CASE STUDY
CARLTON PARK SUBSTATION
LOCATION : Enderby, Leicestershire | DESIGN DURATION : 10 Weeks | VALUE : £50k
OVERALL PROJECT VALUE : circa £4.2M
Delivering what we promise
OVERVIEW
Santander UK established two new data centres at the Carlton Park site near
Enderby, Leicester, necessitating a dedicated 39MW connection from the host
DNO, Western Power Distribution.
PROJECT DETAILS
The project was competitively tendered and won by Morrison Utility Services,
allowing Morrison Engineering Services to undertake the complete design for the
project.
At Carlton Park, a new 132/11kV Substation was established which was connected
to two discrete 11kV switchboards to supply the customers demand. Due to
enhanced system security requirements, duplicate 11kV switchboards with
duplicate SCADA, 110v DC and 48v DC systems were installed within the switch
room, providing further redundancy.
Two new 630mm
2
Al 132kV underground cable circuits supplied a new 132/11kV
Substation on the Carlton Park site from Enderby 400/132kV Substation.
Morrison Engineering Services were responsible for the design, specification and
procurement of the cable, plus joints and accessories.
Following energisation of the transformers and a short period on soak to ensure no
issues arose, the customers outgoing 11kV cabling was connected, allowing them
to commence commissioning of the sites.
BENEFITS
• By managing the complete suite of design in house, MES was able to work
closer with our suppliers and delivery teams.
• The overall coordination of design interfaces across disciplines was easier to
manage and control.
• Single point of contact established
DESIGN DETAILS
The works undertaken by Morrison
Engineering Services included;
Detailed Civil Design -
• 132/11kV Transformer Bunds
• 132kV Structure Bases
• 11kV Switch / Control Room
• Roadways & Drainage
• Structural Engineering
• Specification of materials
• Reinforcement Schedules
• Geotechnical site investigation &
soils analysis
Detailed Electrical Design -
• Earthing Survey & Layout
• Plant / Equipment layout
• Conduit / Multicore cable layout
• 132kV Structure Design
• Bus Bar / Clamps Specification
• Electrical Clearance
• Plant & Equipment specification
Detailed P&C Design –
• Main C&P Design
• SCADA
• Multicore Schedules
• AC / DC Scheme Integration
• 110v Distribution
• Electrical & Mechanical
Interlocking
• Relay Specification & Relay Panel
Design
• Protection coordination / settings
report

More Related Content

What's hot (20)

dharmapandian
dharmapandiandharmapandian
dharmapandian
dharmadurai pandian
Ìý
Gabriel Gichinga Gen tech
Gabriel Gichinga Gen techGabriel Gichinga Gen tech
Gabriel Gichinga Gen tech
Gichinga Wainaina
Ìý
Wind Power EPCM
Wind Power EPCMWind Power EPCM
Wind Power EPCM
Peter Bright
Ìý
Ir. Unggang CV latest
Ir. Unggang CV latestIr. Unggang CV latest
Ir. Unggang CV latest
Ir. unggang Emban
Ìý
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
PETER MAIDENS
Ìý
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.doc
Abdul Razzaq
Ìý
ajit-cv-updated
ajit-cv-updatedajit-cv-updated
ajit-cv-updated
Ajit Bhaskaran
Ìý
TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016
Terry Evans
Ìý
Cemb
CembCemb
Cemb
POWERGEN SRL
Ìý
TOSH
TOSHTOSH
TOSH
Alexander Narvasa
Ìý
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1
Holland Kendall
Ìý
Robert Resume 8-26-15
Robert Resume 8-26-15Robert Resume 8-26-15
Robert Resume 8-26-15
Robert Thomas
Ìý
Resume Edward Maszczak linkedin
Resume  Edward Maszczak linkedinResume  Edward Maszczak linkedin
Resume Edward Maszczak linkedin
Edward Maszczak
Ìý
EMFN Kelley Resume
EMFN Kelley ResumeEMFN Kelley Resume
EMFN Kelley Resume
Cody Kelley
Ìý
Ahmed Raslan_CV
Ahmed Raslan_CVAhmed Raslan_CV
Ahmed Raslan_CV
ahmed raslan
Ìý
Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects
Gensol Engineering Limited
Ìý
gamal ghazy svc
gamal ghazy svcgamal ghazy svc
gamal ghazy svc
gamal ghazy
Ìý
Larry Hebert Resume
Larry Hebert ResumeLarry Hebert Resume
Larry Hebert Resume
Larry Hebert
Ìý
venkatCV
venkatCVvenkatCV
venkatCV
venkateswarao veerla
Ìý
Nexans submarine technology-1
Nexans submarine technology-1Nexans submarine technology-1
Nexans submarine technology-1
thinknice
Ìý
Gabriel Gichinga Gen tech
Gabriel Gichinga Gen techGabriel Gichinga Gen tech
Gabriel Gichinga Gen tech
Gichinga Wainaina
Ìý
Wind Power EPCM
Wind Power EPCMWind Power EPCM
Wind Power EPCM
Peter Bright
Ìý
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
PETER MAIDENS
Ìý
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.doc
Abdul Razzaq
Ìý
TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016
Terry Evans
Ìý
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1
Holland Kendall
Ìý
Robert Resume 8-26-15
Robert Resume 8-26-15Robert Resume 8-26-15
Robert Resume 8-26-15
Robert Thomas
Ìý
Resume Edward Maszczak linkedin
Resume  Edward Maszczak linkedinResume  Edward Maszczak linkedin
Resume Edward Maszczak linkedin
Edward Maszczak
Ìý
EMFN Kelley Resume
EMFN Kelley ResumeEMFN Kelley Resume
EMFN Kelley Resume
Cody Kelley
Ìý
Ahmed Raslan_CV
Ahmed Raslan_CVAhmed Raslan_CV
Ahmed Raslan_CV
ahmed raslan
Ìý
Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects
Gensol Engineering Limited
Ìý
gamal ghazy svc
gamal ghazy svcgamal ghazy svc
gamal ghazy svc
gamal ghazy
Ìý
Larry Hebert Resume
Larry Hebert ResumeLarry Hebert Resume
Larry Hebert Resume
Larry Hebert
Ìý
Nexans submarine technology-1
Nexans submarine technology-1Nexans submarine technology-1
Nexans submarine technology-1
thinknice
Ìý

