MOKHTAR油FAWZY油RESUME油
油
PERSONAL DATA
Name: Mokhtar Fwazy Mokhtar
Nationality: Egyptian.
Marital Status: Married.
Date of Birth: 14 December 1981
Military Service: Permanent Exempt.
Address: Military buildings Block 47G flat 43 - Tosson Alexandria - Egypt
Telephones:
Home 002 03 5621728.
Mobile 002 01159553304 - +96893913074
Driver's Licenses:
Private Egyptian License.
Private Qatar License
Private Oman License
Private Bahrain License
Engineers Syndicate ID: 31/00577.
E-mail: m.fawzy@aici.com.eg
eng_mokhtarfawzy@yahoo.com.
CAREER OBJECTIVE
A Challenging Position in a new atmosphere where I can have an opportunity to enhance and utilize my skills
and broaden my knowledge about Construction Manager.
EDUCATION
Alexandria University  Faculty of Engineering
B.Sc. in Civil Engineering 2005-
With Very good degree in airports and highways engineering project.
LANGUAGES
 Arabic: Mother Tongue
 English: Good Reading, Writing and Speaking
Computer Skills:
 Microsoft Office Self Study
 AutoCAD Self Study
PERSONAL SKILLS
 Public relation & Cooperation.
MOKHTAR油FAWZY油RESUME油
油
 Dealing with people & ability to work within a team
 Self-motivated active work
 Ready to work anywhere anytime.
TRAINING COURSES
 PADI SCUBA Diving [Open Water Diver]
 PCC AIRFIELED PAVING WORKSHOP [Transportation System Center, Al Musannah AB,
Oman].
 Confined Space Entry CourseTraining Institute  Oman
 OSHA 30-Hour outreach training for the construction industry  June 2013  Oman.油
 Fire Protection System Training  TREMCO  Bahrain 油
油
CAREER PROFILE & JOB DESCRIPTION
As a Civil Construction
 PCC AIRFIELED PAVING (new asphalt/concrete taxi way using slip form paver, connecting it to the
run way, And have paved and unpaved shoulders, edge lights and area/security lights. Fuel Tanks,
storage tank, Electrical Building, Filter Building, Transformer Building, and Fuel Hydrant Pits with
appropriate cathode protection.)
 Diving Engineer checking placing of (GRP Pipes  Concrete Cubes  Accropodes and Rocks)
in the offshore Projects
 Placing and installation for GRP pipe lines of Intake and Discharge pipe lines for Elec. Power
Planet.(Offshore works).
 Driving Piles and Sheet piles (temporary and permanent).(near shore and off shore works).
 Follow up of all sites work (Earth work - Insulation  Concrete  Repair  Masonry work 
most of finishing activities  Pavements).
 Flow up & create the method statement for the each activity. (MS)
 Reporting on construction activities within the framework of Daily / weekly / monthly reporting
by site management.
 Follow up the inspection test Plan (ITP) for the project activities.
 coordinating between QC & Technical Office follow up progress of the daily, weekly, monthly,
reports
As a Quality Control & Quality Assurance Engineer  QA/QC
 To assist the site engineer to inspect the permanent work, including delivered materials, in order to
verify conformance with the contract quality requirements and the implementation of the company
corporate quality system in accordance with ISO 9001:2000.
 Certifying all Quality Control Submittals and assure that they comply with the Contract Documents
and Specifications
 Flow up & create Quality Control plan. (QCP)
 Flow up & create [Inspection Test Plan "ITP" for work complying with project specifications].
 Follow up calibrations certificates & reports.
MOKHTAR油FAWZY油RESUME油
油
COMPANIES PROFILE
American International Contractors INC. AICI
www.AICI.org
August 2016  up to present..
 Project : Airlift Apron  Alumsanah Air Base  Oman
 Profession: Construction Manager.
 Owner: Royal Air Force at Oman RAFO.
 Consultant: US Army Corps of Engineer.
 Budget: (Total value of the project US $24.4 million Dollars).
 Summary of work:
 The Project consists of the construction of an aircraft parking apron of approximately
164,000 square meters along with miscellaneous upgrades to the surrounding airfield
and taxiways.
 The civil works of the project are construction of:
 Mobilization and De-mobilization including, Laydown Area, Batch Plant, material and
equipment storage area, and all temporary facilities, structures, and utilities.
 Construction of the complete Airlift Apron (56000m3 of paving concrete).
 Construction of the Apron Access Road
Archirodon Construction (overseas) CO. S.A.
www.Archirodon.net油
July 2015  July206.
 Project : Salehia Airport development- 2000 pound capacity shelter - Salehia Air Base- EGYPT
 Profession: Construction Manager.
 Owner: EGYPTIAN AIR FORCES.
 Budget: (Total value of the project 100 million L.E).
