ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
¸éé²õ³Ü³¾Ã©
Said Bourbab
Career Statement
Said Bourbab, Dutch nationality, I got my bachelor after Bachelor degree in 1997 at Higher School of
Rotterdam, study towards energy technology.
During my carrier ,I worked by different companies in different Areas in the Netherlands, Belgium and
France. I did several tasks from Electrical Engineer to Site Manager (seen my cv for more info).
Personal Details
Name: Said Bourbab
GSM No: +32465946455 /+ 31 68 55 85 114
E-Mail: s.bourbab@gmail.com
Birthdate: 04/02/1965
Address: Frederik van Eedenplein, 2050 Antwerp, Belgium
Languages Spoken
Dutch, English, French and Arabic
Education
School/University Period Certificate
High School of electronics, Rotterdam, The Netherlands 1994-1997 Bachelor-energy
University of sciences Abdelmalik Saadi, Morocco 1986 - 1990 Physics/Mathematics
Certificates:
ï‚· VCA ++, NEN 3140, NH2/NH3
ï‚· Piping Engineering (certificate 29 February 2016).
Skills:
Management:
• Managing electrical projects (HV+LV) and define the risks analyze;
• Calculation of costs in money and time
• Ensure the safety of people and equipment’s,
• Create schedule of activities;
• Manage the meetings with clients and subcontractors;
Installation (HV/LV/Data) of the cables and instrumentation (E&I):
• Define and manage the cable list and calculation of the thickness of the cables;
• Plans for the cableways, cable routing and Earthing network
• Coordinating testing, commissioning and energizing of all cabling;
• Control and maintenance of the instrumentation on field;
Design, inspection and administration of the networks:
• Load balance and Single Line Diagram;
• The PA, CCTV and Fire alarm systems;
• The sprinkler system;
• Lighting including the fixtures;
Detailed Work Experience
September 2015 – july 2016 - Engie-Fabricom:
Engineering manager / E&I Surveyor
For the construction of the extension wind stations, I was busy with the control of the installation and
the engineering of different electric systems following the specifications and reporting the overall
progress to the management team.
Responsibilities:
ï‚· Supervise the electrical works on field: HV/ LV systems, and all
Auxiliary & SCADA systems,
ï‚· Quantity controller,
ï‚· Management of the cable/equipment list: pulling, connecting and
testing
ï‚· Report the daily Progress of the construction platform to the
Project managers,
ï‚· Composition of system documents: Fire Fighting, HV, LV, UPS, 110VDC, HVAC, Diesel
Generator system …etc;
ï‚· Supports the project commissioning supervisors for the onshore commissioning and
testing activities
ï‚· Control and adjustment of the electrical construction drawings.
Jan 2015 – Aug 2015 - Van Oord:
Project Manager
For the building of a new cable laying vessel (Nexus) with a cable
carousel capacity of 5000 tons, I did the management and the control
of the electrical installation.
Responsibilities:
ï‚· System Integrator
ï‚· Electrical engineering;
ï‚· Supporting inspection and monitoring of electrical installation and
ï‚· commissioning activities.
ï‚· Checking as built documentation prior to issue ensuring correct and complete information
is present
2013 - 2014 - SMIT Transformers:
Project Manager
For various projects related to the installation of the transformers from 100 MVA up to 1,200 MVA
and/or its parts, I was responsible for the management of these projects
Responsibilities:
ï‚· Management of international projects;
ï‚· Site manager for EDF-Nuclear site
ï‚· Maintain a safe work environment within the team and the
contractors on site according to Engineering Change
Request (ECR) and project health, safety, security,
environment (HSSE) guidelines and procedures.
ï‚· Supports the project commissioning supervisors for the commissioning and testing
activities,
ï‚· Directing the field operations of the various specialty contractors on the project site;
ï‚· Quality Control; Budget control and safety control
ï‚· Supervises subcontractors work development is in line with agreed schedules and to
required spec/quality.
