際際滷

際際滷Share a Scribd company logo
1| P a g e
Wael Mohamed Mohamed Abd Elghaffer
Senior Instrumentation Engineer, B.Sc. Industrial Electronic and Control, 2006
 Date of Birth: 26-March-1976
 Marital Status: Single
 Nationality: Egyptian
 Religion: Muslim
 Place of Birth: Alexandria
 Address: 37 Abd Elaziz Salem St.-Elbetash-Alexandria
 Military Service: Completed
 Work:002-01210080181
 E-mail: waelmohsc@gmail.com
QUALIFICATIONS:
 University Degree: B.Sc. Industrial Electronic And Control.
 Engineering Diploma in Industrial Measurements and Control - Menofia University [09-2011 to 07-2013]
 University: Menofia University  Egypt
 Faculty: faculty of electronic Engineering
 Graduation Year: May (2006)
Graduation Project:
-SCADA+ digital control troubleshooting -DCS -Boiler control system +control valves.
-Process instrumentation troubleshooting
 Transmitters.  Final control elements.  Maintenance, calibration and troubleshooting
Grade: Excellent.
LANGUAGE
 ARABIC: Mother Tongue  ENGLISH: Very Good Read, Written & Spoken
COMPUTER SKILLS
1-Good command of operating 2Diminsion Design (AUTOCAD 2006).
2-Good command of MS Windows, MS Office Word, Excel & PowerPoint.
EXPERIENCE
From 01/2010 till Now:
Senior Instrumentation Engineer at [ALEXANDRIA PETROLEUM MAINTENANCE CO.
PETROMAINT], in EGYPTIAN PROPYLENE AND POLYPROPYLENE CO. EPPC] plant.
Job description:
The same tasks described in the previous job in Alex Fiber in addition to working with following devices:
Flow Measurement:
- Electromagnetic Flowmeter [Endress+Hauser] Proline Promag 10
- Mass Flowmeter [KROHNE] Optimass 1000, 2000,3000,7000,8000
- Magnetic Inductive Flow Velocity [Heinrichs] PIT-520
- Vortex Flowmeter [Rosemount] 8800 A,C,D
- Annubar Averaging Pitot Tube [Rosemount] DCR+15S/16S
- Variable Area Flow Meter [KROHNE] H250
Level Measurement:
- Guided Level Radar [Endress+Hauser] Level Flex M FMP 40, 41c, 45
- Ultrasonic Level [Endress+Hauser] Prosonic M FMU 40, 41
- Displacer For Level, Interface And Density [Foxboro] 244ld
- Level Transmitter [E+H] Proservo NMS 5/7
- Guide Wave Radar [Eclipse] 705
Level switch
- [E+H] Liquiphant M FTL 50 [H], FTL 51 [C/H]
- Level gauge [Honeywell] 854 ATG, XTG
Temperature:
- Temperature transmitter [Rosemount] 644H
- Temperature transmitter [Wika] TR10
Control valves:
2| P a g e
- Pneumatic: Samson type 3241  1, 7
- Masoneila Valve, Metso
- Motorized valve, [AUMA] SAM EX 07.1, 16.1
Solenoid Valve: [Norgren] NAMUR interface
ON/OFF valve:Virgo-Samson
Pressure :
Pressure,Flow and level [Rosemount] 3051 & 3051S
Electro.Pneumatic positioner:
- [ABB] TZIDC
- [Metso] ND9100H, P
- [Samson] type 3730-0-2-3
- [Siemens] SIPART PS2 6DR50,51
- [Foxboro] SRD 991
- [Emerson] DVC6000 SIS
- [FlowServe] 3200MD, Logix 3200 IQ, 3400 IQ
Vibration Switch: [METRIX 5550]
Field Communicator: 475,375 HART communicator
Process Calibrator: [Fluke]744
 Working on MAXIMO CMMS system to trace work orders progress and manging periodic
maintenace works.
