際際滷

際際滷Share a Scribd company logo
CURRICULAM VITAE
DABBIRU VENKATA RAMANA MURTHY
D/NO: 32-10-57/3
Venkateswara Colony
Sheela Nagar
Visakhapatnam-530012
AP, INDIA
Contact mobile no +91-9966070722/7742684502
Email id: dabbiru.murthy@gmail.com
Career Profile
Having 19+ years total experience which includes 12 years Gulf experience in OIL &
GAS PLANTS, Such as TURBINES, CENTRIFUGAL COMPRESSORS & PUMPS, GAS
ENGINES, HEAVY VALVES mechanical parts and Equipment installations in various
construction and maintenance projects.(Oil gathering center, Refineries, Petrochemical plants,
crude Oil distribution systems, crude oil desalting system, flare gas recovery systems, condensate
recovery units)
Associated with Major Multinational Companies like AL NASR, KNPC, KOC, QATAR
PETROLEUM (QP), QVC, L&T, SHOFT Engineering & Construction, and HOFINCONS
INDUSTRIAL SERVICES. Maintenance, Testing and Pre-commissioning, Erection of associated
Equipments for Refineries, Offshore & ON-Shore Oil & Gas projects.
EDUCATION QUALIFICATION
Technical Qualifications : Diploma in Mechanical Engineering
Computer knowledge : MS-Office , Windows 98/2000/XP/SAP SYSTEM
.
Employment Record
Present position
1) EMPLOYER : CAIRN INDIA LTD,
PERIOD : From 03rd
Oct 2011 to till Date,
POSITION HELD : Sr MECHANICAL ENGINEER
Key responsibilities
 Preparing Preventive Maintenance schedule of equipments as per manufacturer
recommendation and compliance thereof.
 Shutdown supervision and execution with assigned work force for all departments in
complex. Coordinating with contractors for job allocation, and completion thereof in time.
 Preparation of critical spares required and inventories control.
 Documents maintaining of ISO 9001, ISO 14001, OHSAS 14001
 Development of the standard maintenance practices (SMPs) and Risk assessments.
 Development of the subordinates & juniors by planning of the training & validation test.
 Good working experience in industrial SAP system.
 Having the experience of better utilization of manpower, machines material & shift handling.
2) EMPLOYER : CONSTRUCTION DEVALOPMENT COMPANY,
PROJECT : QATAR VINYL COMPANY,
PERIOD : From 14th
March 2011 to 25th
September
POSITION HELD : MECHANICAL SUPARVISOR
Key responsibilities
.
 Review of P & IDs, Isometric Drawing, & equipment Drawings.
 Involved in 50 MV GE TURBAIN intermediate overhauling and major involvement in hot
path inspection
 Recycle gas compressor , atlas copco air compressor, chlorine compressor major overhauling
 Making all kind of alignments such as rim face, reverse, and laser alignments
 Dismantling of mechanical seals serviceing,re-assembling and testing
3) EMPLOYER : BRUNEL INDIA PRIVATE LIMITED
CLIENT : CAIRN INDIA PVT LTD
PERIOD : From June 2010 to Feb 2011
POSITION HELD : MECHANICAL ENGINEER
Key responsibilities
 Responsible to check specifications and drawings with latest revision.
 Preventive maintenance of all kind rotating equipment
 Involved in TRIVENI 12 MV STEAM TURBAIN in major shutdown
 Daily check of all oil and gas pads
 To take the permit responsibility in all kind of jobs
 Witness for Hydro static/Pneumatic test.
4) EMPLOYER : CONSTRUCTION DEVALOPMENT COMPANY,
PROJECT : QATAR VINYL COMPANY& QATAR PETROLIUMS
PERIOD : From May 2009 to June 2010
POSITION HELD : MECHANICAL ENGINEER
Key responsibilities
 Major shutdown of four 50 MV GE TURBAINS
 Involved in total fuel combines chamber for dismantling
 Involved in main crank shaft leaner arty test and shaft trueness
 Replaced the all lube oil system modification
 Inspect the packages with approved P & ID and as built isometric drawings.
 Responsible to co-ordinate material issue and control.
 Responsible to ensure material conformity before issue and use
5) EMPLOYER : LARSON & TOUBRO INDIA LTD
PROJECT : VISAKAPATNAM VESSAL PROJECT
OWNER : NAVEL DOCK YARD
PERIOD : From March 2006 to May 2009
POSITION HELD : MECHANICAL SUPERVISOR
Key responsibilities
 Ensuring conformity to Drawings, specifications & Codes.
