際際滷

際際滷Share a Scribd company logo
Engr. Zahid Ullah
B.E (Electronics Engineering)
UET Peshawar.
Mob. 0092-314-7644524
Email: zahid_ullah@lcc.com
To work in a dynamic and challenging environment in the Telecommunication Sector
where I can utilize my knowledge, expertise and skills to build a solid foundation for
my career and to contribute in the development and wellbeing of the organization.
RF Drive Test, Coordinator and Optimization Experience (3+ years) on 2G/3G
Network with Huawei vendor.
Specialties: RF TOOLS & EXPERTISE:
 iPRS
 iManager U2000
 iManager M2000
 Map info
 ACTIX
 Nemo Out Door
 Nemo Analyzer
 Spectrum Analyzer
 Google Earth
 RF Optimization Tool/ Drive Testing Tool, like TEMS 8.0.3, TEMS 14.6.4,
TEMS 15.1, 16.1, and 16.3.4 of ASCOM.
 Microsoft Office.
1. 2G/3G DT Post Processing Engineer at LCC Pakistan.
2. 2G/3G Telenor USF Shangla/Chitral Project.
3. 2G/3G Huawei Mobilink Super 3G Project.
4. 2G/3G Mobilink Internal Customer Complaint Project.
5. Huawei 2G/3G Mobilink Rollout Project.
6. Huawei CM-Pak Benchmark Project.
7. 2G HUAWEI WARID Rollout Project.
8. HUAWEI Ufone Swap Project.
9. HUAWEI Warid Cluster Drive BTS/BSC Upgrade Project Center.
CAREER OBJECTIVE
CAREER SUMMARY
PROJECTS SUMMARY
2G/3G DT Post Processing Engineer LCC Pakistan.
Huawei 2G/3G MOBILINK Rollout Project .
 Check 2G/3G Customer Complain And Move Team According to Complaint.
 Before Move Team Check Major KPi And Check PB,BER (UL,DL)
 After DT, Analysis Logs and Analysis KPi Path Balance Congestion DCR etc.
 Make Mobilink 2G/3G Report and Log file analyses.
 Also Check Neighbor HO Relations and Shift Traffics
 Make 2G/3G Neighbors Plan.
 Modulation Planning
 Post analysis of hardware problems (faulty TRX, VSWR etc.) causing KPIs
degradations network by analyzing TRX level statistics and alarms information.
 Frequency Planning and Neighbor Planning of the New Rollout sites.
 Optimization of worst cells (Based upon Drop Call Rate, Call Setup Success Rate,
Handover, Traffic etc) in the Network through Frequency.
2G/3G Drive Test Engineer LCC Pakistan.
2G/3G Moblink Customer Complaint Project
 Conducted 3G Drive Tests measurements for coverage and quality of service for
WCDMA HSUPA/HSDPA.
 Conducting Benchmark Cluster Drive Test Using TEMS/Nemo Out Door
 Conducting Drive Test Single Site verification on both single carrier sites in TEMS.
 Conducted drive test verification to check coverage extent, call quality, Sector and
Inter-RAT system handover performance of newly integrated sites.
 Resolved Issues of SIR and Pilot Pollution.
 Find Jammers Within Area By Spectrum Analyzer
 Customer complaint resolution. Visited customer place and solve their problems
regarding Pilot Pollution HSDPA/HSUPA throughput.
 SSV test (voice and video call, data test).
 Sector Swap check.
 Walk test to check RSCP and Ec/No indoor.
 Indoor and outdoor CS and PS testing for corporate customer.
 Soft and I-RAT handover verification test.
 2G to 3G and 3G to 2G reselection test.
 PS reselection and Soft/Softer handover test.
 Troubleshoot dropped calls, low RSCP and EC/IO issues to ensure good speech
quality.
 Reading L2 and L3 messages.
 Identify missing and one-way defining Neighbor
 To perform Cluster Drive
 Perform Freeway drive test and according to customer Demand.
WORK EXPERIENCE
2G Drive Test Engineer UCE.
HUAWEI-Warid Rollout/BTS,BSC Upgrade Project Centre
 Quality Testing (RXQual, C/I and SQI).