Have Good Understanding about these equipments:
- Screw compressors [Johnson Control Systems & Services] Unit RWF II E222
- Centrifugal Compressors [Hitachi Plant Manufacturer]
- Air Separation Unit [Linde BOC Process Plant]
- Steam Turbine [Siemens T6483 KBR EBIC]
From 9/2006 till 01-2010:
Instrumentation Engineer in Alexandria Fiber Company (S.A.E) an Egyptian Joint-Stock Company; one of
Aditya Birla Group, Indian companies .
Field: - The Plant Comprises of latest Instrumentation
-Industrial Process measurement
-Flow measurements (Differential pressure, Mass Flow meter, Electronic)
-Pressure measurement (bourdon, diaphragm, bellows and electric transducers)
-Level measurement (float, displacer, differential pressure, ultrasonic)
-Temperature measurement (thermometers, thermocouples, RTDs, infrared pyrometers)
-PH, Conductivity and Density measurement - System unit - Zero, Span and Rang
-Type of sensor -Signal transmitting -Two wires or four wire -Signal type
-ISA Instrument Symbols -Vendor Instrument: YOKOGAWA, Rosemont, Endress+Hauser
FOXBORO -Emerson 375 Hand Held - Smart Transmitters and Valves with
Foundation Fieldbus and HART Technology
-Valves types and Technology
-Principal function of valves -Gate valve -Globe valve -Plug valve -Ball valve
-Needle valve -Diaphragm valve -Butterfly valve -Valve Symbols
-Valve Actuators
-Safety Relief valves -Piping -Fitting
-Valve Maintenance: -Preventive maintenance -Prior to start-up -After start-up
-Workshop overhaul -Maintenance tips
-Valve Leakage: -Leakage in gate valve -Leakage in globe valve
-Leakage in ball valve -Leakage in butterfly valve
-Control Valve Engineering
-Control valve types: -Linear motion valves and its application
-Rotary motion valve and its application -Special valve and its application
3| P a g e
-Vendor this special valve: Siemens ,Samson
-Valve Accessories: -Solenoid application -Positioner -Limit switch type
-Vendor this positioner-: Fisher, Yamatake, Siemens, Honeywell
-Phenomena Associated to the control valve: -Cavitations -Noise
-Testing And Installation: -Control valve test, inspection and calibration
-Valve installation procedure
-Vendor for control valve: Fisher, Valflo, Siemens, Samson
- Yokogawa Centum-CS-3000 DCS For Operate Line1 and Emerson Delta V
For Operate Line 2 and 3
- Attendance the First Start-up for Line 2 and 3
Also, Allen Bradley Control Logix 5000 PLC on Control Net, Siemens S7-300 and Omron PLC.
2 - Annual leave from 20/6/2008 to 10/8/2008, Instrumentation Engineer at Engineering center for general
construction (ECC) to Work in
-Natural Gas WEST DIKIRNIS FIELD of the AL Mansora petroleum Co
- Company supervising the installation: MERLON PETROLEUM CO
- The Designer: Invensys Inc
-Attendance the First Start-up for first oil and second oil in Natural Gas WEST DIKIRNIS FIELD of the AL
Mansora petroleum Co
Field: - The Plant Comprises of latest Instrumentation
-Install cable from Control Room to Field
-Install outstanding Junction Box frames
(Petrojet)
-Install outstanding fire and gas detectors
-Install cable trays in main process area
(Petrojet)
-Install local cable in the field
-Gland and terminate field equipment
-Gland and terminate PCS (Process Control
System) and ESD (Emergency Shutdown System)
control panels
-Install flare ignition panel
-Install additional power supplies in ESD (Emergency Shutdown System) control panels for [first and
second oil in Natural Gas WEST DIKIRNIS FIELD of the AL Mansora petroleum Co.