 Review of P & IDs, Isometric Drawing, Equipment Drawings
 Responsible to monitors daily Equipment erecting activities.
 To conduct Hydro testing and Pneumatic testing of pipe lines and to get it
inspected.
 Alignment the 13 meter length and 350 mm dia of crank shaft with 8 dial gauges
 Alignment of 16 ton main gear box with 12 ton thrust bearing
 Involved in main heavy pumps, centrifugal compressors dismantling and
overhauling
 Dismantling and assembling of heavy gate valves, gear boxes,
6) EMPLOYER : CONSTRUCTION DEVALOPMENT COMPANY,
PROJECT : QATAR VINYL COMPANY& QATAR PETROLIUMS
PERIOD : From Sep 2004 to Jan 2006
POSITION HELD : MECHANICAL FOREMAN & TECHANICIAN
Key responsibilities
 Responsible to monitors daily preventive maintenance
 Review of P & IDs, Isometric Drawing,& Equipment Drawings
 To conduct Hydro testing and Pneumatic testing of pipe lines and to get it
inspected.
7) EMPLOYER : AL MEER TECHNICAL SERVICES WLL
OWNER : Kuwait Oil Company (KOC).
PERIOD : From June 1999 to May 2004
POSITION HELD : LEAD MECHANICAL TECHINICION
Key responsibilities
 Review of P & IDs, Isometric Drawing,& Equipment Drawings
 To carry out the routine plant maintenance activities, connecting with onshore oil gathering
centers , booster station and super G.C  27&28having a capacity of
200,000 BPD containing oil & gas separators , desalters , crude oil path
heaters , booster pumps and feed pumps
 Involved in RUSTAN TA 1500, TB5000, GE 5002 Series solar turbine intermediate
overhauling , major overhaul of GE turbine
 Involved in DRESSER CLARK  KAWASKI (RB5S,RB8S&RB7B) and
SOLAR(C304,C306 &C160)
 Involved in COOPER BESSMER 16 V 250 GAS ENGINE and C.B INTEGRAL
COMPRESSOR mini checks and inter overhauling
 Co-coordinating with site foreman and reporting head of department
8) EMPLOYER : AL NASR TRADEING & CONTRACTING WLL
CLINET : OMAN OIL COMPANY WLL
PERIOD : From April 1998 to Feb 1999.
POSITION HELD : SENIOR MECHANICAL TECHANICION
Key responsibilities
 Read the equipment drawings, understand the scope of work, and distribute the work to the
work men.
 Responsible for daily preventive maintenance jobs
 Involved in erecting, commissioning, and overhauling of all kind of rotating
equipments
 Maintenance of all kind of single stage and malty stage centrifugal pumps
 Dynamic balance of crank shafts and lapping of compressor valve parts
 Preparation of hydro test, tie-in, hot tap tie-in Packages & Coordinating quality control
activities.
 Responsible for safety work of the project and maintains all safety records and
training to all crew for safe work and permit system.
9) EMPLOYER : HOFINCONS INDUSTRIAL SERVICES PVT LTD
CLINET : BELL GRNITO CERAMIC LTD
PERIOD : From June 1995 to March 1998.
POSITION HELD : SENIOR MECHANICAL TECHANICION
Key responsibilities
 Alignment of 110 meter and 3.2 dia rotary kiln with three location foundation and 12
bearing pads
 Blue matching of half bush bearing with gun metal
 Involved in erecting, commissioning, and overhauling of all kind of rotating
equipments
 Worked in 50 ton & 75 ball mills alignment with v belts
 Aligned bull gear to pinion with dial gauge indicator
 Checking the backlash of gear box with feeler gauge
 Involved in dismantling of plate heat exchanger, and tube heat exchanger and
hydro test
DOCUMENTATION:
Good knowledge in understanding the Safety related documents, SMP, JSA, General
Procedures, stage inspection and Checklist related to Pre Commissioning, Commissioning,
and Maintenance activities
PERSONAL DETAILS
Name : D.V.R.MURTHY
Date of Birth : 28-08-1972
Gender : Male
Marital Status : Married
Nationality : Indian
Languages Known : English, Telugu, Hindi & Tamil
POSSPORT DETAILS
Passport No. : G2297419
Place of Issue : VISAKHAPATNAM
Date of Issue : 10 / 05 / 2007
Date of expiry : 09 / 05 / 2017.
DECLARATION
I here by declare that above information and particulars are correct to the best of my
knowledge and belief. I feel honored if called for an interview at your convenience.