 Summary of work:
Construct of 2000 pond capacity of reinforced concrete shelters (30 Pcs) 4800m3 of RC Concrete 4500 m3 of
PC laying concrete each, with 3600m3 of sand backfilling each, Taxi way paving concrete connected to the
main Run way, industrial and technical building ( 24 PCs), admin building (49 Pcs ). Underground site utilities
(elec., communication).
American International Contractors INC. AICI
www.AICI.org
December 2014  June 2015..
 Project : United Kingdom Maritime Component Command ( UKMCC ), Mina Salman Navy
Base, Bahrain
MOKHTAR油FAWZY油RESUME油
油
 Profession: Construction Manager.
 Owner: UK Navy.
 Consultant: US Army Corps of Engineer.
 Budget: (Total value of the project US $9.75 million Dollars).
 Summary of work:
 The base bid includes the construction of the FSU facility, Headquarter facility and all utility
connection, Vehicle sunshade, entrance canopy, Gray water collection system, irrigation system and
landscaping.
 The civil works of the project are construction of:
Concrete油foundation,油Steel油Structure,油Roof油and油walls油sandwich油panels,油Rollup油doors,油S.O.G.油for油all油
levels,油Gypsum油and油cement油board油walls,油CMU油walls,油Ceramic油tiles,油fire油rated油and油blast油windows,油fire油
rated油and油blast油doors,油Cambridge油doors,油wooden油doors,油Acoustical油Ceiling,油plaster油and油painting油
system,油Roof油membrane油and油insulation油system,油sound油insulation油walls,油fire油rated油walls,油Mechanical油
and油electrical油systems油serving油building油and油vehicles油maintenance油operation.油油
American International Contractors INC. AICI
www.AICI.org
December 2013  December 2014.
 Project : FY11 Tactical Ramp/ Vehicle Maintenance Facility Al Udeid, Qatar
 Profession: Construction Manager.
 Owner: US Air Force USAF.
 Consultant: US Army Corps of Engineer.
 Budget: (Total value of the project US $42 million Dollars).
 The civil works of the project are construction of:
 Vehicle油maintenance油facility油is油a油2油stories油building油consist油of油refueling油area,油offices油area,油
workshop油areas油and油store油area,油works油in油this油building油summarized油as油below:油
1. Concrete油foundation.油
2. Steel油structure.油
3. Roof油and油walls油sandwich油panels.油
4. Rollup油doors.油
5. S.O.G.油for油all油levels.油
6. Oil油changing油pit.油
7. Overhead油crane.油
8. Mechanical油and油electrical油systems油serving油building油and油vehicles油maintenance油operation.油
9. Roads油&油parking油lot.油
10. Paving油sidewalk.油
11. CMU油walls油
12. Insulation油for油fire油resistance油areas.油
13. Plastering油and油painting.油
14. Acoustical油ceiling油system.油
15. Electrical油substation油building油and油mechanical油chiller油yard.油油
16. Underground油utilities油(mechanical油and油electrical).油
MOKHTAR油FAWZY油RESUME油
油
 Tactical油Ramp油is油50,000油M3油of油concrete油for油Concrete油pavement油parking油apron油with油
compression油sealant油and油pavement油marking.油
American International Contractors INC. AICI
www.AICI.org
September 2012  November 2013.
 Projects : (Airlift Ramp & Fuel Facilities) & ( Parallel Taxiway Extension) Al Musannah Air Base,
Oman
 Profession: Construction Section Head.
 Owner: Royal Air Force at Oman RAFO.
 Consultant: US Army Corps of Engineer.
 Budget:(Total value of the project US $57 million Dollars).
Archirodon Construction (overseas) CO. S.A.
www.Archirodon.net油
January 2012  September 2012
 Project: Banha Power Station, 750 MW Combined Cycle Project, Kaluobya, Egypt. (CP 102 )
 Profession: Construction Section Head. Intake and Discharge Structure ( Offshore Work )
 Owner: West Delta Electricity Production
 Consultant: " Power Generation Engineering and Services Company  PGESCO
 Budget: (Total value of the project US $50 million Dollars).
 The civil works of the project are construction of:
The work for this Contract Package is subdivided: Site development, Underground Utilities, Power Generation
Facilities, Auxiliary Facilities, Ancillary Facilities, Electrical and Mechanical Work.
American International Contractors INC. AICI
www.AICI.org
June 2010  November 2011
 Project: Construction of a Close Air Support CAS Parking Apron DOHA  QATAR
 Profession: Senior Site Engineer.
 Owner: United States Army - Air Force - Al Udeid Air Base.
 Consultant: US Army Corps of Engineer.
 Budget: (Total value of the project US $50 million Dollars).