-Developing and Applying Standard Instrumentation
P&IDs -Wiring Diagrams -Data sheet -cable scheduling -Instrument lists-Logic Diagram -Loop Diagram 
Installation details -Location plans
Summer training at the SIDI KERIR petrochemicals (SIDPEC) from 31/7/2005 to 11/8/2005 tel [03/4770127-
4770132].
Project training at the Egyptian iron and steel company from 24/1/2006 to 22/2/2006
At the Egyptian and steel company in the power plant department from 23/2/2006 to 15/7/2006 (two days
each week).
Deep knowledge in instrument repairman [maintain a pneumatic pressure control loop] at ARAMCO training.
Deep knowledge in: distributed control system (DCS), MODEL (TDC3000) for Honeywell Automation Company
Deep knowledge in: supervisory control and data acquisition (SCADA)
4| P a g e
Dear Sir,
I am sending this email to apply for a job related to Instrumentation and Control Engineering.
I a Senior instrumentation Engineer with 10 years experience in Oil & Gas, Refinery & Petrochemical
industries.
I have deep experience in:
-Instrumentation Calibration
-Control system, Pneumatic & Hydraulic
-PLC, Siemens SIMATIC, Rockwell Allen-Bradely
-Control Valves, Safety Valves.
-Tank Gauging
Detailed devices mentioned in attached CV.
I have good command in English, Excellent computer & reporting skills.
I hope that my qualifications match the required job criteria.
Best Regards.
Wael AbdElghaffar
Senior Instrumantation Engineer
Petromaint Main Cont. - Egyptian Propylene & Poly-Propylene Co. EPPC,
+201210080181
waelmohsc@gmail.com

More Related Content

What's hot (20)

Maintenance of Instruments & Systems (free chapter download)
Maintenance of Instruments & Systems (free chapter download)Maintenance of Instruments & Systems (free chapter download)
Maintenance of Instruments & Systems (free chapter download)
ISA Interchange
Mohammed Tawfik CV 4-2016
Mohammed Tawfik CV 4-2016 Mohammed Tawfik CV 4-2016
Mohammed Tawfik CV 4-2016
Mohamed Tawfik
T畉i Brochure bi畉n t畉n siemens Sinamic G120
T畉i Brochure bi畉n t畉n siemens Sinamic G120T畉i Brochure bi畉n t畉n siemens Sinamic G120
T畉i Brochure bi畉n t畉n siemens Sinamic G120
C担ng ty c担ng ngh畛 t畛 畛ng h坦a Hong Gia
T畉i Catalog bi畉n t畉n Siemens Sinamic G120X
T畉i Catalog bi畉n t畉n Siemens Sinamic G120XT畉i Catalog bi畉n t畉n Siemens Sinamic G120X
T畉i Catalog bi畉n t畉n Siemens Sinamic G120X
C担ng ty c担ng ngh畛 t畛 畛ng h坦a Hong Gia
Presentation on electrical and automation system of cgl plant (CRM-2) JSW KR.
Presentation on electrical and automation system of cgl plant (CRM-2) JSW KR.Presentation on electrical and automation system of cgl plant (CRM-2) JSW KR.
Presentation on electrical and automation system of cgl plant (CRM-2) JSW KR.