D.V.R.Murthy

More Related Content

What's hot (20)

DOC
Current Public Resume
Lee Riopel
PDF
Mohamed Behiry CV
mohamed behiry
DOC
Madhankumar new cv 2016 june6985
Madhan kumar Thangaraj (International Relationship)
PDF
CV-KMBabu-22-05-2015
manoranjan mbkaranam
DOC
Madhankumar new cv 2016 june6985
Madhan kumar Thangaraj (International Relationship)
DOCX
RESUME-Latest
Jayanta Paul
DOC
Veerappa Panchal_Piping Stress Engineer
veerappa panchal
DOC
UWANDU KENNETH CV
Kenneth Uwandu
DOC
GNS Resume 22.02.16
Gajanan Sawant
DOC
Cv Rafee
Shamsudheen Rafee
DOCX
Arsalan 1
Arsalan Hameed
DOC
HAREESH PILLAI S
Hareesh Pillai
DOCX
R_SealsResume2015
Rocky Seals
DOCX
CV for the post of Mud Specialist I Drilling Fluids Engineer
Bhaskar Hazarika
DOCX
SENTHIL PANDIAN CV
Senthil Pandian
DOC
FINAL CV
RHALF LLAMERA
DOCX
CURRICULUM VITAE
MOHAMMAD KABIR AHMAD AHSAN
DOC
Sathiyaprabhu Piping Stress Engineer CV 2015
sathiya prabhu
DOCX
rajpanday
raj panday
Current Public Resume
Lee Riopel
Mohamed Behiry CV
mohamed behiry
Madhankumar new cv 2016 june6985
Madhan kumar Thangaraj (International Relationship)
CV-KMBabu-22-05-2015
manoranjan mbkaranam
Madhankumar new cv 2016 june6985
Madhan kumar Thangaraj (International Relationship)
RESUME-Latest
Jayanta Paul
Veerappa Panchal_Piping Stress Engineer
veerappa panchal
UWANDU KENNETH CV
Kenneth Uwandu
GNS Resume 22.02.16
Gajanan Sawant
Cv Rafee
Shamsudheen Rafee
Arsalan 1
Arsalan Hameed
HAREESH PILLAI S
Hareesh Pillai
R_SealsResume2015
Rocky Seals
CV for the post of Mud Specialist I Drilling Fluids Engineer
Bhaskar Hazarika
SENTHIL PANDIAN CV
Senthil Pandian
FINAL CV
RHALF LLAMERA
CURRICULUM VITAE
MOHAMMAD KABIR AHMAD AHSAN
Sathiyaprabhu Piping Stress Engineer CV 2015
sathiya prabhu
rajpanday
raj panday

Similar to DVR CV NEW12 (20)

DOC
Mechanical Engineer CV.1
Ashraf Moussa
DOC
Chidambaram_cv
s.chidambaram saravanan
DOC
Chidambaram_cv sr,mech
s.chidambaram saravanan
DOCX
Harikumar
Hari Kumar
DOCX
Nasheem CV- Commissioning Technician
Naseem Ansari
PDF
Nizami_CV
Allahbakhsh Nizami
DOCX
23-01-2015(Millwright Technicion)
Shine K U
DOC
Mechanical Supervisor
Singh Chandra Pratap
DOC
00-Mechanical Technician---
rohan contractor
DOC
Resume- N1 M Mokal New
nitin mokal
DOC
J.R Patel New C.V Oil & Gas
Jagdishchandra Patel
DOC
Mohsin F CV
MOHSIN ALI
DOC
Mohsin F CV
MOHSIN ALI
DOC
Engg-CV -OCT-15
Nagendra Pathak
DOC
MECHANICAL TECHNICIAN (ROTATING EQUIPMENT)
ThineshRajaNatarajan
DOC
mech.cv mk
muthu kumar
DOC
CV Mansoor
Mohammed Mansoor
DOC
RESUME
Prakash Makwana
DOCX
RESUME
Mahesh Parmekar
DOCX
SENTHIL.BIODATA.1 - Copy
SENTHILKUMAR RAJENDRAN
Mechanical Engineer CV.1
Ashraf Moussa
Chidambaram_cv
s.chidambaram saravanan
Chidambaram_cv sr,mech
s.chidambaram saravanan
Harikumar
Hari Kumar
Nasheem CV- Commissioning Technician
Naseem Ansari
Nizami_CV
Allahbakhsh Nizami
23-01-2015(Millwright Technicion)
Shine K U
Mechanical Supervisor
Singh Chandra Pratap
00-Mechanical Technician---
rohan contractor
Resume- N1 M Mokal New
nitin mokal
J.R Patel New C.V Oil & Gas
Jagdishchandra Patel
Mohsin F CV
MOHSIN ALI
Mohsin F CV
MOHSIN ALI
Engg-CV -OCT-15
Nagendra Pathak
MECHANICAL TECHNICIAN (ROTATING EQUIPMENT)
ThineshRajaNatarajan
mech.cv mk
muthu kumar
CV Mansoor
Mohammed Mansoor
SENTHIL.BIODATA.1 - Copy
SENTHILKUMAR RAJENDRAN
Ad

DVR CV NEW12

  • 1. CURRICULAM VITAE DABBIRU VENKATA RAMANA MURTHY D/NO: 32-10-57/3 Venkateswara Colony Sheela Nagar Visakhapatnam-530012 AP, INDIA Contact mobile no +91-9966070722/7742684502 Email id: dabbiru.murthy@gmail.com Career Profile Having 19+ years total experience which includes 12 years Gulf experience in OIL & GAS PLANTS, Such as TURBINES, CENTRIFUGAL COMPRESSORS & PUMPS, GAS ENGINES, HEAVY VALVES mechanical parts and Equipment installations in various construction and maintenance projects.(Oil gathering center, Refineries, Petrochemical plants, crude Oil distribution systems, crude oil desalting system, flare gas recovery systems, condensate recovery units) Associated with Major Multinational Companies like AL NASR, KNPC, KOC, QATAR PETROLEUM (QP), QVC, L&T, SHOFT Engineering & Construction, and HOFINCONS INDUSTRIAL SERVICES. Maintenance, Testing and Pre-commissioning, Erection of associated Equipments for Refineries, Offshore & ON-Shore Oil & Gas projects. EDUCATION QUALIFICATION Technical Qualifications : Diploma in Mechanical Engineering Computer knowledge : MS-Office , Windows 98/2000/XP/SAP SYSTEM . Employment Record