 The civil works of the project are construction of:
(new asphalt/concrete taxi way using slip form paver, connecting it to the run way, and have paved
and unpaved shoulders, edge lights and area/security lights. One fuel storage tank, Electrical Building,
Filter Building, Transformer Building, and Fuel Hydrant Pits with appropriate cathode protection.)
Archirodon Construction (overseas) CO. S.A.
www.Archirodon.net油
December 2009  June 2010
MOKHTAR油FAWZY油RESUME油
油
 Project: Tripoli Harbor Libya Break Water Reconstruction TRIPOLI  LIBYA
 Profession: Marine Site Engineer.
 Owner: Libyan Maritime and Port Authority
 Consultant: "Royal Haskoning  Consultant Engineering
 Budget: (Total value of the project US $300 million Dollars).
 The civil works of the project are construction of:
(Pre-Cast Concrete Works for cubes 10t, 15t,20t & 30t  Pre-Cast Concrete Work for Accropodes
6.3m3 & 9.00m3  Concrete Repair for parapet breakwater- Placing of rocks class (2-4t),(3-5),(5-
8),Cubes & Accropodes for break water along with 4700m.)
Archirodon Construction (Overseas) CO. S.A.
油
www.Archirodon.net油
October 2008 - November 2009.
 Project: SidiKrir Power Plant 750 MW Combined Cycle Project  Offshore Works - ALEXANDRIA
EGYPT
 Profession: Marine Site Engineer.
 Owner: West Delta Electricity Production
 Consultant: "Power Generation Engineering and Services Company  PGESCO
 Budget: (Total value of the project US $85 million Dollars).
 The civil works of the project are construction of:
(Earth Work  Dredging Works  Installation of onshore and offshore FRP Fiber glasses Reinforced
Plastic Pipes  Pre-Cast Concrete Works for mattresses  Sheet Piles for Temporary Jetty.)
American International Contractors INC. AICI
www.AICI.org
April 2007-Jullay 2008
 Project: King Abdalla II Special Operation Training Center (KASOTC) - AMMAN  JORDAN
 Profession: Site Engineer.
 Owner: Jordanian Army.
 Consultant: US Army Corps of Engineer.
 Budget: (Total value of the project US $90 million Dollars).
 The civil works of the project are construction of:
Dormitory Buildings, Administration Buildings, Tactical Buildings, Workshop, Warehouse, Ordinance
Storage Buildings, Shooting Range (300m & 100m), Pump House, Water Tanks, 11Kv Electrical Sub
Station, Retaining Walls, Earth works including 930,000m3 Cut, 483,000m3 Fill, 9,0Km Asphalt
Roads,2.8Km Drain Channel Box and Pipe Culverts, All related utilities including Potable Water Pipe
Lines, Sewer Pipe Lines and Electrical works.
Archirodon Construction (Overseas) CO. S.A.
MOKHTAR油FAWZY油RESUME油
油
www.Archirodon.net油
January 2007  April 2007
 Projects: Mooring dolphin Repair Works Offshore Works- MIDTAP Jetty  Dekhela Port
ALEXANDRIAEGYPT
 Profession: QC Civil engineer
 Owner & Consultant: Middle East Oil Tankage & Pipe Lines (MIDTAP).
 Budget: (Total value of the project $5 million Dollars).
 The civil works of the project are construction of: Cut and Remove all damaged piles, Driving
New Piles, Construction of Dolphin and Walk way, Supports Located extend of MIDTAP Jetty, Pre-Cast
Concrete Units.
American International Contractors INC. AICI
www.AICI.org
January 2006  January 2007
 Projects: Live Fire Fighting and Damage Control Trainer Complex Abo Qir  ALEXANDRIA -EGYPT
 Profession: QC Civil Engineer.
 Owner: Egyptian Naval Forces Abo Qir Navy Base
 Consultant: Booz Allen Hamilton.
 Designer: Booz Allen Hamilton.
 Budget: (Total value of the project 12 million L.E)
 Time Schedule for the Project: 1 year (12 months)
 The civil works of the project are construction of: Concrete Activities, Interior and Exterior
Finishing Activities, All related utilities including Potable Water Pipe Lines, Sewer Pipe Lines and
Electrical works. Asphalt Roads, Water Tank, Full Repair for Building{Cracks Injection, Shootcrete},
Concrete Helicopter Pad, Steel Skelton works.
Alexandria Construction Company (ACC), TallatMoustafa
August 2005  December 2005
 Project: San Stefano Grand Plaza TP2 Supper Structure - ALEXANDRIA  EGYPT
 Profession: Site Engineer.
 Client: Four Seasons and San Stefano for Real Estate Investment
 Consultant: Dar Al-Handasa engineerings Office.
 Budget: (Total value of the project US $95 million Dollars).