neeraj mishra
Intertest
IntertestIntertest
Intertest
Ivaylo Popov
Design checklist instrumentation_17.01.15 (1)
Design checklist instrumentation_17.01.15 (1)Design checklist instrumentation_17.01.15 (1)
Design checklist instrumentation_17.01.15 (1)
Stephanus Roux C Eng , IntPE(uk) , FIET
VEMC Control Panels
VEMC Control Panels VEMC Control Panels
VEMC Control Panels
anshparmar
Wael Alnagar CV
Wael Alnagar CVWael Alnagar CV
Wael Alnagar CV
Wael Al Nagar
Brochure b畛 l畉p tr狸nh PLC Siemens S7-1200
Brochure b畛 l畉p tr狸nh PLC Siemens S7-1200 Brochure b畛 l畉p tr狸nh PLC Siemens S7-1200
Brochure b畛 l畉p tr狸nh PLC Siemens S7-1200
C担ng ty c担ng ngh畛 t畛 畛ng h坦a Hong Gia
Brochure servo siemens v90
Brochure servo siemens v90Brochure servo siemens v90
Brochure servo siemens v90
C担ng ty c担ng ngh畛 t畛 畛ng h坦a Hong Gia
PRESETATIONS
PRESETATIONSPRESETATIONS
PRESETATIONS
Vikas Chavan
Yazan Al-Najjar MAJOR PROJECTS
Yazan Al-Najjar MAJOR PROJECTSYazan Al-Najjar MAJOR PROJECTS
Yazan Al-Najjar MAJOR PROJECTS
Yazan Al-Najjar
Presentation of Oilfield Equipment produced by IRZ
Presentation of Oilfield Equipment produced by IRZPresentation of Oilfield Equipment produced by IRZ
Presentation of Oilfield Equipment produced by IRZ
仆仂仆 弌舒从仂于
IRZ oilfield equipment (ESP)
IRZ oilfield equipment (ESP)IRZ oilfield equipment (ESP)
IRZ oilfield equipment (ESP)
Ivan Isaev
Industrial Sales Presentation
Industrial Sales PresentationIndustrial Sales Presentation
Industrial Sales Presentation
ExpertsLogicTechnolo
Martin Cv
Martin CvMartin Cv
Martin Cv
Martin Pallister
IRZ artificial lift solutions [version 1.4 july 2016]
IRZ artificial lift solutions [version 1.4 july 2016]IRZ artificial lift solutions [version 1.4 july 2016]
IRZ artificial lift solutions [version 1.4 july 2016]
Ivan Isaev
Technical instructions to work
Technical instructions to workTechnical instructions to work
Technical instructions to work
Amit Kumar
Nagy_CV_Docx
Nagy_CV_DocxNagy_CV_Docx
Nagy_CV_Docx
Nagy Ibraheem Abo El Khair, PMP
Maintenance of Instruments & Systems (free chapter download)
Maintenance of Instruments & Systems (free chapter download)Maintenance of Instruments & Systems (free chapter download)
Maintenance of Instruments & Systems (free chapter download)
ISA Interchange
Mohammed Tawfik CV 4-2016
Mohammed Tawfik CV 4-2016 Mohammed Tawfik CV 4-2016
Mohammed Tawfik CV 4-2016
Mohamed Tawfik
Presentation on electrical and automation system of cgl plant (CRM-2) JSW KR.
Presentation on electrical and automation system of cgl plant (CRM-2) JSW KR.Presentation on electrical and automation system of cgl plant (CRM-2) JSW KR.
Presentation on electrical and automation system of cgl plant (CRM-2) JSW KR.
