Can they be big, like a Terminal?
Where are we?
What are the obstacles?
ELUSIVE
Agenda
1 Rian Burger, Principal, Stantec
2 David Robbins, Project Administrator, CDA
3 Patrick Magnotta, Environmental Specialist, FAA
4 Kenny McNamee, Sustainable Building Analyst,
Stantec
Locations of ZNE Buildings and Districts
Stantecs Net Zero Buildings
220,000sqft - NREL RSF- I - Golden, CO  Built, measured =
Net Zero.
120,000sqft - NREL RSF- II - Golden, CO  120,000sqft 
built, measured = Net Zero
380,000sqft - SMUD EC-OC (6 buildings)  Sacramento  Built, being
measured
125,000sqft  Salt Lake County DAs Office building 
Designed  In bid phase
EU  EEM  RE
EU  RE  0
or
2013-03-06_Rian_Burger_Net Zero Energy and Sustainability
0
4
8
12
16
20
24
28
32
36
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
Model
RSF
PV
Model
RSF
PV
Model
RSF
PV
Model
RSF
PV
Model
RSF
PV
Model
RSF
PV
Model
RSF
PV
Model
RSF
PV
Model
RSF
PV
Model
RSF
PV
Model
RSF
PV
Model
RSF
PV
October
2010
November
2010
December
2010
January
2011
February
2011
March
2011
April
2011
May
2011
June
2011
July
2011
August
2011
September
2011
AnnualEUI(kBtu/ft2)
MonthlyEUI(kBtu/ft2)
PV
Data Center
Mechanical Systems
Plug Loads
Lighting
Heating
Cooling
Model Annual EUI
RSF Annual EUI
Note: The annual EUI values
are demand side values
and do not include the
PV generation.
The PV system is
sized for an
annual EUI of
35.1 kBtu/ft2.
Measured / Modeled & Cumulative EUI
Commercial Building Cost Comparison
Toronto Pearson T3 Energy Study
1,754,470 ft2 - Target: 30% reduction
Achievable: 20%
Study Results
Baseline target reduction
 Reduce absolute energy consumption by 30% from 2012
levels.
 Target savings ~90,500 GJ
 Modeled savings ~ 56,400 GJ, 19%
Metered Energy - 2012 Baseline
(GJ)
Total Energy Savings - vs. 2012
Baseline
(GJ)
% Savings
(%)
T3 - Main Terminal 292,326 58,271 20%
T3 - Pier A 9,359 (1,833) -20%
T3 - Total 301,685 56,438 19%
SEATAC North Satellite (Built 1970)
0
50
100
150
200
250
300
Current Building Connected to CUP Disconnected from
CUP
David Tomber, Manager Strategic Facility Planning, Port Of Seattle SEA
Not
zero
kBTU/ft族/yr
Opportunity!
Energy Use Intensity (EUI)
Existing Building Stock
By repurposing existing building stock to be more
energy efficient when we replace aging systems,
and setting appropriate targets for new building
stock, SEA can add 50% square footage of
buildings to the airport campusand reduce
energy use by 25% from current levels.
David Tomber
Manager Strategic Facility Planning
Port Of Seattle SEA
42.5%
Heading for 50%
Printed cells, 4 deep
Cheaper than coal
John Rogers,
Univ. of Illinois, Urbana Champaign
What has been achieved?
What are the issues?
David Robbins
Patrick Magnotta
Kenneth McNamee

More Related Content

What's hot (20)

33 freeman modelling_energy_losses_due_to_snow_on_pv_systems
33 freeman modelling_energy_losses_due_to_snow_on_pv_systems33 freeman modelling_energy_losses_due_to_snow_on_pv_systems
33 freeman modelling_energy_losses_due_to_snow_on_pv_systems
Sandia National Laboratories: Energy & Climate: Renewables
Project 2019 05
Project 2019 05Project 2019 05
Project 2019 05
Lviv Data Science Summer School
Long-term energy system modelling with improved resolution to address short-t...
