際際滷

際際滷Share a Scribd company logo
Jeff Potocnik Home: 715-635-4744
N7420 Trego Haven Road e-mail: jkpotocnik@centurytel.net
Trego, WI 54888
Jeffrey A. Potocnik
Objective Consider opportunities that coincide with my personal development and flexibility that
allows me to apply: Education, Management and Project Management experience
attained over the years to add value within an organization.
Qualifications Attained a degree in Electric Power Distribution and built upon this foundation to
broaden that knowledge base. Familiar with PLC based systems, AC inverter & DC
motor control, instrumentation and sensing equipment. Over Nine (9) years of Facility
Management experience that includes Safety, Environmental Compliance, Operations,
Employee Relations, Business Planning, Capital Project Development and Project
Management with fiscal and compliance responsibilities. Versed in Statistical Process
Control (SPC), Process Quality Management (PQM), Business Process Improvement
Fundamentals and Lean Six Sigma principles. My main background is grounded within
industrial manufacturing. Experienced with contract development and contract
administration. Also served as a Board Member for the Michigan, Luce County
Economic Development Corporation for several years.
Skill development includes the ability to review schematics and drawings for a variety of
machine, component and construction applications. This would include power
distribution, equipment design, structures and grade. Computer skills include MS Word,
Excel, Power Point, Outlook, MS Project, AutoCAD and Business applications such as
BI Factory.
Employment May 2010 to Oct 2014 Louisiana Pacific Corporation Hayward, WI
Project Engineer
 Identify opportunities that have the ability to increase efficiencies within the
manufacturing processes. Prepare proposals to present to the Business Team
Engineering Manager and facilitate implementation of approved projects.
 Ensure projects maintain compliance with established Safety, Environmental and
Health Standards.
 Capital project development including documentation development for projects
up to $6MM. Define equipment specifications and develop scopes of work for
mechanical design, installation and electrical power distribution and integration.
 Manage internal and external resources throughout project development,
execution, implementation and capitalization.
 Maintain project budgets and timelines.
Apr 2009-Oct 2009 Indeck Ladysmith Bio-fuel Center Ladysmith, WI
Plant Superintendent
 Monitored the manufacturing equipment installation throughout the construction
process and participated in the initial manufacturing process startup.
 Reviewed employee applications and worked together with the Management
Team to develop an interview and hiring process.
 Assisted with employee safety orientation and training.
 Responsible for employee training, performance and development. Established
employee schedules and objectives. Provided coaching and counseling to improve
employee performance.
 Developed operation and maintenance procedures for the major machine centers
and participated in various maintenance and production activities.
 Directed daily production and maintenance activities to ensure production met
delivery schedules.
 Ordered manufacturing supplies and parts to maintain or improve operational
efficiencies.
2005-Jan 1st, 2009 Louisiana Pacific Corporation Hayward, WI
Regional Engineering Manager
 Identify opportunities that have the potential to improve efficiencies within the
manufacturing processes. Prepared proposals to present to the Business Teams
and facilitated the implementation of approved projects.
 Ensured that projects were in compliance with environmental, health and safety
standards.
 Managed Engineering resources at four (4) locations throughout Northern
Wisconsin, Minnesota and the Upper Peninsula of Michigan.
 Accounting responsibilities to include the creation and maintenance of the
Business Unit Capital Budget. Management responsibilities for up to $40MM
worth of Capital implementation activity.
 Direct Project Management responsibility for multiple projects of up to $5MM
 Ensure that project accounting procedures met corporate guidelines.
 Capital project management to include documentation development and ROI
calculations. Defined equipment specifications and the scopes of work for
mechanical installation as well as electrical power distribution and integration.
 Assisted in Business Plan development. Worked closely with the Plant
Management Teams to develop strategies to meet corporate objectives.
 Established an Engineering presence throughout Louisiana Pacifics North
Central Region. Managed four (4) engineering personnel at multiple locations.
Mentored employees to assume leadership roles in order to develop effective
multi-functional project teams.
1999-2005 Louisiana Pacific Corporation Newberry, MI
Manager, Operations Research/ Maintenance Supt II
 Identify opportunities that have the potential to improve efficiencies within the
manufacturing processes. Prepared proposals to present to the Business Teams
and facilitated the implementation of approved projects.