neeraj mishra
VEMC Control Panels
VEMC Control Panels VEMC Control Panels
VEMC Control Panels
anshparmar
Yazan Al-Najjar MAJOR PROJECTS
Yazan Al-Najjar MAJOR PROJECTSYazan Al-Najjar MAJOR PROJECTS
Yazan Al-Najjar MAJOR PROJECTS
Yazan Al-Najjar
Presentation of Oilfield Equipment produced by IRZ
Presentation of Oilfield Equipment produced by IRZPresentation of Oilfield Equipment produced by IRZ
Presentation of Oilfield Equipment produced by IRZ
仆仂仆 弌舒从仂于
IRZ oilfield equipment (ESP)
IRZ oilfield equipment (ESP)IRZ oilfield equipment (ESP)
IRZ oilfield equipment (ESP)
Ivan Isaev
IRZ artificial lift solutions [version 1.4 july 2016]
IRZ artificial lift solutions [version 1.4 july 2016]IRZ artificial lift solutions [version 1.4 july 2016]
IRZ artificial lift solutions [version 1.4 july 2016]
Ivan Isaev
Technical instructions to work
Technical instructions to workTechnical instructions to work
Technical instructions to work
Amit Kumar

Viewers also liked (10)

Cat叩logo Novy PremiumCat叩logo Novy Premium
Cat叩logo Novy Premium
Gustavo Bono
Bonustro-Resume
Bonustro-ResumeBonustro-Resume
Bonustro-Resume
Marco Donnie Bonustro
Il Marketing Capovolto - Bernard Cova
Il Marketing Capovolto - Bernard CovaIl Marketing Capovolto - Bernard Cova
Il Marketing Capovolto - Bernard Cova
Tommaso Sorchiotti
SEMESTER 3 : PROJECT 1 BRIEF BUILDING SCIENCE 1
SEMESTER 3 : PROJECT 1 BRIEF BUILDING SCIENCE 1SEMESTER 3 : PROJECT 1 BRIEF BUILDING SCIENCE 1
SEMESTER 3 : PROJECT 1 BRIEF BUILDING SCIENCE 1
Darshiini Vig
Magical Wedding Sales Kit
Magical Wedding Sales KitMagical Wedding Sales Kit
Magical Wedding Sales Kit
nicholaszfox
Actualisation pss rapdiagnostic_v_23_02_2016Actualisation pss rapdiagnostic_v_23_02_2016
Actualisation pss rapdiagnostic_v_23_02_2016
dinepacom
Bulletin sisklor onepa_juillet2015_rev pvBulletin sisklor onepa_juillet2015_rev pv
Bulletin sisklor onepa_juillet2015_rev pv
dinepacom
Pss epa ht_ defis_repris-myl 21 juin 2016Pss epa ht_ defis_repris-myl 21 juin 2016
Pss epa ht_ defis_repris-myl 21 juin 2016
dinepacom
Break even analysis
Break even analysisBreak even analysis
Break even analysis
Shivam Jhajj
BESTMINDS COMPANY PROFILE 2016
BESTMINDS COMPANY PROFILE 2016BESTMINDS COMPANY PROFILE 2016
BESTMINDS COMPANY PROFILE 2016
ICT Select Professionals at BESTMINDS
Cat叩logo Novy PremiumCat叩logo Novy Premium
Cat叩logo Novy Premium
Gustavo Bono
Il Marketing Capovolto - Bernard Cova
Il Marketing Capovolto - Bernard CovaIl Marketing Capovolto - Bernard Cova
Il Marketing Capovolto - Bernard Cova
Tommaso Sorchiotti
SEMESTER 3 : PROJECT 1 BRIEF BUILDING SCIENCE 1
SEMESTER 3 : PROJECT 1 BRIEF BUILDING SCIENCE 1SEMESTER 3 : PROJECT 1 BRIEF BUILDING SCIENCE 1
SEMESTER 3 : PROJECT 1 BRIEF BUILDING SCIENCE 1
Darshiini Vig
Magical Wedding Sales Kit
Magical Wedding Sales KitMagical Wedding Sales Kit
Magical Wedding Sales Kit
nicholaszfox
Actualisation pss rapdiagnostic_v_23_02_2016Actualisation pss rapdiagnostic_v_23_02_2016
Actualisation pss rapdiagnostic_v_23_02_2016
dinepacom
Bulletin sisklor onepa_juillet2015_rev pvBulletin sisklor onepa_juillet2015_rev pv
Bulletin sisklor onepa_juillet2015_rev pv
dinepacom
Pss epa ht_ defis_repris-myl 21 juin 2016Pss epa ht_ defis_repris-myl 21 juin 2016
Pss epa ht_ defis_repris-myl 21 juin 2016