 Time Project Description :Project consists of four stories basement, five commercial mall, Two
towers {31 & 29 Repeated floors},Twenty Five Stories Four Seasons Five Stars Hotel, Three Floors
underground Parking, Landscapes, All Finishing activities, the project was over an 28,000m2
Murray & Roberts Contractors International Limited
MOKHTAR油FAWZY油RESUME油
油
January 2005  July 2005
 Project: San Stefano Grand Plaza TP2 Supper Structure - ALEXANDRIA  EGYPT
 Profession: Site Engineer (Training Period).
 Client: Four Seasons and San Stefano for Real Estate Investment
 Consultant: Dar Al-Handasa engineerings Office.
 Budget: (Total value of the project US $95 million Dollars).
REFERENCES
Recommendation & Certificates:
 Recommendation letters & certifications of graduation and all software are available upon requisition.
YEARS OF EXPERIENCES
 10 years in Construction Field
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full

More Related Content

What's hot (19)

ahmed mohammed elsaied wadi 26-04-2015
ahmed mohammed elsaied wadi 26-04-2015ahmed mohammed elsaied wadi 26-04-2015
ahmed mohammed elsaied wadi 26-04-2015
Ahmed Wadi
Yousef Abu Alwafa Resume
Yousef Abu Alwafa ResumeYousef Abu Alwafa Resume
Yousef Abu Alwafa Resume
Yousef Abu Alwafa
Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad Sahi
cv
cvcv
cv
Mohamed Salama
Profesional Engineer c.v
Profesional Engineer c.vProfesional Engineer c.v
Profesional Engineer c.v
mohamed almansy
Sr Civil Engineer
Sr Civil EngineerSr Civil Engineer
Sr Civil Engineer
Mohamed Khalil
Mahmoud Abou-Elhamd
Mahmoud Abou-ElhamdMahmoud Abou-Elhamd
Mahmoud Abou-Elhamd
Mahmoud Abouelhamd
悋愕惘悸 悋悵悋惠悸 悒惡惘悋 悋惺惠惘
悋愕惘悸 悋悵悋惠悸 悒惡惘悋 悋惺惠惘悋愕惘悸 悋悵悋惠悸 悒惡惘悋 悋惺惠惘
悋愕惘悸 悋悵悋惠悸 悒惡惘悋 悋惺惠惘
ibrahim shukri el-eter
elsayed cv last
elsayed cv lastelsayed cv last
elsayed cv last
elsayed hegazy
MB.cv
MB.cvMB.cv
MB.cv
Eng Magdy
My cv 9-2015 scan PDF
My cv  9-2015 scan PDFMy cv  9-2015 scan PDF
My cv 9-2015 scan PDF
Karim Ashry
SLFraley Resumeex 2015
SLFraley Resumeex 2015SLFraley Resumeex 2015
SLFraley Resumeex 2015
Stan Fraley
2017 悋愕惘 悋悵悋惠 惆愕 忰惆 忰惡惶
2017 悋愕惘 悋悵悋惠 惆愕 忰惆 忰惡惶2017 悋愕惘 悋悵悋惠 惆愕 忰惆 忰惡惶
2017 悋愕惘 悋悵悋惠 惆愕 忰惆 忰惡惶
Mohamed Hablas
emadosmancv-FINAL
emadosmancv-FINALemadosmancv-FINAL
emadosmancv-FINAL
emad farrag
amr
amramr
amr
Amr etman
Adham mohammad Daradkeh
Adham mohammad DaradkehAdham mohammad Daradkeh
Adham mohammad Daradkeh
adham daradkeh
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exp
sameh todary
Robert W Kapp Resume
Robert W Kapp Resume Robert W Kapp Resume
Robert W Kapp Resume
robbert1806
MOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
MOSTAFA HASSAN-PROJECT MANAGER - InfrastructuresMOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
MOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
Mostafa Hassan
ahmed mohammed elsaied wadi 26-04-2015
ahmed mohammed elsaied wadi 26-04-2015ahmed mohammed elsaied wadi 26-04-2015
ahmed mohammed elsaied wadi 26-04-2015
Ahmed Wadi
Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad Sahi
Profesional Engineer c.v
Profesional Engineer c.vProfesional Engineer c.v
Profesional Engineer c.v
mohamed almansy
悋愕惘悸 悋悵悋惠悸 悒惡惘悋 悋惺惠惘
悋愕惘悸 悋悵悋惠悸 悒惡惘悋 悋惺惠惘悋愕惘悸 悋悵悋惠悸 悒惡惘悋 悋惺惠惘
悋愕惘悸 悋悵悋惠悸 悒惡惘悋 悋惺惠惘
ibrahim shukri el-eter
My cv 9-2015 scan PDF
My cv  9-2015 scan PDFMy cv  9-2015 scan PDF
My cv 9-2015 scan PDF
Karim Ashry
SLFraley Resumeex 2015
SLFraley Resumeex 2015SLFraley Resumeex 2015
SLFraley Resumeex 2015
Stan Fraley
2017 悋愕惘 悋悵悋惠 惆愕 忰惆 忰惡惶
2017 悋愕惘 悋悵悋惠 惆愕 忰惆 忰惡惶2017 悋愕惘 悋悵悋惠 惆愕 忰惆 忰惡惶
2017 悋愕惘 悋悵悋惠 惆愕 忰惆 忰惡惶
Mohamed Hablas
emadosmancv-FINAL
emadosmancv-FINALemadosmancv-FINAL
emadosmancv-FINAL
emad farrag
Adham mohammad Daradkeh
Adham mohammad DaradkehAdham mohammad Daradkeh
Adham mohammad Daradkeh
adham daradkeh
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exp
sameh todary
Robert W Kapp Resume
Robert W Kapp Resume Robert W Kapp Resume
Robert W Kapp Resume
robbert1806
MOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