 Accounting responsibilities to include the creation and maintenance of the
Business Unit Capital Budget and ensure that project accounting procedures met
the corporate guidelines.
 Capital project management to include documentation development for projects
up to $3MM. Defined equipment specifications and the scopes of work for
mechanical installation as well as electrical power distribution and integration.
 Assisted in Business Plan development. Worked closely with the Plant
Management Teams to develop strategies to meet corporate objectives.
1990-1999 Louisiana Pacific Corporation Newberry, MI
Plant Manager
 Responsibilities for whole plant operations to include Health, Safety,
Environmental and Quality Compliance.
 Responsible for the creation and maintenance of the facility operating budget and
to ensure that the accounting procedures met the corporate standards.
Management responsibility for operating budgets of up to $50MM.
 Bottom line accountability to include production, maintenance and capital
implementation. Management responsibilities for 125 employees. This effort also
defined manufacturing objectives and established the criteria for employee
performance plans.
1987-1990 Louisiana Pacific Corporation Sagola, MI
Electrical Superintendent
 Responsible for all aspects of electrical maintenance and power distribution at the
LP Sagola facility.
 Assisted with construction design and start up of the LP Dawson Creek, BC
manufacturing facility.
 Assisted with construction design and start up of the LP Sagola, MI
manufacturing facility.
 Assisted with the start up of the LP Newberry, MI OSB manufacturing facility.
 Familiar with and maintained PLC controllers, Inverter & DC drives,
Instrumentation and 3 phase motor control centers.
1983-1987 Louisiana Pacific Corporation Hayward, WI
Lead Electrician
 Responsible for the preventative maintenance of the electrical equipment, project
set up, drawing and design for the electrical control systems and installation.
 Assigned work duties to shift electricians and followed up on the completion of
tasks.
 Assisted with the construction design and start up of the LP Hayward Line II
Production line.
 Responsible for minimizing down time.
1980-1983 Louisiana Pacific Corporation Hayward, WI
Maintenance Electrician
 Maintenance electrician in charge of trouble shooting and repair of electrical
equipment throughout the facility.
 Assisted with the start up of the LP Hayward Line I production line.
Education 1974-1975 Chippewa Valley Technical Institute Eau Claire, WI
Electric Power Distribution
 Diploma in Electric Power Distribution
1970-1974 Owen-Withee High School Owen, WI
High School Diploma
 Graduate

More Related Content

What's hot (19)

William Thomas Beckley resume
William Thomas Beckley resumeWilliam Thomas Beckley resume
William Thomas Beckley resume
Tommy Beckley
Perez, Nelson Res Jan 2011
Perez, Nelson Res Jan  2011Perez, Nelson Res Jan  2011
Perez, Nelson Res Jan 2011
Nelson Perez
Resume updated (083117)
Resume updated (083117)Resume updated (083117)
Resume updated (083117)
Joey Sorallo
C. Babilya resume 4-2011
C. Babilya resume 4-2011C. Babilya resume 4-2011
C. Babilya resume 4-2011
chuckbab
Perez, Nelson Res 11 1 2010 2
Perez, Nelson Res 11 1 2010 2Perez, Nelson Res 11 1 2010 2
Perez, Nelson Res 11 1 2010 2
Nelson Perez
Bendixen David Resume 2 7 2012
Bendixen David Resume 2 7 2012Bendixen David Resume 2 7 2012
Bendixen David Resume 2 7 2012
David Bendixen
Job resume
Job resumeJob resume
Job resume
Warner Sherman
C. Babilya resume 4-2011
C. Babilya resume 4-2011C. Babilya resume 4-2011
C. Babilya resume 4-2011
chuckbab
Gregory Lipham Resume 2015
Gregory Lipham Resume 2015Gregory Lipham Resume 2015
Gregory Lipham Resume 2015
Gregory Lipham
R gibas project strategic planner management resume 2016
R gibas project strategic planner management resume 2016R gibas project strategic planner management resume 2016
