velocity Survey
Cased Hole Logging Package:
1. CBL/VDL/CET
Net to Gross map
Gross
Net
Net
B-29A2 Net to Gross Map
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007
02 drilling preparation   ui 15 sep 2007

More Related Content

02 drilling preparation ui 15 sep 2007

  • 1. By R. Harry Eddyarso PT. SARIPARI PERTIWI ABADI 15 September 2006 KMI Goes to Campus Program Komunitas Migas Indonesia Universitas Indonesia
  • 2. 1. Rig Type Including Rig Lay-Out Diagram (for Land Rig & Swamp Barge) 2. Rig Size Calculation 3. Torque & Drag Calculation 4. Casing / Liner Design & Cementing Procedures 5. Wellhead Design & Installation 6. Mud Engineering & Design 7. Directional Drilling Plan & Drill String Design 8. Drilling Hydraulic Optimization 9. Bit Selection 10.Formation Evaluation (Logging, Coring) 11.BOP Stack Diagram & Well Control Procedures 12.Drill Stem Testing Procedures, Well Stimulation and or Well Completion 13.Health, Safety, Environment 14.Emergency Response Plan (ERP) 15. Etc
  • 10. Closest location between fault and well path at depth 3064 tvdss Closest distance from the fault = 95 mtr. Fault position error bar = 30 mtr. Drilling target radius = 50 ft.
  • 11. Open Hole Logging Package: 1. Resistivity / Sonic 2. Density / Porosity 3. Core Sampling 4. Dipmeter 5. RFT 6. Velocity Survey Cased Hole Logging Package: 1. CBL/VDL/CET
  • 12. Net to Gross map Gross Net Net B-29A2 Net to Gross Map