  • 2. Present position 1) EMPLOYER : CAIRN INDIA LTD, PERIOD : From 03rd Oct 2011 to till Date, POSITION HELD : Sr MECHANICAL ENGINEER Key responsibilities Preparing Preventive Maintenance schedule of equipments as per manufacturer recommendation and compliance thereof. Shutdown supervision and execution with assigned work force for all departments in complex. Coordinating with contractors for job allocation, and completion thereof in time. Preparation of critical spares required and inventories control. Documents maintaining of ISO 9001, ISO 14001, OHSAS 14001 Development of the standard maintenance practices (SMPs) and Risk assessments. Development of the subordinates & juniors by planning of the training & validation test. Good working experience in industrial SAP system. Having the experience of better utilization of manpower, machines material & shift handling. 2) EMPLOYER : CONSTRUCTION DEVALOPMENT COMPANY, PROJECT : QATAR VINYL COMPANY, PERIOD : From 14th March 2011 to 25th September POSITION HELD : MECHANICAL SUPARVISOR Key responsibilities . Review of P & IDs, Isometric Drawing, & equipment Drawings. Involved in 50 MV GE TURBAIN intermediate overhauling and major involvement in hot path inspection Recycle gas compressor , atlas copco air compressor, chlorine compressor major overhauling Making all kind of alignments such as rim face, reverse, and laser alignments Dismantling of mechanical seals serviceing,re-assembling and testing
  • 3. 3) EMPLOYER : BRUNEL INDIA PRIVATE LIMITED CLIENT : CAIRN INDIA PVT LTD PERIOD : From June 2010 to Feb 2011 POSITION HELD : MECHANICAL ENGINEER Key responsibilities Responsible to check specifications and drawings with latest revision. Preventive maintenance of all kind rotating equipment Involved in TRIVENI 12 MV STEAM TURBAIN in major shutdown Daily check of all oil and gas pads To take the permit responsibility in all kind of jobs Witness for Hydro static/Pneumatic test. 4) EMPLOYER : CONSTRUCTION DEVALOPMENT COMPANY, PROJECT : QATAR VINYL COMPANY& QATAR PETROLIUMS PERIOD : From May 2009 to June 2010 POSITION HELD : MECHANICAL ENGINEER Key responsibilities Major shutdown of four 50 MV GE TURBAINS Involved in total fuel combines chamber for dismantling Involved in main crank shaft leaner arty test and shaft trueness Replaced the all lube oil system modification Inspect the packages with approved P & ID and as built isometric drawings. Responsible to co-ordinate material issue and control. Responsible to ensure material conformity before issue and use
  • 4. 5) EMPLOYER : LARSON & TOUBRO INDIA LTD PROJECT : VISAKAPATNAM VESSAL PROJECT OWNER : NAVEL DOCK YARD PERIOD : From March 2006 to May 2009 POSITION HELD : MECHANICAL SUPERVISOR Key responsibilities Ensuring conformity to Drawings, specifications & Codes. Review of P & IDs, Isometric Drawing, Equipment Drawings Responsible to monitors daily Equipment erecting activities. To conduct Hydro testing and Pneumatic testing of pipe lines and to get it inspected. Alignment the 13 meter length and 350 mm dia of crank shaft with 8 dial gauges Alignment of 16 ton main gear box with 12 ton thrust bearing Involved in main heavy pumps, centrifugal compressors dismantling and overhauling Dismantling and assembling of heavy gate valves, gear boxes, 6) EMPLOYER : CONSTRUCTION DEVALOPMENT COMPANY, PROJECT : QATAR VINYL COMPANY& QATAR PETROLIUMS PERIOD : From Sep 2004 to Jan 2006 POSITION HELD : MECHANICAL FOREMAN & TECHANICIAN Key responsibilities Responsible to monitors daily preventive maintenance Review of P & IDs, Isometric Drawing,& Equipment Drawings To conduct Hydro testing and Pneumatic testing of pipe lines and to get it inspected.