MOSTAFA HASSAN-PROJECT MANAGER - InfrastructuresMOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
MOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
Mostafa Hassan

Similar to My Resume Full (20)

ayman y7ia
ayman y7iaayman y7ia
ayman y7ia
ayman yehia
Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015
AHMED afifi
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
AHMED MOUNIR
Mostafa CV
Mostafa CVMostafa CV
Mostafa CV
Mostafa Aly
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
Mahmoud Mohamed
Ahm elbouz cv 2016 new
Ahm elbouz cv  2016 newAhm elbouz cv  2016 new
Ahm elbouz cv 2016 new
ahmed elbouz
Ahm Elbouz_CV_ 2016 new
Ahm Elbouz_CV_ 2016 newAhm Elbouz_CV_ 2016 new
Ahm Elbouz_CV_ 2016 new
ahmed elbouz
Ahmed el gohary cv
Ahmed el gohary cvAhmed el gohary cv
Ahmed el gohary cv
Ahmed El gohary
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
Hesham Fathy, PMP
Snr. civil eng. ibrahim hamdan
Snr. civil eng. ibrahim hamdan  Snr. civil eng. ibrahim hamdan
Snr. civil eng. ibrahim hamdan
Ibrahim hamdan
MCV
MCVMCV
MCV
Mudassar Iqbal
Wissam chehab's CV
Wissam chehab's CVWissam chehab's CV
Wissam chehab's CV
Wissam Shehab
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
Hassan Halhoul
Mohamed Morshed
Mohamed MorshedMohamed Morshed
Mohamed Morshed
忰惆 惘愆惆
CV_M ASKAR 2017
CV_M ASKAR 2017CV_M ASKAR 2017
CV_M ASKAR 2017
Moh Ask
Alaa_Attiya resume
Alaa_Attiya resumeAlaa_Attiya resume
Alaa_Attiya resume
Alaa Attiya
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
Ahmed Mishrif
updated wagdi cm cv
updated wagdi cm cvupdated wagdi cm cv
updated wagdi cm cv
Wagdi Wahba
emad_azab_CV
emad_azab_CVemad_azab_CV
emad_azab_CV
Emad Azab
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
waleed thabet
Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015
AHMED afifi
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
AHMED MOUNIR
Ahm elbouz cv 2016 new
Ahm elbouz cv  2016 newAhm elbouz cv  2016 new
Ahm elbouz cv 2016 new
ahmed elbouz
Ahm Elbouz_CV_ 2016 new
Ahm Elbouz_CV_ 2016 newAhm Elbouz_CV_ 2016 new
Ahm Elbouz_CV_ 2016 new
ahmed elbouz
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
Hesham Fathy, PMP
Snr. civil eng. ibrahim hamdan
Snr. civil eng. ibrahim hamdan  Snr. civil eng. ibrahim hamdan
Snr. civil eng. ibrahim hamdan
Ibrahim hamdan
Wissam chehab's CV
Wissam chehab's CVWissam chehab's CV
Wissam chehab's CV
Wissam Shehab
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
Hassan Halhoul
CV_M ASKAR 2017
CV_M ASKAR 2017CV_M ASKAR 2017
CV_M ASKAR 2017
Moh Ask
Alaa_Attiya resume
Alaa_Attiya resumeAlaa_Attiya resume
Alaa_Attiya resume
Alaa Attiya
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
Ahmed Mishrif
updated wagdi cm cv
updated wagdi cm cvupdated wagdi cm cv
updated wagdi cm cv
Wagdi Wahba
emad_azab_CV
emad_azab_CVemad_azab_CV
emad_azab_CV
Emad Azab

My Resume Full

  • 1. MOKHTAR油FAWZY油RESUME油 油 PERSONAL DATA Name: Mokhtar Fwazy Mokhtar Nationality: Egyptian. Marital Status: Married. Date of Birth: 14 December 1981 Military Service: Permanent Exempt. Address: Military buildings Block 47G flat 43 - Tosson Alexandria - Egypt Telephones: Home 002 03 5621728. Mobile 002 01159553304 - +96893913074 Driver's Licenses: Private Egyptian License. Private Qatar License Private Oman License Private Bahrain License Engineers Syndicate ID: 31/00577. E-mail: m.fawzy@aici.com.eg eng_mokhtarfawzy@yahoo.com. CAREER OBJECTIVE A Challenging Position in a new atmosphere where I can have an opportunity to enhance and utilize my skills and broaden my knowledge about Construction Manager. EDUCATION Alexandria University Faculty of Engineering B.Sc. in Civil Engineering 2005- With Very good degree in airports and highways engineering project. LANGUAGES Arabic: Mother Tongue English: Good Reading, Writing and Speaking Computer Skills: Microsoft Office Self Study AutoCAD Self Study PERSONAL SKILLS Public relation & Cooperation.