 Perform BTS And BSC Level Testing
 Making 2G Report Rollout BTS, BSC Level.
 Cluster Drive, In Idle, Dedicated and packet mode.
 Coverage tests, Fixed Point throughput tests, mobile throughput tests etc.
 Analysis of DT files using TEMS tool, and forwarding recommendations.
 Making DT & Cluster Reports using, Google Earth and MapInfo tools.
 Identification for bad coverage, throughput, sector swapping, overshooting, Tx
power, handover issues etc.
 Preparing Drive Test Reports Using TEMS 8.0.4 & MapInfo 8.5/11.0
 Reports regarding Drive Test and mutual discussion on site issues with Warid
Engineers
 Carrying out drives Test for Huawei Warid PCU Upgrade Project.
2G/3G Drive Test Engineer LCC Pakistan.
HUAWEI-Ufone Rollout/NPM project.
 Performed cluster drive and examine performance of network, coverage and quality
issues, interferences, co-BCCH and call blocking issues and handover problems.
 Identifying different network problems like drop call, block call, missing neighbor,
co-BCCH, Adjacent BCCH,
 identified interference sources
 Performed Neighbor Audits, removing frequency clashes (Co-BCCH, MAIO, and
Fixed Frequency TRXs).
 Customer complaint resolution. Visited customer place and solve their problems
 Verification of planning data during the drive test e.g. Neighbor relations, Handover
parameters, MA list, HSN, BCCH verification, MAIO, LAC etc.
 Analysis of drive test log files and troubleshooting of the problems related to
coverage, call drops, quality etc.
 Initial tuning (Drive testing) of new on-air sites (e.g. checking sector swapping,
coverage, call origination / termination, C/I etc.)
 TRx Testing, Inter-Site and Intra-Site Handover Testing, Site Coverage Test,
GPRS/Edge Testing etc.
 Making 2g Rollout Report.
 Identifying and escalating hardware issues Swap Sector/Partial/Transmit/Receive.
 Perform NEMO Drive Test
 Perform MOS DT For SQI Checking
 OMO DT Idle and Dedicated also benchmarking for PS and CS, Also Perform
Scanning MOD DT.
 Conducting Drive test of new integrated sites/ Customer complaints to resolve bad
quality, poor coverage, over shooting cells and failure events issues etc.
 Analyze Drive test results and make fine tuning by changing antenna tilt, azimuth and
frequency to meet the coverage and quality requirements.
 Checking of DT reports.
 Resolve Handover issues and remove the overshooting.
 Bench marking activities for ISB city and prepared bench marking reports.
 Remove Swap Full Swap/Partial Swaps
 Perform Issue Based Drive Test.
1. One Month Training on RF Optimization organized by LCC Pakistan.
2. Three days training on Community Service in collaboration with
British Council Peshawar, KPK.
 3rd
position in School during Matric examinations.
 1st
position in College during F.Sc examinations.
 Got 1st
position in inter school quiz competition at district Mardan level.
(2003).
 Got 1st
position in inter school quiz competition at Province level. (2006).
ACADEMIC QUALIFICATION
DEGREE YEAR INSTITUTIONS SUBJECT Grade/Division
B.Sc. (Hons.)
Electronics Engineering
2014
University of Engineering
and Technology,
(UET) Peshawar.
Over all
Electronics
Engineering
courses
1st
Higher Secondary School
Certificate(HSSC)
2010
B.I.S.E Mardan.
Khyber Pakhtunkhwa
Pre Engineering 1st
Secondary School
Certificate (SSC)
2008
B.I.S.E Mardan.
Khyber Pakhtunkhwa
Science 1st
Fathers Name: Yar Muhammad
Date of birth: 02-02 1992
PROFESSIONAL TRAINING/ COURSES
DISTINCTIONS
PERSONAL DETAILS
NIC.No: 16101-5986152-9
Domicile: Mardan (Khyber Pakhtoonkhwa)
Nationality: Pakistani
Marital status: Single
Permanent Address: House No.02, Street No.03, Masjid
Colony Sugar Mills Road Near Railway
Phatak Charsadda Chowk, Teh:& Distt:
Mardan, KPK, Pakistan.
