MAJOR PROJECTS LIST
Employer: SILVERTECH MIDDLE EAST
PROJECT: INSTALLATION OF ELECTRICAL SUPMERSABLE PUMPS IN WELLHEAD-7 AND
WELLHEAD-15
END USER : ZADCO.
PROCESS : FIRE & GAS, ESD, DCS
WORKPLACE: UMM AL-DALAKH (OFFSHORE)
CONTROL SYSTEM: Siemens PCS7 v7.1 SP4
STATUS: DONE
SCOPE DESCIPTION:
• Design & Execute the complete fire & gas system and ESD system (Siemens S7-400) for Wellhead-07 and
Wellhead-15 in UMM AL-DALAKH field and integrate them with the existing DCS system for the field (PCS7).
• Design & supply five Panel Door HMI WinCC flexible.
• Update the graphics & alarms of existing DCS Servers control room.
• The ESD and Fire & gas Systems are SIL-3 safety certified Systems (Exd).
• The Fire & gas System is having the following detectors: HC- Flammable gas detectors, H2S- Toxic Gas detectors,
Flame Detectors and Smoke Detectors in addition to MACs and Sounders / Beacons.
• Supplying Explosion Proof Engineering Station (Laptop) .
RESPONSIBILITIES ACHIEVED:
• Programming the logic for all IOs of ESD, F&G and RTUs for the wellheads.
• Establish the communication between those systems and the DCS system over S7-connections.
• Commissioning the whole project
• Conducted a Training for ZADCO Operators & maintenance engineers about the Functionality of Safety PLC and all
the required troubleshooting techniques
• Configure all the alarm, events and faceplates in the DCS,
Employer: SILVERTECH MIDDLE EAST
PROJECT: SATAH FULL FIELD DEVELOPMENT
END USER : ZADCO
PROCESS : F&G, RTU COMMUNICATION WITH ARZANAH ISLAND
WORKPLACE: SATAH, UAE (OFFSHORE)
CONTROL SYSTEM: SIEMENS S7-400, STEP7, WinCC Flexible
STATUS: DONE
SCOPE DESCIPTION:
• Reprogram the existing F&G system to include all new F&G devices and optimize the running program.
• Programming the new installed instrumens and devices which are connected to main production platform RTU.
• Updating all local HMIs in all wellheads to include the new modifications.
• Upgrade RTUs from 300 series to 400 series.
RESPONSIBILITIES ACHIEVED:
• Re program the existing F&G system to include all new F&G devices and optimize the running program.
• Programming the new installed instrumens and devices which are connected to main production platform RTU
• Updating all local HMIs in all wellheads to include the new modifications
• Conducting the FAT.
• Commissioning the Project.
Yazan Al-Najjar
Attachment:
Employer: SILVERTECH MIDDLE EAST
PROJECT: FIRE AND GAS SYSTEM FOR THE NEW WELLHEADS (PC-110, PC-055, ZW-100)
END USER : ZADCO
PROCESS : FIRE AND GAS SYSTEM
WORKPLACE: UPPER ZAKUM, UAE (OFFSHORE)
CONTROL SYSTEM: SIEMENS S7-400, STEP7, WinCC Flexible
STATUS: DONE
SCOPE DESCIPTION
• Supply three Fire and Gas panels for the wellheads with Siemens control system based.
• Supply three door mounted HMIs configured in WinCC flexible.
• Establish communication between Siemens F&G panel and existing Honeywell RTUs over Modbus RS-485.
• Training for ZADCO operators.
RESPONSIBILITIES ACHIEVED :
• Programming the logic for the F&G system.
• Leading & conducting the I.F.A.T
• IFAT with Honeywell team in Abu Dhabi
• Trainig for ZADCO operators.
• Engineering & Documentation of the major PLC specifications
Employer: SILVERTECH MIDDLE EAST
PROJECT: UMM LULU
END USER : ZADCO
PROCESS : F&G, ESD, DCS
WORKPLACE: UMM AL-DALAKH, UAE (OFFSHORE)
CONTROL SYSTEM: SIEMENS S7-400, PCS7, STEP7
STATUS: DONE
SCOPE DESCIPTION
• Expansstion of the Existing F&G, DCS and ESD systems in CPC.
• Updating all DCS screens and alarms.
• Communication with many therd party packages over Modbus (MPFM, HVAC, H2S Analyser,..).
• Documentation and Training for ZADCO operators.