dinepacom
Break even analysis
Break even analysisBreak even analysis
Break even analysis
Shivam Jhajj

Similar to Wael Abd Elghaffar, Instrumentation Engineer (20)

Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
Yousef Elbaradie
WV CV_Eng_2016
WV CV_Eng_2016WV CV_Eng_2016
WV CV_Eng_2016
Wynand Vermeulen
Teycad CV (1)
Teycad CV (1)Teycad CV (1)
Teycad CV (1)
christopher delgado
Lingeswaran CVe
Lingeswaran CVeLingeswaran CVe
Lingeswaran CVe
Lingeswaran Padmanabhan
Raja CV Instrument
Raja CV InstrumentRaja CV Instrument
Raja CV Instrument
Raja Instrumentation
CV 2016 SALAH
CV 2016 SALAHCV 2016 SALAH
CV 2016 SALAH
Salah Taman
Resume_AbgHaider
Resume_AbgHaiderResume_AbgHaider
Resume_AbgHaider
Abang Haider Abang Othman
CV Ahmed Elsayad
CV Ahmed ElsayadCV Ahmed Elsayad
CV Ahmed Elsayad
ahmed elsayad
Ismail Ramadan
Ismail RamadanIsmail Ramadan
Ismail Ramadan
Ismail Ramadan
sr.in tech
sr.in techsr.in tech
sr.in tech
PATEL VIJAY
Elsayed Mohamed Elsayed.rev6
Elsayed Mohamed Elsayed.rev6Elsayed Mohamed Elsayed.rev6
Elsayed Mohamed Elsayed.rev6
Elsayed Mohamed
Bruce c vs
Bruce c vsBruce c vs
Bruce c vs
Andonguyung bruce edum
Ahmed Hussein
Ahmed HusseinAhmed Hussein
Ahmed Hussein
Ahmed Hussien
ibrahim saleh c v (1)
ibrahim saleh c v (1)ibrahim saleh c v (1)
ibrahim saleh c v (1)
Ibrahim saleh
Resume
ResumeResume
Resume
Vivek Karn
CV 2015
CV 2015CV 2015
CV 2015
Steve Watt
SATHISH KUMAR - E&I
SATHISH KUMAR - E&ISATHISH KUMAR - E&I
SATHISH KUMAR - E&I
chandrasekaran sathishkumar
Mohammed seddik-cv
Mohammed seddik-cvMohammed seddik-cv
Mohammed seddik-cv
Mohammed Seddik
Cv marwan ibrahim
Cv marwan ibrahimCv marwan ibrahim
Cv marwan ibrahim
Marwan Abraheem
Nagy_CV_Docx
Nagy_CV_DocxNagy_CV_Docx
Nagy_CV_Docx
Nagy Ibraheem Abo El Khair, PMP

Wael Abd Elghaffar, Instrumentation Engineer

  • 1. 1| P a g e Wael Mohamed Mohamed Abd Elghaffer Senior Instrumentation Engineer, B.Sc. Industrial Electronic and Control, 2006 Date of Birth: 26-March-1976 Marital Status: Single Nationality: Egyptian Religion: Muslim Place of Birth: Alexandria Address: 37 Abd Elaziz Salem St.-Elbetash-Alexandria Military Service: Completed Work:002-01210080181 E-mail: waelmohsc@gmail.com QUALIFICATIONS: University Degree: B.Sc. Industrial Electronic And Control. Engineering Diploma in Industrial Measurements and Control - Menofia University [09-2011 to 07-2013] University: Menofia University Egypt Faculty: faculty of electronic Engineering Graduation Year: May (2006) Graduation Project: -SCADA+ digital control troubleshooting -DCS -Boiler control system +control valves. -Process instrumentation troubleshooting Transmitters. Final control elements. Maintenance, calibration and troubleshooting Grade: Excellent. LANGUAGE ARABIC: Mother Tongue ENGLISH: Very Good Read, Written & Spoken COMPUTER SKILLS 1-Good command of operating 2Diminsion Design (AUTOCAD 2006). 