1. Mr. Naseem Shinwari
Project Coordinator PMO, Network Engineering Technology at LCC-
Pakistan
G-11 Markaz Islamabad, Pakistan
Email: naseem_shinwari@lcc.com
Cell # +92-308-5200484
2. Mr. Basit Rabbani
Team Lead (Nation Wide) at LCC-Pakistan.
Mobilink Customer Complaint Project (PMCL-CC), Islamabad, Pakistan.
Email: basit.rabbani@guest.mobilink.net
Cell # +92-301-8500519
3. Mr. Haroon Tariq
Team Lead & RF Engineer Level-1 at LCC Pakistan.
Huawei Mobilink Super 3G Project, Islamabad.
Email:haroon.tariq1@huawei.com
Cell # +92-302-8492727
REFERENCES
NIC.No: 16101-5986152-9
Domicile: Mardan (Khyber Pakhtoonkhwa)
Nationality: Pakistani
Marital status: Single
Permanent Address: House No.02, Street No.03, Masjid
Colony Sugar Mills Road Near Railway
Phatak Charsadda Chowk, Teh:& Distt:
Mardan, KPK, Pakistan.
1. Mr. Naseem Shinwari
Project Coordinator PMO, Network Engineering Technology at LCC-
Pakistan
G-11 Markaz Islamabad, Pakistan
Email: naseem_shinwari@lcc.com
Cell # +92-308-5200484
2. Mr. Basit Rabbani
Team Lead (Nation Wide) at LCC-Pakistan.
Mobilink Customer Complaint Project (PMCL-CC), Islamabad, Pakistan.
Email: basit.rabbani@guest.mobilink.net
Cell # +92-301-8500519
3. Mr. Haroon Tariq
Team Lead & RF Engineer Level-1 at LCC Pakistan.
Huawei Mobilink Super 3G Project, Islamabad.
Email:haroon.tariq1@huawei.com
Cell # +92-302-8492727
REFERENCES

More Related Content

What's hot (20)

DOC
Resume Lelin Kumar singh
lelin singh
DOCX
Updated
AMIT PRATAP SINGH
DOC
CV_Satbir
Satbir Singh Rana
DOC
Anoop_RF_
Anoop Singh
DOC
CV_ANUPAM MONDAL
Anupam Mondal
PDF
SK_RF ENGR@NETKOM 2016
Engr. Sardar kashif Shahzad
DOC
Telecom Engineer
junaid hussain
PDF
CV_Update_Anang Supriyatna_2016
Anang Supriyatna
DOC
Resume_Ajith
Ajith Shetty
DOC
Sandeep Sharma_CV
sandeep sharma
PDF
Ijett v4 i10p113
agni mohananda
DOC
Fawad Tanveer Butt CV
Fawad Butt
DOCX
Adeel Ahmed- CV
ADEEL AHMED
DOC
Harpreet Singh Resume
harpreet singh
PDF
Ahmet_Ondortoglu Resume
Ahmet Ondortoglu
DOC
Harshit resume
Harshit Sengar
DOC
AJIT KUMAR SHARMA CV
ajit sharma
DOC
AJITKUMARSHARMACV
ajit sharma
DOC
Aslam[1][1]
Mohd Aslam
DOCX
Vikrant Tiwari Resume(RNO)
vikrant tiwari
Resume Lelin Kumar singh
lelin singh
CV_Satbir
Satbir Singh Rana
Anoop_RF_
Anoop Singh
CV_ANUPAM MONDAL
Anupam Mondal
SK_RF ENGR@NETKOM 2016
Engr. Sardar kashif Shahzad
Telecom Engineer
junaid hussain
CV_Update_Anang Supriyatna_2016
Anang Supriyatna
Resume_Ajith
Ajith Shetty
Sandeep Sharma_CV
sandeep sharma
Ijett v4 i10p113
agni mohananda
Fawad Tanveer Butt CV
Fawad Butt
Adeel Ahmed- CV
ADEEL AHMED
Harpreet Singh Resume
harpreet singh
Ahmet_Ondortoglu Resume
Ahmet Ondortoglu
Harshit resume
Harshit Sengar
AJIT KUMAR SHARMA CV
ajit sharma
AJITKUMARSHARMACV
ajit sharma
Aslam[1][1]
Mohd Aslam
Vikrant Tiwari Resume(RNO)
vikrant tiwari

Similar to 3G RF Optimization CV (20)

DOC
Naqash
Naqash Khalid
DOCX
Usman Ghani Resume LTE
usman ghani
DOC
CV(M.Javed )
Muhammad Javed Iqbal
DOC
sahil_resume
shahil khan
DOC
Nawab Zada (Telecom Engineer)
Nawab Zada
DOC
Faisal Aziz CV
Faisal Aziz
DOCX
Sunil saini rf engineer updated resume
sunil Saini
DOC
SKK RESUME (1)
Subodh kant kumar
DOCX
Pankaj Patel Resume
pankaj patel