RESPONSIBILITIES ACHIEVED :
• Programming the logic for the F&G system.
• Leading & conducting the I.F.A.T
• IFAT with third party packages.
• Engineering & Documentation.
• Training for ZADCO Operators.
Yazan Al-Najjar
Attachment:
Employer: SILVERTECH MIDDLE EAST
PROJECT: ONE WAY DATA CONNECTIVITY BETWEEN UAD AND ZADCO HQ (DATA DIODE)
END USER : ZADCO.
PROCESS : DATA DIODE
WORKPLACE: UMM AL-DALAKH (OFFSHORE) & ZADCO HQ
CONTROL SYSTEM: FOX IT DATA DIODE / SQL SERVER / WinCC Explorer
STATUS: 90% DONE
SCOPE DESCIPTION:
• As IT security recruitment in ZADCO network, the firewall architecture is not enough to guarantee the security of
the connection between Offshore (UAD) and ZADCO HQ, the scope was to reflect the database of the archive
server in UAD to ZADCO HQ servers without handshaking connections.
RESPONSIBILITIES ACHIEVED:
• Scripting VB tasks in UAD archive server to map all UAD running field data in SQL database and send them throw
the Data Diode to ZADCO HQ and map it again ins ZADCO WinCC servers.
• Configuring near real time data monitoring and reporting for UAD in ZADCO HQ.
• Configuring Web accessing for WinCC near real time data.

More Related Content

What's hot (18)

abid1
abid1abid1
abid1
Abid Ali
Ìý
Brij mohan cv
Brij mohan  cvBrij mohan  cv
Brij mohan cv
Brij Mohan
Ìý
E&I Role Firebag
E&I Role FirebagE&I Role Firebag
E&I Role Firebag
Marty York
Ìý
Martin Cv
Martin CvMartin Cv
Martin Cv
Martin Pallister
Ìý
Mechanical completion handbook1
Mechanical completion handbook1Mechanical completion handbook1
Mechanical completion handbook1
zulfikar N joel
Ìý
Programmable Logic Controllers
Programmable Logic ControllersProgrammable Logic Controllers
Programmable Logic Controllers
RichmondEngineering1601
Ìý
tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
Ahmed Tayssir
Ìý
Vodaworld - As-built documentation
Vodaworld - As-built documentationVodaworld - As-built documentation
Vodaworld - As-built documentation
hannese
Ìý
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
Maurice Strachan PMP
Ìý
Raghu Resume
Raghu Resume Raghu Resume
Raghu Resume
Venakadasula RaghuNandan
Ìý
Ahmed Hussein
Ahmed HusseinAhmed Hussein
Ahmed Hussein
Ahmed Hussien
Ìý
TCL Control Systems
TCL Control SystemsTCL Control Systems
TCL Control Systems
Turbine Controls Ltd TCL
Ìý
CV Ahmed 2016
CV Ahmed 2016CV Ahmed 2016
CV Ahmed 2016
Ahmed Adel AboElEla
Ìý
Mechanical completion
Mechanical completionMechanical completion
Mechanical completion
Ronie Chu
Ìý
Aa
AaAa
Aa
Ahmed Mounir
Ìý
Special Seismic Certification OSHPD
Special Seismic Certification OSHPDSpecial Seismic Certification OSHPD
Special Seismic Certification OSHPD
michaeljmack
Ìý
CV_AD1
CV_AD1CV_AD1
CV_AD1
Alex Druk
Ìý
updated_ashishmalhotra
updated_ashishmalhotraupdated_ashishmalhotra
updated_ashishmalhotra
Ashish Malhotra
Ìý
abid1
abid1abid1
abid1
Abid Ali
Ìý
Brij mohan cv
Brij mohan  cvBrij mohan  cv
Brij mohan cv
Brij Mohan
Ìý
E&I Role Firebag
E&I Role FirebagE&I Role Firebag
E&I Role Firebag
Marty York
Ìý
Mechanical completion handbook1
Mechanical completion handbook1Mechanical completion handbook1
Mechanical completion handbook1
zulfikar N joel
Ìý
tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
Ahmed Tayssir
Ìý
Vodaworld - As-built documentation
Vodaworld - As-built documentationVodaworld - As-built documentation
Vodaworld - As-built documentation
hannese
Ìý
Mechanical completion
Mechanical completionMechanical completion
Mechanical completion