R gibas project strategic planner management resume 2016
Rebecca Gibas
John Reilly
John ReillyJohn Reilly
John Reilly
John Reilly
ac (1)
ac (1)ac (1)
ac (1)
Saipavani Sk
CV-shase-2016
CV-shase-2016CV-shase-2016
CV-shase-2016
Shasedhara Bangalore
gene-malboeuf-resume.1
gene-malboeuf-resume.1gene-malboeuf-resume.1
gene-malboeuf-resume.1
Gene Malboeuf
RT resume 2007 new
RT resume 2007 newRT resume 2007 new
RT resume 2007 new
BOB TEPPER
David Wright Project Manager Resume
David Wright Project Manager ResumeDavid Wright Project Manager Resume
David Wright Project Manager Resume
David Wright
Resume (Prashant Shinde)
Resume (Prashant Shinde)Resume (Prashant Shinde)
Resume (Prashant Shinde)
Prashant Shinde
Christopher Flowers Resume
Christopher Flowers ResumeChristopher Flowers Resume
Christopher Flowers Resume
Chris Flowers
IT Project Manager - Charlotte NC
IT Project Manager - Charlotte NCIT Project Manager - Charlotte NC
IT Project Manager - Charlotte NC
JeffWitzer
William Thomas Beckley resume
William Thomas Beckley resumeWilliam Thomas Beckley resume
William Thomas Beckley resume
Tommy Beckley
Perez, Nelson Res Jan 2011
Perez, Nelson Res Jan  2011Perez, Nelson Res Jan  2011
Perez, Nelson Res Jan 2011
Nelson Perez
Resume updated (083117)
Resume updated (083117)Resume updated (083117)
Resume updated (083117)
Joey Sorallo
C. Babilya resume 4-2011
C. Babilya resume 4-2011C. Babilya resume 4-2011
C. Babilya resume 4-2011
chuckbab
Perez, Nelson Res 11 1 2010 2
Perez, Nelson Res 11 1 2010 2Perez, Nelson Res 11 1 2010 2
Perez, Nelson Res 11 1 2010 2
Nelson Perez
Bendixen David Resume 2 7 2012
Bendixen David Resume 2 7 2012Bendixen David Resume 2 7 2012
Bendixen David Resume 2 7 2012
David Bendixen
C. Babilya resume 4-2011
C. Babilya resume 4-2011C. Babilya resume 4-2011
C. Babilya resume 4-2011
chuckbab
Gregory Lipham Resume 2015
Gregory Lipham Resume 2015Gregory Lipham Resume 2015
Gregory Lipham Resume 2015
Gregory Lipham
R gibas project strategic planner management resume 2016
R gibas project strategic planner management resume 2016R gibas project strategic planner management resume 2016
R gibas project strategic planner management resume 2016
Rebecca Gibas
gene-malboeuf-resume.1
gene-malboeuf-resume.1gene-malboeuf-resume.1
gene-malboeuf-resume.1
Gene Malboeuf
RT resume 2007 new
RT resume 2007 newRT resume 2007 new
RT resume 2007 new
BOB TEPPER
David Wright Project Manager Resume
David Wright Project Manager ResumeDavid Wright Project Manager Resume
David Wright Project Manager Resume
David Wright
Resume (Prashant Shinde)
Resume (Prashant Shinde)Resume (Prashant Shinde)
Resume (Prashant Shinde)
Prashant Shinde
Christopher Flowers Resume
Christopher Flowers ResumeChristopher Flowers Resume
Christopher Flowers Resume
Chris Flowers
IT Project Manager - Charlotte NC
IT Project Manager - Charlotte NCIT Project Manager - Charlotte NC
IT Project Manager - Charlotte NC
JeffWitzer

Viewers also liked (8)

Strategic Communications Plan
Strategic Communications PlanStrategic Communications Plan
Strategic Communications Plan
Katlin Dangel
Jane Austen Paper
Jane Austen PaperJane Austen Paper
Jane Austen Paper
Katlin Dangel
Mike Okey CV FM1 Linked in
Mike Okey  CV FM1 Linked inMike Okey  CV FM1 Linked in
Mike Okey CV FM1 Linked in
Mike Okey
About me
About meAbout me
About me
Ana Somera
Star Wars Science: University of Arizona space systems engineer designs a reb...
Star Wars Science: University of Arizona space systems engineer designs a reb...Star Wars Science: University of Arizona space systems engineer designs a reb...
Star Wars Science: University of Arizona space systems engineer designs a reb...
University of Arizona Research, Discovery & Innovation
FINAL Summary Hearing Report H1_Select Committee on Children with Special Nee...
FINAL Summary Hearing Report H1_Select Committee on Children with Special Nee...FINAL Summary Hearing Report H1_Select Committee on Children with Special Nee...
