CareerHighlights:
ï‚· Develop Weld Procedures to repair FPF while at Operational Draught without interruption to Oil
Production and Export.
ï‚· Carry Out UWILD survey while on location carrying out ACFM inspection of welds
ï‚· Northern Producer Hybrid mooring system design & installation
ï‚· Installed the first offshore installation in the German Sector. HVDC transformer platform.
ï‚· Increased Thistle Alpha Production by 1000bbls per day though choke management
ï‚· Increased Thistle Alpha productive time 45% to 87% over an 18 month period.
ï‚· Provided idea to Enquest to increase the Thistle life of field. Enquest have just received an engineering
award for implementing the idea.
ï‚· Changed Thistle Alpha DFPV procedure to release work fronts within 48hrs of commencing shutdown.
From 7 days
ï‚· SIMOPS organisation of both Thistle Alpha & Heather Alpha
ï‚· Management re-organisation of Montrose & Arbroath platforms
ï‚· Produced drilling readiness audit

More Related Content

What's hot (20)

Projects - senior machinery engineer
Projects - senior machinery engineerProjects - senior machinery engineer
Projects - senior machinery engineer
Chris Owen
Ìý
HOERBIGER Service MEA Introduction
HOERBIGER Service MEA IntroductionHOERBIGER Service MEA Introduction
HOERBIGER Service MEA Introduction
Ekundayo Ajayi
Ìý
6S Project
6S Project6S Project
6S Project
Philip Misner
Ìý
Introducing imaging energy may2015 (1)
Introducing imaging energy may2015 (1)Introducing imaging energy may2015 (1)
Introducing imaging energy may2015 (1)
imagingenergy
Ìý
Kaizen (senior project)
Kaizen (senior project)Kaizen (senior project)
Kaizen (senior project)
Eihab Garout
Ìý
ASEZ Annual Report 2015_16 FINAL (5)
ASEZ Annual Report 2015_16 FINAL (5)ASEZ Annual Report 2015_16 FINAL (5)
ASEZ Annual Report 2015_16 FINAL (5)
Thabo Thulare
Ìý
Professional Experience
Professional ExperienceProfessional Experience
Professional Experience
Venkatganesh Subramanian
Ìý
EQUALIZING PRONG-4
EQUALIZING PRONG-4EQUALIZING PRONG-4
EQUALIZING PRONG-4
SYED BAKHTIARY
Ìý
Aeris Brochure
Aeris BrochureAeris Brochure
Aeris Brochure
Aeris Dynamics India
Ìý
Loader
LoaderLoader
Loader
Craig Ford
Ìý
Arcelor Mittal
Arcelor Mittal Arcelor Mittal
Arcelor Mittal
AGE Technologies
Ìý
David Mortimer – Summary ‘09
David Mortimer – Summary ‘09David Mortimer – Summary ‘09
David Mortimer – Summary ‘09
DavidMortimer
Ìý
Prax Air Interview Presentation
Prax Air Interview PresentationPrax Air Interview Presentation
Prax Air Interview Presentation
Shadasious
Ìý
Tales from the Trenches – Leveraging Agile on Fixed Fee Projects
Tales from the Trenches – Leveraging Agile on Fixed Fee ProjectsTales from the Trenches – Leveraging Agile on Fixed Fee Projects
Tales from the Trenches – Leveraging Agile on Fixed Fee Projects
Marco Silva
Ìý
GDT Resume_6.15.16
GDT Resume_6.15.16GDT Resume_6.15.16
GDT Resume_6.15.16
Gary D Terranova
Ìý
Cement_infographic_AUG2014_Opt1
Cement_infographic_AUG2014_Opt1Cement_infographic_AUG2014_Opt1
Cement_infographic_AUG2014_Opt1
Joanne Tsarouha
Ìý
LNG Cap - Jan 2016
LNG Cap - Jan 2016LNG Cap - Jan 2016
LNG Cap - Jan 2016
Naqqash Todai
Ìý
Bauer fdp lost bit projects english
Bauer   fdp lost bit projects englishBauer   fdp lost bit projects english
Bauer fdp lost bit projects english
cfpbolivia
Ìý
Joseph Michaels Resume 1 (10)
Joseph Michaels Resume 1 (10)Joseph Michaels Resume 1 (10)
Joseph Michaels Resume 1 (10)
Joseph Michaels
Ìý
Kurt PinLock - Workholding Today
Kurt PinLock - Workholding TodayKurt PinLock - Workholding Today
Kurt PinLock - Workholding Today
Kurt Workholding
Ìý
Projects - senior machinery engineer
Projects - senior machinery engineerProjects - senior machinery engineer
Projects - senior machinery engineer
Chris Owen
Ìý
HOERBIGER Service MEA Introduction
HOERBIGER Service MEA IntroductionHOERBIGER Service MEA Introduction
HOERBIGER Service MEA Introduction
Ekundayo Ajayi
Ìý
Introducing imaging energy may2015 (1)
Introducing imaging energy may2015 (1)Introducing imaging energy may2015 (1)
Introducing imaging energy may2015 (1)
imagingenergy
Ìý
Kaizen (senior project)
Kaizen (senior project)Kaizen (senior project)
Kaizen (senior project)
Eihab Garout
Ìý
ASEZ Annual Report 2015_16 FINAL (5)
ASEZ Annual Report 2015_16 FINAL (5)ASEZ Annual Report 2015_16 FINAL (5)
ASEZ Annual Report 2015_16 FINAL (5)
Thabo Thulare
Ìý
EQUALIZING PRONG-4
EQUALIZING PRONG-4EQUALIZING PRONG-4
EQUALIZING PRONG-4
SYED BAKHTIARY
Ìý
David Mortimer – Summary ‘09
David Mortimer – Summary ‘09David Mortimer – Summary ‘09
David Mortimer – Summary ‘09
DavidMortimer
Ìý
Prax Air Interview Presentation
Prax Air Interview PresentationPrax Air Interview Presentation
Prax Air Interview Presentation
Shadasious
Ìý
Tales from the Trenches – Leveraging Agile on Fixed Fee Projects
Tales from the Trenches – Leveraging Agile on Fixed Fee ProjectsTales from the Trenches – Leveraging Agile on Fixed Fee Projects
Tales from the Trenches – Leveraging Agile on Fixed Fee Projects
Marco Silva
Ìý
Cement_infographic_AUG2014_Opt1
Cement_infographic_AUG2014_Opt1Cement_infographic_AUG2014_Opt1
Cement_infographic_AUG2014_Opt1
Joanne Tsarouha
Ìý
LNG Cap - Jan 2016
LNG Cap - Jan 2016LNG Cap - Jan 2016
LNG Cap - Jan 2016
Naqqash Todai
Ìý
Bauer fdp lost bit projects english
Bauer   fdp lost bit projects englishBauer   fdp lost bit projects english
Bauer fdp lost bit projects english
cfpbolivia
Ìý
Joseph Michaels Resume 1 (10)
Joseph Michaels Resume 1 (10)Joseph Michaels Resume 1 (10)
Joseph Michaels Resume 1 (10)
Joseph Michaels
Ìý
Kurt PinLock - Workholding Today
Kurt PinLock - Workholding TodayKurt PinLock - Workholding Today
Kurt PinLock - Workholding Today
Kurt Workholding
Ìý