DOCX
Updated CV MNK
Muhammad Nawaz Khan
DOCX
ABRAR_ RF
Abrar Hussain
PDF
Naveed RF Engineer
Naveed Ahmad
DOCX
Adeel Ahmed-CV
ADEEL AHMED
DOC
Ehab Atta Optimizer
Ehab Atta
DOC
karunakar.u
Karunakar Uppu
DOCX
Syed imran Hussain (Resume)
imran Hussain
DOC
SANTOSH_TELECOM_CV_2
santosh verma
DOC
Deepk Resume Updated
Deepak Yadav
DOCX
Aleem Ashraf CV
Aleem Ashraf
Naqash
Naqash Khalid
Usman Ghani Resume LTE
usman ghani
CV(M.Javed )
Muhammad Javed Iqbal
sahil_resume
shahil khan
Nawab Zada (Telecom Engineer)
Nawab Zada
Faisal Aziz CV
Faisal Aziz
Sunil saini rf engineer updated resume
sunil Saini
SKK RESUME (1)
Subodh kant kumar
Pankaj Patel Resume
pankaj patel
Updated CV MNK
Muhammad Nawaz Khan
ABRAR_ RF
Abrar Hussain
Naveed RF Engineer
Naveed Ahmad
Adeel Ahmed-CV
ADEEL AHMED
Ehab Atta Optimizer
Ehab Atta
karunakar.u
Karunakar Uppu
Syed imran Hussain (Resume)
imran Hussain
SANTOSH_TELECOM_CV_2
santosh verma
Deepk Resume Updated
Deepak Yadav
Aleem Ashraf CV
Aleem Ashraf
Ad

3G RF Optimization CV

  • 1. Engr. Zahid Ullah B.E (Electronics Engineering) UET Peshawar. Mob. 0092-314-7644524 Email: zahid_ullah@lcc.com To work in a dynamic and challenging environment in the Telecommunication Sector where I can utilize my knowledge, expertise and skills to build a solid foundation for my career and to contribute in the development and wellbeing of the organization. RF Drive Test, Coordinator and Optimization Experience (3+ years) on 2G/3G Network with Huawei vendor. Specialties: RF TOOLS & EXPERTISE: iPRS iManager U2000 iManager M2000 Map info ACTIX Nemo Out Door Nemo Analyzer Spectrum Analyzer Google Earth RF Optimization Tool/ Drive Testing Tool, like TEMS 8.0.3, TEMS 14.6.4, TEMS 15.1, 16.1, and 16.3.4 of ASCOM. Microsoft Office. 1. 2G/3G DT Post Processing Engineer at LCC Pakistan. 2. 2G/3G Telenor USF Shangla/Chitral Project. 3. 2G/3G Huawei Mobilink Super 3G Project. 4. 2G/3G Mobilink Internal Customer Complaint Project. 5. Huawei 2G/3G Mobilink Rollout Project. 6. Huawei CM-Pak Benchmark Project. 7. 2G HUAWEI WARID Rollout Project. 8. HUAWEI Ufone Swap Project. 9. HUAWEI Warid Cluster Drive BTS/BSC Upgrade Project Center. CAREER OBJECTIVE CAREER SUMMARY PROJECTS SUMMARY
  • 2. 2G/3G DT Post Processing Engineer LCC Pakistan. Huawei 2G/3G MOBILINK Rollout Project . Check 2G/3G Customer Complain And Move Team According to Complaint. Before Move Team Check Major KPi And Check PB,BER (UL,DL) After DT, Analysis Logs and Analysis KPi Path Balance Congestion DCR etc. Make Mobilink 2G/3G Report and Log file analyses. Also Check Neighbor HO Relations and Shift Traffics Make 2G/3G Neighbors Plan. Modulation Planning Post analysis of hardware problems (faulty TRX, VSWR etc.) causing KPIs degradations network by analyzing TRX level statistics and alarms information. Frequency Planning and Neighbor Planning of the New Rollout sites. Optimization of worst cells (Based upon Drop Call Rate, Call Setup Success Rate, Handover, Traffic etc) in the Network through Frequency. 2G/3G Drive Test Engineer LCC Pakistan. 