Long-term energy system modelling with improved resolution to address short-t...Long-term energy system modelling with improved resolution to address short-t...
Long-term energy system modelling with improved resolution to address short-t...
IEA-ETSAP
02 sandia pv modeling conference 9 may2017
02 sandia pv modeling conference 9 may201702 sandia pv modeling conference 9 may2017
02 sandia pv modeling conference 9 may2017
Sandia National Laboratories: Energy & Climate: Renewables
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
IEA-ETSAP
EDF Carbon Capture & Storage
EDF Carbon Capture & StorageEDF Carbon Capture & Storage
EDF Carbon Capture & Storage
kene2008
Carbon Capture & Sequestration Feasibility Report; Pendergrass, PE, RG, Gary;...
Carbon Capture & Sequestration Feasibility Report; Pendergrass, PE, RG, Gary;...Carbon Capture & Sequestration Feasibility Report; Pendergrass, PE, RG, Gary;...
Carbon Capture & Sequestration Feasibility Report; Pendergrass, PE, RG, Gary;...
MECConference
40 zhang bificial_module_overview
40 zhang bificial_module_overview40 zhang bificial_module_overview
40 zhang bificial_module_overview
Sandia National Laboratories: Energy & Climate: Renewables
Energy-Water-Land Nexus in Germany: A case study
Energy-Water-Land Nexus in Germany: A case studyEnergy-Water-Land Nexus in Germany: A case study
Energy-Water-Land Nexus in Germany: A case study
IEA-ETSAP
Workflow for Urban Regenerative Design and Climate Adaptation_MC Meeting Bolz...
Workflow for Urban Regenerative Design and Climate Adaptation_MC Meeting Bolz...Workflow for Urban Regenerative Design and Climate Adaptation_MC Meeting Bolz...
Workflow for Urban Regenerative Design and Climate Adaptation_MC Meeting Bolz...
RESTORE
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
IEA-ETSAP
Modelling different Thermal Energy Storage (TES) options in a TIMES model
Modelling different Thermal Energy Storage (TES) options in a TIMES modelModelling different Thermal Energy Storage (TES) options in a TIMES model
Modelling different Thermal Energy Storage (TES) options in a TIMES model
IEA-ETSAP
05 2017 05-04-clear sky models g-kimball
05 2017 05-04-clear sky models g-kimball05 2017 05-04-clear sky models g-kimball
05 2017 05-04-clear sky models g-kimball
Sandia National Laboratories: Energy & Climate: Renewables
54 paul gibbs_helioscope
54 paul gibbs_helioscope54 paul gibbs_helioscope
54 paul gibbs_helioscope
Sandia National Laboratories: Energy & Climate: Renewables
Co-locating wind and solar: Combining powers
Co-locating wind and solar: Combining powersCo-locating wind and solar: Combining powers
Co-locating wind and solar: Combining powers
NSW Environment and Planning
Addressing demand uncertainty in long-term planning models
Addressing demand uncertainty in long-term planning modelsAddressing demand uncertainty in long-term planning models
Addressing demand uncertainty in long-term planning models
IEA-ETSAP
Early-Stage Design Simulation for Architects
Early-Stage Design Simulation for ArchitectsEarly-Stage Design Simulation for Architects
Early-Stage Design Simulation for Architects
SimScale
41 corbellini analysis_and_modelling_of_bifacial_pv_modules
41 corbellini analysis_and_modelling_of_bifacial_pv_modules41 corbellini analysis_and_modelling_of_bifacial_pv_modules
41 corbellini analysis_and_modelling_of_bifacial_pv_modules
Sandia National Laboratories: Energy & Climate: Renewables
Preparing for Zero Net Energy Buildings
Preparing for Zero Net Energy BuildingsPreparing for Zero Net Energy Buildings
Preparing for Zero Net Energy Buildings
Enercare Inc.