Ronie Chu
Ìý
Special Seismic Certification OSHPD
Special Seismic Certification OSHPDSpecial Seismic Certification OSHPD
Special Seismic Certification OSHPD
michaeljmack
Ìý
CV_AD1
CV_AD1CV_AD1
CV_AD1
Alex Druk
Ìý
updated_ashishmalhotra
updated_ashishmalhotraupdated_ashishmalhotra
updated_ashishmalhotra
Ashish Malhotra
Ìý

Viewers also liked (17)

Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects AnalysisPoster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Anas Momen
Ìý
SOR-WellheadPressure
SOR-WellheadPressureSOR-WellheadPressure
SOR-WellheadPressure
LaQuayne Wright, CSHO
Ìý
Wellhead control panels
Wellhead control panelsWellhead control panels
Wellhead control panels
Gholamhossain Emami
Ìý
Diploma XMas Tree-Allen_Joel_Lobo
Diploma XMas Tree-Allen_Joel_LoboDiploma XMas Tree-Allen_Joel_Lobo
Diploma XMas Tree-Allen_Joel_Lobo
Allen Joel Lobo
Ìý
Ashraf CV
Ashraf CVAshraf CV
Ashraf CV
Ashraf AL Najjar
Ìý
Mohannad Alhousani CV (2)
Mohannad Alhousani CV (2)Mohannad Alhousani CV (2)
Mohannad Alhousani CV (2)
Mohannad Alhousani
Ìý
cv mazen hasan Senior INTERIOR DESIGNER AND Architecture (3)
cv mazen hasan Senior INTERIOR DESIGNER AND   Architecture (3)cv mazen hasan Senior INTERIOR DESIGNER AND   Architecture (3)
cv mazen hasan Senior INTERIOR DESIGNER AND Architecture (3)
MAZEN HASAN
Ìý
Mazen Abbas CV
Mazen Abbas CVMazen Abbas CV
Mazen Abbas CV
Mazen Abbas
Ìý
Mazen Daraweesh CV..
Mazen Daraweesh CV..Mazen Daraweesh CV..
Mazen Daraweesh CV..
Mazen Darweesh
Ìý
Abdallah Al Najjar
Abdallah Al NajjarAbdallah Al Najjar
Abdallah Al Najjar
Abdallah AL_Najjar
Ìý
Mazen CV
Mazen CVMazen CV
Mazen CV
Mazen Mroue
Ìý
Wellhead System Diploma Course
Wellhead System Diploma CourseWellhead System Diploma Course
Wellhead System Diploma Course
Allen Joel Lobo
Ìý
Hwayoo - Wellhead Equipment & Christmass Tree 20160802
Hwayoo - Wellhead Equipment & Christmass Tree 20160802Hwayoo - Wellhead Equipment & Christmass Tree 20160802
Hwayoo - Wellhead Equipment & Christmass Tree 20160802
Hwayoo Petroleum
Ìý
South Pars Gas Field Development ~ Phases 17/18 Project - Offshore Platforms
South Pars Gas Field Development ~ Phases 17/18 Project  - Offshore PlatformsSouth Pars Gas Field Development ~ Phases 17/18 Project  - Offshore Platforms
South Pars Gas Field Development ~ Phases 17/18 Project - Offshore Platforms
Saeed Moosavi
Ìý
Ezz Al deen AL Najjar CV
Ezz Al deen AL Najjar CVEzz Al deen AL Najjar CV
Ezz Al deen AL Najjar CV
Ezz Aldeen Al Najjar
Ìý
Basic cpp presentation(1)
Basic cpp presentation(1)Basic cpp presentation(1)
Basic cpp presentation(1)
nguyen_uptorcem
Ìý
Mohammad Mazen CV
Mohammad Mazen CVMohammad Mazen CV
Mohammad Mazen CV
Mohammad Odeh
Ìý
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects AnalysisPoster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Anas Momen
Ìý
Diploma XMas Tree-Allen_Joel_Lobo
Diploma XMas Tree-Allen_Joel_LoboDiploma XMas Tree-Allen_Joel_Lobo
Diploma XMas Tree-Allen_Joel_Lobo
Allen Joel Lobo
Ìý
Mohannad Alhousani CV (2)
Mohannad Alhousani CV (2)Mohannad Alhousani CV (2)
Mohannad Alhousani CV (2)
Mohannad Alhousani
Ìý
cv mazen hasan Senior INTERIOR DESIGNER AND Architecture (3)
cv mazen hasan Senior INTERIOR DESIGNER AND   Architecture (3)cv mazen hasan Senior INTERIOR DESIGNER AND   Architecture (3)
cv mazen hasan Senior INTERIOR DESIGNER AND Architecture (3)
MAZEN HASAN
Ìý
Mazen Abbas CV
Mazen Abbas CVMazen Abbas CV
Mazen Abbas CV
Mazen Abbas
Ìý
Mazen Daraweesh CV..