  • 5. 7) EMPLOYER : AL MEER TECHNICAL SERVICES WLL OWNER : Kuwait Oil Company (KOC). PERIOD : From June 1999 to May 2004 POSITION HELD : LEAD MECHANICAL TECHINICION Key responsibilities Review of P & IDs, Isometric Drawing,& Equipment Drawings To carry out the routine plant maintenance activities, connecting with onshore oil gathering centers , booster station and super G.C 27&28having a capacity of 200,000 BPD containing oil & gas separators , desalters , crude oil path heaters , booster pumps and feed pumps Involved in RUSTAN TA 1500, TB5000, GE 5002 Series solar turbine intermediate overhauling , major overhaul of GE turbine Involved in DRESSER CLARK KAWASKI (RB5S,RB8S&RB7B) and SOLAR(C304,C306 &C160) Involved in COOPER BESSMER 16 V 250 GAS ENGINE and C.B INTEGRAL COMPRESSOR mini checks and inter overhauling Co-coordinating with site foreman and reporting head of department 8) EMPLOYER : AL NASR TRADEING & CONTRACTING WLL CLINET : OMAN OIL COMPANY WLL PERIOD : From April 1998 to Feb 1999. POSITION HELD : SENIOR MECHANICAL TECHANICION Key responsibilities Read the equipment drawings, understand the scope of work, and distribute the work to the work men. Responsible for daily preventive maintenance jobs Involved in erecting, commissioning, and overhauling of all kind of rotating equipments
  • 6. Maintenance of all kind of single stage and malty stage centrifugal pumps Dynamic balance of crank shafts and lapping of compressor valve parts Preparation of hydro test, tie-in, hot tap tie-in Packages & Coordinating quality control activities. Responsible for safety work of the project and maintains all safety records and training to all crew for safe work and permit system. 9) EMPLOYER : HOFINCONS INDUSTRIAL SERVICES PVT LTD CLINET : BELL GRNITO CERAMIC LTD PERIOD : From June 1995 to March 1998. POSITION HELD : SENIOR MECHANICAL TECHANICION Key responsibilities Alignment of 110 meter and 3.2 dia rotary kiln with three location foundation and 12 bearing pads Blue matching of half bush bearing with gun metal Involved in erecting, commissioning, and overhauling of all kind of rotating equipments Worked in 50 ton & 75 ball mills alignment with v belts Aligned bull gear to pinion with dial gauge indicator Checking the backlash of gear box with feeler gauge Involved in dismantling of plate heat exchanger, and tube heat exchanger and hydro test DOCUMENTATION: Good knowledge in understanding the Safety related documents, SMP, JSA, General Procedures, stage inspection and Checklist related to Pre Commissioning, Commissioning, and Maintenance activities
  • 7. PERSONAL DETAILS Name : D.V.R.MURTHY Date of Birth : 28-08-1972 Gender : Male Marital Status : Married Nationality : Indian Languages Known : English, Telugu, Hindi & Tamil POSSPORT DETAILS Passport No. : G2297419 Place of Issue : VISAKHAPATNAM Date of Issue : 10 / 05 / 2007 Date of expiry : 09 / 05 / 2017. DECLARATION I here by declare that above information and particulars are correct to the best of my knowledge and belief. I feel honored if called for an interview at your convenience. D.V.R.Murthy