Physikal - JSR 363 and Kotlin for Clean Energy - Java2Days 2017
Physikal - JSR 363 and Kotlin for Clean Energy - Java2Days 2017Physikal - JSR 363 and Kotlin for Clean Energy - Java2Days 2017
Physikal - JSR 363 and Kotlin for Clean Energy - Java2Days 2017
Werner Keil
Long-term energy system modelling with improved resolution to address short-t...
Long-term energy system modelling with improved resolution to address short-t...Long-term energy system modelling with improved resolution to address short-t...
Long-term energy system modelling with improved resolution to address short-t...
IEA-ETSAP
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
IEA-ETSAP
EDF Carbon Capture & Storage
EDF Carbon Capture & StorageEDF Carbon Capture & Storage
EDF Carbon Capture & Storage
kene2008
Carbon Capture & Sequestration Feasibility Report; Pendergrass, PE, RG, Gary;...
Carbon Capture & Sequestration Feasibility Report; Pendergrass, PE, RG, Gary;...Carbon Capture & Sequestration Feasibility Report; Pendergrass, PE, RG, Gary;...
Carbon Capture & Sequestration Feasibility Report; Pendergrass, PE, RG, Gary;...
MECConference
Energy-Water-Land Nexus in Germany: A case study
Energy-Water-Land Nexus in Germany: A case studyEnergy-Water-Land Nexus in Germany: A case study
Energy-Water-Land Nexus in Germany: A case study
IEA-ETSAP
Workflow for Urban Regenerative Design and Climate Adaptation_MC Meeting Bolz...
Workflow for Urban Regenerative Design and Climate Adaptation_MC Meeting Bolz...Workflow for Urban Regenerative Design and Climate Adaptation_MC Meeting Bolz...
Workflow for Urban Regenerative Design and Climate Adaptation_MC Meeting Bolz...
RESTORE
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
IEA-ETSAP
Modelling different Thermal Energy Storage (TES) options in a TIMES model
Modelling different Thermal Energy Storage (TES) options in a TIMES modelModelling different Thermal Energy Storage (TES) options in a TIMES model
Modelling different Thermal Energy Storage (TES) options in a TIMES model
IEA-ETSAP
Addressing demand uncertainty in long-term planning models
Addressing demand uncertainty in long-term planning modelsAddressing demand uncertainty in long-term planning models
Addressing demand uncertainty in long-term planning models
IEA-ETSAP
Early-Stage Design Simulation for Architects
Early-Stage Design Simulation for ArchitectsEarly-Stage Design Simulation for Architects
Early-Stage Design Simulation for Architects
SimScale
Preparing for Zero Net Energy Buildings
Preparing for Zero Net Energy BuildingsPreparing for Zero Net Energy Buildings
Preparing for Zero Net Energy Buildings
Enercare Inc.
Physikal - JSR 363 and Kotlin for Clean Energy - Java2Days 2017
Physikal - JSR 363 and Kotlin for Clean Energy - Java2Days 2017Physikal - JSR 363 and Kotlin for Clean Energy - Java2Days 2017
Physikal - JSR 363 and Kotlin for Clean Energy - Java2Days 2017
Werner Keil

Viewers also liked (13)

La coparticipaci坦n federal present坦 un crecimiento del 42%La coparticipaci坦n federal present坦 un crecimiento del 42%
La coparticipaci坦n federal present坦 un crecimiento del 42%
Eduardo Nelson German
Updated Writing samples 8_10 (KW)
Updated Writing samples 8_10 (KW)Updated Writing samples 8_10 (KW)
Updated Writing samples 8_10 (KW)
Kelsea Wilkerson
Rasheeda-Job Resume
Rasheeda-Job ResumeRasheeda-Job Resume
Rasheeda-Job Resume
Rasheeda Kabba
Festival Victor Hugo  Guernesey Festival Victor Hugo  Guernesey
Festival Victor Hugo Guernesey
Esperluette & Associ辿s
En 2016 ser叩 dif鱈cil la reactivaci坦n del producto, pero las exportaciones com...En 2016 ser叩 dif鱈cil la reactivaci坦n del producto, pero las exportaciones com...