Mazen Daraweesh CV..Mazen Daraweesh CV..
Mazen Daraweesh CV..
Mazen Darweesh
Ìý
Wellhead System Diploma Course
Wellhead System Diploma CourseWellhead System Diploma Course
Wellhead System Diploma Course
Allen Joel Lobo
Ìý
Hwayoo - Wellhead Equipment & Christmass Tree 20160802
Hwayoo - Wellhead Equipment & Christmass Tree 20160802Hwayoo - Wellhead Equipment & Christmass Tree 20160802
Hwayoo - Wellhead Equipment & Christmass Tree 20160802
Hwayoo Petroleum
Ìý
South Pars Gas Field Development ~ Phases 17/18 Project - Offshore Platforms
South Pars Gas Field Development ~ Phases 17/18 Project  - Offshore PlatformsSouth Pars Gas Field Development ~ Phases 17/18 Project  - Offshore Platforms
South Pars Gas Field Development ~ Phases 17/18 Project - Offshore Platforms
Saeed Moosavi
Ìý
Basic cpp presentation(1)
Basic cpp presentation(1)Basic cpp presentation(1)
Basic cpp presentation(1)
nguyen_uptorcem
Ìý
Mohammad Mazen CV
Mohammad Mazen CVMohammad Mazen CV
Mohammad Mazen CV
Mohammad Odeh
Ìý

Similar to Yazan Al-Najjar MAJOR PROJECTS (20)

Mr. Ahmed ElSewassy
Mr. Ahmed ElSewassyMr. Ahmed ElSewassy
Mr. Ahmed ElSewassy
Ahmed ElSewassy
Ìý
FInal_CV_08_4_2016
FInal_CV_08_4_2016FInal_CV_08_4_2016
FInal_CV_08_4_2016
PANKAJ PAL
Ìý
Sondus Ahmed - CV - 2016
Sondus Ahmed - CV - 2016Sondus Ahmed - CV - 2016
Sondus Ahmed - CV - 2016
Sondus Ahmed
Ìý
Resume McWhirterDerek
Resume McWhirterDerekResume McWhirterDerek
Resume McWhirterDerek
Derek McWhirter
Ìý
CV-Bokarica
CV-BokaricaCV-Bokarica
CV-Bokarica
Cvjetko Bokarica
Ìý
Debashis_Resume
Debashis_ResumeDebashis_Resume
Debashis_Resume
Debashis mishra
Ìý
Mohamed Zakaria 01-2017
Mohamed Zakaria 01-2017Mohamed Zakaria 01-2017
Mohamed Zakaria 01-2017
Mohamed Zakaria
Ìý
WV CV_Eng_2016
WV CV_Eng_2016WV CV_Eng_2016
WV CV_Eng_2016
Wynand Vermeulen
Ìý
CV_Sandeep Anugade
CV_Sandeep AnugadeCV_Sandeep Anugade
CV_Sandeep Anugade
Sandeep Anugade
Ìý
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
Vijayakumar Kumar
Ìý
Mohamed Shawky Ashour CV
Mohamed Shawky Ashour CVMohamed Shawky Ashour CV
Mohamed Shawky Ashour CV
Mohamed Shawky
Ìý
Mohamed Shawky Ashour CV
Mohamed Shawky Ashour CVMohamed Shawky Ashour CV
Mohamed Shawky Ashour CV
Mohamed Shawky
Ìý
CV 2016 SALAH
CV 2016 SALAHCV 2016 SALAH
CV 2016 SALAH
Salah Taman
Ìý
Resume
ResumeResume
Resume
Aswin Sha
Ìý
Ahmed Elsayed Salem CV
Ahmed Elsayed Salem CVAhmed Elsayed Salem CV
Ahmed Elsayed Salem CV
Ahmed Salem
Ìý
TechComp_overview_brief
TechComp_overview_briefTechComp_overview_brief
TechComp_overview_brief
Theodore (Ted) Corbeill Jr
Ìý
KP Controls CV 1.4
KP Controls CV 1.4KP Controls CV 1.4
KP Controls CV 1.4
kevin pratt
Ìý
Saurabh Singh - CV.DOC
Saurabh Singh - CV.DOCSaurabh Singh - CV.DOC
Saurabh Singh - CV.DOC
saurabh singh
Ìý
Shahid_Bilal_CV_F_19012016
Shahid_Bilal_CV_F_19012016Shahid_Bilal_CV_F_19012016
Shahid_Bilal_CV_F_19012016
Shahid Bilal
Ìý
Electrical Engineer cv.PDF
Electrical Engineer cv.PDFElectrical Engineer cv.PDF
Electrical Engineer cv.PDF
Muhammad Zuhad Siddiqui
Ìý
Mr. Ahmed ElSewassy
Mr. Ahmed ElSewassyMr. Ahmed ElSewassy
Mr. Ahmed ElSewassy
Ahmed ElSewassy
Ìý
FInal_CV_08_4_2016