  • 2. MOKHTAR油FAWZY油RESUME油 油 Dealing with people & ability to work within a team Self-motivated active work Ready to work anywhere anytime. TRAINING COURSES PADI SCUBA Diving [Open Water Diver] PCC AIRFIELED PAVING WORKSHOP [Transportation System Center, Al Musannah AB, Oman]. Confined Space Entry CourseTraining Institute Oman OSHA 30-Hour outreach training for the construction industry June 2013 Oman.油 Fire Protection System Training TREMCO Bahrain 油 油 CAREER PROFILE & JOB DESCRIPTION As a Civil Construction PCC AIRFIELED PAVING (new asphalt/concrete taxi way using slip form paver, connecting it to the run way, And have paved and unpaved shoulders, edge lights and area/security lights. Fuel Tanks, storage tank, Electrical Building, Filter Building, Transformer Building, and Fuel Hydrant Pits with appropriate cathode protection.) Diving Engineer checking placing of (GRP Pipes Concrete Cubes Accropodes and Rocks) in the offshore Projects Placing and installation for GRP pipe lines of Intake and Discharge pipe lines for Elec. Power Planet.(Offshore works). Driving Piles and Sheet piles (temporary and permanent).(near shore and off shore works). Follow up of all sites work (Earth work - Insulation Concrete Repair Masonry work most of finishing activities Pavements). Flow up & create the method statement for the each activity. (MS) Reporting on construction activities within the framework of Daily / weekly / monthly reporting by site management. Follow up the inspection test Plan (ITP) for the project activities. coordinating between QC & Technical Office follow up progress of the daily, weekly, monthly, reports As a Quality Control & Quality Assurance Engineer QA/QC To assist the site engineer to inspect the permanent work, including delivered materials, in order to verify conformance with the contract quality requirements and the implementation of the company corporate quality system in accordance with ISO 9001:2000. Certifying all Quality Control Submittals and assure that they comply with the Contract Documents and Specifications Flow up & create Quality Control plan. (QCP) Flow up & create [Inspection Test Plan "ITP" for work complying with project specifications]. Follow up calibrations certificates & reports.
  • 3. MOKHTAR油FAWZY油RESUME油 油 COMPANIES PROFILE American International Contractors INC. AICI www.AICI.org August 2016 up to present.. Project : Airlift Apron Alumsanah Air Base Oman Profession: Construction Manager. Owner: Royal Air Force at Oman RAFO. Consultant: US Army Corps of Engineer. Budget: (Total value of the project US $24.4 million Dollars). Summary of work: The Project consists of the construction of an aircraft parking apron of approximately 164,000 square meters along with miscellaneous upgrades to the surrounding airfield and taxiways. The civil works of the project are construction of: Mobilization and De-mobilization including, Laydown Area, Batch Plant, material and equipment storage area, and all temporary facilities, structures, and utilities. Construction of the complete Airlift Apron (56000m3 of paving concrete). Construction of the Apron Access Road Archirodon Construction (overseas) CO. S.A. www.Archirodon.net油 July 2015 July206. Project : Salehia Airport development- 2000 pound capacity shelter - Salehia Air Base- EGYPT Profession: Construction Manager. Owner: EGYPTIAN AIR FORCES. Budget: (Total value of the project 100 million L.E). Summary of work: Construct of 2000 pond capacity of reinforced concrete shelters (30 Pcs) 4800m3 of RC Concrete 4500 m3 of PC laying concrete each, with 3600m3 of sand backfilling each, Taxi way paving concrete connected to the main Run way, industrial and technical building ( 24 PCs), admin building (49 Pcs ). Underground site utilities (elec., communication). American International Contractors INC. AICI www.AICI.org December 2014 June 2015.. Project : United Kingdom Maritime Component Command ( UKMCC ), Mina Salman Navy Base, Bahrain