ï‚· Updating the project when risks are identified;
 Transport documents, Lettre of Crédit; EUR1, EXA
My clients for this period:
Countries Companies Functions/Tasks
Saudi Arabia Alfanar Transformer Tap Changer
France EDF Site Manager: installation new transformers
Scotland Scottish Power High voltage Transformer Cable Boxes
Algeria SonelGaz High voltage equipments
Netherlands Many companies Services and maintenance
2011-2012 - Tractebel Engineering (GDF Suez)
Electrical Supervisor, Quality and Quantity Controller
Construction of the 800MW Coal Fired Power Plant in Rotterdam-Maasvlakte
Responsibilities:
ï‚· Field Management Support
ï‚· Supervision of the electrical works (cables, cable trays,
HVAC, Gas detectors, ...etc)
ï‚· Commissioning Assistent,
ï‚· Checking all drawings for accuracy and Coordinator of the
QA/QC activities
ï‚· Inspection of the electrical equipments/installations
ï‚· Application of the Standards: NEN 1010, NEN 3140 and
3840
ï‚· Supervision/coordination of 380KV cable pulling works from the central to the
distribution Network (Tennet)
ï‚· Daily inspections, and adherence to project schedules + punch list
ï‚· Supervisor for the civil and mechanical works and identify of the quality problems;
ï‚· Reporting to senior management
2010 - Various companies:
Project Manager
Renovation of schools and buildings:
Responsibilities:
ï‚· Made the electrical- and lightings plans
ï‚· Installation of the electrical lighting for buildings and schools
 Installation of the security camera’s
ï‚· Installation of the sound systems
ï‚· Project cost calculation
2008 - 2009 - Damen Naval shipbuilding: Senior Electrical Engineer
Construction of three Multimitions Frigates for the Moroccan Navy
Responsibilities:
ï‚· Control/Engineering of the electrical drawings;
ï‚· Control of the load balance;
ï‚· Managing and organizing the Interface and Planning meetings between the suppliers;
ï‚· Engineering of the instrumentation
ï‚· Preparation of FAT and / or SAT protocols
ï‚· Application of the Standards : Lloyds, Damen and the specifications;
ï‚· Control of the electrical documentations mad by Suppliers and Imtech;
ï‚· Report to the different parties of the project (Imtech + Thales + Damen + Heinen &
Hopman);
ï‚· Translation of the documents from Engels to French;
ï‚· Quality Control on the ship (cables, Cable Trays and the electrical equipments)
2007 – 2008 - Keppel Verolme: Senior Electrical Engineer
Renovation of the electrical apparatus and cables in the oilrig
Responsibilities:
ï‚· Overall supervision of the electrical cables
ï‚· Maintenance of standards
ï‚· Inspection of the cable types and implementation of the data
ï‚· Perform administrative functions such as writing technical reports
and ordering materials
ï‚· Inspection and upgrade of the telecommunication and calamities alarm network
ï‚· Up to date the drawings
ï‚· Report to the high management the weekly project implementation
2006 - 2007 - Ericsson: Transmission Engineer
Realization of an optimal working Ericsson microwave Links network
Responsibilities:
ï‚· Management of telecom site projects
ï‚· Network planning with Maximo, Site Handler and IQ-Link
ï‚· Resolve transmission Networks problems
ï‚· Networks planning for new sites and upgrade the older Microwaves
Radio links
ï‚· Design the frequency planning for the transmission paths
ï‚· Define the sites for the fiber nodes (CAT1) and the hubs (CAT2)
ï‚· Participation on final site survey for approved nominee.
2000 - 2005 - KPN Mobile: Transmission Engineer and Project Leader
Realization of an optimal working radio and microwave net on lung period according to the marketing
requirement.