FInal_CV_08_4_2016FInal_CV_08_4_2016
FInal_CV_08_4_2016
PANKAJ PAL
Ìý
Sondus Ahmed - CV - 2016
Sondus Ahmed - CV - 2016Sondus Ahmed - CV - 2016
Sondus Ahmed - CV - 2016
Sondus Ahmed
Ìý
Resume McWhirterDerek
Resume McWhirterDerekResume McWhirterDerek
Resume McWhirterDerek
Derek McWhirter
Ìý
Mohamed Zakaria 01-2017
Mohamed Zakaria 01-2017Mohamed Zakaria 01-2017
Mohamed Zakaria 01-2017
Mohamed Zakaria
Ìý
CV_Sandeep Anugade
CV_Sandeep AnugadeCV_Sandeep Anugade
CV_Sandeep Anugade
Sandeep Anugade
Ìý
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
Vijayakumar Kumar
Ìý
Mohamed Shawky Ashour CV
Mohamed Shawky Ashour CVMohamed Shawky Ashour CV
Mohamed Shawky Ashour CV
Mohamed Shawky
Ìý
Mohamed Shawky Ashour CV
Mohamed Shawky Ashour CVMohamed Shawky Ashour CV
Mohamed Shawky Ashour CV
Mohamed Shawky
Ìý
CV 2016 SALAH
CV 2016 SALAHCV 2016 SALAH
CV 2016 SALAH
Salah Taman
Ìý
Resume
ResumeResume
Resume
Aswin Sha
Ìý
Ahmed Elsayed Salem CV
Ahmed Elsayed Salem CVAhmed Elsayed Salem CV
Ahmed Elsayed Salem CV
Ahmed Salem
Ìý
KP Controls CV 1.4
KP Controls CV 1.4KP Controls CV 1.4
KP Controls CV 1.4
kevin pratt
Ìý
Saurabh Singh - CV.DOC
Saurabh Singh - CV.DOCSaurabh Singh - CV.DOC
Saurabh Singh - CV.DOC
saurabh singh
Ìý
Shahid_Bilal_CV_F_19012016
Shahid_Bilal_CV_F_19012016Shahid_Bilal_CV_F_19012016
Shahid_Bilal_CV_F_19012016
Shahid Bilal
Ìý

Yazan Al-Najjar MAJOR PROJECTS

  • 1. Yazan Al-Najjar Attachment: MAJOR PROJECTS LIST Employer: SILVERTECH MIDDLE EAST PROJECT: INSTALLATION OF ELECTRICAL SUPMERSABLE PUMPS IN WELLHEAD-7 AND WELLHEAD-15 END USER : ZADCO. PROCESS : FIRE & GAS, ESD, DCS WORKPLACE: UMM AL-DALAKH (OFFSHORE) CONTROL SYSTEM: Siemens PCS7 v7.1 SP4 STATUS: DONE SCOPE DESCIPTION: • Design & Execute the complete fire & gas system and ESD system (Siemens S7-400) for Wellhead-07 and Wellhead-15 in UMM AL-DALAKH field and integrate them with the existing DCS system for the field (PCS7). • Design & supply five Panel Door HMI WinCC flexible. • Update the graphics & alarms of existing DCS Servers control room. • The ESD and Fire & gas Systems are SIL-3 safety certified Systems (Exd). • The Fire & gas System is having the following detectors: HC- Flammable gas detectors, H2S- Toxic Gas detectors, Flame Detectors and Smoke Detectors in addition to MACs and Sounders / Beacons. • Supplying Explosion Proof Engineering Station (Laptop) . RESPONSIBILITIES ACHIEVED: • Programming the logic for all IOs of ESD, F&G and RTUs for the wellheads. • Establish the communication between those systems and the DCS system over S7-connections. • Commissioning the whole project • Conducted a Training for ZADCO Operators & maintenance engineers about the Functionality of Safety PLC and all the required troubleshooting techniques • Configure all the alarm, events and faceplates in the DCS, Employer: SILVERTECH MIDDLE EAST PROJECT: SATAH FULL FIELD DEVELOPMENT END USER : ZADCO PROCESS : F&G, RTU COMMUNICATION WITH ARZANAH ISLAND WORKPLACE: SATAH, UAE (OFFSHORE) CONTROL SYSTEM: SIEMENS S7-400, STEP7, WinCC Flexible STATUS: DONE SCOPE DESCIPTION: • Reprogram the existing F&G system to