Similar to Career Highlights (20)

KEY ATTRIBUTES FULL TEXT
KEY ATTRIBUTES FULL TEXTKEY ATTRIBUTES FULL TEXT
KEY ATTRIBUTES FULL TEXT
Aled Long
Ìý
Industrial training presentation
Industrial training presentationIndustrial training presentation
Industrial training presentation
Muhamad Farhan
Ìý
Turnkey Company Presentation Feb 2024.pptx
Turnkey Company Presentation Feb 2024.pptxTurnkey Company Presentation Feb 2024.pptx
Turnkey Company Presentation Feb 2024.pptx
andre538649
Ìý
RAJEEV GANDHI JANUARY 2016 RESUME
RAJEEV GANDHI JANUARY 2016 RESUMERAJEEV GANDHI JANUARY 2016 RESUME
RAJEEV GANDHI JANUARY 2016 RESUME
Rajeev Gandhi
Ìý
RESUME_BA
RESUME_BARESUME_BA
RESUME_BA
Bill Adler
Ìý
BDSResume1
BDSResume1BDSResume1
BDSResume1
Brandon D. Steele, Sr.
Ìý
Zhanyun Liu - CV standard
Zhanyun Liu - CV standardZhanyun Liu - CV standard
Zhanyun Liu - CV standard
zhanyun Liu
Ìý
Scott Smith-complete-employment-history
Scott Smith-complete-employment-historyScott Smith-complete-employment-history
Scott Smith-complete-employment-history
Scott Smith
Ìý
BDSResume1
BDSResume1BDSResume1
BDSResume1
Brandon D. Steele, Sr.
Ìý
Resume-Roger Stocksiek 1
Resume-Roger Stocksiek 1Resume-Roger Stocksiek 1
Resume-Roger Stocksiek 1
Roger Stocksiek
Ìý
John P Chan II
John P Chan IIJohn P Chan II
John P Chan II
john chan
Ìý
Javier Gómez García Resume
Javier Gómez García ResumeJavier Gómez García Resume
Javier Gómez García Resume
Javier Gomez
Ìý
Updated resume
Updated resumeUpdated resume
Updated resume
Rajendra Chakole
Ìý
KallalArunCV_TCS
KallalArunCV_TCSKallalArunCV_TCS
KallalArunCV_TCS
Arunachalam Kallal-Somasundaram
Ìý
Pegler Yorkshire record 25% uptime improvement after upgrade by Optima
Pegler Yorkshire record 25% uptime improvement after upgrade by OptimaPegler Yorkshire record 25% uptime improvement after upgrade by Optima
Pegler Yorkshire record 25% uptime improvement after upgrade by Optima
Optima Control Solutions
Ìý
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
Mujahid Ali Akhtar
Ìý
Process Engr_Rashid CV
Process Engr_Rashid CVProcess Engr_Rashid CV
Process Engr_Rashid CV
Rashid Iqbal
Ìý
CV - Bill Robb 2014
CV - Bill Robb 2014CV - Bill Robb 2014
CV - Bill Robb 2014
Billy Robb
Ìý
1407_A study in solutions_Hydrocarbon Engineering_November 2016
1407_A study in solutions_Hydrocarbon Engineering_November 20161407_A study in solutions_Hydrocarbon Engineering_November 2016
1407_A study in solutions_Hydrocarbon Engineering_November 2016
Julie Bodine, MBA
Ìý
CV - Bill Robb 2014
CV - Bill Robb 2014CV - Bill Robb 2014
CV - Bill Robb 2014
William Robb
Ìý
KEY ATTRIBUTES FULL TEXT
KEY ATTRIBUTES FULL TEXTKEY ATTRIBUTES FULL TEXT
KEY ATTRIBUTES FULL TEXT
Aled Long
Ìý
Industrial training presentation
Industrial training presentationIndustrial training presentation
Industrial training presentation
Muhamad Farhan
Ìý
Turnkey Company Presentation Feb 2024.pptx