Responsibilities:
ï‚· Management of telecom microwaves site projects
ï‚· Network Planning with IQ-Link
ï‚· Coast calculation of various telecom projects
ï‚· Main driver for CAPEX and OPEX finance budgets
ï‚· Managing the civil engineering of the sites with the contractors
ï‚· Capacity and frequency planning for PDH & SDH network
ï‚· Rollout planning and administration end-to end physical and/or logical
trouble isolation on customer digital data services
ï‚· Testing and optimization of the Microwaves network
 Installation, testing, commissioning of the equipment’s
1998 – 1999 - IV-Oil & Gas: Electrical Engineer
Various projects: Electrical plans en Cost calculations
Responsibilities:
ï‚· CADVEW: Design instrument loop protection diagram For a K4BE Satelliet Platform
ï‚· Managing the civil engineering of various buildings
ï‚· Cost calculation of various electrical projects
ï‚· Reporting and writing specifications of civil constructions
ï‚· Defining the Hazardous area classification in the oil refinery
ï‚· Various projects for heating, ventilation and air conditioning
1997 – 1998 - NBM Petrol System & Services: Electrical Engineer
Planner and cost calculator of the electrical Projects
Responsibilities:
ï‚· Managing the electrical engineering of various Petrol stations
ï‚· Cost calculation of various electrical projects
ï‚· Reporting and writing specifications of electrical constructions
ï‚· Installation and test of new computer software and hardware within a networks
1996 – 1997 - Exxon Mobile: Junior Project Engineer
Technical administration for various projects inside the company
Responsibilities:
ï‚· Cost calculation of the electrical Project;
ï‚· Inspection and maintenance of the electrical Network;
ï‚· Inspection of the battery systems;
ï‚· calculation of the cable cross-section

More Related Content

What's hot (20)

MOHAMED SALEM C.V
MOHAMED  SALEM  C.VMOHAMED  SALEM  C.V
MOHAMED SALEM C.V
mohamed salem
Ìý
1.mep engineer latest
1.mep engineer latest1.mep engineer latest
1.mep engineer latest
Arun Das
Ìý
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updated
Nouman Jamil
Ìý
Curriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey GuiebCurriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey Guieb
Mario Rey Rguieb_68
Ìý
Jon_MacInnis_Electrical
Jon_MacInnis_ElectricalJon_MacInnis_Electrical
Jon_MacInnis_Electrical
Jon MacInnis
Ìý
AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016
Ahmed Maamoun
Ìý
Curriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey GuiebCurriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey Guieb
Mario Rey Rguieb_68
Ìý
Intertest
IntertestIntertest
Intertest
Ivaylo Popov
Ìý
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
KAJA MOHIDEEN
Ìý
Steve Scott CV
Steve Scott CVSteve Scott CV
Steve Scott CV
Steve Scott
Ìý
Ww cv 2016
Ww cv 2016Ww cv 2016
Ww cv 2016
Walt Williams
Ìý
Brian Norton
Brian NortonBrian Norton
Brian Norton
Brian Norton
Ìý
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
sajeevrajagopalan nair
Ìý
Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016
dil mus
Ìý
The W4 Group Presentation 1
The W4 Group Presentation 1The W4 Group Presentation 1
The W4 Group Presentation 1
Christopher White
Ìý
Ww CV 2016
Ww CV 2016Ww CV 2016
Ww CV 2016
Walt Williams
Ìý
CV C Poenaru
CV C PoenaruCV C Poenaru
CV C Poenaru
CAMELIA POENARU
Ìý
mustapha ..b
mustapha ..bmustapha ..b
mustapha ..b
mustafa al kalidi
Ìý
Irfan-Mohammad
Irfan-MohammadIrfan-Mohammad
Irfan-Mohammad
Mohammed Irfan Parvaz
Ìý
MPK - Resume
MPK - ResumeMPK - Resume
MPK - Resume
Kariappa M.P
Ìý
MOHAMED SALEM C.V
MOHAMED  SALEM  C.VMOHAMED  SALEM  C.V
MOHAMED SALEM C.V
mohamed salem
Ìý
1.mep engineer latest