2-Good command of MS Windows, MS Office Word, Excel & PowerPoint. EXPERIENCE From 01/2010 till Now: Senior Instrumentation Engineer at [ALEXANDRIA PETROLEUM MAINTENANCE CO. PETROMAINT], in EGYPTIAN PROPYLENE AND POLYPROPYLENE CO. EPPC] plant. Job description: The same tasks described in the previous job in Alex Fiber in addition to working with following devices: Flow Measurement: - Electromagnetic Flowmeter [Endress+Hauser] Proline Promag 10 - Mass Flowmeter [KROHNE] Optimass 1000, 2000,3000,7000,8000 - Magnetic Inductive Flow Velocity [Heinrichs] PIT-520 - Vortex Flowmeter [Rosemount] 8800 A,C,D - Annubar Averaging Pitot Tube [Rosemount] DCR+15S/16S - Variable Area Flow Meter [KROHNE] H250 Level Measurement: - Guided Level Radar [Endress+Hauser] Level Flex M FMP 40, 41c, 45 - Ultrasonic Level [Endress+Hauser] Prosonic M FMU 40, 41 - Displacer For Level, Interface And Density [Foxboro] 244ld - Level Transmitter [E+H] Proservo NMS 5/7 - Guide Wave Radar [Eclipse] 705 Level switch - [E+H] Liquiphant M FTL 50 [H], FTL 51 [C/H] - Level gauge [Honeywell] 854 ATG, XTG Temperature: - Temperature transmitter [Rosemount] 644H - Temperature transmitter [Wika] TR10 Control valves:
  • 2. 2| P a g e - Pneumatic: Samson type 3241 1, 7 - Masoneila Valve, Metso - Motorized valve, [AUMA] SAM EX 07.1, 16.1 Solenoid Valve: [Norgren] NAMUR interface ON/OFF valve:Virgo-Samson Pressure : Pressure,Flow and level [Rosemount] 3051 & 3051S Electro.Pneumatic positioner: - [ABB] TZIDC - [Metso] ND9100H, P - [Samson] type 3730-0-2-3 - [Siemens] SIPART PS2 6DR50,51 - [Foxboro] SRD 991 - [Emerson] DVC6000 SIS - [FlowServe] 3200MD, Logix 3200 IQ, 3400 IQ Vibration Switch: [METRIX 5550] Field Communicator: 475,375 HART communicator Process Calibrator: [Fluke]744 Working on MAXIMO CMMS system to trace work orders progress and manging periodic maintenace works. Have Good Understanding about these equipments: - Screw compressors [Johnson Control Systems & Services] Unit RWF II E222 - Centrifugal Compressors [Hitachi Plant Manufacturer] - Air Separation Unit [Linde BOC Process Plant] - Steam Turbine [Siemens T6483 KBR EBIC] From 9/2006 till 01-2010: Instrumentation Engineer in Alexandria Fiber Company (S.A.E) an Egyptian Joint-Stock Company; one of Aditya Birla Group, Indian companies . Field: - The Plant Comprises of latest Instrumentation -Industrial Process measurement -Flow measurements (Differential pressure, Mass Flow meter, Electronic) -Pressure measurement (bourdon, diaphragm, bellows and electric transducers) -Level measurement (float, displacer, differential pressure, ultrasonic) -Temperature measurement (thermometers, thermocouples, RTDs, infrared pyrometers) -PH, Conductivity and Density measurement - System unit - Zero, Span and Rang -Type of sensor -Signal transmitting -Two wires or four wire -Signal type -ISA Instrument Symbols -Vendor Instrument: YOKOGAWA, Rosemont, Endress+Hauser FOXBORO -Emerson 375 Hand Held - Smart Transmitters and Valves with Foundation Fieldbus and HART Technology -Valves types and Technology -Principal function of valves -Gate valve -Globe valve -Plug valve -Ball valve -Needle valve -Diaphragm valve -Butterfly valve -Valve Symbols -Valve Actuators -Safety Relief valves -Piping -Fitting -Valve Maintenance: -Preventive maintenance -Prior to start-up -After start-up -Workshop overhaul -Maintenance tips -Valve Leakage: -Leakage in gate valve -Leakage in globe valve -Leakage in ball valve -Leakage in butterfly valve -Control Valve Engineering -Control valve types: -Linear motion valves and its application -Rotary motion valve and its application -Special valve and its application