Turnkey Company Presentation Feb 2024.pptxTurnkey Company Presentation Feb 2024.pptx
Turnkey Company Presentation Feb 2024.pptx
andre538649
Ìý
RAJEEV GANDHI JANUARY 2016 RESUME
RAJEEV GANDHI JANUARY 2016 RESUMERAJEEV GANDHI JANUARY 2016 RESUME
RAJEEV GANDHI JANUARY 2016 RESUME
Rajeev Gandhi
Ìý
RESUME_BA
RESUME_BARESUME_BA
RESUME_BA
Bill Adler
Ìý
Zhanyun Liu - CV standard
Zhanyun Liu - CV standardZhanyun Liu - CV standard
Zhanyun Liu - CV standard
zhanyun Liu
Ìý
Scott Smith-complete-employment-history
Scott Smith-complete-employment-historyScott Smith-complete-employment-history
Scott Smith-complete-employment-history
Scott Smith
Ìý
Resume-Roger Stocksiek 1
Resume-Roger Stocksiek 1Resume-Roger Stocksiek 1
Resume-Roger Stocksiek 1
Roger Stocksiek
Ìý
John P Chan II
John P Chan IIJohn P Chan II
John P Chan II
john chan
Ìý
Javier Gómez García Resume
Javier Gómez García ResumeJavier Gómez García Resume
Javier Gómez García Resume
Javier Gomez
Ìý
Pegler Yorkshire record 25% uptime improvement after upgrade by Optima
Pegler Yorkshire record 25% uptime improvement after upgrade by OptimaPegler Yorkshire record 25% uptime improvement after upgrade by Optima
Pegler Yorkshire record 25% uptime improvement after upgrade by Optima
Optima Control Solutions
Ìý
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
Mujahid Ali Akhtar
Ìý
Process Engr_Rashid CV
Process Engr_Rashid CVProcess Engr_Rashid CV
Process Engr_Rashid CV
Rashid Iqbal
Ìý
CV - Bill Robb 2014
CV - Bill Robb 2014CV - Bill Robb 2014
CV - Bill Robb 2014
Billy Robb
Ìý
1407_A study in solutions_Hydrocarbon Engineering_November 2016
1407_A study in solutions_Hydrocarbon Engineering_November 20161407_A study in solutions_Hydrocarbon Engineering_November 2016
1407_A study in solutions_Hydrocarbon Engineering_November 2016
Julie Bodine, MBA
Ìý
CV - Bill Robb 2014
CV - Bill Robb 2014CV - Bill Robb 2014
CV - Bill Robb 2014
William Robb
Ìý

Career Highlights

  • 1. CareerHighlights: ï‚· Develop Weld Procedures to repair FPF while at Operational Draught without interruption to Oil Production and Export. ï‚· Carry Out UWILD survey while on location carrying out ACFM inspection of welds ï‚· Northern Producer Hybrid mooring system design & installation ï‚· Installed the first offshore installation in the German Sector. HVDC transformer platform. ï‚· Increased Thistle Alpha Production by 1000bbls per day though choke management ï‚· Increased Thistle Alpha productive time 45% to 87% over an 18 month period. ï‚· Provided idea to Enquest to increase the Thistle life of field. Enquest have just received an engineering award for implementing the idea. ï‚· Changed Thistle Alpha DFPV procedure to release work fronts within 48hrs of commencing shutdown. From 7 days ï‚· SIMOPS organisation of both Thistle Alpha & Heather Alpha ï‚· Management re-organisation of Montrose & Arbroath platforms ï‚· Produced drilling readiness audit