1.mep engineer latest1.mep engineer latest
1.mep engineer latest
Arun Das
Ìý
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updated
Nouman Jamil
Ìý
Curriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey GuiebCurriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey Guieb
Mario Rey Rguieb_68
Ìý
Jon_MacInnis_Electrical
Jon_MacInnis_ElectricalJon_MacInnis_Electrical
Jon_MacInnis_Electrical
Jon MacInnis
Ìý
AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016
Ahmed Maamoun
Ìý
Curriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey GuiebCurriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey Guieb
Mario Rey Rguieb_68
Ìý
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
KAJA MOHIDEEN
Ìý
Steve Scott CV
Steve Scott CVSteve Scott CV
Steve Scott CV
Steve Scott
Ìý
Brian Norton
Brian NortonBrian Norton
Brian Norton
Brian Norton
Ìý
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
sajeevrajagopalan nair
Ìý
Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016
dil mus
Ìý
The W4 Group Presentation 1
The W4 Group Presentation 1The W4 Group Presentation 1
The W4 Group Presentation 1
Christopher White
Ìý
MPK - Resume
MPK - ResumeMPK - Resume
MPK - Resume
Kariappa M.P
Ìý

Similar to CV-EN+ (20)

CV PF
CV PFCV PF
CV PF
Manzoor Ahmad
Ìý
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Ibrahem Sakkot
Ìý
CV mohamed -2016
CV mohamed  -2016CV mohamed  -2016
CV mohamed -2016
Mohamed Abd-Elrahman
Ìý
CV mohamed -2016
CV mohamed  -2016CV mohamed  -2016
CV mohamed -2016
Mohamed Abd-Elrahman
Ìý
ENG ISLAM SAID
ENG ISLAM SAIDENG ISLAM SAID
ENG ISLAM SAID
Eslam Mohamed
Ìý
CV Joris Van Den Bosch
CV Joris Van Den BoschCV Joris Van Den Bosch
CV Joris Van Den Bosch
Joris Van den Bosch
Ìý
Cover Letter - CV Full - PerRef - Nord Gonzalez
Cover Letter - CV Full - PerRef - Nord GonzalezCover Letter - CV Full - PerRef - Nord Gonzalez
Cover Letter - CV Full - PerRef - Nord Gonzalez
Nord Gonzalez
Ìý
Electronic& Electrical Engineer, LUAY's PROFESSIONAL RESUME in English .
Electronic& Electrical Engineer, LUAY's PROFESSIONAL RESUME in English .Electronic& Electrical Engineer, LUAY's PROFESSIONAL RESUME in English .
Electronic& Electrical Engineer, LUAY's PROFESSIONAL RESUME in English .
Luay Philip
Ìý
ENG Ayman ali
ENG Ayman aliENG Ayman ali
ENG Ayman ali
ayman ali
Ìý
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Ali Omar
Ìý
Ahmed Elsayed Salem CV
Ahmed Elsayed Salem CVAhmed Elsayed Salem CV
Ahmed Elsayed Salem CV
Ahmed Salem
Ìý
Hani Shaker mep
Hani Shaker mepHani Shaker mep
Hani Shaker mep
hani ayyad
Ìý
Kerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum VitaeKerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum Vitae
Kerry Ow Buland
Ìý
Electrical_Engineer_CV
Electrical_Engineer_CVElectrical_Engineer_CV
Electrical_Engineer_CV
Al_hassan Khalifa
Ìý
consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11
Ali Elamin
Ìý
¸éé²õ³Üé
¸éé²õ³Üé¸éé²õ³Üé
¸éé²õ³Üé
jjwesdorp
Ìý
¸éé²õ³Ü³¾Ã©
¸éé²õ³Ü³¾Ã©¸éé²õ³Ü³¾Ã©
¸éé²õ³Ü³¾Ã©
jjwesdorp
Ìý
N137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CVN137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CV
Eben van Dyk
Ìý
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
waleed thabet
Ìý
Nizar Maddah CV
Nizar Maddah CVNizar Maddah CV
Nizar Maddah CV
Nizar Maddah
Ìý
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Ibrahem Sakkot
Ìý
ENG ISLAM SAID
ENG ISLAM SAIDENG ISLAM SAID
ENG ISLAM SAID
Eslam Mohamed
Ìý
Cover Letter - CV Full - PerRef - Nord Gonzalez
Cover Letter - CV Full - PerRef - Nord GonzalezCover Letter - CV Full - PerRef - Nord Gonzalez
Cover Letter - CV Full - PerRef - Nord Gonzalez
Nord Gonzalez
Ìý
Electronic& Electrical Engineer, LUAY's PROFESSIONAL RESUME in English .
