SENIOR PLANNING ENGINEER
Experience in executing prestigious projects of large magnitude within strict time schedules, cost & quality
P R O F I L E S U M M A R Y
• Mechanical Engineer with 5+ years of experience in the field of Planning & Project Management.
• Experienced in preparing the overall integrated schedule, L1, L2, L3 and L4 schedule.
• Experienced in reviewing the contractors schedule based on the scope specified as per the contract
• Familiar with:
o Primavera P6
o MS Project
• Experience in preparing resource & cost loaded schedules, generating the S-curve in primavera based on the resource
allocation and forecasting the resource for future requirement.
• Experienced in working out the sequence of activities required and linking the activities with resource based on the
best possible effort to optimize the sequence to fit as per the time line specified in the contract.
• Vastly experienced in preparing, analyzing & performing the critical path analysis to determine the critical items of the
project, based on the schedule.
• Enough knowledge in preparing the S-curve, progress monitoring dash boards, area wise tracking sheets, weekly &
monthly progress reports.
• Exposure to dealing with Lenders as well as Senior and Executive Management and preparing the progress reports for
these levels as well as other government and other legislative bodies.
• Highly experienced in successfully identifying and troubleshooting the major risk items during the course of the
project, as well as preparing what if scenarios of potential mitigation measures.
• Experienced in constructability review for the major interface areas to facilitate the erection and interface between
multiple contractors.
• Experienced in Power Generation Projects covering design, manufacturing, procurement, construction and
commissioning for civil, mechanical and electrical and instrumentation disciplines.
• Experience in the reviewing the quality documents like Test certificates, stage wise inspection reports in accordance
with the quality assurance plan as specified for the project.
• Qualified ASNT level 2 NDT in PT, MPT, RT & UT.
• Exposure in the shop planning works like processing, Scheduling and Expediting
C O R E C O M P E T E N C I E S
Planning Project Management Primavera
Site Coordination Expediting
P R O F E S S I O N A L E X P E R I E N C E
Planning Engineer, Tractebel Engineering Private limited, Chennai Mar’12-Present
Major Projects:
Project: 2 X 350 MW Coastal Thermal Power Plant, Nellore (Sub-critical)
Client: Meenakshi Energy Private Limited, Nellore
Deputations:
• 2 x 350 MW Meenakshi Energy ENGIE (India) on site in Nellore
Key Responsibilities:
• Preparing the overall integrated schedule for the project in primavera P6.
• Preparing the area wise L4 schedule with resource loaded for close monitoring of the work progress.
• Performing the critical path analysis to identify the critical items for the project on monthly basis and suggesting the
mitigation measures to catchup the delay.
• Updating the monthly progress on the overall project schedule and circulating the look ahead activities to the concern
discipline for the next period to proceed them further.
• Preparing the overall project report based on the outcome of critical path analysis and presenting to the top
management.
• Preparing the key performance indicators, Progress dashboards, weekly & Monthly progress reports, lenders progress
reports, government bodies monthly progress reports.
• Preparing the package wise S-curve for the project to measure the progress and delay as per the plan.
• Preparing the resource loaded schedule and detailed monitoring of the progress.
• Conducting the plan of the day & weekly schedule meeting with the contractors to assets the progress at site.
• Supporting the EPCM team with the project schedule to enable them to proceed with contractual obligations with the
contractors.
Planning & Order Management Engineer, M/s. Arun Enterprises Limited, Trichy Nov’11 - Mar’12
Project: Sub Contracting BHEL Jobs
Client: BHEL Trichy
Key Responsibilities:
• Involved shop planning and expediting in pipe shop activities.
• Preparation of weekly & monthly plan and schedules.
• Allocating jobs to the contractors, Capacity analysis and work centre scheduling.
• Involved in manufacturing process for Coils, Panels, Coal gates, Beams & columns.
• Follow up & expediting the manufacturing process in the shop floor.
• Reviewing of quality assurance plans.
• Involved in inspection coordination with the inspection agency & quality inspectors.
Graduate Apprentice, M/s. BHEL Trichy Nov’10 – Nov’11
Department: Operation planning & Control
Client: BHEL Jobs
Key Responsibilities:
• Involved shop planning and expediting in pipe shop activities.
• Preparation of weekly & monthly plan and schedules.
• Follow up & expediting the supply of components for shop assembly.
• Effective utilization of Raw Material and wastage reduction,
• Capacity analysis and work centre scheduling.
• Interpretation and Clarification in manufacturing & pipeline layout drawings.
• Issuing of documents & components to shop
• During the tenure coordination with the interrelated departments such as Product design engineering, Material
Planning, Quality Assurance & Control and Tool Engineering.
Highlights:
• Attended trainings on Primavera P6 at Meenakshi Energy Pvt. Ltd., for one week.
A C A D E M I C D E T A I L S
• BE (Mechanical Engineering) from PSNA College of Engineering & Technology, Anna University, Tamil Nadu in 2010
year with 71 %
I T S K I L L S
• Primavera P6
• MS Project
• Microsoft Office
• R E F E R E N C E
Mr. Santhosh kumar – Sr. Engineer (Operation Planning & Control Department, BHEL Trichy) – 09442552907
Mr. Robin Clare-Talbot – Project Controls Manager Meenakshi Energy Private Limited – robin.claretalbot@gmail.com