FINAL Summary Hearing Report H1_Select Committee on Children with Special Nee...
Cristina Jade Pe
American League Cy Young -recruitHSathletes.comAmerican League Cy Young -recruitHSathletes.com
American League Cy Young -recruitHSathletes.com
recruitHSathletes.com
Koqowey nemitun
Koqowey nemitunKoqowey nemitun
Koqowey nemitun
Melissa Marie
Strategic Communications Plan
Strategic Communications PlanStrategic Communications Plan
Strategic Communications Plan
Katlin Dangel
Jane Austen Paper
Jane Austen PaperJane Austen Paper
Jane Austen Paper
Katlin Dangel
Mike Okey CV FM1 Linked in
Mike Okey  CV FM1 Linked inMike Okey  CV FM1 Linked in
Mike Okey CV FM1 Linked in
Mike Okey
FINAL Summary Hearing Report H1_Select Committee on Children with Special Nee...
FINAL Summary Hearing Report H1_Select Committee on Children with Special Nee...FINAL Summary Hearing Report H1_Select Committee on Children with Special Nee...
FINAL Summary Hearing Report H1_Select Committee on Children with Special Nee...
Cristina Jade Pe
American League Cy Young -recruitHSathletes.comAmerican League Cy Young -recruitHSathletes.com
American League Cy Young -recruitHSathletes.com
recruitHSathletes.com

Similar to Resume 4-14-2015 (20)

Kerry_Sheehan_15
Kerry_Sheehan_15Kerry_Sheehan_15
Kerry_Sheehan_15
Kerry Sheehan
Ed McCarty Resume
Ed McCarty ResumeEd McCarty Resume
Ed McCarty Resume
Ed McCarty
GARRETTC_Resume M
GARRETTC_Resume MGARRETTC_Resume M
GARRETTC_Resume M
Chad Garrett
Jason Kitchenham 2016highlights
Jason Kitchenham 2016highlightsJason Kitchenham 2016highlights
Jason Kitchenham 2016highlights
Jason Kitchenham
Resume[1][2]
Resume[1][2]Resume[1][2]
Resume[1][2]
Aaron Blask
755592 rm.43883
755592 rm.43883755592 rm.43883
755592 rm.43883
moss48073
Jason Kitchenham Mhighlights
Jason Kitchenham MhighlightsJason Kitchenham Mhighlights
Jason Kitchenham Mhighlights
Jason Kitchenham
cindy-murray-resume-accounting
cindy-murray-resume-accountingcindy-murray-resume-accounting
cindy-murray-resume-accounting
Cindy Murray
Montey ThamesMil
Montey ThamesMilMontey ThamesMil
Montey ThamesMil
Montey Thames
GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015
Tim Gilliatt
Resume 80115docx
Resume 80115docxResume 80115docx
Resume 80115docx
Chowki Nesser
John Blatt_ Resume 070615
John Blatt_ Resume 070615John Blatt_ Resume 070615
John Blatt_ Resume 070615
John Blatt
Shannon K Watson Resume 9-08-2016
Shannon K Watson Resume 9-08-2016Shannon K Watson Resume 9-08-2016
Shannon K Watson Resume 9-08-2016
Shannon Watson
Dustin Leo Current IT Resume
Dustin Leo Current IT ResumeDustin Leo Current IT Resume
Dustin Leo Current IT Resume
Dustin Leo
bufford, peter resume 160608
bufford, peter resume 160608bufford, peter resume 160608
bufford, peter resume 160608
Peter Bufford
Dave Parta sipm resume 2017 11 15
Dave Parta sipm resume 2017 11 15Dave Parta sipm resume 2017 11 15
Dave Parta sipm resume 2017 11 15
Dave Parta P.E., PMP
Mark Unwin CV Oct 16
Mark Unwin CV Oct 16Mark Unwin CV Oct 16
Mark Unwin CV Oct 16
Mark Unwin
Tony resume 30 jan16
Tony resume 30 jan16Tony resume 30 jan16
Tony resume 30 jan16
Tony Lowery
Chad Burnworth 2016 Accomplishment Resume
Chad Burnworth 2016 Accomplishment ResumeChad Burnworth 2016 Accomplishment Resume
Chad Burnworth 2016 Accomplishment Resume
Chad Burnworth CISSP MCSE CCNA CTGA
Michael laskowski Professional Resume
Michael laskowski Professional ResumeMichael laskowski Professional Resume
Michael laskowski Professional Resume
Michael Laskowski
Ed McCarty Resume
Ed McCarty ResumeEd McCarty Resume
Ed McCarty Resume
Ed McCarty
GARRETTC_Resume M
GARRETTC_Resume MGARRETTC_Resume M
GARRETTC_Resume M
Chad Garrett
Jason Kitchenham 2016highlights
Jason Kitchenham 2016highlightsJason Kitchenham 2016highlights
Jason Kitchenham 2016highlights
Jason Kitchenham
755592 rm.43883
755592 rm.43883755592 rm.43883