Electronic& Electrical Engineer, LUAY's PROFESSIONAL RESUME in English .Electronic& Electrical Engineer, LUAY's PROFESSIONAL RESUME in English .
Electronic& Electrical Engineer, LUAY's PROFESSIONAL RESUME in English .
Luay Philip
Ìý
ENG Ayman ali
ENG Ayman aliENG Ayman ali
ENG Ayman ali
ayman ali
Ìý
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Ali Omar
Ìý
Ahmed Elsayed Salem CV
Ahmed Elsayed Salem CVAhmed Elsayed Salem CV
Ahmed Elsayed Salem CV
Ahmed Salem
Ìý
Hani Shaker mep
Hani Shaker mepHani Shaker mep
Hani Shaker mep
hani ayyad
Ìý
Kerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum VitaeKerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum Vitae
Kerry Ow Buland
Ìý
Electrical_Engineer_CV
Electrical_Engineer_CVElectrical_Engineer_CV
Electrical_Engineer_CV
Al_hassan Khalifa
Ìý
consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11
Ali Elamin
Ìý
¸éé²õ³Üé
¸éé²õ³Üé¸éé²õ³Üé
¸éé²õ³Üé
jjwesdorp
Ìý
¸éé²õ³Ü³¾Ã©
¸éé²õ³Ü³¾Ã©¸éé²õ³Ü³¾Ã©
¸éé²õ³Ü³¾Ã©
jjwesdorp
Ìý
N137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CVN137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CV
Eben van Dyk
Ìý
Nizar Maddah CV
Nizar Maddah CVNizar Maddah CV
Nizar Maddah CV
Nizar Maddah
Ìý

CV-EN+

  • 1. ¸éé²õ³Ü³¾Ã© Said Bourbab Career Statement Said Bourbab, Dutch nationality, I got my bachelor after Bachelor degree in 1997 at Higher School of Rotterdam, study towards energy technology. During my carrier ,I worked by different companies in different Areas in the Netherlands, Belgium and France. I did several tasks from Electrical Engineer to Site Manager (seen my cv for more info). Personal Details Name: Said Bourbab GSM No: +32465946455 /+ 31 68 55 85 114 E-Mail: s.bourbab@gmail.com Birthdate: 04/02/1965 Address: Frederik van Eedenplein, 2050 Antwerp, Belgium Languages Spoken Dutch, English, French and Arabic Education School/University Period Certificate High School of electronics, Rotterdam, The Netherlands 1994-1997 Bachelor-energy University of sciences Abdelmalik Saadi, Morocco 1986 - 1990 Physics/Mathematics Certificates: ï‚· VCA ++, NEN 3140, NH2/NH3 ï‚· Piping Engineering (certificate 29 February 2016). Skills: Management: • Managing electrical projects (HV+LV) and define the risks analyze; • Calculation of costs in money and time • Ensure the safety of people and equipment’s, • Create schedule of activities; • Manage the meetings with clients and subcontractors; Installation (HV/LV/Data) of the cables and instrumentation (E&I): • Define and manage the cable list and calculation of the thickness of the cables; • Plans for the cableways, cable routing and Earthing network • Coordinating testing, commissioning and energizing of all cabling; • Control and maintenance of the instrumentation on field; Design, inspection and administration of the networks: • Load balance and Single Line Diagram; • The PA, CCTV and Fire alarm systems; • The sprinkler system; • Lighting including the fixtures;
  • 2. Detailed Work Experience September 2015 – july 2016 - Engie-Fabricom: Engineering manager / E&I Surveyor For the construction of the extension wind stations, I was busy with the control of the installation and the engineering of different electric systems following the specifications and reporting the overall progress to the management team. Responsibilities: ï‚· Supervise the electrical works on field: HV/ LV systems, and all Auxiliary & SCADA systems, ï‚· Quantity controller, ï‚· Management of the cable/equipment list: pulling, connecting and testing ï‚· Report the daily Progress of the construction platform to the