The document outlines the key elements of a drilling plan for an oil and gas well, including:
1. Rig specifications and layout, size calculations, torque and drag calculations, casing and cementing procedures, wellhead design and installation.
2. Mud engineering and design, directional drilling plan, drill string design, drilling optimization, bit selection, and formation evaluation including logging, coring, and testing.
3. Health, safety, environment procedures and an emergency response plan.
1 of 18
Download to read offline
More Related Content
02 drilling preparation ui 15 sep 2007
1. By
R. Harry Eddyarso
PT. SARIPARI PERTIWI ABADI
15 September 2006
KMI Goes to Campus Program
Komunitas Migas Indonesia Universitas Indonesia
2. 1. Rig Type Including Rig Lay-Out Diagram (for Land Rig & Swamp Barge)
2. Rig Size Calculation
3. Torque & Drag Calculation
4. Casing / Liner Design & Cementing Procedures
5. Wellhead Design & Installation
6. Mud Engineering & Design
7. Directional Drilling Plan & Drill String Design
8. Drilling Hydraulic Optimization
9. Bit Selection
10.Formation Evaluation (Logging, Coring)
11.BOP Stack Diagram & Well Control Procedures
12.Drill Stem Testing Procedures, Well Stimulation and or Well Completion
13.Health, Safety, Environment
14.Emergency Response Plan (ERP)
15. Etc
10. Closest location between fault and well
path at depth 3064 tvdss
Closest distance from the fault = 95 mtr.
Fault position error bar = 30 mtr.
Drilling target radius = 50 ft.
11. Open Hole Logging Package:
1. Resistivity / Sonic
2. Density / Porosity
3. Core Sampling
4. Dipmeter
5. RFT
6. Velocity Survey
Cased Hole Logging Package:
1. CBL/VDL/CET
12. Net to Gross map
Gross
Net
Net
B-29A2 Net to Gross Map