755592 rm.43883
moss48073
Jason Kitchenham Mhighlights
Jason Kitchenham MhighlightsJason Kitchenham Mhighlights
Jason Kitchenham Mhighlights
Jason Kitchenham
cindy-murray-resume-accounting
cindy-murray-resume-accountingcindy-murray-resume-accounting
cindy-murray-resume-accounting
Cindy Murray
GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015
Tim Gilliatt
John Blatt_ Resume 070615
John Blatt_ Resume 070615John Blatt_ Resume 070615
John Blatt_ Resume 070615
John Blatt
Shannon K Watson Resume 9-08-2016
Shannon K Watson Resume 9-08-2016Shannon K Watson Resume 9-08-2016
Shannon K Watson Resume 9-08-2016
Shannon Watson
Dustin Leo Current IT Resume
Dustin Leo Current IT ResumeDustin Leo Current IT Resume
Dustin Leo Current IT Resume
Dustin Leo
bufford, peter resume 160608
bufford, peter resume 160608bufford, peter resume 160608
bufford, peter resume 160608
Peter Bufford
Dave Parta sipm resume 2017 11 15
Dave Parta sipm resume 2017 11 15Dave Parta sipm resume 2017 11 15
Dave Parta sipm resume 2017 11 15
Dave Parta P.E., PMP
Mark Unwin CV Oct 16
Mark Unwin CV Oct 16Mark Unwin CV Oct 16
Mark Unwin CV Oct 16
Mark Unwin
Tony resume 30 jan16
Tony resume 30 jan16Tony resume 30 jan16
Tony resume 30 jan16
Tony Lowery
Michael laskowski Professional Resume
Michael laskowski Professional ResumeMichael laskowski Professional Resume
Michael laskowski Professional Resume
Michael Laskowski

Resume 4-14-2015

  • 1. Jeff Potocnik Home: 715-635-4744 N7420 Trego Haven Road e-mail: jkpotocnik@centurytel.net Trego, WI 54888 Jeffrey A. Potocnik Objective Consider opportunities that coincide with my personal development and flexibility that allows me to apply: Education, Management and Project Management experience attained over the years to add value within an organization. Qualifications Attained a degree in Electric Power Distribution and built upon this foundation to broaden that knowledge base. Familiar with PLC based systems, AC inverter & DC motor control, instrumentation and sensing equipment. Over Nine (9) years of Facility Management experience that includes Safety, Environmental Compliance, Operations, Employee Relations, Business Planning, Capital Project Development and Project Management with fiscal and compliance responsibilities. Versed in Statistical Process Control (SPC), Process Quality Management (PQM), Business Process Improvement Fundamentals and Lean Six Sigma principles. My main background is grounded within industrial manufacturing. Experienced with contract development and contract administration. Also served as a Board Member for the Michigan, Luce County Economic Development Corporation for several years. Skill development includes the ability to review schematics and drawings for a variety of machine, component and construction applications. This would include power distribution, equipment design, structures and grade. Computer skills include MS Word, Excel, Power Point, Outlook, MS Project, AutoCAD and Business applications such as BI Factory. Employment May 2010 to Oct 2014 Louisiana Pacific Corporation Hayward, WI Project Engineer Identify opportunities that have the ability to increase efficiencies within the manufacturing processes. Prepare proposals to present to the Business Team Engineering Manager and facilitate implementation of approved projects. Ensure projects maintain compliance with established Safety, Environmental and Health Standards. Capital project development including documentation development for projects up to $6MM. Define equipment specifications and develop scopes of work for mechanical design, installation and electrical power distribution and integration. Manage internal and external resources throughout project development, execution, implementation and capitalization. Maintain project budgets and timelines.