Project managers, ï‚· Composition of system documents: Fire Fighting, HV, LV, UPS, 110VDC, HVAC, Diesel Generator system …etc; ï‚· Supports the project commissioning supervisors for the onshore commissioning and testing activities ï‚· Control and adjustment of the electrical construction drawings. Jan 2015 – Aug 2015 - Van Oord: Project Manager For the building of a new cable laying vessel (Nexus) with a cable carousel capacity of 5000 tons, I did the management and the control of the electrical installation. Responsibilities: ï‚· System Integrator ï‚· Electrical engineering; ï‚· Supporting inspection and monitoring of electrical installation and ï‚· commissioning activities. ï‚· Checking as built documentation prior to issue ensuring correct and complete information is present 2013 - 2014 - SMIT Transformers: Project Manager For various projects related to the installation of the transformers from 100 MVA up to 1,200 MVA and/or its parts, I was responsible for the management of these projects Responsibilities: ï‚· Management of international projects; ï‚· Site manager for EDF-Nuclear site ï‚· Maintain a safe work environment within the team and the contractors on site according to Engineering Change Request (ECR) and project health, safety, security, environment (HSSE) guidelines and procedures. ï‚· Supports the project commissioning supervisors for the commissioning and testing activities, ï‚· Directing the field operations of the various specialty contractors on the project site; ï‚· Quality Control; Budget control and safety control
  • 3. ï‚· Supervises subcontractors work development is in line with agreed schedules and to required spec/quality. ï‚· Updating the project when risks are identified; ï‚· Transport documents, Lettre of Crédit; EUR1, EXA My clients for this period: Countries Companies Functions/Tasks Saudi Arabia Alfanar Transformer Tap Changer France EDF Site Manager: installation new transformers Scotland Scottish Power High voltage Transformer Cable Boxes Algeria SonelGaz High voltage equipments Netherlands Many companies Services and maintenance 2011-2012 - Tractebel Engineering (GDF Suez) Electrical Supervisor, Quality and Quantity Controller Construction of the 800MW Coal Fired Power Plant in Rotterdam-Maasvlakte Responsibilities: ï‚· Field Management Support ï‚· Supervision of the electrical works (cables, cable trays, HVAC, Gas detectors, ...etc) ï‚· Commissioning Assistent, ï‚· Checking all drawings for accuracy and Coordinator of the QA/QC activities ï‚· Inspection of the electrical equipments/installations ï‚· Application of the Standards: NEN 1010, NEN 3140 and 3840 ï‚· Supervision/coordination of 380KV cable pulling works from the central to the distribution Network (Tennet) ï‚· Daily inspections, and adherence to project schedules + punch list ï‚· Supervisor for the civil and mechanical works and identify of the quality problems; ï‚· Reporting to senior management 2010 - Various companies: Project Manager Renovation of schools and buildings: Responsibilities: ï‚· Made the electrical- and lightings plans ï‚· Installation of the electrical lighting for buildings and schools ï‚· Installation of the security camera’s ï‚· Installation of the sound systems ï‚· Project cost calculation