  • 3. 3| P a g e -Vendor this special valve: Siemens ,Samson -Valve Accessories: -Solenoid application -Positioner -Limit switch type -Vendor this positioner-: Fisher, Yamatake, Siemens, Honeywell -Phenomena Associated to the control valve: -Cavitations -Noise -Testing And Installation: -Control valve test, inspection and calibration -Valve installation procedure -Vendor for control valve: Fisher, Valflo, Siemens, Samson - Yokogawa Centum-CS-3000 DCS For Operate Line1 and Emerson Delta V For Operate Line 2 and 3 - Attendance the First Start-up for Line 2 and 3 Also, Allen Bradley Control Logix 5000 PLC on Control Net, Siemens S7-300 and Omron PLC. 2 - Annual leave from 20/6/2008 to 10/8/2008, Instrumentation Engineer at Engineering center for general construction (ECC) to Work in -Natural Gas WEST DIKIRNIS FIELD of the AL Mansora petroleum Co - Company supervising the installation: MERLON PETROLEUM CO - The Designer: Invensys Inc -Attendance the First Start-up for first oil and second oil in Natural Gas WEST DIKIRNIS FIELD of the AL Mansora petroleum Co Field: - The Plant Comprises of latest Instrumentation -Install cable from Control Room to Field -Install outstanding Junction Box frames (Petrojet) -Install outstanding fire and gas detectors -Install cable trays in main process area (Petrojet) -Install local cable in the field -Gland and terminate field equipment -Gland and terminate PCS (Process Control System) and ESD (Emergency Shutdown System) control panels -Install flare ignition panel -Install additional power supplies in ESD (Emergency Shutdown System) control panels for [first and second oil in Natural Gas WEST DIKIRNIS FIELD of the AL Mansora petroleum Co. -Developing and Applying Standard Instrumentation P&IDs -Wiring Diagrams -Data sheet -cable scheduling -Instrument lists-Logic Diagram -Loop Diagram Installation details -Location plans Summer training at the SIDI KERIR petrochemicals (SIDPEC) from 31/7/2005 to 11/8/2005 tel [03/4770127- 4770132]. Project training at the Egyptian iron and steel company from 24/1/2006 to 22/2/2006 At the Egyptian and steel company in the power plant department from 23/2/2006 to 15/7/2006 (two days each week). Deep knowledge in instrument repairman [maintain a pneumatic pressure control loop] at ARAMCO training. Deep knowledge in: distributed control system (DCS), MODEL (TDC3000) for Honeywell Automation Company Deep knowledge in: supervisory control and data acquisition (SCADA)
  • 4. 4| P a g e Dear Sir, I am sending this email to apply for a job related to Instrumentation and Control Engineering. I a Senior instrumentation Engineer with 10 years experience in Oil & Gas, Refinery & Petrochemical industries. I have deep experience in: -Instrumentation Calibration -Control system, Pneumatic & Hydraulic -PLC, Siemens SIMATIC, Rockwell Allen-Bradely -Control Valves, Safety Valves. -Tank Gauging Detailed devices mentioned in attached CV. I have good command in English, Excellent computer & reporting skills. I hope that my qualifications match the required job criteria. Best Regards. Wael AbdElghaffar Senior Instrumantation Engineer Petromaint Main Cont. - Egyptian Propylene & Poly-Propylene Co. EPPC, +201210080181 waelmohsc@gmail.com