  • 4. MOKHTAR油FAWZY油RESUME油 油 Profession: Construction Manager. Owner: UK Navy. Consultant: US Army Corps of Engineer. Budget: (Total value of the project US $9.75 million Dollars). Summary of work: The base bid includes the construction of the FSU facility, Headquarter facility and all utility connection, Vehicle sunshade, entrance canopy, Gray water collection system, irrigation system and landscaping. The civil works of the project are construction of: Concrete油foundation,油Steel油Structure,油Roof油and油walls油sandwich油panels,油Rollup油doors,油S.O.G.油for油all油 levels,油Gypsum油and油cement油board油walls,油CMU油walls,油Ceramic油tiles,油fire油rated油and油blast油windows,油fire油 rated油and油blast油doors,油Cambridge油doors,油wooden油doors,油Acoustical油Ceiling,油plaster油and油painting油 system,油Roof油membrane油and油insulation油system,油sound油insulation油walls,油fire油rated油walls,油Mechanical油 and油electrical油systems油serving油building油and油vehicles油maintenance油operation.油油 American International Contractors INC. AICI www.AICI.org December 2013 December 2014. Project : FY11 Tactical Ramp/ Vehicle Maintenance Facility Al Udeid, Qatar Profession: Construction Manager. Owner: US Air Force USAF. Consultant: US Army Corps of Engineer. Budget: (Total value of the project US $42 million Dollars). The civil works of the project are construction of: Vehicle油maintenance油facility油is油a油2油stories油building油consist油of油refueling油area,油offices油area,油 workshop油areas油and油store油area,油works油in油this油building油summarized油as油below:油 1. Concrete油foundation.油 2. Steel油structure.油 3. Roof油and油walls油sandwich油panels.油 4. Rollup油doors.油 5. S.O.G.油for油all油levels.油 6. Oil油changing油pit.油 7. Overhead油crane.油 8. Mechanical油and油electrical油systems油serving油building油and油vehicles油maintenance油operation.油 9. Roads油&油parking油lot.油 10. Paving油sidewalk.油 11. CMU油walls油 12. Insulation油for油fire油resistance油areas.油 13. Plastering油and油painting.油 14. Acoustical油ceiling油system.油 15. Electrical油substation油building油and油mechanical油chiller油yard.油油 16. Underground油utilities油(mechanical油and油electrical).油
  • 5. MOKHTAR油FAWZY油RESUME油 油 Tactical油Ramp油is油50,000油M3油of油concrete油for油Concrete油pavement油parking油apron油with油 compression油sealant油and油pavement油marking.油 American International Contractors INC. AICI www.AICI.org September 2012 November 2013. Projects : (Airlift Ramp & Fuel Facilities) & ( Parallel Taxiway Extension) Al Musannah Air Base, Oman Profession: Construction Section Head. Owner: Royal Air Force at Oman RAFO. Consultant: US Army Corps of Engineer. Budget:(Total value of the project US $57 million Dollars). Archirodon Construction (overseas) CO. S.A. www.Archirodon.net油 January 2012 September 2012 Project: Banha Power Station, 750 MW Combined Cycle Project, Kaluobya, Egypt. (CP 102 ) Profession: Construction Section Head. Intake and Discharge Structure ( Offshore Work ) Owner: West Delta Electricity Production Consultant: " Power Generation Engineering and Services Company PGESCO Budget: (Total value of the project US $50 million Dollars). The civil works of the project are construction of: The work for this Contract Package is subdivided: Site development, Underground Utilities, Power Generation Facilities, Auxiliary Facilities, Ancillary Facilities, Electrical and Mechanical Work. American International Contractors INC. AICI www.AICI.org June 2010 November 2011 Project: Construction of a Close Air Support CAS Parking Apron DOHA QATAR Profession: Senior Site Engineer. Owner: United States Army - Air Force - Al Udeid Air Base. Consultant: US Army Corps of Engineer. Budget: (Total value of the project US $50 million Dollars). The civil works of the project are construction of: (new asphalt/concrete taxi way using slip form paver, connecting it to the run way, and have paved and unpaved shoulders, edge lights and area/security lights. One fuel storage tank, Electrical Building, Filter Building, Transformer Building, and Fuel Hydrant Pits with appropriate cathode protection.) Archirodon Construction (overseas) CO. S.A. www.Archirodon.net油 December 2009 June 2010