En 2016 ser叩 dif鱈cil la reactivaci坦n del producto, pero las exportaciones com...
Eduardo Nelson German
留厦旅マ侶-留亮留竜厦凌喝僚僚留喝1049199喝留留慮留僚留溜凌喝流亮侶厦留喝1049179
留厦旅マ侶-留亮留竜厦凌喝僚僚留喝1049199喝留留慮留僚留溜凌喝流亮侶厦留喝1049179留厦旅マ侶-留亮留竜厦凌喝僚僚留喝1049199喝留留慮留僚留溜凌喝流亮侶厦留喝1049179
留厦旅マ侶-留亮留竜厦凌喝僚僚留喝1049199喝留留慮留僚留溜凌喝流亮侶厦留喝1049179
AnnaKariotiKamaterou
Informe sobre la Industria Automotriz N尊 24 con datos al mes de Noviembre de ...Informe sobre la Industria Automotriz N尊 24 con datos al mes de Noviembre de ...
Informe sobre la Industria Automotriz N尊 24 con datos al mes de Noviembre de ...
Eduardo Nelson German
Eurotier 2016Eurotier 2016
Eurotier 2016
Bretagne Commerce International
Loan Officer Mastermind: Generate Endless Buyer Leads with Open Houses
Loan Officer Mastermind: Generate Endless Buyer Leads with Open HousesLoan Officer Mastermind: Generate Endless Buyer Leads with Open Houses
Loan Officer Mastermind: Generate Endless Buyer Leads with Open Houses
Total Expert
Sketchnotes / Apuntes Gr叩ficosSketchnotes / Apuntes Gr叩ficos
Sketchnotes / Apuntes Gr叩ficos
ReillyDow
2016 Business Planning Mastermind
2016 Business Planning Mastermind2016 Business Planning Mastermind
2016 Business Planning Mastermind
Total Expert
Comment nous sommes devenus plus Agile - De l'impl辿mentation de Scrum dans un...
Comment nous sommes devenus plus Agile - De l'impl辿mentation de Scrum dans un...Comment nous sommes devenus plus Agile - De l'impl辿mentation de Scrum dans un...
Comment nous sommes devenus plus Agile - De l'impl辿mentation de Scrum dans un...
Benjamin Robic
Hong kong immigration
Hong kong immigrationHong kong immigration
Hong kong immigration
MoreVisas Immigration Visa Consultants
La coparticipaci坦n federal present坦 un crecimiento del 42%La coparticipaci坦n federal present坦 un crecimiento del 42%
La coparticipaci坦n federal present坦 un crecimiento del 42%
Eduardo Nelson German
Updated Writing samples 8_10 (KW)
Updated Writing samples 8_10 (KW)Updated Writing samples 8_10 (KW)
Updated Writing samples 8_10 (KW)
Kelsea Wilkerson
Rasheeda-Job Resume
Rasheeda-Job ResumeRasheeda-Job Resume
Rasheeda-Job Resume
Rasheeda Kabba
Festival Victor Hugo  Guernesey Festival Victor Hugo  Guernesey
Festival Victor Hugo Guernesey
Esperluette & Associ辿s
En 2016 ser叩 dif鱈cil la reactivaci坦n del producto, pero las exportaciones com...En 2016 ser叩 dif鱈cil la reactivaci坦n del producto, pero las exportaciones com...
En 2016 ser叩 dif鱈cil la reactivaci坦n del producto, pero las exportaciones com...
Eduardo Nelson German
留厦旅マ侶-留亮留竜厦凌喝僚僚留喝1049199喝留留慮留僚留溜凌喝流亮侶厦留喝1049179
留厦旅マ侶-留亮留竜厦凌喝僚僚留喝1049199喝留留慮留僚留溜凌喝流亮侶厦留喝1049179留厦旅マ侶-留亮留竜厦凌喝僚僚留喝1049199喝留留慮留僚留溜凌喝流亮侶厦留喝1049179
留厦旅マ侶-留亮留竜厦凌喝僚僚留喝1049199喝留留慮留僚留溜凌喝流亮侶厦留喝1049179
AnnaKariotiKamaterou
Informe sobre la Industria Automotriz N尊 24 con datos al mes de Noviembre de ...Informe sobre la Industria Automotriz N尊 24 con datos al mes de Noviembre de ...