2G/3G Moblink Customer Complaint Project Conducted 3G Drive Tests measurements for coverage and quality of service for WCDMA HSUPA/HSDPA. Conducting Benchmark Cluster Drive Test Using TEMS/Nemo Out Door Conducting Drive Test Single Site verification on both single carrier sites in TEMS. Conducted drive test verification to check coverage extent, call quality, Sector and Inter-RAT system handover performance of newly integrated sites. Resolved Issues of SIR and Pilot Pollution. Find Jammers Within Area By Spectrum Analyzer Customer complaint resolution. Visited customer place and solve their problems regarding Pilot Pollution HSDPA/HSUPA throughput. SSV test (voice and video call, data test). Sector Swap check. Walk test to check RSCP and Ec/No indoor. Indoor and outdoor CS and PS testing for corporate customer. Soft and I-RAT handover verification test. 2G to 3G and 3G to 2G reselection test. PS reselection and Soft/Softer handover test. Troubleshoot dropped calls, low RSCP and EC/IO issues to ensure good speech quality. Reading L2 and L3 messages. Identify missing and one-way defining Neighbor To perform Cluster Drive Perform Freeway drive test and according to customer Demand. WORK EXPERIENCE
  • 3. 2G Drive Test Engineer UCE. HUAWEI-Warid Rollout/BTS,BSC Upgrade Project Centre Quality Testing (RXQual, C/I and SQI). Perform BTS And BSC Level Testing Making 2G Report Rollout BTS, BSC Level. Cluster Drive, In Idle, Dedicated and packet mode. Coverage tests, Fixed Point throughput tests, mobile throughput tests etc. Analysis of DT files using TEMS tool, and forwarding recommendations. Making DT & Cluster Reports using, Google Earth and MapInfo tools. Identification for bad coverage, throughput, sector swapping, overshooting, Tx power, handover issues etc. Preparing Drive Test Reports Using TEMS 8.0.4 & MapInfo 8.5/11.0 Reports regarding Drive Test and mutual discussion on site issues with Warid Engineers Carrying out drives Test for Huawei Warid PCU Upgrade Project. 2G/3G Drive Test Engineer LCC Pakistan. HUAWEI-Ufone Rollout/NPM project. Performed cluster drive and examine performance of network, coverage and quality issues, interferences, co-BCCH and call blocking issues and handover problems. Identifying different network problems like drop call, block call, missing neighbor, co-BCCH, Adjacent BCCH, identified interference sources Performed Neighbor Audits, removing frequency clashes (Co-BCCH, MAIO, and Fixed Frequency TRXs). Customer complaint resolution. Visited customer place and solve their problems Verification of planning data during the drive test e.g. Neighbor relations, Handover parameters, MA list, HSN, BCCH verification, MAIO, LAC etc. Analysis of drive test log files and troubleshooting of the problems related to coverage, call drops, quality etc. Initial tuning (Drive testing) of new on-air sites (e.g. checking sector swapping, coverage, call origination / termination, C/I etc.) TRx Testing, Inter-Site and Intra-Site Handover Testing, Site Coverage Test, GPRS/Edge Testing etc. Making 2g Rollout Report. Identifying and escalating hardware issues Swap Sector/Partial/Transmit/Receive. Perform NEMO Drive Test Perform MOS DT For SQI Checking OMO DT Idle and Dedicated also benchmarking for PS and CS, Also Perform Scanning MOD DT.