  • 4. 2008 - 2009 - Damen Naval shipbuilding: Senior Electrical Engineer Construction of three Multimitions Frigates for the Moroccan Navy Responsibilities: ï‚· Control/Engineering of the electrical drawings; ï‚· Control of the load balance; ï‚· Managing and organizing the Interface and Planning meetings between the suppliers; ï‚· Engineering of the instrumentation ï‚· Preparation of FAT and / or SAT protocols ï‚· Application of the Standards : Lloyds, Damen and the specifications; ï‚· Control of the electrical documentations mad by Suppliers and Imtech; ï‚· Report to the different parties of the project (Imtech + Thales + Damen + Heinen & Hopman); ï‚· Translation of the documents from Engels to French; ï‚· Quality Control on the ship (cables, Cable Trays and the electrical equipments) 2007 – 2008 - Keppel Verolme: Senior Electrical Engineer Renovation of the electrical apparatus and cables in the oilrig Responsibilities: ï‚· Overall supervision of the electrical cables ï‚· Maintenance of standards ï‚· Inspection of the cable types and implementation of the data ï‚· Perform administrative functions such as writing technical reports and ordering materials ï‚· Inspection and upgrade of the telecommunication and calamities alarm network ï‚· Up to date the drawings ï‚· Report to the high management the weekly project implementation 2006 - 2007 - Ericsson: Transmission Engineer Realization of an optimal working Ericsson microwave Links network Responsibilities: ï‚· Management of telecom site projects ï‚· Network planning with Maximo, Site Handler and IQ-Link ï‚· Resolve transmission Networks problems ï‚· Networks planning for new sites and upgrade the older Microwaves Radio links ï‚· Design the frequency planning for the transmission paths ï‚· Define the sites for the fiber nodes (CAT1) and the hubs (CAT2) ï‚· Participation on final site survey for approved nominee.
  • 5. 2000 - 2005 - KPN Mobile: Transmission Engineer and Project Leader Realization of an optimal working radio and microwave net on lung period according to the marketing requirement. Responsibilities: ï‚· Management of telecom microwaves site projects ï‚· Network Planning with IQ-Link ï‚· Coast calculation of various telecom projects ï‚· Main driver for CAPEX and OPEX finance budgets ï‚· Managing the civil engineering of the sites with the contractors ï‚· Capacity and frequency planning for PDH & SDH network ï‚· Rollout planning and administration end-to end physical and/or logical trouble isolation on customer digital data services ï‚· Testing and optimization of the Microwaves network ï‚· Installation, testing, commissioning of the equipment’s 1998 – 1999 - IV-Oil & Gas: Electrical Engineer Various projects: Electrical plans en Cost calculations Responsibilities: ï‚· CADVEW: Design instrument loop protection diagram For a K4BE Satelliet Platform ï‚· Managing the civil engineering of various buildings ï‚· Cost calculation of various electrical projects ï‚· Reporting and writing specifications of civil constructions ï‚· Defining the Hazardous area classification in the oil refinery ï‚· Various projects for heating, ventilation and air conditioning 1997 – 1998 - NBM Petrol System & Services: Electrical Engineer Planner and cost calculator of the electrical Projects Responsibilities: ï‚· Managing the electrical engineering of various Petrol stations ï‚· Cost calculation of various electrical projects ï‚· Reporting and writing specifications of electrical constructions ï‚· Installation and test of new computer software and hardware within a networks 1996 – 1997 - Exxon Mobile: Junior Project Engineer Technical administration for various projects inside the company Responsibilities: ï‚· Cost calculation of the electrical Project; ï‚· Inspection and maintenance of the electrical Network; ï‚· Inspection of the battery systems; ï‚· calculation of the cable cross-section