Informe sobre la Industria Automotriz N尊 24 con datos al mes de Noviembre de ...
Eduardo Nelson German
Loan Officer Mastermind: Generate Endless Buyer Leads with Open Houses
Loan Officer Mastermind: Generate Endless Buyer Leads with Open HousesLoan Officer Mastermind: Generate Endless Buyer Leads with Open Houses
Loan Officer Mastermind: Generate Endless Buyer Leads with Open Houses
Total Expert
Sketchnotes / Apuntes Gr叩ficosSketchnotes / Apuntes Gr叩ficos
Sketchnotes / Apuntes Gr叩ficos
ReillyDow
2016 Business Planning Mastermind
2016 Business Planning Mastermind2016 Business Planning Mastermind
2016 Business Planning Mastermind
Total Expert
Comment nous sommes devenus plus Agile - De l'impl辿mentation de Scrum dans un...
Comment nous sommes devenus plus Agile - De l'impl辿mentation de Scrum dans un...Comment nous sommes devenus plus Agile - De l'impl辿mentation de Scrum dans un...
Comment nous sommes devenus plus Agile - De l'impl辿mentation de Scrum dans un...
Benjamin Robic

Similar to 2013-03-06_Rian_Burger_Net Zero Energy and Sustainability (20)

Webinar: CCS major project development lessons from the ZeroGen experience
Webinar: CCS major project development lessons from the ZeroGen experienceWebinar: CCS major project development lessons from the ZeroGen experience
Webinar: CCS major project development lessons from the ZeroGen experience
Global CCS Institute
Status of US CCS projects and data available
Status of US CCS projects and data availableStatus of US CCS projects and data available
Status of US CCS projects and data available
IEA-ETSAP
Case study of ms1525 energy efficiency and renewable energy code of practice.
Case study of ms1525   energy efficiency and renewable energy code of practice.Case study of ms1525   energy efficiency and renewable energy code of practice.
Case study of ms1525 energy efficiency and renewable energy code of practice.
Steve Lojuntin
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
Steve Lojuntin
The Role of Performance Digital Twins in Achieving Net-Zero Campus Estates - IES
The Role of Performance Digital Twins in Achieving Net-Zero Campus Estates - IESThe Role of Performance Digital Twins in Achieving Net-Zero Campus Estates - IES
The Role of Performance Digital Twins in Achieving Net-Zero Campus Estates - IES
IES VE
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.pptAPP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
somnathmahapatra6
Examples of NZEB in the Public Sector by John Furlong
Examples of NZEB in the Public Sector by John FurlongExamples of NZEB in the Public Sector by John Furlong
Examples of NZEB in the Public Sector by John Furlong
SustainableEnergyAut
Solar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed SoilSolar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed Soil
Yamen Nanne
Low Carbon Buildings in Malaysia @ Low Carbon Asia Conference by UTM
Low Carbon Buildings in Malaysia @ Low Carbon Asia Conference by UTMLow Carbon Buildings in Malaysia @ Low Carbon Asia Conference by UTM
Low Carbon Buildings in Malaysia @ Low Carbon Asia Conference by UTM
Steve Lojuntin
05_GMR Hyderabad International Airport.pdf
05_GMR Hyderabad International Airport.pdf05_GMR Hyderabad International Airport.pdf
05_GMR Hyderabad International Airport.pdf
shiv53296
Rising To The Challenge: Toward Carbon Neutral Buildings
Rising To The Challenge: Toward Carbon Neutral BuildingsRising To The Challenge: Toward Carbon Neutral Buildings
Rising To The Challenge: Toward Carbon Neutral Buildings
Tom Hootman
Effective Contingency Management - Contractor Management Forum - PD July 2013
Effective Contingency Management - Contractor Management Forum - PD July 2013Effective Contingency Management - Contractor Management Forum - PD July 2013
Effective Contingency Management - Contractor Management Forum - PD July 2013
Pedram Danesh-Mand
Ashrae Sustainability The Road To Net Zero Gcg