  • 6. MOKHTAR油FAWZY油RESUME油 油 Project: Tripoli Harbor Libya Break Water Reconstruction TRIPOLI LIBYA Profession: Marine Site Engineer. Owner: Libyan Maritime and Port Authority Consultant: "Royal Haskoning Consultant Engineering Budget: (Total value of the project US $300 million Dollars). The civil works of the project are construction of: (Pre-Cast Concrete Works for cubes 10t, 15t,20t & 30t Pre-Cast Concrete Work for Accropodes 6.3m3 & 9.00m3 Concrete Repair for parapet breakwater- Placing of rocks class (2-4t),(3-5),(5- 8),Cubes & Accropodes for break water along with 4700m.) Archirodon Construction (Overseas) CO. S.A. 油 www.Archirodon.net油 October 2008 - November 2009. Project: SidiKrir Power Plant 750 MW Combined Cycle Project Offshore Works - ALEXANDRIA EGYPT Profession: Marine Site Engineer. Owner: West Delta Electricity Production Consultant: "Power Generation Engineering and Services Company PGESCO Budget: (Total value of the project US $85 million Dollars). The civil works of the project are construction of: (Earth Work Dredging Works Installation of onshore and offshore FRP Fiber glasses Reinforced Plastic Pipes Pre-Cast Concrete Works for mattresses Sheet Piles for Temporary Jetty.) American International Contractors INC. AICI www.AICI.org April 2007-Jullay 2008 Project: King Abdalla II Special Operation Training Center (KASOTC) - AMMAN JORDAN Profession: Site Engineer. Owner: Jordanian Army. Consultant: US Army Corps of Engineer. Budget: (Total value of the project US $90 million Dollars). The civil works of the project are construction of: Dormitory Buildings, Administration Buildings, Tactical Buildings, Workshop, Warehouse, Ordinance Storage Buildings, Shooting Range (300m & 100m), Pump House, Water Tanks, 11Kv Electrical Sub Station, Retaining Walls, Earth works including 930,000m3 Cut, 483,000m3 Fill, 9,0Km Asphalt Roads,2.8Km Drain Channel Box and Pipe Culverts, All related utilities including Potable Water Pipe Lines, Sewer Pipe Lines and Electrical works. Archirodon Construction (Overseas) CO. S.A.
  • 7. MOKHTAR油FAWZY油RESUME油 油 www.Archirodon.net油 January 2007 April 2007 Projects: Mooring dolphin Repair Works Offshore Works- MIDTAP Jetty Dekhela Port ALEXANDRIAEGYPT Profession: QC Civil engineer Owner & Consultant: Middle East Oil Tankage & Pipe Lines (MIDTAP). Budget: (Total value of the project $5 million Dollars). The civil works of the project are construction of: Cut and Remove all damaged piles, Driving New Piles, Construction of Dolphin and Walk way, Supports Located extend of MIDTAP Jetty, Pre-Cast Concrete Units. American International Contractors INC. AICI www.AICI.org January 2006 January 2007 Projects: Live Fire Fighting and Damage Control Trainer Complex Abo Qir ALEXANDRIA -EGYPT Profession: QC Civil Engineer. Owner: Egyptian Naval Forces Abo Qir Navy Base Consultant: Booz Allen Hamilton. Designer: Booz Allen Hamilton. Budget: (Total value of the project 12 million L.E) Time Schedule for the Project: 1 year (12 months) The civil works of the project are construction of: Concrete Activities, Interior and Exterior Finishing Activities, All related utilities including Potable Water Pipe Lines, Sewer Pipe Lines and Electrical works. Asphalt Roads, Water Tank, Full Repair for Building{Cracks Injection, Shootcrete}, Concrete Helicopter Pad, Steel Skelton works. Alexandria Construction Company (ACC), TallatMoustafa August 2005 December 2005 Project: San Stefano Grand Plaza TP2 Supper Structure - ALEXANDRIA EGYPT Profession: Site Engineer. Client: Four Seasons and San Stefano for Real Estate Investment Consultant: Dar Al-Handasa engineerings Office. Budget: (Total value of the project US $95 million Dollars). Time Project Description :Project consists of four stories basement, five commercial mall, Two towers {31 & 29 Repeated floors},Twenty Five Stories Four Seasons Five Stars Hotel, Three Floors underground Parking, Landscapes, All Finishing activities, the project was over an 28,000m2 Murray & Roberts Contractors International Limited
  • 8. MOKHTAR油FAWZY油RESUME油 油 January 2005 July 2005 Project: San Stefano Grand Plaza TP2 Supper Structure - ALEXANDRIA EGYPT Profession: Site Engineer (Training Period). Client: Four Seasons and San Stefano for Real Estate Investment Consultant: Dar Al-Handasa engineerings Office. Budget: (Total value of the project US $95 million Dollars). REFERENCES Recommendation & Certificates: Recommendation letters & certifications of graduation and all software are available upon requisition. YEARS OF EXPERIENCES 10 years in Construction Field