  • 4. Conducting Drive test of new integrated sites/ Customer complaints to resolve bad quality, poor coverage, over shooting cells and failure events issues etc. Analyze Drive test results and make fine tuning by changing antenna tilt, azimuth and frequency to meet the coverage and quality requirements. Checking of DT reports. Resolve Handover issues and remove the overshooting. Bench marking activities for ISB city and prepared bench marking reports. Remove Swap Full Swap/Partial Swaps Perform Issue Based Drive Test. 1. One Month Training on RF Optimization organized by LCC Pakistan. 2. Three days training on Community Service in collaboration with British Council Peshawar, KPK. 3rd position in School during Matric examinations. 1st position in College during F.Sc examinations. Got 1st position in inter school quiz competition at district Mardan level. (2003). Got 1st position in inter school quiz competition at Province level. (2006). ACADEMIC QUALIFICATION DEGREE YEAR INSTITUTIONS SUBJECT Grade/Division B.Sc. (Hons.) Electronics Engineering 2014 University of Engineering and Technology, (UET) Peshawar. Over all Electronics Engineering courses 1st Higher Secondary School Certificate(HSSC) 2010 B.I.S.E Mardan. Khyber Pakhtunkhwa Pre Engineering 1st Secondary School Certificate (SSC) 2008 B.I.S.E Mardan. Khyber Pakhtunkhwa Science 1st Fathers Name: Yar Muhammad Date of birth: 02-02 1992 PROFESSIONAL TRAINING/ COURSES DISTINCTIONS PERSONAL DETAILS
  • 5. NIC.No: 16101-5986152-9 Domicile: Mardan (Khyber Pakhtoonkhwa) Nationality: Pakistani Marital status: Single Permanent Address: House No.02, Street No.03, Masjid Colony Sugar Mills Road Near Railway Phatak Charsadda Chowk, Teh:& Distt: Mardan, KPK, Pakistan. 1. Mr. Naseem Shinwari Project Coordinator PMO, Network Engineering Technology at LCC- Pakistan G-11 Markaz Islamabad, Pakistan Email: naseem_shinwari@lcc.com Cell # +92-308-5200484 2. Mr. Basit Rabbani Team Lead (Nation Wide) at LCC-Pakistan. Mobilink Customer Complaint Project (PMCL-CC), Islamabad, Pakistan. Email: basit.rabbani@guest.mobilink.net Cell # +92-301-8500519 3. Mr. Haroon Tariq Team Lead & RF Engineer Level-1 at LCC Pakistan. Huawei Mobilink Super 3G Project, Islamabad. Email:haroon.tariq1@huawei.com Cell # +92-302-8492727 REFERENCES
  • 6. NIC.No: 16101-5986152-9 Domicile: Mardan (Khyber Pakhtoonkhwa) Nationality: Pakistani Marital status: Single Permanent Address: House No.02, Street No.03, Masjid Colony Sugar Mills Road Near Railway Phatak Charsadda Chowk, Teh:& Distt: Mardan, KPK, Pakistan. 1. Mr. Naseem Shinwari Project Coordinator PMO, Network Engineering Technology at LCC- Pakistan G-11 Markaz Islamabad, Pakistan Email: naseem_shinwari@lcc.com Cell # +92-308-5200484 2. Mr. Basit Rabbani Team Lead (Nation Wide) at LCC-Pakistan. Mobilink Customer Complaint Project (PMCL-CC), Islamabad, Pakistan. Email: basit.rabbani@guest.mobilink.net Cell # +92-301-8500519 3. Mr. Haroon Tariq Team Lead & RF Engineer Level-1 at LCC Pakistan. Huawei Mobilink Super 3G Project, Islamabad. Email:haroon.tariq1@huawei.com Cell # +92-302-8492727 REFERENCES