Ashrae Sustainability  The Road To Net Zero GcgAshrae Sustainability  The Road To Net Zero Gcg
Ashrae Sustainability The Road To Net Zero Gcg
Hayley Pallister
Green Belt Project V2
Green Belt Project V2Green Belt Project V2
Green Belt Project V2
Jonathan Shriqui, PMP
Net-Zero Energy Case Studies
Net-Zero Energy Case StudiesNet-Zero Energy Case Studies
Net-Zero Energy Case Studies
aiahouston
Solar power plants in rajasthan
Solar power plants in rajasthanSolar power plants in rajasthan
Solar power plants in rajasthan
Asafak Husain
2015 - Building Simulation Best of 2015-03-23.pptx
2015 - Building Simulation Best of 2015-03-23.pptx2015 - Building Simulation Best of 2015-03-23.pptx
2015 - Building Simulation Best of 2015-03-23.pptx
nbulger
(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS
Aiman Ali
Research Support Facility: Three years of net zero operations, occupants, and...
Research Support Facility: Three years of net zero operations, occupants, and...Research Support Facility: Three years of net zero operations, occupants, and...
Research Support Facility: Three years of net zero operations, occupants, and...
Shanti Pless
Low Carbon Building in Malaysia (update 2014) @ bcck
Low Carbon Building in Malaysia (update 2014) @ bcckLow Carbon Building in Malaysia (update 2014) @ bcck
Low Carbon Building in Malaysia (update 2014) @ bcck
Steve Lojuntin
Webinar: CCS major project development lessons from the ZeroGen experience
Webinar: CCS major project development lessons from the ZeroGen experienceWebinar: CCS major project development lessons from the ZeroGen experience
Webinar: CCS major project development lessons from the ZeroGen experience
Global CCS Institute
Status of US CCS projects and data available
Status of US CCS projects and data availableStatus of US CCS projects and data available
Status of US CCS projects and data available
IEA-ETSAP
Case study of ms1525 energy efficiency and renewable energy code of practice.
Case study of ms1525   energy efficiency and renewable energy code of practice.Case study of ms1525   energy efficiency and renewable energy code of practice.
Case study of ms1525 energy efficiency and renewable energy code of practice.
Steve Lojuntin
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
Steve Lojuntin
The Role of Performance Digital Twins in Achieving Net-Zero Campus Estates - IES
The Role of Performance Digital Twins in Achieving Net-Zero Campus Estates - IESThe Role of Performance Digital Twins in Achieving Net-Zero Campus Estates - IES
The Role of Performance Digital Twins in Achieving Net-Zero Campus Estates - IES
IES VE
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.pptAPP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
somnathmahapatra6
Examples of NZEB in the Public Sector by John Furlong
Examples of NZEB in the Public Sector by John FurlongExamples of NZEB in the Public Sector by John Furlong
Examples of NZEB in the Public Sector by John Furlong
SustainableEnergyAut
Solar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed SoilSolar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed Soil
Yamen Nanne
Low Carbon Buildings in Malaysia @ Low Carbon Asia Conference by UTM
Low Carbon Buildings in Malaysia @ Low Carbon Asia Conference by UTMLow Carbon Buildings in Malaysia @ Low Carbon Asia Conference by UTM
Low Carbon Buildings in Malaysia @ Low Carbon Asia Conference by UTM
Steve Lojuntin
05_GMR Hyderabad International Airport.pdf
05_GMR Hyderabad International Airport.pdf05_GMR Hyderabad International Airport.pdf
05_GMR Hyderabad International Airport.pdf
shiv53296
Rising To The Challenge: Toward Carbon Neutral Buildings
Rising To The Challenge: Toward Carbon Neutral BuildingsRising To The Challenge: Toward Carbon Neutral Buildings
Rising To The Challenge: Toward Carbon Neutral Buildings
Tom Hootman