More Related Content

What's hot (20)

Roshanak Jalili CV
Roshanak Jalili CVRoshanak Jalili CV
Roshanak Jalili CV
Roshanak Jalili
Ìý
Robert W Self Resume 2009
Robert W Self Resume 2009Robert W Self Resume 2009
Robert W Self Resume 2009
guest3e8191
Ìý
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
mahmood mansor
Ìý
Nawaz Eng-OCT
Nawaz Eng-OCTNawaz Eng-OCT
Nawaz Eng-OCT
Nawas A.C.M
Ìý
RESUME - Rajesh
RESUME - RajeshRESUME - Rajesh
RESUME - Rajesh
Chandrasekar Rajesh
Ìý
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
Dhana Lakshmi
Ìý
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
Sankar Sundaram PMP
Ìý
Project Control
Project ControlProject Control
Project Control
Martin Sillaots
Ìý
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project management
Kabilan Kabi
Ìý
Sohaib_CV-
Sohaib_CV-Sohaib_CV-
Sohaib_CV-
Sohaib Safdar (PMP)
Ìý
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
Sajith Nair
Ìý
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
Dhana Lakshmi
Ìý
CustomerCopy raghu
CustomerCopy raghuCustomerCopy raghu
CustomerCopy raghu
Raghu p
Ìý
SamGhoshProjectmanagement7
SamGhoshProjectmanagement7SamGhoshProjectmanagement7
SamGhoshProjectmanagement7
Sam Ghosh
Ìý
Project Engineer 3
Project Engineer 3Project Engineer 3
Project Engineer 3
Sunil Mall
Ìý
Resume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS BamadefahResume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS Bamadefah
Mohamed Bamadhaf
Ìý
my cv.doc
my cv.docmy cv.doc
my cv.doc
Yoedi Padrihi
Ìý
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
Susitra Anandan
Ìý
Project Planning & Control Engineer
Project Planning & Control EngineerProject Planning & Control Engineer
Project Planning & Control Engineer
Moshir Shabbir Moshir
Ìý
CV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning EngineerCV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning Engineer
KHAJA Raheemuddin
Ìý
Roshanak Jalili CV
Roshanak Jalili CVRoshanak Jalili CV
Roshanak Jalili CV
Roshanak Jalili
Ìý
Robert W Self Resume 2009
Robert W Self Resume 2009Robert W Self Resume 2009
Robert W Self Resume 2009
guest3e8191
Ìý
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
mahmood mansor
Ìý
Nawaz Eng-OCT
Nawaz Eng-OCTNawaz Eng-OCT
Nawaz Eng-OCT
Nawas A.C.M
Ìý
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
Dhana Lakshmi
Ìý
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
Sankar Sundaram PMP
Ìý
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project management
Kabilan Kabi
Ìý
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
Sajith Nair
Ìý
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
Dhana Lakshmi
Ìý
CustomerCopy raghu
CustomerCopy raghuCustomerCopy raghu
CustomerCopy raghu
Raghu p
Ìý
SamGhoshProjectmanagement7
SamGhoshProjectmanagement7SamGhoshProjectmanagement7
SamGhoshProjectmanagement7
Sam Ghosh
Ìý
Project Engineer 3
Project Engineer 3Project Engineer 3
Project Engineer 3
Sunil Mall
Ìý
Resume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS BamadefahResume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS Bamadefah
Mohamed Bamadhaf
Ìý
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
Susitra Anandan
Ìý
Project Planning & Control Engineer
Project Planning & Control EngineerProject Planning & Control Engineer
Project Planning & Control Engineer
Moshir Shabbir Moshir
Ìý
CV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning EngineerCV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning Engineer
KHAJA Raheemuddin
Ìý

Similar to 2016 - Balaji Manivel - CV (20)