Viewers also liked (13)

Evaluación Segundo Quimestre ANGEL VERAEvaluación Segundo Quimestre ANGEL VERA
Evaluación Segundo Quimestre ANGEL VERA
Angelsteveen
Ìý
Jv 17Jv 17
Jv 17
Fbjj Brasilia
Ìý
Agosto octubreAgosto octubre
Agosto octubre
Sánchez Administrador de Fincas, S.L.
Ìý
UH Project Management certificate
UH Project Management  certificateUH Project Management  certificate
UH Project Management certificate
Angela Hsu
Ìý
Certification
CertificationCertification
Certification
Brian Steele
Ìý
TRABAJO EN CLASETRABAJO EN CLASE
TRABAJO EN CLASE
cespedesfelipe14
Ìý
Don't be MOST people
Don't be MOST peopleDon't be MOST people
Don't be MOST people
Life School
Ìý
Turnuva Basvuru Formu
Turnuva Basvuru FormuTurnuva Basvuru Formu
Turnuva Basvuru Formu
iytespor
Ìý
Kate mc dowell resume (3_9_16)
Kate mc dowell resume (3_9_16)Kate mc dowell resume (3_9_16)
Kate mc dowell resume (3_9_16)
Kate McDowell
Ìý
Auto sugiero LZAuto sugiero LZ
Auto sugiero LZ
Lia Berenise Zanarini
Ìý
10noviembre201510noviembre2015
10noviembre2015
Sánchez Administrador de Fincas, S.L.
Ìý
embedded system and AVR
embedded system and AVRembedded system and AVR
embedded system and AVR
Urvashi Khandelwal
Ìý
MMR vaccine
MMR vaccineMMR vaccine
MMR vaccine
Beenish Choudhary
Ìý
Evaluación Segundo Quimestre ANGEL VERAEvaluación Segundo Quimestre ANGEL VERA
Evaluación Segundo Quimestre ANGEL VERA
Angelsteveen
Ìý
Jv 17Jv 17
Jv 17
Fbjj Brasilia
Ìý
UH Project Management certificate
UH Project Management  certificateUH Project Management  certificate
UH Project Management certificate
Angela Hsu
Ìý
Certification
CertificationCertification
Certification
Brian Steele
Ìý
TRABAJO EN CLASETRABAJO EN CLASE
TRABAJO EN CLASE
cespedesfelipe14
Ìý
Don't be MOST people
Don't be MOST peopleDon't be MOST people
Don't be MOST people
Life School
Ìý
Turnuva Basvuru Formu
Turnuva Basvuru FormuTurnuva Basvuru Formu
Turnuva Basvuru Formu
iytespor
Ìý
Kate mc dowell resume (3_9_16)
Kate mc dowell resume (3_9_16)Kate mc dowell resume (3_9_16)
Kate mc dowell resume (3_9_16)
Kate McDowell
Ìý
Auto sugiero LZAuto sugiero LZ
Auto sugiero LZ
Lia Berenise Zanarini
Ìý

Similar to MES Case Study - Carlton Park Substation (20)

Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017
Abdul Alim Dewan
Ìý
Balpara Electrical Engineering Projects 2017
Balpara Electrical Engineering Projects 2017Balpara Electrical Engineering Projects 2017
Balpara Electrical Engineering Projects 2017
Digna Nichols
Ìý
Mankotia ankit
Mankotia ankitMankotia ankit
Mankotia ankit
Thakur Mankotia
Ìý
Hvdc transmission
Hvdc transmissionHvdc transmission
Hvdc transmission
Sajan Sahu
Ìý
Zinfra Group Australia: Power Brochure
Zinfra Group Australia: Power BrochureZinfra Group Australia: Power Brochure
Zinfra Group Australia: Power Brochure
Zinfra Group
Ìý
KEVIN DAVID MORTON cv
KEVIN DAVID MORTON cvKEVIN DAVID MORTON cv
KEVIN DAVID MORTON cv
Kevin Morton/GBPTD/ABB
Ìý
KinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementKinetIQ Solutions Capability Statement
KinetIQ Solutions Capability Statement
Ray Salmons
Ìý
New Persentation
New PersentationNew Persentation
New Persentation
Tarek Fagal
Ìý
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical Enginner
Reza Shah Abadi
Ìý
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical Enginner
Reza Shah Abadi
Ìý
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
Engr.ayaz khan
Ìý
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
Alwin Jose
Ìý
Complex connections Rick Chorley
Complex connections Rick ChorleyComplex connections Rick Chorley
Complex connections Rick Chorley
NSW Environment and Planning
Ìý
CV PF
CV PFCV PF
CV PF
Manzoor Ahmad
Ìý
Engage with...Network Rail
Engage with...Network RailEngage with...Network Rail
Engage with...Network Rail
KTN
Ìý
Zinfra Renewables Capability Statement
Zinfra Renewables Capability StatementZinfra Renewables Capability Statement
Zinfra Renewables Capability Statement
Zinfra Group
Ìý
Resume
ResumeResume
Resume
Mohammed Khan
Ìý
ameen cv new
ameen cv newameen cv new
ameen cv new
ameen badhusha
Ìý
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
Farrukh Chughtai
Ìý
2012 Network design
2012 Network design2012 Network design
2012 Network design
John Snoxell
Ìý
Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017
Abdul Alim Dewan
Ìý
Balpara Electrical Engineering Projects 2017
Balpara Electrical Engineering Projects 2017Balpara Electrical Engineering Projects 2017
Balpara Electrical Engineering Projects 2017
Digna Nichols
Ìý
Hvdc transmission
Hvdc transmissionHvdc transmission
Hvdc transmission
Sajan Sahu
Ìý
Zinfra Group Australia: Power Brochure
Zinfra Group Australia: Power BrochureZinfra Group Australia: Power Brochure
Zinfra Group Australia: Power Brochure
Zinfra Group
Ìý
KinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementKinetIQ Solutions Capability Statement
KinetIQ Solutions Capability Statement
Ray Salmons
Ìý
New Persentation
New PersentationNew Persentation
New Persentation
Tarek Fagal
Ìý
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical Enginner
Reza Shah Abadi
Ìý
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical Enginner
Reza Shah Abadi
Ìý
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
Engr.ayaz khan
Ìý
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
Alwin Jose
Ìý
Engage with...Network Rail
Engage with...Network RailEngage with...Network Rail
Engage with...Network Rail
KTN
Ìý
Zinfra Renewables Capability Statement
Zinfra Renewables Capability StatementZinfra Renewables Capability Statement
Zinfra Renewables Capability Statement
Zinfra Group
Ìý
2012 Network design
2012 Network design2012 Network design
2012 Network design
John Snoxell
Ìý

MES Case Study - Carlton Park Substation

  • 1. CASE STUDY CARLTON PARK SUBSTATION LOCATION : Enderby, Leicestershire | DESIGN DURATION : 10 Weeks | VALUE : £50k OVERALL PROJECT VALUE : circa £4.2M Delivering what we promise OVERVIEW Santander UK established two new data centres at the Carlton Park site near Enderby, Leicester, necessitating a dedicated 39MW connection from the host DNO, Western Power Distribution. PROJECT DETAILS The project was competitively tendered and won by Morrison Utility Services, allowing Morrison Engineering Services to undertake the complete design for the project. At Carlton Park, a new 132/11kV Substation was established which was connected to two discrete 11kV switchboards to supply the customers demand. Due to enhanced system security requirements, duplicate 11kV switchboards with duplicate SCADA, 110v DC and 48v DC systems were installed within the switch room, providing further redundancy. Two new 630mm 2 Al 132kV underground cable circuits supplied a new 132/11kV Substation on the Carlton Park site from Enderby 400/132kV Substation. Morrison Engineering Services were responsible for the design, specification and procurement of the cable, plus joints and accessories. Following energisation of the transformers and a short period on soak to ensure no issues arose, the customers outgoing 11kV cabling was connected, allowing them to commence commissioning of the sites. BENEFITS • By managing the complete suite of design in house, MES was able to work closer with our suppliers and delivery teams. • The overall coordination of design interfaces across disciplines was easier to manage and control. • Single point of contact established DESIGN DETAILS The works undertaken by Morrison Engineering Services included; Detailed Civil Design - • 132/11kV Transformer Bunds • 132kV Structure Bases • 11kV Switch / Control Room • Roadways & Drainage • Structural Engineering • Specification of materials • Reinforcement Schedules • Geotechnical site investigation & soils analysis Detailed Electrical Design - • Earthing Survey & Layout • Plant / Equipment layout • Conduit / Multicore cable layout • 132kV Structure Design • Bus Bar / Clamps Specification • Electrical Clearance • Plant & Equipment specification Detailed P&C Design – • Main C&P Design • SCADA • Multicore Schedules • AC / DC Scheme Integration • 110v Distribution • Electrical & Mechanical Interlocking • Relay Specification & Relay Panel Design • Protection coordination / settings report