include all new F&G devices and optimize the running program. • Programming the new installed instrumens and devices which are connected to main production platform RTU. • Updating all local HMIs in all wellheads to include the new modifications. • Upgrade RTUs from 300 series to 400 series. RESPONSIBILITIES ACHIEVED: • Re program the existing F&G system to include all new F&G devices and optimize the running program. • Programming the new installed instrumens and devices which are connected to main production platform RTU • Updating all local HMIs in all wellheads to include the new modifications • Conducting the FAT. • Commissioning the Project.
  • 2. Yazan Al-Najjar Attachment: Employer: SILVERTECH MIDDLE EAST PROJECT: FIRE AND GAS SYSTEM FOR THE NEW WELLHEADS (PC-110, PC-055, ZW-100) END USER : ZADCO PROCESS : FIRE AND GAS SYSTEM WORKPLACE: UPPER ZAKUM, UAE (OFFSHORE) CONTROL SYSTEM: SIEMENS S7-400, STEP7, WinCC Flexible STATUS: DONE SCOPE DESCIPTION • Supply three Fire and Gas panels for the wellheads with Siemens control system based. • Supply three door mounted HMIs configured in WinCC flexible. • Establish communication between Siemens F&G panel and existing Honeywell RTUs over Modbus RS-485. • Training for ZADCO operators. RESPONSIBILITIES ACHIEVED : • Programming the logic for the F&G system. • Leading & conducting the I.F.A.T • IFAT with Honeywell team in Abu Dhabi • Trainig for ZADCO operators. • Engineering & Documentation of the major PLC specifications Employer: SILVERTECH MIDDLE EAST PROJECT: UMM LULU END USER : ZADCO PROCESS : F&G, ESD, DCS WORKPLACE: UMM AL-DALAKH, UAE (OFFSHORE) CONTROL SYSTEM: SIEMENS S7-400, PCS7, STEP7 STATUS: DONE SCOPE DESCIPTION • Expansstion of the Existing F&G, DCS and ESD systems in CPC. • Updating all DCS screens and alarms. • Communication with many therd party packages over Modbus (MPFM, HVAC, H2S Analyser,..). • Documentation and Training for ZADCO operators. RESPONSIBILITIES ACHIEVED : • Programming the logic for the F&G system. • Leading & conducting the I.F.A.T • IFAT with third party packages. • Engineering & Documentation. • Training for ZADCO Operators.
  • 3. Yazan Al-Najjar Attachment: Employer: SILVERTECH MIDDLE EAST PROJECT: ONE WAY DATA CONNECTIVITY BETWEEN UAD AND ZADCO HQ (DATA DIODE) END USER : ZADCO. PROCESS : DATA DIODE WORKPLACE: UMM AL-DALAKH (OFFSHORE) & ZADCO HQ CONTROL SYSTEM: FOX IT DATA DIODE / SQL SERVER / WinCC Explorer STATUS: 90% DONE SCOPE DESCIPTION: • As IT security recruitment in ZADCO network, the firewall architecture is not enough to guarantee the security of the connection between Offshore (UAD) and ZADCO HQ, the scope was to reflect the database of the archive server in UAD to ZADCO HQ servers without handshaking connections. RESPONSIBILITIES ACHIEVED: • Scripting VB tasks in UAD archive server to map all UAD running field data in SQL database and send them throw the Data Diode to ZADCO HQ and map it again ins ZADCO WinCC servers. • Configuring near real time data monitoring and reporting for UAD in ZADCO HQ. • Configuring Web accessing for WinCC near real time data.