UCM-CV
UCM-CVUCM-CV
UCM-CV
Umesh Chandra Mohapatra
Ìý
sravankumar
sravankumarsravankumar
sravankumar
sravan gorthi
Ìý
Suraj Kumar-Resume Program Management
Suraj Kumar-Resume Program ManagementSuraj Kumar-Resume Program Management
Suraj Kumar-Resume Program Management
suraj kumar
Ìý
Anusha
AnushaAnusha
Anusha
anusha y
Ìý
Samsul Alam Resume
Samsul Alam ResumeSamsul Alam Resume
Samsul Alam Resume
Samsul Alam
Ìý
Soumyajit Das
Soumyajit DasSoumyajit Das
Soumyajit Das
Soumyajit Dash
Ìý
Resume- Project Management Analyst
Resume- Project Management AnalystResume- Project Management Analyst
Resume- Project Management Analyst
Amol Gaikwad
Ìý
Santhan CV-2016
Santhan CV-2016Santhan CV-2016
Santhan CV-2016
Jeevanantham Santha Kumar
Ìý
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
Mahesh Narayanan Subburam
Ìý
madhu updated cv
madhu updated cvmadhu updated cv
madhu updated cv
Madhu Civil
Ìý
Haythem jamli candidature cv
Haythem jamli   candidature cvHaythem jamli   candidature cv
Haythem jamli candidature cv
jamli haythem
Ìý
Raghu CV 30_12_15
Raghu CV 30_12_15Raghu CV 30_12_15
Raghu CV 30_12_15
Raghunatha MN
Ìý
SFK_ Resume-jobchange_dec2016
SFK_ Resume-jobchange_dec2016SFK_ Resume-jobchange_dec2016
SFK_ Resume-jobchange_dec2016
Fazlullah Khan
Ìý
Mujtaba Ahmed Khan Resume (2)
Mujtaba Ahmed Khan Resume (2)Mujtaba Ahmed Khan Resume (2)
Mujtaba Ahmed Khan Resume (2)
Mujtaba Khan
Ìý
DEEPU CV
DEEPU CVDEEPU CV
DEEPU CV
Deepu Francis
Ìý
CV Project Manager
CV Project ManagerCV Project Manager
CV Project Manager
Dhananjay Abitkar
Ìý
Sayantan resume
Sayantan resumeSayantan resume
Sayantan resume
Sayantan Dhar
Ìý
Subhash CV Dec 2016
Subhash CV Dec 2016Subhash CV Dec 2016
Subhash CV Dec 2016
Subhash Patil
Ìý
Henry CV
Henry CVHenry CV
Henry CV
Henry Jayahar
Ìý
ADARSH kUMAR
ADARSH kUMARADARSH kUMAR
ADARSH kUMAR
Adarsh Kumar
Ìý
Suraj Kumar-Resume Program Management
Suraj Kumar-Resume Program ManagementSuraj Kumar-Resume Program Management
Suraj Kumar-Resume Program Management
suraj kumar
Ìý
Anusha
AnushaAnusha
Anusha
anusha y
Ìý
Samsul Alam Resume
Samsul Alam ResumeSamsul Alam Resume
Samsul Alam Resume
Samsul Alam
Ìý
Resume- Project Management Analyst
Resume- Project Management AnalystResume- Project Management Analyst
Resume- Project Management Analyst
Amol Gaikwad
Ìý
madhu updated cv
madhu updated cvmadhu updated cv
madhu updated cv
Madhu Civil
Ìý
Haythem jamli candidature cv
Haythem jamli   candidature cvHaythem jamli   candidature cv
Haythem jamli candidature cv
jamli haythem
Ìý
Raghu CV 30_12_15
Raghu CV 30_12_15Raghu CV 30_12_15
Raghu CV 30_12_15
Raghunatha MN
Ìý
SFK_ Resume-jobchange_dec2016
SFK_ Resume-jobchange_dec2016SFK_ Resume-jobchange_dec2016
SFK_ Resume-jobchange_dec2016
Fazlullah Khan
Ìý
Mujtaba Ahmed Khan Resume (2)
Mujtaba Ahmed Khan Resume (2)Mujtaba Ahmed Khan Resume (2)
Mujtaba Ahmed Khan Resume (2)
Mujtaba Khan
Ìý
Sayantan resume
Sayantan resumeSayantan resume
Sayantan resume
Sayantan Dhar
Ìý
Subhash CV Dec 2016
Subhash CV Dec 2016Subhash CV Dec 2016
Subhash CV Dec 2016
Subhash Patil
Ìý
ADARSH kUMAR
ADARSH kUMARADARSH kUMAR
ADARSH kUMAR
Adarsh Kumar
Ìý