Effective Contingency Management - Contractor Management Forum - PD July 2013
Effective Contingency Management - Contractor Management Forum - PD July 2013Effective Contingency Management - Contractor Management Forum - PD July 2013
Effective Contingency Management - Contractor Management Forum - PD July 2013
Pedram Danesh-Mand
Ashrae Sustainability The Road To Net Zero Gcg
Ashrae Sustainability  The Road To Net Zero GcgAshrae Sustainability  The Road To Net Zero Gcg
Ashrae Sustainability The Road To Net Zero Gcg
Hayley Pallister
Net-Zero Energy Case Studies
Net-Zero Energy Case StudiesNet-Zero Energy Case Studies
Net-Zero Energy Case Studies
aiahouston
Solar power plants in rajasthan
Solar power plants in rajasthanSolar power plants in rajasthan
Solar power plants in rajasthan
Asafak Husain
2015 - Building Simulation Best of 2015-03-23.pptx
2015 - Building Simulation Best of 2015-03-23.pptx2015 - Building Simulation Best of 2015-03-23.pptx
2015 - Building Simulation Best of 2015-03-23.pptx
nbulger
(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS
Aiman Ali
Research Support Facility: Three years of net zero operations, occupants, and...
Research Support Facility: Three years of net zero operations, occupants, and...Research Support Facility: Three years of net zero operations, occupants, and...
Research Support Facility: Three years of net zero operations, occupants, and...
Shanti Pless
Low Carbon Building in Malaysia (update 2014) @ bcck
Low Carbon Building in Malaysia (update 2014) @ bcckLow Carbon Building in Malaysia (update 2014) @ bcck
Low Carbon Building in Malaysia (update 2014) @ bcck
Steve Lojuntin

2013-03-06_Rian_Burger_Net Zero Energy and Sustainability

Editor's Notes

  • #5: ZEC Zero Energy capable.
  • #6: NREL = National Renewable Energy Laboratory SMUD = Sacramento Municipal Utility District
  • #9: Model is within 1% of reality
  • #13: Our project looked at an expansion and extensive remodel of our North Satellite, built in 1970 with an EUI of 282.油 The firm doing the study designed one of the first net zero office buildings in the United States, the Bullitt Center Foundation in Seattle.油 Terminals are a different building type and operational use.油 Connected to our central utility plant, the best we could get to was an EUI of 97 (with strategies for high performance building envelope, high performance mechanical with chilled beams, daylighting, geothermal, and improved controls).油 Decoupled from our central utility plant, with the same strategies, we could get to an EUI of 72.油 These are significant improvements for energy efficiency, but not net zero.油 PV does not provide much opportunity within the envelope of the North Satellite in our climate.油 For airports like SEA, most of the opportunity for energy savings will be through terminals, which use the most energy per square foot compared to other building types (parking, cargo, maintenance, hotel).油 SEA, like many airports, has a significant square footage of existing building stock that will not be going away anytime soon.油 Repurposing the building stock to be more energy efficient offers great opportunity.油 By repurposing existing building stock to be more energy efficient when we replace aging systems, and setting appropriate targets for new bulding stock, SEA can add 50% square footage of buildings to the airport campusand reduce energy use by 25% from current levels.
  • #15: John Rogers, of the University of Illinois, Urbana-Champaign has devised solar cells (which are being made, packaged into panels and deployed in pilot projects by Semprius, North Carolina) which convert 42.5% of sunlight. Even when surrounded by the paraphernalia of a panel they manage 35%. Suitably tweaked, Dr Rogers reckons, their efficiency could rise to 50%. Their secret is that they are actually not one cell, but four, stacked one on top of another. The Economist