  • 2. Apr 2009-Oct 2009 Indeck Ladysmith Bio-fuel Center Ladysmith, WI Plant Superintendent Monitored the manufacturing equipment installation throughout the construction process and participated in the initial manufacturing process startup. Reviewed employee applications and worked together with the Management Team to develop an interview and hiring process. Assisted with employee safety orientation and training. Responsible for employee training, performance and development. Established employee schedules and objectives. Provided coaching and counseling to improve employee performance. Developed operation and maintenance procedures for the major machine centers and participated in various maintenance and production activities. Directed daily production and maintenance activities to ensure production met delivery schedules. Ordered manufacturing supplies and parts to maintain or improve operational efficiencies. 2005-Jan 1st, 2009 Louisiana Pacific Corporation Hayward, WI Regional Engineering Manager Identify opportunities that have the potential to improve efficiencies within the manufacturing processes. Prepared proposals to present to the Business Teams and facilitated the implementation of approved projects. Ensured that projects were in compliance with environmental, health and safety standards. Managed Engineering resources at four (4) locations throughout Northern Wisconsin, Minnesota and the Upper Peninsula of Michigan. Accounting responsibilities to include the creation and maintenance of the Business Unit Capital Budget. Management responsibilities for up to $40MM worth of Capital implementation activity. Direct Project Management responsibility for multiple projects of up to $5MM Ensure that project accounting procedures met corporate guidelines. Capital project management to include documentation development and ROI calculations. Defined equipment specifications and the scopes of work for mechanical installation as well as electrical power distribution and integration. Assisted in Business Plan development. Worked closely with the Plant Management Teams to develop strategies to meet corporate objectives. Established an Engineering presence throughout Louisiana Pacifics North Central Region. Managed four (4) engineering personnel at multiple locations. Mentored employees to assume leadership roles in order to develop effective multi-functional project teams. 1999-2005 Louisiana Pacific Corporation Newberry, MI Manager, Operations Research/ Maintenance Supt II Identify opportunities that have the potential to improve efficiencies within the manufacturing processes. Prepared proposals to present to the Business Teams and facilitated the implementation of approved projects.
  • 3. Accounting responsibilities to include the creation and maintenance of the Business Unit Capital Budget and ensure that project accounting procedures met the corporate guidelines. Capital project management to include documentation development for projects up to $3MM. Defined equipment specifications and the scopes of work for mechanical installation as well as electrical power distribution and integration. Assisted in Business Plan development. Worked closely with the Plant Management Teams to develop strategies to meet corporate objectives. 1990-1999 Louisiana Pacific Corporation Newberry, MI Plant Manager Responsibilities for whole plant operations to include Health, Safety, Environmental and Quality Compliance. Responsible for the creation and maintenance of the facility operating budget and to ensure that the accounting procedures met the corporate standards. Management responsibility for operating budgets of up to $50MM. Bottom line accountability to include production, maintenance and capital implementation. Management responsibilities for 125 employees. This effort also defined manufacturing objectives and established the criteria for employee performance plans. 1987-1990 Louisiana Pacific Corporation Sagola, MI Electrical Superintendent Responsible for all aspects of electrical maintenance and power distribution at the LP Sagola facility. Assisted with construction design and start up of the LP Dawson Creek, BC manufacturing facility. Assisted with construction design and start up of the LP Sagola, MI manufacturing facility. Assisted with the start up of the LP Newberry, MI OSB manufacturing facility. Familiar with and maintained PLC controllers, Inverter & DC drives, Instrumentation and 3 phase motor control centers. 1983-1987 Louisiana Pacific Corporation Hayward, WI Lead Electrician Responsible for the preventative maintenance of the electrical equipment, project set up, drawing and design for the electrical control systems and installation. Assigned work duties to shift electricians and followed up on the completion of tasks. Assisted with the construction design and start up of the LP Hayward Line II Production line. Responsible for minimizing down time. 1980-1983 Louisiana Pacific Corporation Hayward, WI Maintenance Electrician Maintenance electrician in charge of trouble shooting and repair of electrical equipment throughout the facility. Assisted with the start up of the LP Hayward Line I production line.
  • 4. Education 1974-1975 Chippewa Valley Technical Institute Eau Claire, WI Electric Power Distribution Diploma in Electric Power Distribution 1970-1974 Owen-Withee High School Owen, WI High School Diploma Graduate