2016 - Balaji Manivel - CV

  • 1. M. Balaji E-Mail: mbalaji.manivel@gmail.com Date of Birth: 25 December 1988 Phone: +91 9943982411 Languages: Tamil, English, Telugu Country of Origin : India SENIOR PLANNING ENGINEER Experience in executing prestigious projects of large magnitude within strict time schedules, cost & quality P R O F I L E S U M M A R Y • Mechanical Engineer with 5+ years of experience in the field of Planning & Project Management. • Experienced in preparing the overall integrated schedule, L1, L2, L3 and L4 schedule. • Experienced in reviewing the contractors schedule based on the scope specified as per the contract • Familiar with: o Primavera P6 o MS Project • Experience in preparing resource & cost loaded schedules, generating the S-curve in primavera based on the resource allocation and forecasting the resource for future requirement. • Experienced in working out the sequence of activities required and linking the activities with resource based on the best possible effort to optimize the sequence to fit as per the time line specified in the contract. • Vastly experienced in preparing, analyzing & performing the critical path analysis to determine the critical items of the project, based on the schedule. • Enough knowledge in preparing the S-curve, progress monitoring dash boards, area wise tracking sheets, weekly & monthly progress reports. • Exposure to dealing with Lenders as well as Senior and Executive Management and preparing the progress reports for these levels as well as other government and other legislative bodies. • Highly experienced in successfully identifying and troubleshooting the major risk items during the course of the project, as well as preparing what if scenarios of potential mitigation measures. • Experienced in constructability review for the major interface areas to facilitate the erection and interface between multiple contractors. • Experienced in Power Generation Projects covering design, manufacturing, procurement, construction and commissioning for civil, mechanical and electrical and instrumentation disciplines. • Experience in the reviewing the quality documents like Test certificates, stage wise inspection reports in accordance with the quality assurance plan as specified for the project. • Qualified ASNT level 2 NDT in PT, MPT, RT & UT. • Exposure in the shop planning works like processing, Scheduling and Expediting C O R E C O M P E T E N C I E S Planning Project Management Primavera Site Coordination Expediting P R O F E S S I O N A L E X P E R I E N C E Planning Engineer, Tractebel Engineering Private limited, Chennai Mar’12-Present Major Projects: Project: 2 X 350 MW Coastal Thermal Power Plant, Nellore (Sub-critical) Client: Meenakshi Energy Private Limited, Nellore Deputations: • 2 x 350 MW Meenakshi Energy ENGIE (India) on site in Nellore Key Responsibilities: • Preparing the overall integrated schedule for the project in primavera P6. • Preparing the area wise L4 schedule with resource loaded for close monitoring of the work progress. • Performing the critical path analysis to identify the critical items for the project on monthly basis and suggesting the mitigation measures to catchup the delay. • Updating the monthly progress on the overall project schedule and circulating the look ahead activities to the concern discipline for the next period to proceed them further.
  • 2. • Preparing the overall project report based on the outcome of critical path analysis and presenting to the top management. • Preparing the key performance indicators, Progress dashboards, weekly & Monthly progress reports, lenders progress reports, government bodies monthly progress reports. • Preparing the package wise S-curve for the project to measure the progress and delay as per the plan. • Preparing the resource loaded schedule and detailed monitoring of the progress. • Conducting the plan of the day & weekly schedule meeting with the contractors to assets the progress at site. • Supporting the EPCM team with the project schedule to enable them to proceed with contractual obligations with the contractors. Planning & Order Management Engineer, M/s. Arun Enterprises Limited, Trichy Nov’11 - Mar’12 Project: Sub Contracting BHEL Jobs Client: BHEL Trichy Key Responsibilities: • Involved shop planning and expediting in pipe shop activities. • Preparation of weekly & monthly plan and schedules. • Allocating jobs to the contractors, Capacity analysis and work centre scheduling. • Involved in manufacturing process for Coils, Panels, Coal gates, Beams & columns. • Follow up & expediting the manufacturing process in the shop floor. • Reviewing of quality assurance plans. • Involved in inspection coordination with the inspection agency & quality inspectors. Graduate Apprentice, M/s. BHEL Trichy Nov’10 – Nov’11 Department: Operation planning & Control Client: BHEL Jobs Key Responsibilities: • Involved shop planning and expediting in pipe shop activities. • Preparation of weekly & monthly plan and schedules. • Follow up & expediting the supply of components for shop assembly. • Effective utilization of Raw Material and wastage reduction, • Capacity analysis and work centre scheduling. • Interpretation and Clarification in manufacturing & pipeline layout drawings. • Issuing of documents & components to shop • During the tenure coordination with the interrelated departments such as Product design engineering, Material Planning, Quality Assurance & Control and Tool Engineering. Highlights: • Attended trainings on Primavera P6 at Meenakshi Energy Pvt. Ltd., for one week. A C A D E M I C D E T A I L S • BE (Mechanical Engineering) from PSNA College of Engineering & Technology, Anna University, Tamil Nadu in 2010 year with 71 % I T S K I L L S • Primavera P6 • MS Project • Microsoft Office • R E F E R E N C E Mr. Santhosh kumar – Sr. Engineer (Operation Planning & Control Department, BHEL Trichy) – 09442552907 Mr. Robin Clare-Talbot – Project Controls Manager Meenakshi Energy Private Limited – robin.claretalbot@gmail.com